CN105442906A - 拉线塔塔脚结构 - Google Patents
拉线塔塔脚结构 Download PDFInfo
- Publication number
- CN105442906A CN105442906A CN201410437163.6A CN201410437163A CN105442906A CN 105442906 A CN105442906 A CN 105442906A CN 201410437163 A CN201410437163 A CN 201410437163A CN 105442906 A CN105442906 A CN 105442906A
- Authority
- CN
- China
- Prior art keywords
- connecting portion
- cambered surface
- column foot
- guywire tower
- gripper shoe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 43
- 239000010959 steel Substances 0.000 claims abstract description 43
- 230000015572 biosynthetic process Effects 0.000 claims description 4
- 230000035515 penetration Effects 0.000 claims description 4
- 238000012545 processing Methods 0.000 abstract description 11
- 238000010276 construction Methods 0.000 abstract description 10
- 238000009434 installation Methods 0.000 abstract 1
- 238000000926 separation method Methods 0.000 abstract 1
- 230000001052 transient effect Effects 0.000 abstract 1
- 238000003466 welding Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 5
- 239000000463 material Substances 0.000 description 4
- 230000004308 accommodation Effects 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000006835 compression Effects 0.000 description 2
- 238000007906 compression Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 210000003141 lower extremity Anatomy 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000010412 perfusion Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
Claims (11)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410437163.6A CN105442906B (zh) | 2014-09-01 | 2014-09-01 | 拉线塔塔脚结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410437163.6A CN105442906B (zh) | 2014-09-01 | 2014-09-01 | 拉线塔塔脚结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105442906A true CN105442906A (zh) | 2016-03-30 |
CN105442906B CN105442906B (zh) | 2019-03-08 |
Family
ID=55553496
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410437163.6A Active CN105442906B (zh) | 2014-09-01 | 2014-09-01 | 拉线塔塔脚结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105442906B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108843114A (zh) * | 2018-05-31 | 2018-11-20 | 中国电力科学研究院有限公司 | 一种可应对采动区不均匀沉降的铁塔及其扶正方法 |
WO2020005173A1 (en) * | 2018-06-26 | 2020-01-02 | Sa-Ra Enerji Insaat Ticaret Ve Sanayi Anonim Sirketi | Connection apparatus for mounting a guyed mast. |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29520545U1 (de) * | 1995-12-27 | 1997-04-24 | Gust. Alberts GmbH & Co KG, 58849 Herscheid | Einschraubbodenhülse |
US20060278772A1 (en) * | 2003-04-09 | 2006-12-14 | Peak Innovations, Inc. | Adjustable post support |
CN201236518Y (zh) * | 2008-06-30 | 2009-05-13 | 上海邮电设计院有限公司 | 双脚拉线塔 |
CN103638643A (zh) * | 2013-12-30 | 2014-03-19 | 哈尔滨师范大学 | 带有信息反馈功能的一维互动平衡训练装置 |
CN204081621U (zh) * | 2014-09-01 | 2015-01-07 | 国家电网公司 | 拉线塔塔脚结构 |
-
2014
- 2014-09-01 CN CN201410437163.6A patent/CN105442906B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29520545U1 (de) * | 1995-12-27 | 1997-04-24 | Gust. Alberts GmbH & Co KG, 58849 Herscheid | Einschraubbodenhülse |
US20060278772A1 (en) * | 2003-04-09 | 2006-12-14 | Peak Innovations, Inc. | Adjustable post support |
CN201236518Y (zh) * | 2008-06-30 | 2009-05-13 | 上海邮电设计院有限公司 | 双脚拉线塔 |
CN103638643A (zh) * | 2013-12-30 | 2014-03-19 | 哈尔滨师范大学 | 带有信息反馈功能的一维互动平衡训练装置 |
CN204081621U (zh) * | 2014-09-01 | 2015-01-07 | 国家电网公司 | 拉线塔塔脚结构 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108843114A (zh) * | 2018-05-31 | 2018-11-20 | 中国电力科学研究院有限公司 | 一种可应对采动区不均匀沉降的铁塔及其扶正方法 |
CN108843114B (zh) * | 2018-05-31 | 2022-03-08 | 中国电力科学研究院有限公司 | 一种可应对采动区不均匀沉降的铁塔及其扶正方法 |
WO2020005173A1 (en) * | 2018-06-26 | 2020-01-02 | Sa-Ra Enerji Insaat Ticaret Ve Sanayi Anonim Sirketi | Connection apparatus for mounting a guyed mast. |
US11286684B2 (en) | 2018-06-26 | 2022-03-29 | Sa-Ra Enerjiinsaat Ticaret Ve Sanayi Anonim Sirketi | Connection apparatus for mounting a guyed mast |
Also Published As
Publication number | Publication date |
---|---|
CN105442906B (zh) | 2019-03-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8826614B2 (en) | System for joining a gondola to the concrete tower of an aerogenerator | |
CN103774861B (zh) | 一种网架结构杆件的加固方法 | |
CN102912972A (zh) | 一种多功能可抬升钢平台转换胎架及施工方法 | |
CN204081621U (zh) | 拉线塔塔脚结构 | |
CA2823814A1 (en) | Mounting assembly and method to erect in sections an annular tower for wind or heliostatic power generators in an energy farm | |
CN105442906A (zh) | 拉线塔塔脚结构 | |
CN202164621U (zh) | 可排列组装的塔机基础 | |
CN102261043A (zh) | 拼装式钢管立柱系统 | |
CN201738329U (zh) | 桅杆式机械设备与基础的垂直连接构造 | |
CN101560793B (zh) | 一种带防松脱限位结构的万向球铰支座 | |
CN204163095U (zh) | 一种建筑基础结构及其组合构件 | |
CN203160116U (zh) | 一种抗倾覆桥墩机构 | |
CN215408998U (zh) | 一种风电机组混凝土塔筒预应力钢绞线端部保护装置 | |
CN203821939U (zh) | 一种±800kV特高压直流线路用圆形塔脚板 | |
CN102535507B (zh) | 组合式塔基 | |
CN101864808A (zh) | 塔桅式机械设备与基础的垂直定位构造 | |
CN210684493U (zh) | 一种可快速拆除临时支座 | |
CN104314354A (zh) | 高压电塔基座 | |
CN201411926Y (zh) | 弧形梁起重结构 | |
CN103216013A (zh) | 撑杆端头焊接板式大转角球铰节点装置 | |
CN203498852U (zh) | 一种塔机底架与基础的垂直连接构造 | |
CN102108714B (zh) | 塔式机械设备底架的垂直定位连接构造 | |
CN109868717A (zh) | 一种大跨度桥梁 | |
CN210001480U (zh) | 塔节置换装置和包含其的塔吊 | |
CN102762804A (zh) | 可伸缩结构和提升系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 100031 West Chang'an Avenue, Xicheng District, Xicheng District, Beijing Applicant after: STATE GRID CORPORATION OF CHINA Applicant after: NORTH CHINA POWER ENGINEERING CO., LTD. OF CHINA POWER ENGINEERING CONSULTING Group Applicant after: STATE GRID ECONOMIC AND TECHNOLOGICAL RESEARCH INSTITUTE Co.,Ltd. Applicant after: STATE GRID JIANGSU ELECTRIC POWER Co.,Ltd. Address before: 100031 West Chang'an Avenue, Xicheng District, Xicheng District, Beijing Applicant before: State Grid Corporation of China Applicant before: NORTH CHINA POWER ENGINEERING CO., LTD. OF CHINA POWER ENGINEERING CONSULTING Group Applicant before: STATE GRID ECONOMIC AND TECHNOLOGICAL RESEARCH INSTITUTE Co.,Ltd. Applicant before: STATE GRID JIANGSU ELECTRIC POWER Co. Address after: 100031 West Chang'an Avenue, Xicheng District, Xicheng District, Beijing Applicant after: STATE GRID CORPORATION OF CHINA Applicant after: NORTH CHINA POWER ENGINEERING CO., LTD. OF CHINA POWER ENGINEERING CONSULTING Group Applicant after: STATE GRID ECONOMIC AND TECHNOLOGICAL RESEARCH INSTITUTE Co.,Ltd. Applicant after: STATE GRID JIANGSU ELECTRIC POWER Co. Address before: 100031 West Chang'an Avenue, Xicheng District, Xicheng District, Beijing Applicant before: State Grid Corporation of China Applicant before: NORTH CHINA POWER ENGINEERING CO., LTD. OF CHINA POWER ENGINEERING CONSULTING Group Applicant before: STATE POWER ECONOMIC Research Institute Applicant before: JIANGSU ELECTRIC POWER Co. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |