CN105442842A - Construction method for plugging fair-faced concrete split bolt hole - Google Patents

Construction method for plugging fair-faced concrete split bolt hole Download PDF

Info

Publication number
CN105442842A
CN105442842A CN201510787027.4A CN201510787027A CN105442842A CN 105442842 A CN105442842 A CN 105442842A CN 201510787027 A CN201510787027 A CN 201510787027A CN 105442842 A CN105442842 A CN 105442842A
Authority
CN
China
Prior art keywords
fair
faced concrete
plug
split bolt
faced
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510787027.4A
Other languages
Chinese (zh)
Inventor
孟虹
李鼎文
陈建斌
胡连寿
赵莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GANSU 7TH CONSTRUCTION GROUP CO Ltd
Original Assignee
GANSU 7TH CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GANSU 7TH CONSTRUCTION GROUP CO Ltd filed Critical GANSU 7TH CONSTRUCTION GROUP CO Ltd
Priority to CN201510787027.4A priority Critical patent/CN105442842A/en
Publication of CN105442842A publication Critical patent/CN105442842A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/007Plugs to close openings in forms' surface

Abstract

The invention relates to a construction method for plugging a fair-faced concrete split bolt hole. The method includes the following steps that firstly, aluminum alloy profile plugs are machined, and the color of the surfaces of the aluminum alloy profile plugs is matched with that of a fair-faced concrete wall; secondly, aluminum alloy sleeves are filled with foam polyurethane adhesives; thirdly, the plugs are fixed to the fair-faced concrete wall face, after it is detected that leakage does not exist, a wallpaper cutter is used for scraping remaining sealant, after sealant is dried in the air, towels and soap liquid are adopted for thorough cleaning, and therefore the plugs in a row are consistent with the fair-faced concrete wall in overall impression. The construction method is simple in process and high in speed.

Description

A kind of fair-faced concrete split bolt eyelet plugging construction way
Technical field
The present invention relates to the technical field of construction of building engineering fair-faced concrete wall secondary plugging screw rod eyelet, particularly relate to a kind of fair-faced concrete split bolt eyelet plugging construction way.
Background technology
Urban planning exhibition hall, Lanzhou engineering exterior wall design is the thick fair-faced concrete containing striped skin texture and gravel skin texture in a large number of 200mm.Fair-faced concrete Screw arbor with nut at both-ends mainly mainly plays when reinforcing template and controls wall section size, prevent from building the effect of mould of rising, but screw rod eyelet can be unfavorable to body of wall energy-saving heat preserving after the shaping form removal of body of wall, easily form " cold bridge " effect, need to carry out the shutoff of secondary eyelet.Conventional shutoff is all generally manually utilize thermal insulation mortar that hole plug is real, the mainly end out-of-flatness of its defect, and aberration is difficult to process, and perception effect is difficult to ensure.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of technique simple, fireballing fair-faced concrete split bolt eyelet plugging construction way.
For solving the problem, a kind of fair-faced concrete split bolt eyelet plugging construction way of the present invention, comprises the following steps:
(1) machining aluminium alloy extrusions plug:
According to the design concept of architect, effect and corresponding construction drawing, customization fair-faced concrete split bolt eyelet plug, this plug is stamped to form by aluminium alloys cover plate and aluminium alloy sleeve barrel, and the color of its surface color and fair-faced concrete wall is matched;
(2) filling-foam polyurethane adhesive in described aluminium alloy sleeve barrel;
(3) fix described plug at fair-faced metope:
The Screw arbor with nut at both-ends reserved by the former dry wall near the eyes dust lime-ash on limit is examined to wash and is cleaned out, and after filling screw rod intraocular part with polyurathamc glue, the outside of described aluminium alloy sleeve barrel by carrying out Seal treatment between fluid sealant and concrete, makes described plug be fixed on fair-faced metope by employing manual mode; Utilize wallpaper cutter to scrape totally by the described fluid sealant of remnants after testing after leakproof in time, after described fluid sealant is air-dry, adopts towel soap lye to clean up, make the overall perception of plug in a row and dry wall harmonious.
Described step (1) in the thickness of aluminium alloys cover plate be 2mm, diameter is 300mm.
Described step (1) in the wall thickness of aluminium alloy sleeve barrel be 2mm, diameter is 200mm, and length is 200mm.
Described step (3) middle fluid sealant refers to weather-proof waterproof gasket cement.
The present invention compared with prior art has the following advantages:
1, in the present invention, plug is stamped to form by aluminium alloys cover plate and aluminium alloy sleeve barrel, has long-term non-corrosive, temperature deformation is little, external surface easily adjusts tone feature.
2, the present invention's filling-foam polyurethane adhesive in aluminium alloy sleeve barrel, can avoid the split bolt eyelet of dry concrete wall to form little air channel, meanwhile, utilizes polyurathamc glue to carry out shutoff and can play heat preservation energy-saving effect.
3, present invention process is simple, with low cost, and speed is fast, quality and artistic perception effect good, be successfully applied to urban planning exhibition hall, Lanzhou engineering.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is described in further detail.
Fig. 1 is schematic diagram of the present invention.
In figure: 1-aluminium alloys cover plate, 2-aluminium alloy sleeve barrel.
Detailed description of the invention
A kind of fair-faced concrete split bolt eyelet plugging construction way, comprises the following steps:
(1) machining aluminium alloy extrusions plug:
According to the design concept of architect, effect and corresponding construction drawing, professional aluminium alloys producer is entrusted to customize fair-faced concrete split bolt eyelet plug, this plug is stamped to form (as shown in Figure 1) by aluminium alloys cover plate 1 and aluminium alloy sleeve barrel 2, and the color of its surface color and fair-faced concrete wall is matched.
Wherein: the thickness of aluminium alloys cover plate 1 is 2mm, and diameter is 300mm.The wall thickness of aluminium alloy sleeve barrel 2 is 2mm, and diameter is 200mm, and length is 200mm.
(2) filling-foam polyurethane adhesive in aluminium alloy sleeve barrel 2.
(3) fix plug at fair-faced metope:
The Screw arbor with nut at both-ends reserved by the former dry wall near the eyes dust lime-ash on limit is examined to wash and is cleaned out, and after filling screw rod intraocular part with polyurathamc glue, the outside of aluminium alloy sleeve barrel 2 by carrying out Seal treatment between fluid sealant and concrete, makes plug be fixed on fair-faced metope by employing manual mode; Utilize wallpaper cutter to scrape totally by the fluid sealant of remnants after testing after leakproof in time, the air-dry rear employing towel soap lye of glue to be sealed cleans up, and makes the overall perception of plug in a row and dry wall harmonious.
Wherein: fluid sealant refers to weather-proof waterproof gasket cement.

Claims (4)

1. a fair-faced concrete split bolt eyelet plugging construction way, comprises the following steps:
(1) machining aluminium alloy extrusions plug:
According to the design concept of architect, effect and corresponding construction drawing, customization fair-faced concrete split bolt eyelet plug, this plug is stamped to form by aluminium alloys cover plate (1) and aluminium alloy sleeve barrel (2), and the color of its surface color and fair-faced concrete wall is matched;
(2) filling-foam polyurethane adhesive in described aluminium alloy sleeve barrel (2);
(3) fix described plug at fair-faced metope:
The Screw arbor with nut at both-ends reserved by the former dry wall near the eyes dust lime-ash on limit is examined to wash and is cleaned out, and after filling screw rod intraocular part with polyurathamc glue, the outside of described aluminium alloy sleeve barrel (2) by carrying out Seal treatment between fluid sealant and concrete, makes described plug be fixed on fair-faced metope by employing manual mode; Utilize wallpaper cutter to scrape totally by the described fluid sealant of remnants after testing after leakproof in time, after described fluid sealant is air-dry, adopts towel soap lye to clean up, make the overall perception of plug in a row and dry wall harmonious.
2. a kind of fair-faced concrete split bolt eyelet plugging construction way as claimed in claim 1, is characterized in that: described step (1) in the thickness of aluminium alloys cover plate (1) be 2mm, diameter is 300mm.
3. a kind of fair-faced concrete split bolt eyelet plugging construction way as claimed in claim 1, is characterized in that: described step (1) in the wall thickness of aluminium alloy sleeve barrel (2) be 2mm, diameter is 200mm, and length is 200mm.
4. a kind of fair-faced concrete split bolt eyelet plugging construction way as claimed in claim 1, is characterized in that: described step (3) middle fluid sealant refers to weather-proof waterproof gasket cement.
CN201510787027.4A 2015-11-17 2015-11-17 Construction method for plugging fair-faced concrete split bolt hole Pending CN105442842A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510787027.4A CN105442842A (en) 2015-11-17 2015-11-17 Construction method for plugging fair-faced concrete split bolt hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510787027.4A CN105442842A (en) 2015-11-17 2015-11-17 Construction method for plugging fair-faced concrete split bolt hole

Publications (1)

Publication Number Publication Date
CN105442842A true CN105442842A (en) 2016-03-30

Family

ID=55553432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510787027.4A Pending CN105442842A (en) 2015-11-17 2015-11-17 Construction method for plugging fair-faced concrete split bolt hole

Country Status (1)

Country Link
CN (1) CN105442842A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759283A (en) * 2017-01-13 2017-05-31 山东大学 A kind of ECC die trials and its application method
CN107100377A (en) * 2017-06-02 2017-08-29 中建八局第三建设有限公司 The bolt hole closure fix tool and plugging repair method of a kind of clear-water concrete
CN113370358A (en) * 2020-12-28 2021-09-10 北京益汇达清水建筑工程有限公司 Production method of bare concrete screw hole prefabricated plug

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2042093U (en) * 1987-11-11 1989-08-02 旭电化工业株式会社 Filling tool of vestigial joint hole on concrete wall
JPH0972091A (en) * 1995-09-01 1997-03-18 Marumatsu Seito Kk Decoration piece for separator bolt hole in concrete surface
CN201058472Y (en) * 2007-06-20 2008-05-14 深圳市明远氟涂料有限公司 Forming tool for opposite drawing bolt points
CN202730971U (en) * 2012-08-07 2013-02-13 中国建筑第八工程局有限公司 Decorating and blocking device for split bolt hole of fair-faced concrete wall surface
CN203334440U (en) * 2013-06-27 2013-12-11 中国建筑第四工程局有限公司 Structure for plugging threaded rod hole with corks
CN103711205A (en) * 2014-01-13 2014-04-09 任斌向 Waterproof wall split bolt hole plugging structure and construction method thereof
CN203546919U (en) * 2013-09-24 2014-04-16 宝鸡市第一建筑工程有限责任公司 Split bolt hole structure for filling concrete shear wall

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2042093U (en) * 1987-11-11 1989-08-02 旭电化工业株式会社 Filling tool of vestigial joint hole on concrete wall
JPH0972091A (en) * 1995-09-01 1997-03-18 Marumatsu Seito Kk Decoration piece for separator bolt hole in concrete surface
CN201058472Y (en) * 2007-06-20 2008-05-14 深圳市明远氟涂料有限公司 Forming tool for opposite drawing bolt points
CN202730971U (en) * 2012-08-07 2013-02-13 中国建筑第八工程局有限公司 Decorating and blocking device for split bolt hole of fair-faced concrete wall surface
CN203334440U (en) * 2013-06-27 2013-12-11 中国建筑第四工程局有限公司 Structure for plugging threaded rod hole with corks
CN203546919U (en) * 2013-09-24 2014-04-16 宝鸡市第一建筑工程有限责任公司 Split bolt hole structure for filling concrete shear wall
CN103711205A (en) * 2014-01-13 2014-04-09 任斌向 Waterproof wall split bolt hole plugging structure and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759283A (en) * 2017-01-13 2017-05-31 山东大学 A kind of ECC die trials and its application method
CN107100377A (en) * 2017-06-02 2017-08-29 中建八局第三建设有限公司 The bolt hole closure fix tool and plugging repair method of a kind of clear-water concrete
CN113370358A (en) * 2020-12-28 2021-09-10 北京益汇达清水建筑工程有限公司 Production method of bare concrete screw hole prefabricated plug

Similar Documents

Publication Publication Date Title
CN105442842A (en) Construction method for plugging fair-faced concrete split bolt hole
CN103711205A (en) Waterproof wall split bolt hole plugging structure and construction method thereof
CN202559540U (en) Waterproof plugging structure for outer wall split bolt hole
CN103790382A (en) Rapid blocking method and structure of external wall screw hole of concrete structure
CN203783173U (en) Mold-proof structure for wall surface repair construction
CN105840047A (en) Insulation mortar exterior wall external window leakage water control construction method
CN103306383A (en) Infiltration prevention method for bolt hole in outer wall of reinforced concrete shear wall
CN203684414U (en) Rapid blocking structure of screw hole of concrete structure outer wall
CN204533842U (en) A kind of building layer through pipe leakage proof structure
CN108533125B (en) A kind of installation method of energy conservation auxiliary frame antiseep
CN112502463A (en) Outer wall screw rod plugging structure and construction method thereof
CN205955513U (en) Waterproof construction at windowsill position
CN203334440U (en) Structure for plugging threaded rod hole with corks
CN205153571U (en) Outer wall bolt hole novel to drawing block structure
CN113775197A (en) Construction method for plugging and preventing leakage of concrete outer wall through-wall bolt hole
CN211622710U (en) Manual mortar packer used in building and finishing engineering
CN204283090U (en) Construction window waterproof sealing structure
CN206957461U (en) Aluminium alloy door's window hole one-step shaping system
CN204238368U (en) Pre-fix plate body system wall insulation system
CN209539044U (en) Closing-in structure outside a kind of exterior window room
CN208009894U (en) A kind of wall crack Sealing formboard
CN208518290U (en) A kind of corner edger
CN210483050U (en) Concrete bolt sleeve
CN201722866U (en) Integral board for veneer side fixing, heat insulating and decoration
CN216616715U (en) Tool for decorating wall screw hole

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhu Tongran

Inventor after: Li Dingwen

Inventor after: Hu Lianshou

Inventor after: Chen Zhidong

Inventor after: Zhao Li

Inventor before: Meng Hong

Inventor before: Li Dingwen

Inventor before: Chen Jianbin

Inventor before: Hu Lianshou

Inventor before: Zhao Li

COR Change of bibliographic data
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160330