CN105442854A - 一种大跨度网壳钢结构屋面的施工工艺 - Google Patents

一种大跨度网壳钢结构屋面的施工工艺 Download PDF

Info

Publication number
CN105442854A
CN105442854A CN201510935189.8A CN201510935189A CN105442854A CN 105442854 A CN105442854 A CN 105442854A CN 201510935189 A CN201510935189 A CN 201510935189A CN 105442854 A CN105442854 A CN 105442854A
Authority
CN
China
Prior art keywords
construction
reticulated shell
span
node
net shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510935189.8A
Other languages
English (en)
Inventor
曹雁冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI WEIHONG STEEL STRUCTURE GROUP Co Ltd
Original Assignee
ANHUI WEIHONG STEEL STRUCTURE GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI WEIHONG STEEL STRUCTURE GROUP Co Ltd filed Critical ANHUI WEIHONG STEEL STRUCTURE GROUP Co Ltd
Priority to CN201510935189.8A priority Critical patent/CN105442854A/zh
Publication of CN105442854A publication Critical patent/CN105442854A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Abstract

本发明公开一种大跨度网壳钢结构屋面的施工工艺,包括以下步骤:采用CFD数值风动计算技术得到网壳节点杆件的尺寸,绘出施工图纸;按照计算结果安装节点和预埋件;连接下弦杆、上弦杆和腹杆使其成为网壳单元,根据施工图纸定出五个施工段,每段施工段的轴向长度在10-13米之间,在地面上拼装网壳,并在网壳单元的一端固定安装可转动支座,另一端由汽吊吊起;网壳安装结束后进行屋面板和内部设备的安装。本发明大跨度网壳钢结构屋面的施工工艺适用于重量大、跨度大、现场制作安装、吊装的钢结构工程,加快了安装施工进度,安装精度高,提高测量的数字化和自动化程度;本发明施工工艺简单、操作方便快捷。

Description

一种大跨度网壳钢结构屋面的施工工艺
技术领域
本发明属于钢结构建筑技术领域,具体是一种大跨度网壳钢结构屋面的施工工艺。
背景技术
随着社会经济的飞速发展以级人民生活水平的日益提高,为了建造更大、更强、更长的各种超大型复杂结构物来满足人们对生活空间的追求。大跨度钢结构随之被发展起来。大跨度钢结构具有单榀重量大、建筑造型复杂、施工过程的受力状态与设计成型时受力状态相差甚远以及与混凝土结构交叉施工的特点。
煤炭、电力、化工等存储设施主要用来存储颗粒状、粉状材料,他们起到了环保和遮风挡雨的作用,不仅保护原料不受损失,也保护了运营设备。随着规模越来越大,存储仓的建设数量和规模也越来越大,其跨度、高度、存储量也在不断增加。大跨度空间结构的储粮仓存在造价高、安装施工精度不高的缺陷。
发明内容
本发明的目的在于提供一种大跨度网壳钢结构屋面的施工工艺。
本发明的目的可以通过以下技术方案实现:
一种大跨度网壳钢结构屋面的施工工艺,其特征在于,包括以下步骤:
(1)采用CFD数值风动计算技术得到网壳节点杆件的尺寸,即每个节点的球头直径和其上安装的杆件的几何参数,绘出施工图纸;
(2)按照计算结果安装节点和预埋件,节点安装顺序为先装上弦节点,后装下弦节点,在地面完成节点杆件的拼装,将预埋件按图纸位置和定位尺寸用定位模板进行埋设,测量复核,进行混凝土浇筑施工;
(3)连接下弦杆、上弦杆和腹杆使其成为网壳单元,根据施工图纸定出五个施工段,每段施工段的轴向长度在10-13米之间,在地面上拼装网壳,并在网壳单元的一端固定安装可转动支座,另一端由汽吊吊起,在接近地面的位置上向外拼接节点杆件,向另一个支座方向延伸,完成相应的测量和调整,安装并焊接网壳尾部的支座,同时焊接固定网壳头部的支座,网壳安装结束;
(4)网壳安装结束后进行屋面板和内部设备的安装。
作为进一步地优选,本发明所述跨度不小于50米,高度不小于30米。
本发明的有益效果:本发明一种大跨度网壳钢结构屋面的施工工艺适用于重量大、跨度大、现场制作安装、吊装的钢结构工程,加快了安装施工进度,安装精度高,提高测量的数字化和自动化程度;本发明施工工艺简单、操作方便快捷。
具体实施方式
实施例1
一种大跨度网壳钢结构屋面的施工工艺,包括以下步骤:
1、采用CFD数值风动计算技术得到网壳节点杆件的尺寸,跨度50米以上,高度30米,即每个节点的球头直径和其上安装的杆件的几何参数,绘出施工图纸。
2、按照计算结果安装节点和预埋件,节点安装顺序为先装上弦节点,后装下弦节点,在地面完成节点杆件的拼装,将预埋件按图纸位置和定位尺寸用定位模板进行埋设,测量复核,进行混凝土浇筑施工。
3、连接下弦杆、上弦杆和腹杆使其成为网壳单元,根据施工图纸定出五个施工段,每段施工段的轴向长度在10-13米之间,在地面上拼装网壳,并在网壳单元的一端固定安装可转动支座,另一端由汽吊吊起,在接近地面的位置上向外拼接节点杆件,向另一个支座方向延伸,完成相应的测量和调整,安装并焊接网壳尾部的支座,同时焊接固定网壳头部的支座,网壳安装结束。
网壳支座在施工过程中可以转动,但不可作任何方向的移动。
以网壳单元为基础,采用高空散装法,向外延伸安装整个网壳系统。
在地面上拼装网壳,并在网壳单元的一端固定安装可转动支座,用2根钢丝绳拉住已完成初始段网壳的支座节点及尾部节点,用汽吊机将网壳尾部吊至一定高度,具体高度根据网壳竖直方向的高度而定,增加节点杆件,用2根钢丝绳拉住新增网壳的头尾节点,拆除前2根钢丝绳,重新调整后2根钢丝绳的预应力,重复上面步骤,直至完成所有网壳的安装。
4、网壳安装结束后进行屋面板和内部设备的安装。

Claims (2)

1.一种大跨度网壳钢结构屋面的施工工艺,其特征在于,包括以下步骤:
(1)采用CFD数值风动计算技术得到网壳节点杆件的尺寸,即每个节点的球头直径和其上安装的杆件的几何参数,绘出施工图纸;
(2)按照计算结果安装节点和预埋件,节点安装顺序为先装上弦节点,后装下弦节点,在地面完成节点杆件的拼装,将预埋件按图纸位置和定位尺寸用定位模板进行埋设,测量复核,进行混凝土浇筑施工;
(3)连接下弦杆、上弦杆和腹杆使其成为网壳单元,根据施工图纸定出五个施工段,每段施工段的轴向长度在10-13米之间,在地面上拼装网壳,并在网壳单元的一端固定安装可转动支座,另一端由汽吊吊起,在接近地面的位置上向外拼接节点杆件,向另一个支座方向延伸,完成相应的测量和调整,安装并焊接网壳尾部的支座,同时焊接固定网壳头部的支座,网壳安装结束;
(4)网壳安装结束后进行屋面板和内部设备的安装。
2.根据权利要求1所述的一种大跨度网壳钢结构屋面的施工工艺,其特征在于,所述跨度不小于50米,高度不小于30米。
CN201510935189.8A 2015-12-15 2015-12-15 一种大跨度网壳钢结构屋面的施工工艺 Pending CN105442854A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510935189.8A CN105442854A (zh) 2015-12-15 2015-12-15 一种大跨度网壳钢结构屋面的施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510935189.8A CN105442854A (zh) 2015-12-15 2015-12-15 一种大跨度网壳钢结构屋面的施工工艺

Publications (1)

Publication Number Publication Date
CN105442854A true CN105442854A (zh) 2016-03-30

Family

ID=55553444

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510935189.8A Pending CN105442854A (zh) 2015-12-15 2015-12-15 一种大跨度网壳钢结构屋面的施工工艺

Country Status (1)

Country Link
CN (1) CN105442854A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106812236A (zh) * 2017-03-07 2017-06-09 新乡学院 一种大跨度网壳钢结构屋面的施工工艺

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2224875Y (zh) * 1994-12-15 1996-04-17 开封市华中空间结构有限公司 空间钢网架的球节点
FR2753468A1 (fr) * 1996-09-19 1998-03-20 Raison Stephane Maisons et batiments anti-ouragan prefabriques en usine ou sur chantier
CN101029530A (zh) * 2007-04-05 2007-09-05 崔文瀛 球网壳组合结构
CN101100876A (zh) * 2007-08-02 2008-01-09 中国建筑第七工程局 螺栓球节点的网壳网架悬挑高空散装施工方法
CN101988308A (zh) * 2010-09-30 2011-03-23 中国华西企业有限公司 大跨度空间螺栓球钢网壳穹顶无支撑安装工法
CN102337785A (zh) * 2011-08-19 2012-02-01 徐州中煤百甲重钢结构有限公司 超大跨度网架拱棚储料仓施工工艺
CN104831939A (zh) * 2015-05-22 2015-08-12 常州第一建筑集团有限公司 螺栓球焊接球混合节点大跨度悬挑空间网格结构施工方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2224875Y (zh) * 1994-12-15 1996-04-17 开封市华中空间结构有限公司 空间钢网架的球节点
FR2753468A1 (fr) * 1996-09-19 1998-03-20 Raison Stephane Maisons et batiments anti-ouragan prefabriques en usine ou sur chantier
CN101029530A (zh) * 2007-04-05 2007-09-05 崔文瀛 球网壳组合结构
CN101100876A (zh) * 2007-08-02 2008-01-09 中国建筑第七工程局 螺栓球节点的网壳网架悬挑高空散装施工方法
CN101988308A (zh) * 2010-09-30 2011-03-23 中国华西企业有限公司 大跨度空间螺栓球钢网壳穹顶无支撑安装工法
CN102337785A (zh) * 2011-08-19 2012-02-01 徐州中煤百甲重钢结构有限公司 超大跨度网架拱棚储料仓施工工艺
CN104831939A (zh) * 2015-05-22 2015-08-12 常州第一建筑集团有限公司 螺栓球焊接球混合节点大跨度悬挑空间网格结构施工方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106812236A (zh) * 2017-03-07 2017-06-09 新乡学院 一种大跨度网壳钢结构屋面的施工工艺

Similar Documents

Publication Publication Date Title
CN100591877C (zh) 超大跨度双层网架穹顶施工工艺
CN100545367C (zh) 螺栓球节点的网壳网架悬挑高空散装施工方法
CN102337785B (zh) 超大跨度网架拱棚储料仓施工工艺
CN106284668B (zh) 一种大跨度大空间钢结构屋面桁架安装方法
CN103615064A (zh) 一种索穹顶及其安装方法
CN101839068B (zh) 安装大跨度双层网壳结构的预应力方法
CN103866986B (zh) 大跨度变截面螺栓球节点网壳安装方法
CN102345393A (zh) 螺栓球网架高空散装工艺
CN103669885A (zh) 超大跨度钢桁架分段吊装工艺
CN207211775U (zh) 液压顶升装置及网架结构
CN101435224A (zh) 筒壳型螺栓球节点网架高空悬挑散装施工方法
CN104674665B (zh) 大空间钢结构连廊桥安装方法
CN103556836A (zh) 受限空间条件下球形网壳拼装施工方法
CN113123469A (zh) 复杂曲面造型屋面网架结构施设方法
CN103043543B (zh) 沿海区域塔吊加固装置
CN103276908A (zh) 一种用于组装钢网架筒壳结构干煤棚的施工方法
CN103711322A (zh) 一种悬挑安装大跨度半球形网壳的施工方法
CN111980165A (zh) 大跨度网架外扩拼装整体顶升施工方法
CN203626105U (zh) 一种索穹顶
CN105442854A (zh) 一种大跨度网壳钢结构屋面的施工工艺
CN102505864A (zh) 大体积三角形变截面管桁架结构胎架固定端拼装法
CN102953547B (zh) 蜂窝型网壳三角锥单元拼装方法
CN204435675U (zh) 一种格构式螺旋形柱结构
CN105442868A (zh) 一种可调式钢结构网壳拼装胎架
CN114961282A (zh) 一种带中筒柱的单层网壳结构飘带施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160330