CN105450764B - New energy power station interactive design system (IDS) - Google Patents

New energy power station interactive design system (IDS) Download PDF

Info

Publication number
CN105450764B
CN105450764B CN201510882177.3A CN201510882177A CN105450764B CN 105450764 B CN105450764 B CN 105450764B CN 201510882177 A CN201510882177 A CN 201510882177A CN 105450764 B CN105450764 B CN 105450764B
Authority
CN
China
Prior art keywords
design
module
client
user
server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510882177.3A
Other languages
Chinese (zh)
Other versions
CN105450764A (en
Inventor
彭怀午
韩晓亮
孙海泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Electric Power Survey and Design Institute Co Ltd
Original Assignee
Inner Mongolia Electric Power Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inner Mongolia Electric Power Survey and Design Institute Co Ltd filed Critical Inner Mongolia Electric Power Survey and Design Institute Co Ltd
Priority to CN201510882177.3A priority Critical patent/CN105450764B/en
Publication of CN105450764A publication Critical patent/CN105450764A/en
Application granted granted Critical
Publication of CN105450764B publication Critical patent/CN105450764B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/2866Architectures; Arrangements

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Health & Medical Sciences (AREA)
  • Computing Systems (AREA)
  • General Health & Medical Sciences (AREA)
  • Medical Informatics (AREA)
  • Information Transfer Between Computers (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of new energy power station interactive design system (IDS) is proposed, Power Plant Design and field of computer technology are belonged to.The system includes client, interaction design server, background data base server and multiple design terminals, in which: the interaction design server includes: that design team is shown and selecting module, design scheme displaying and selecting module and engineering Dynamic Display and modified module;Above-mentioned each module for realizing during the design and client and background data base server real-time, interactive;The multiple design terminal is used to read each parameter of design from background data base server to be designed, and real-time design result is sent to background data base server to store.This programme solve existing design inefficiency can not effective interaction the problems such as, have promoted user experience, save design duration, improve design efficiency many advantages, such as.

Description

New energy power station interactive design system (IDS)
Technical field
The present invention relates to Power Plant Design and field of computer technology more particularly to a kind of new energy power station Interactive Design systems System.
Background technique
Currently, cannot intuitively be reacted in the design process in new energy power station design with the interaction content of customer, customer Design scheme, design team cannot easily be selected, also can not in real time consulting and design content, modification design parameter, lower commission Book is even signed a contract online, thus can not real-time selection it is favorite set it is total, master set the design teams such as people, cannot real-time selection reason The design scheme thought, cannot real-time tracking progress, design after the completion of also the satisfaction of design can not timely be evaluated.Cause This, user is not high to the satisfaction of design side, and user experience is excessively poor, and the side of design often result come out after, receive industry Primary feedback opinion is just modified.On the one hand, modification time can be long, on the other hand, modifies, pays compared in process Cost is higher.
Currently, national each Electric Power Design Institute generallys use the designing system of not interactive function, such as used by personnel Face-to-face, the forms such as phone, fax interact with user, and user is unclear to progress, process regimes, the suggestion feedback time It is long, and there is no dynamic reminding function.
Summary of the invention
It is an object of the invention to overcome the above-mentioned problems in the prior art, it is interactive to provide a kind of new energy power station Designing system, designer needed for which can realize user's on-line selection and parameter, and can be according to the design of Real-time Feedback Progress carries out real time modifying, and the user experience is improved and shortens design time improves efficiency.
In order to achieve the above object, the present invention proposes a kind of new energy power station interactive design system (IDS), the new energy power station Interactive design system (IDS) includes client, interaction design server, background data base server and multiple design terminals, In: the client for realizing user and interaction design server interaction;After the interaction design server is for extracting The data stored in platform database server, and these data are showed into user by client, it is logical to be also used to receive user The data of client transmission are crossed, and by storage after the data processing of transmission into background data base server;The interaction design Server includes: design team displaying and selecting module, design scheme displaying and selecting module and engineering Dynamic Display and repairs Change module;The multiple design terminal is for reading each parameter of design from background data base server to be set Meter, and real-time design result is sent to background data base server to store.
According to an aspect of the present invention, the design team show and selecting module include design team display module and Design team selecting module, wherein the design team display module is for extracting design team from background data base server Information simultaneously sends that information to client;The design team selecting module is used to set from what client reception user was clicked Team is counted, and the design team that user is clicked is sent to background data base server to store;The design scheme is shown It include design scheme display module and design scheme selecting module with selecting module, wherein the design scheme display module is used for Design scheme information is extracted from background data base server and the information is showed into client, and the design scheme selects mould Block is used to receive the design scheme that user is clicked from client, and the design scheme that user is clicked is sent to back-end data Library server is to store;The engineering Dynamic Display and modified module include engineering Dynamic Display module and engineering dynamic modification mould Block, wherein the engineering Dynamic Display module is used to extract real-time design result from background data base server and will be real-time Design result shows client, and the engineering dynamic modified module is used to provide real time modifying interface for the client, use It family can be by the client and the real time modifying interface to setting in real time by the engineering Dynamic Display modules exhibit Meter result is modified.
According to an aspect of the present invention, the interaction design server further include: engineering GIS information module, for reading The extracted real-time design of engineering Dynamic Display module is taken as a result, extracting this when the real-time design result is that design finishes The location information of secondary design, and by the location information association so far secondary design to be stored in background data base server.
According to an aspect of the present invention, the interaction design server further include: feedback module, for providing user couple The Function of Evaluation of design is completed.
According to an aspect of the present invention, the design scheme selecting module further includes design scheme modified module and design Scheme uploading module, in which: the design scheme uploading module is used to provide upload interface for the client, to allow user Upload user design scheme, user's design scheme are the design schemes that the design scheme display module is not shown;It is described Design scheme modified module is used to for the client provide modification interface, to allow user to having been selected or uploaded Design parameter in each design scheme is modified.
According to an aspect of the present invention, the background data base server is used in user's complete design team and design After the selection of scheme, the design scheme that user selects is sent to the design terminal of the design team of user's selection, the design Terminal is used to real-time design result being sent to background data base server.
According to an aspect of the present invention, the real-time design result includes the real-time completion node of each profession and not complete At node, the node of completing includes that mentioning for completion provides list, drawing, volume specification, and unfinished node includes unfinished mentions Money list, volume specification, is fully completed the data for also needing user to provide at drawing;The engineering Dynamic Display module is used for certainly It is dynamic to draw the network node figure that is completed and does not complete, and provide the three-dimensional display of system engineering progress and be fully completed and also need The time wanted, and ought newly complete a node or user has submitted the money for being fully completed and user also being needed to provide by client It is described to be fully completed the time also needed and update again when material.
According to an aspect of the present invention, data collision detection technology is used in the engineering dynamic modified module, It real-time design result used by middle design terminal and engineering Dynamic Display module and is stored in background data base server The real-time design result be directed toward same address, when user modifies by client some parameter in the real-time design result And when being committed to interaction design server, the engineering Dynamic Display module in interaction design server is used to modify the parameter and will Cause the change of the parameter in background data base server, the background data base server is for intercepting and capturing the change and being committed to Corresponding design terminal, design terminal are used to assess the parameter before changing and after changing, if allowing to change, receive Modified parameter is simultaneously redesigned, if it is not allowed, then returning to corresponding prompting message to client.
According to an aspect of the present invention, the interaction design server further includes existing engineering displaying and selecting module; The existing engineering is shown and selecting module includes existing engineering display module and existing engineering selecting module;The client packet Include the GPS module for obtaining the specific location where user, the client be used to for the specific location being sent to it is described There are engineering displaying and selecting module;The existing engineering is shown and selecting module is used for according to where the received user of client Specific location, with from the specific location where user from closely being completed in background data base server is set to remote mode Meter is ranked up;The design that is completed of sequence is showed the client by the existing engineering display module;The existing work Journey selecting module is used to that design to be completed from what client reception user selected, and the design team in design is completed described in extraction With design scheme and be respectively sent to that design team is shown and selecting module and design scheme are shown and selecting module.
According to an aspect of the present invention, the interaction design server further includes existing engineering image parsing module;Institute Stating client 101 includes camera, and the camera is described complete for capturing and the image for designing relevant information being completed It include the text information or two dimensional code for indicating to be completed design at relevant information is designed, the client is used for described image It is sent to the existing engineering image parsing module of interaction design server;The existing engineering image solution of the interaction design server Analysis module identifies and design is completed represented by the image for parsing the image, mentions from background data base server Take the design team being completed in design and design scheme and be respectively sent to design team show and selecting module and Design scheme is shown and selecting module.
It can be seen that the present invention improves the design of new energy power station by multi-level, many-sided, one is proposed Kind is all the designing system that real-time, interactive is carried out with user in every aspect, and not only the user experience is improved for it, also shortens and sets Timing length improves design efficiency.
Detailed description of the invention
Fig. 1 is the general frame figure of new energy power station interactive design system (IDS) proposed by the present invention;
Fig. 2 is the schematic diagram of internal structure according to the interaction design server of one embodiment;
Fig. 3 is the signal graph interacted according to the client of another embodiment with interaction design server.
Specific embodiment
As described below is preferable embodiment of the invention, is not intended to limit the scope of the present invention.
As shown in Figure 1, new energy power station interactive design system (IDS) proposed by the invention mainly includes client 101, hands over Mutual design server 102, background data base server 103 and multiple design terminals 104.
Wherein, client 101 is communicatively coupled to interaction design server 102, and interaction design server 102 can communicate Ground is connected to background data base server 103, and background data base server 103 also communicably connects with multiple design terminals 104 It connects.
User realizes the interaction with interaction design server 102, the interaction design server by operation client 101 102 show use by client 101 for extracting the data stored in background data base server 103, and by these data Family is also used to receive user and passes through the data that client 101 is sent, and background data base is arrived in storage after the data processing of transmission Server 103, the multiple design terminal 104 from background data base server 103 for reading each parameter of design To be designed, and real-time design result is sent to background data base server 103 to store.
Interaction design server 102 is the key components for realizing Interactive Design, below with reference to Fig. 2 to the interaction Design server 102 is described in detail.
Described in Fig. 2 in one embodiment, the interaction design server 102 includes that design team shows and selects Select module 201, design scheme is shown and selecting module 202, engineering Dynamic Display and modified module 203, engineering GIS (geography letter Breath system) information module 204, feedback module 205 and expansion module 206.
The design team is shown and selecting module 201 includes design team display module and design team selecting module.
The design team display module is used to extract design team information from background data base server 103 and should Information is sent to client 101, and the design team information includes the design chief engineer of each design team, each profession such as electricity Gas, civil engineering, education background, length of service, work achievement, the obtained engineering of the expert engineer of resource section and major design personnel Awards;
The design team selecting module is used to receive the design team that is clicked of user from client 101, and by user The design team clicked is sent to background data base server 103 to store.
The design scheme is shown and selecting module 202 includes design scheme display module and design scheme selecting module.
The design scheme display module is used to extract design scheme information from background data base server 103 and should Information shows client 101, and the design scheme information includes all kinds of building sides of wind power plant, solar power station booster stations Case, electrical main connecting wire arrangement, general layout scheme, being showed each design scheme in a manner of 3 d effect graph Client 101;
The design scheme selecting module is used to receive the design scheme that is clicked of user from client 101, and by user The design scheme clicked is sent to background data base server 103 to store.
Wherein, the design scheme selecting module further includes design scheme modified module and design scheme uploading module, In, the design scheme uploading module is used to provide upload interface for the client, to allow user's upload user design side Case, user's design scheme are the design schemes that the design scheme display module is not shown;The design scheme modifies mould Block is used to provide modification interface for the client, to allow user in each design scheme for having been selected or having uploaded Design parameter is modified.The design parameter includes such as overall floorage, room-size, room quantity, alien invasion and room Interior finish material and decoration style, current period installed capacity, long term planning capacity, main transformer capacity size and number, booster stations General layout, general electric arrangement.
The background data base server is used for after the selection of user's complete design team and design scheme, and user is selected The design scheme selected is sent to the design terminal 104 of the design team of user's selection, and the design terminal 104 for that will set in real time Meter result is sent to background data base server.
The engineering Dynamic Display and modified module 203 include engineering Dynamic Display module and engineering dynamic modified module.
The engineering Dynamic Display module is used to extract real-time design result from background data base server and will be real-time Design result show client.The real-time design result includes the real-time completion node and unfinished section of each profession Point, it is described complete node include complete mention money list, drawing, volume specification, unfinished node include it is unfinished mention money list, Drawing, is fully completed the data for also needing user to provide at volume specification, draws the network node for being completed and not completing automatically Figure, and provide the three-dimensional display of system engineering progress and be fully completed the time also needed.A node or use are completed when new It is described to be fully completed the time also needed and weigh when family has submitted the data for being fully completed and user also being needed to provide by client It is new to update.In addition, being also intended to deadline and running time progress real time contrast, the speed feelings of reaction designing progress Condition.User can be reminded in this way and is set always, and offer data is provided or accelerate design schedule.
The engineering dynamic modified module is used to provide real time modifying interface for the client, and user can pass through the visitor Family end and the real time modifying interface modify to the real-time design result by the engineering Dynamic Display modules exhibit. In one embodiment, for this modification process, present invention utilizes data collision detection technologies, i.e. design terminal and work Real-time design result used by journey Dynamic Display module and the real-time design knot being stored in background data base server Fruit is directed toward same address, when user modifies some parameter in the real-time design result by client and is committed to interaction design When server, the engineering Dynamic Display module in interaction design server modifies the parameter and will cause background data base server In the parameter change, described background data base server intercepts change is simultaneously committed to corresponding design terminal, design terminal Parameter before changing and after changing is assessed, if allowing to change, receives modified parameter and is redesigned, If it is not allowed, then returning to corresponding prompting message to client.This dynamic modification process embodies to be used in the design process Family is interacted with design team, helps to improve design efficiency, promotes user experience.
The engineering dynamic modified module also provides for the choosing for normal design period or urgent specified design period It selects and the selection of dynamic notification mode (short message, phone, Email) and notice time (each week, per two weeks).
The engineering GIS information module 204 is for reading the extracted real-time design of engineering Dynamic Display module as a result, working as When the real-time design result is that design finishes, the location information of this secondary design is extracted, and the location information is associated with to this Design is to be stored in background data base server 103.For example, the engineering GIS information module 204 provides the range of this engineering Coordinate (longitude and latitude or Beijing 54 Coordinate System (3 degree of bands, 6 degree of bands) or Xi'an1980 coordinate system (3 degree of bands, 6 degree of bands)), in addition, may be used also The planned capacity of this engineering, current period installed capacity are provided, Wind turbines recommend direct-drive unit or double-fed unit, recommend single-machine capacity (1.5MW, 2MW, 2.5MW, 3MW etc.), photovoltaic module recommend monocrystalline or polycrystalline, recommended maximum size (250W, 255W, 260W, 280W, 285W, 300W, 305W, 310W etc.).
The feedback module 205 for providing user's evaluation function, such as to the power station designed provide all kinds of suggestions with Opinion specifically includes the evaluation for providing user to change release performance, such as both can be to each of design team It is evaluated, each design scheme can also be evaluated, finally provide overall evaluation score, for the industry to design team Achievement examination.
The expansion module 206 is used to provide the described the Function Extension interface of interaction design server.For example, providing pairing With the interface of management module, the contract management module can be used for assigning change release, and receive label of the user by client Word is affixed one's seal confirmation, and realizes the functions such as on-line payment left fund after the completion of on-line payment advance payment and engineering.
Modules in interaction design server 201 can be with any one or a few knot of software, hardware or firmware The mode of conjunction implements, this is it will become apparent to those skilled in the art that for example, these modules can use respectively Different chips is made, using can realize its function by the corresponding program that processor executes or execute program using having cured Storage chip and corresponding controller are realized.
Although emphasis is described in detail for interaction design server 102 above, wherein also relate to for The description of client 101, background data base server 103, design terminal 104.Wherein, the client 101 is implemented at one It can be portable equipment, mobile phone, tablet computer etc. in example.
In the following, in order to further enhance user experience, design efficiency is improved, the invention proposes another embodiment, referring to Shown in Fig. 3.The embodiment may be used in combination with embodiment before.
The interaction design server 102 further includes that existing engineering is shown and selecting module 207.
Here existing engineering is shown and selecting module 207 includes that existing engineering display module and existing engineering select mould Block.
It is first at the beginning of user selects design team and design scheme in order to promote user experience and save design total duration Design first is completed for user's displaying is existing, user therefrom can intuitively understand and select.
In addition, it is contemplated that design needed for user is normally near user location, here in order to further enhance user User location, is alternatively completed the foundation of design by experience.
The GPS module of client 101 obtains the specific location where user, and the specific location is sent to described existing Engineering is shown and selecting module 207;
As described above, the engineering GIS information module 204 can set the geography information that design is completed with corresponding Meter is associated and is stored in background data base server, therefore, the existing engineering show and selecting module 207 according to from Specific location where the received user of client, with from the specific location where user from closely to remote mode by back-end data The design that is completed in the server of library is ranked up.
Specifically, the design that is completed of sequence is showed the client by the existing engineering display module.It is described There is engineering display module to be used to completed all kinds of wind power plants, the geography information of solar power station carrying out Dynamic Display, including Where the position displaying in the whole world, project scale, main Wind turbines type, main photovoltaic module, engineering safety grade, engineering Ground annual mean wind speed, annual solar energy global radiation value.
The existing engineering selecting module is used to receive the design that is completed of user's selection from client, and extraction is described complete At the design team and design scheme in design and it is respectively sent to design team displaying and selecting module 201 and design scheme It shows and selecting module 202.
The design team show and selecting module 201 and design scheme displaying and selecting module 202 be previously mentioned Function it is identical, that is, be equivalent to and default value be provided with by be selected as design team and the design scheme that design is completed, Due to user selected oneself it is favorite design is completed, then need to only modify design team according to the actual needs of itself or set Sub-fraction parameter in meter scheme, which offers a saving the times of user's selection, and the user experience is improved.
In addition, the interaction design server 102 further includes existing engineering image solution in order to further enhance user experience Analyse module 208.
User can at the beginning of design to be completed engineering carry out on-the-spot investigation at this moment encounter the design that is completed admired, use The relevant information of the design directly can be sent to interaction design server 102 by family, by interaction design server 102 from rear number of units Design team displaying and selecting module 201 are designed and are sent to according to being completed in the server of library according to the relevant information selection And design scheme shows the default value that design team and design scheme are arranged with selecting module 202.
Specifically, the client 101 includes camera, and the camera is for capturing letter relevant to design is completed The image of breath, the relevant information of design that is completed includes the text information or two dimensional code for indicating to be completed design, the visitor Described image is sent to interaction design server 102 by family end;
The existing engineering image parsing module 208 of the interaction design server 102 is identified for parsing the image Design is completed represented by the image, the design team and design scheme being completed in design described in extraction are simultaneously respectively sent to Design team is shown to be shown and selecting module 202 with selecting module 201 and design scheme.
Image processing techniques is utilized to identify the letter for including in described image in the existing engineering image parsing module 208 Image recognition processes have been placed in interaction design server by breath, the larger workload as needed for image recognition here, when So, it can also be placed in the client, i.e., by design information is completed in the image of client parsing shooting, and be sent to Interaction design server.
It can be seen that the present invention improves the design of new energy power station by multi-level, many-sided, one is proposed Kind is all the designing system that real-time, interactive is carried out with user in every aspect, and not only the user experience is improved for it, also shortens and sets Timing length improves design efficiency.For example, the system realizes the real-time dynamic interaction with customer, customer can utilize mobile phone at any time Or tablet computer is designed commission, design team selection, the design cycle (may be selected urgent), and real time inspection project progress is right It is replied in real time if total receipts money is single, engineering connection is single, the design scheme for providing menu mode is selected for customer.To design engineering The various schemes of middle formation provide 3 d effect graph Dynamic Display, and user proposes new idea at any time, according to user demand dynamic Modification.Entire engineering design process to user be it is open with it is transparent, and design scheme is directed entirely to user demand.
It should be noted that specific embodiment and application field proposed by the invention merely for the purpose of illustration, is not intended as pair The limitation of the scope of the present invention, those skilled in the art can modify to a specific embodiment of the invention to meet reality It needs.

Claims (9)

1. a kind of new energy power station interactive design system (IDS), it is characterised in that:
The new energy power station interactive design system (IDS) include client, interaction design server, background data base server with And multiple design terminals, in which:
The client for realizing user and interaction design server interaction;
The interaction design server include: design team show and selecting module, design scheme show and selecting module and Engineering Dynamic Display and modified module;Each module of the interaction design server is deposited in background data base server for extracting The corresponding data of storage, and these data are showed into user by client, it is also used to receive what user was sent by client Corresponding data, and by storage after the processing of the corresponding data of transmission into background data base server;
The design team is shown and selecting module includes design team display module and design team selecting module, wherein described Design team display module is used to extract design team information from background data base server and sends that information to client End;The design team selecting module is used to receive the design team that user is clicked from client, and user is clicked Design team is sent to background data base server to store;
The design scheme is shown and selecting module includes design scheme display module and design scheme selecting module, wherein described Design scheme display module is used to extract design scheme information from background data base server and the information is showed client End, the design scheme selecting module are used to receive the design scheme that user is clicked from client, and user is clicked Design scheme is sent to background data base server to store;
The engineering Dynamic Display and modified module include engineering Dynamic Display module and engineering dynamic modified module, wherein described Engineering Dynamic Display module is used to extract real-time design result from background data base server and by real-time design result exhibition Show to client, the engineering dynamic modified module is used to provide real time modifying interface for the client, and user can pass through institute Client and the real time modifying interface is stated to carry out to by the real-time design result of the engineering Dynamic Display modules exhibit Modification;
The multiple design terminal is used to read each parameter of design from background data base server to be designed, and Real-time design result is sent to background data base server to store.
2. new energy power station interactive design system (IDS) according to claim 1, it is characterised in that:
The interaction design server further include:
Engineering GIS information module, for reading the extracted real-time design of engineering Dynamic Display module as a result, setting in real time when described Meter result is design when finishing, and extracts the location information of this secondary design, and by location information association so far secondary design to store In background data base server.
3. new energy power station interactive design system (IDS) according to claim 1, it is characterised in that:
The interaction design server further include:
Feedback module, for providing user to the Function of Evaluation that design is completed.
4. new energy power station interactive design system (IDS) according to claim 1, it is characterised in that:
The design scheme selecting module further includes design scheme modified module and design scheme uploading module, in which:
The design scheme uploading module is used to provide upload interface for the client, to allow user's upload user design side Case, user's design scheme are the design schemes that the design scheme display module is not shown;
The design scheme modified module is used to for the client provide modification interface, to allow user to having been selected or Design parameter in each design scheme through uploading is modified.
5. new energy power station interactive design system (IDS) according to claim 1, it is characterised in that:
The background data base server is used for after the selection of user's complete design team and design scheme, by user's selection Design scheme is sent to the design terminal of the design team of user's selection, and the design terminal is for sending real-time design result Give background data base server.
6. new energy power station interactive design system (IDS) according to claim 1, it is characterised in that:
The real-time design result includes the real-time completion node and unfinished node of each profession, and the completion node has included At mention money list, drawing, volume specification, unfinished node includes that unfinished mention provides list, drawing, volume specification, whole Complete the data for also needing user to provide;The engineering Dynamic Display module for drawing the network for being completed and not completing automatically Node diagram, and provide the three-dimensional display of system engineering progress and be fully completed the time also needed, and ought newly complete one When node or user have submitted the data for being fully completed and user also being needed to provide by client, described be fully completed also needs Time will update again.
7. new energy power station interactive design system (IDS) according to claim 1, it is characterised in that:
Data collision detection technology is used in the engineering dynamic modified module, wherein design terminal and engineering Dynamic Display Real-time design result used by module is directed toward same with the real-time design result being stored in background data base server Address, when user modifies some parameter in the real-time design result by client and is committed to interaction design server, Engineering Dynamic Display module in interaction design server is somebody's turn to do in background data base server for modifying the parameter and will cause The change of parameter, the background data base server is for intercepting and capturing the change and being committed to corresponding design terminal, design terminal For assessing the parameter before changing and after changing, if allowing to change, receives modified parameter and carry out again Design, if it is not allowed, then returning to corresponding prompting message to client.
8. new energy power station interactive design system (IDS) according to claim 2, it is characterised in that:
The interaction design server further includes existing engineering displaying and selecting module;The existing engineering is shown and selecting module Including existing engineering display module and existing engineering selecting module;
The client includes the GPS module for obtaining the specific location where user, and the client is used for this is specific Position is sent to the existing engineering displaying and selecting module;
The existing engineering is shown and selecting module is used for according to from the specific location where the received user of client, with from The design that is completed in background data base server from being closely ranked up to remote mode by specific location where family;It is described There is engineering display module that the design that is completed of sequence is showed the client;
The existing engineering selecting module is used to that design to be completed from what client reception user selected, is completed and sets described in extraction Design team and design scheme in meter and be respectively sent to design team show and selecting module and design scheme show and Selecting module.
9. new energy power station interactive design system (IDS) according to claim 1, it is characterised in that:
The interaction design server further includes existing engineering image parsing module;
The client includes camera, and the camera is described for capturing and the image for designing relevant information being completed Being completed and designing relevant information includes the text information or two dimensional code for indicating to be completed design, and the client is used for will be described Image is sent to the existing engineering image parsing module of interaction design server;
The existing engineering image parsing module of the interaction design server identifies the image institute table for parsing the image That shows is completed design, simultaneously from the design team and design scheme being completed in design described in extraction in background data base server Design team is respectively sent to show and selecting module and design scheme displaying and selecting module.
CN201510882177.3A 2015-12-05 2015-12-05 New energy power station interactive design system (IDS) Active CN105450764B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510882177.3A CN105450764B (en) 2015-12-05 2015-12-05 New energy power station interactive design system (IDS)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510882177.3A CN105450764B (en) 2015-12-05 2015-12-05 New energy power station interactive design system (IDS)

Publications (2)

Publication Number Publication Date
CN105450764A CN105450764A (en) 2016-03-30
CN105450764B true CN105450764B (en) 2018-12-07

Family

ID=55560530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510882177.3A Active CN105450764B (en) 2015-12-05 2015-12-05 New energy power station interactive design system (IDS)

Country Status (1)

Country Link
CN (1) CN105450764B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107944666A (en) * 2017-11-02 2018-04-20 浙江大学 A kind of motor cloud design platform
CN107995307A (en) * 2017-12-15 2018-05-04 江苏盖亚建筑工程有限公司 A kind of construction work design system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201667560U (en) * 2010-04-20 2010-12-08 上海正泰自动化软件系统有限公司 Cross-platform monitoring device
CN101958899A (en) * 2010-09-29 2011-01-26 海盐县供电局 Remote interactive business hall customer service device and operation method thereof
CN102592248A (en) * 2012-01-12 2012-07-18 江苏电力信息技术有限公司 Power interaction service system for mobile phone terminal
CN102915488A (en) * 2012-10-26 2013-02-06 李香存 Online intelligent design system of engineering project and method of system
CN102930374A (en) * 2012-09-27 2013-02-13 乐华建科技(北京)有限公司 System for realizing project management by using three-dimensional model for simulating reality
KR101329395B1 (en) * 2012-06-04 2013-11-14 한국남동발전 주식회사 Power plant equipment management system and control method for thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201667560U (en) * 2010-04-20 2010-12-08 上海正泰自动化软件系统有限公司 Cross-platform monitoring device
CN101958899A (en) * 2010-09-29 2011-01-26 海盐县供电局 Remote interactive business hall customer service device and operation method thereof
CN102592248A (en) * 2012-01-12 2012-07-18 江苏电力信息技术有限公司 Power interaction service system for mobile phone terminal
KR101329395B1 (en) * 2012-06-04 2013-11-14 한국남동발전 주식회사 Power plant equipment management system and control method for thereof
CN102930374A (en) * 2012-09-27 2013-02-13 乐华建科技(北京)有限公司 System for realizing project management by using three-dimensional model for simulating reality
CN102915488A (en) * 2012-10-26 2013-02-06 李香存 Online intelligent design system of engineering project and method of system

Also Published As

Publication number Publication date
CN105450764A (en) 2016-03-30

Similar Documents

Publication Publication Date Title
Xiang et al. Optimal active distribution network planning: a review
KR102121361B1 (en) Method and device for identifying the type of geographic location where the user is located
US20180132015A1 (en) Integrated Solution of Internet of Things and Smart Grid Network Pertaining to Communication, Data and Asset Serialization, and Data Modeling Algorithms
US20180218525A1 (en) Energy grid data platform
CN105488177A (en) Visual presentation method and system of data
CN103179212A (en) Intelligent community management service method and network architecture
Marnay et al. Applications of optimal building energy system selection and operation
CN103714209B (en) A kind of wind rose method for drafting based on ExtJs
MacLean et al. The construction of citizenship and the public provision of electricity during the 2014 World Cup in Ghana
Barragán-Escandón et al. Incidence of photovoltaics in cities based on indicators of occupancy and urban sustainability
Sumanik-Leary Small wind turbines for decentralised rural electrification: case studies in Peru, Nicaragua and Scotland
Massaro et al. Advanced and Complex Energy Systems Monitoring and Control: A Review on Available Technologies and Their Application Criteria
CN105450764B (en) New energy power station interactive design system (IDS)
Jie et al. Analysis and modelling regarding frequency regulation of power systems and power supply–demand‐control based on penetration of renewable energy sources
Buchholz et al. Considerations of project scale and sustainability of modern bioenergy systems in Uganda
CN206021354U (en) One kind is based on BIM and VR smart cities pipeline coordination platform
CN112926854B (en) Distribution network emergency material demand reporting method based on data intelligent perception
CN105610487B (en) Cross-domain coordinated scheduling method for satellite observation resources
CN112001574A (en) Work order management method, computing device, work order management system and computer readable storage medium
CN102930452A (en) Method and device for releasing home decoration advertisements accurately
Zafeiropoulou et al. A Flexibility Platform for Managing Outages and Ensuring the Power System’s Resilience during Extreme Weather Conditions
Khan et al. Smart distribution mechanisms—Part I: from the perspectives of planning
Tegou et al. A multi-criteria framework for an isolated electricity system design with renewable energy sources in the context of distributed generation: The case study of Lesvos Island, Greece
CN108171487A (en) A kind of project of transmitting and converting electricity design review system
CN110348669B (en) Intelligent rule generation method, intelligent rule generation device, computer equipment and storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant