CN105442817B - A kind of liftable laser positioning high spatial suspension rod punching erecting device and construction method - Google Patents

A kind of liftable laser positioning high spatial suspension rod punching erecting device and construction method Download PDF

Info

Publication number
CN105442817B
CN105442817B CN201610050451.5A CN201610050451A CN105442817B CN 105442817 B CN105442817 B CN 105442817B CN 201610050451 A CN201610050451 A CN 201610050451A CN 105442817 B CN105442817 B CN 105442817B
Authority
CN
China
Prior art keywords
suspension rod
elevating lever
impact drill
vertical duct
shaped connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610050451.5A
Other languages
Chinese (zh)
Other versions
CN105442817A (en
Inventor
陈鹏
陈伟
邱梁武
余志良
阮敏敏
纪晓鹏
文辉
赵广
吴喜元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Onstruction Lighting Co ltd
China Construction Shenzhen Decoration Co Ltd
Original Assignee
China Construction Third Bureau Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Bureau Decoration Co Ltd filed Critical China Construction Third Bureau Decoration Co Ltd
Priority to CN201610050451.5A priority Critical patent/CN105442817B/en
Publication of CN105442817A publication Critical patent/CN105442817A/en
Application granted granted Critical
Publication of CN105442817B publication Critical patent/CN105442817B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25DPERCUSSIVE TOOLS
    • B25D17/00Details of, or accessories for, portable power-driven percussive tools
    • B25D17/28Supports; Devices for holding power-driven percussive tools in working position

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

A kind of liftable laser positioning high spatial suspension rod punching erecting device and construction method, described device includes double ladder, the vertical lowering or hoisting gear being connected on double ladder and the impact drill being connected at the top of lowering or hoisting gear, the impact drill switch of the impact drill is connected on double ladder, hand-operating device is connected between the lowering or hoisting gear and double ladder, suspension rod lowering or hoisting gear and hanger rod mounting device are also associated between the lowering or hoisting gear and double ladder.The present invention realizes punching, suspension rod transport, the purpose of hanger erection integration so that smallpox punching, hanger erection are settled at one go, further to improve smallpox punching, hanger erection efficiency, saves artificial, and operation is more convenient.It can be widely applied to suspension rod punching installation.

Description

A kind of liftable laser positioning high spatial suspension rod punching erecting device and construction method
Technical field
The present invention relates to indoor decoration construction field, particularly a kind of suspension rod punching erecting device and its construction party Method.
Background technology
At present, a kind of liftable laser positioning line traffic control is automatically positioned perforating device, the device collection laser positioning, smallpox are beaten Hole, hanger erection are integrated, solve smallpox punching, hanger erection traditional-handwork mode efficiencies it is low, the problems such as cost is big, but It is that the device still has some shortcomings, the laser orientation system of original equipment is on puncher fuselage, with puncher together It is mobile, because equipment trembles in moving process in itself, certain influence can be produced for the precision and speed of laser positioning; In addition, original hanger erection system is mounted in the impact drill top after punching, although operation is easy, without suspension rod itself Transport channel, so suspension rod is needed independent to consider by the transport transmission link of placement location to installation site, in addition it is also necessary in addition Operated.
The content of the invention
It is an object of the invention to provide a kind of liftable laser positioning high spatial suspension rod punching erecting device and construction method, Solve the technical problem for facilitating suspension rod transmission to install;And solve to realize the problem of suspension rod punching, installation integration.
To achieve the above object, the present invention is adopted the following technical scheme that:
A kind of liftable laser positioning high spatial suspension rod punches erecting device, including double ladder, is vertically connected to double ladder On lowering or hoisting gear and the impact drill that is connected at the top of lowering or hoisting gear, the impact drill switch of the impact drill is connected to double ladder On, hand-operating device is connected between the lowering or hoisting gear and double ladder, is also connected between the lowering or hoisting gear and double ladder There are suspension rod lowering or hoisting gear and hanger rod mounting device.
The double ladder is connected and composed by two single straight ladders, and the upper ends of two single straight ladders is hinged by hinge, lower end connection There is mobile universal wheel.
The mobile universal wheel is provided with fixing lock.
The lowering or hoisting gear includes main elevating lever, the secondary elevating lever being socketed in main elevating lever, is connected on secondary elevating lever The impact drill group frame at end, the impact drill collet being connected on impact drill group frame, be connected to impact drill collet upper end impact drill consolidate The fixed impact drill limiter for covering and being connected to impact drill collet side;The impact drill collet is by angle steel and semicircle steel-pipe welding ;Impact drill limiter is round bar, is welded on impact drill collet, for keyhole depth;Impact drill fixed cover is used In connection impact drill collet and impact drill.
The top of the main elevating lever is connected to the middle part that the top of double ladder, middle part are connected to control stick connects bearing, The main elevating lever is square tube or pipe.
The side of the main elevating lever is provided with a narrow slot and a sipes to end downwards by middle part or top.
The narrow slot and sipes are parallel to each other and positioned at the offside of main elevating lever, realize secondary elevating lever in main elevating lever Internal oscilaltion and the connection with steel wire rope, hanger rod mounting device and suspension rod lowering or hoisting gear.
The impact drill group frame includes horizon bar, L shaped plate and the triangle floor being connected between horizon bar and L shaped plate, The horizon bar is connected laterally at the bottom of impact drill collet, and a limb of the L shaped plate is bolted under horizon bar Surface, another limb are bolted the upper side in secondary elevating lever.
The horizon bar is and secondary elevating lever identical aluminium alloy extrusions that cross sectional shape is identical, and required length is different .
The hand-operating device includes manual joystick spacer pin, control stick connects bearing, steel wire rope, wire rope rotating Groove, fixed pulley, steel wire rope connecting plate, Manual operation handle and action bars.
The control stick connects bearing is fixed in the middle part of two single straight ladders of double ladder on corresponding pedal.
The action bars is connected in control stick connects bearing, one end is connected with Manual operation handle.
The manual joystick spacer pin is parallel to action bars pin joint in control stick connects bearing.
The fixed pulley is connected to the upper end that narrow slot side is provided with main elevating lever.
The narrow slot of the steel wire rope connecting plate through main elevating lever is connected to the bottom of secondary elevating lever;The steel wire rope connects Fishplate bar is slidably connected with main elevating lever, connecting hole is provided with steel wire rope connecting plate, for connecting steel wire ropes.
The wire rope rotating groove is connected on action bars, the lower section of steel wire rope connecting plate.
The wire rope rotating groove and action bars are coaxial, and action bars drives the wire rope rotating groove to rotate, put when rotating Pine tightens up steel wire rope.
One end of the steel wire rope is connected on steel wire rope connecting plate, the other end is wrapped in wire rope rotating through fixed pulley On groove.
The hanger rod mounting device includes vertical duct and is connected to the installation handle of vertical duct lower end, the vertical duct The upper/lower terminal in road is connected by conduit coupling with secondary elevating lever, and the conduit coupling of wherein upper end is connected to secondary lifting The upper end of bar, the sipes of conduit coupling through the main elevating lever of lower end is connected to the bottom of secondary elevating lever;The pipe of lower end Pipe connecting is flexibly connected with main elevating lever.
The conduit coupling includes the first U-shaped connector, relative the second U-shaped for being plugged on the first U-shaped connector front end Connector and the backing plate being connected between the first U-shaped connector rear end and secondary elevating lever;The medial surface of the second U-shaped connector For the arcwall face agreed with vertical duct outline;First U-shaped connector and the second U-shaped connector are bolted, the first U The side plate front end of shape connector and the second U-shaped connector corresponds to the through hole being provided with through bolt, the first U-shaped connector and second The side plate of U-shaped connector homonymy is bolted, and the backing plate is connected by bolt with secondary elevating lever, be provided with backing plate through The through hole of bolt.
The width of the openend of the second U-shaped connector is less than the diameter of vertical duct, and vertical duct is limited in into the In the deep-slotted chip breaker of two U-shaped connectors.
The suspension rod lowering or hoisting gear includes being connected to the upper roller installing plate on secondary elevating lever top, is connected to upper roller installation Suspension rod on plate lifts upper roller, the bottom roller installing plate of secondary elevating lever bottom is connected to through main elevating lever sipes, is connected Suspension rod on bottom roller installing plate lifts bottom roller, the suspension rod lifting handle being connected with suspension rod lifting bottom roller, is connected to and hangs Bar lifts the suspension rod feed belt between upper roller and suspension rod lifting bottom roller and the magnet being connected on suspension rod feed belt And cushion block;Wherein bottom roller installing plate is flexibly connected with main elevating lever.
The magnet and cushion block have multiple and uniform intervals to be distributed, it is ensured that suspension rod flowing water is transmitted, and the magnet pasting is in hanging On bar feed belt, the cushion block back side is connected on magnet, and the front of the cushion block is the arc agreed with vertical duct outer wall Shape concave surface.
The suspension rod feed belt is parallel to vertical duct and upper and lower ends respectively by the biside plate of the first U-shaped connector Between pass through.
The vertical duct is connected by suspension rod spider with suspension rod, and the upper port of the suspension rod spider is and on suspension rod outer six The interior hexagonal slotted eye that angle nut agrees with, the hole depth of the interior hexagonal slotted eye is less than the height of outer-hexagonal nut.
The vertical duct is tube and pipe of aluminium alloy, and suspension rod spider is socketed in vertical duct and both gaps coordinate, suspension rod There are the groove and projection of mutual cooperation on the outer wall of spider and the inwall of vertical duct, the suspension rod spider is with magnet by attracting Power is connected.
The stopper slot of ring, conduit coupling are being provided with conduit coupling link position on the outer wall of the vertical duct The end of the bolt of the first U-shaped connector of middle connection and the second U-shaped connector is stuck in stopper slot, and limitation vertical duct can not phase For conduit coupling it is vertically movable but can in the horizontal direction circumference rotate.
The manual joystick limiter, control stick connects bearing, wire rope rotating groove, Manual operation handle, main lifting Bar, impact drill collet and impact drill limiter are made by steel.
The steel wire rope connecting plate, impact drill group frame, secondary elevating lever, vertical duct, install handle, suspension rod lifting handle, Suspension rod lifting roller, roller installing plate and suspension rod spider are made by aluminium alloy.
A kind of construction party of the punching construction of liftable laser positioning high spatial suspension rod punching erecting device described in application Method, is comprised the following steps that:
Step one, the point position determined according to early stage surveying setting-out, mobile double ladder to puncture site, by mobile universal wheel lock It is good.
Step 2, operates hand-operating device, and secondary elevating lever is lifted or dropped by steel wire rope by rotation manual operation handle Correct position is as little as punched, manual joystick spacer pin is extracted manual joystick handle is spacing.
Step 3: starting impact drill switch, manual joystick spacer pin is withdrawn, rotation manual joystick lever drills, when When impact drill limiter touches floor, drilling terminates.
Step 4, the mobile universal wheel of unblock, repeat step one is to step 3, until all punching construction is completed.
What a kind of hanger erection of the liftable laser positioning high spatial suspension rod punching erecting device described in application was constructed applies Work method, is comprised the following steps that:
Step one, double ladder is moved to hanger erection position, and locks mobile universal wheel.
Step 2, operates hand-operating device, and secondary elevating lever is lifted or dropped by steel wire rope by rotation manual operation handle The correct position of suspension rod is as little as installed, manual joystick spacer pin is extracted manual joystick handle is spacing.
Step 3, operates suspension rod lowering or hoisting gear, rotates suspension rod lifting handle, makes one be connected on suspension rod feed belt Magnet is close to the bottom of vertical duct.
Step 4, suspension rod is placed in suspension rod spider and loads it from the bottom of vertical duct, mobile suspension rod spider At position to magnet.
Step 5, rotates suspension rod lifting handle, suspension rod rises to the top of vertical duct under the drive of suspension rod feed belt Portion, reaches installation of ceiling position.
Suspension rod, is rotatablely installed onto furred ceiling by step 6, left and right horizontal direction rotational installation handle by vertical duct.
After the completion of step 7, hanger erection, manual joystick spacer pin is withdrawn, rotation manual operation handle makes secondary lifting Bar drops to suspension rod and departs from vertical duct.
Step 8, rotates suspension rod lifting handle, now, and suspension rod spider departs from suspension rod with magnet together by suspension rod feed belt It is sent to the bottom of vertical duct.
Compared with prior art the invention has the characteristics that and beneficial effect:
Instant invention overcomes the low shortcoming of traditional perforating device hanger erection efficiency, solve facilitate suspension rod transmission install, Improve efficiency of construction, save artificial technical problem.
The present invention is to be improved, innovated on the basis of existing, improves the defect of existing apparatus, compensate for existing apparatus Deficiency, exploitation devise new structure, realize the integrated purpose of punching, suspension rod transport, hanger erection so that smallpox is beaten Hole, hanger erection are settled at one go, further improve smallpox punching, hanger erection efficiency, save artificial, and operate more just It is prompt.
The present invention is mainly improved optimization in following several respects:
1st, the punching of optimization smallpox, hanger erection integral structure:Original hanger rod mounting device is placed in smallpox perforating device Top, connection and the hanger erection realized with hanger rod mounting device are bored by hole percussive.Though the method can effectively realize installation Suspension rod, but suspension rod is sent to the independent consideration of installation position needs, and device is in itself without this function.It is of the invention then by hanger erection system System is effectively combined together with smallpox drilling system by secondary elevating lever, it is spatially turned into 2 systems arranged side by side.
2nd, suspension rod transmission system:The transmission system of suspension rod is added in hanger erection system, it is not necessary to individually consider to hang again Bar transmission problem, is greatly improved the installation effectiveness of suspension rod, has saved artificial.
Invention removes original laser orientation system, original hanger erection system is improved, suspension rod transport is added logical Road, its advantage is as follows:
(1)Perforating efficiency is improved, single Workforce Operations inefficiency is solved, production scale etc. can not be formed asks Topic.
(2)Mechanical semi-automatic operation is upgraded to by traditional manual hand manipulation, puncturing rate is lifted at double, according to daily 8 hours work Time Calculations, traditional hole knockout punches 200~300, present invention punching 600~800 daily daily per capita It is individual.
(3)Due to being mechanically actuated, accurately, drilling depth is consistent, accurate, and error is few, is conducive to the later stage to hang for punch position Bar is installed.
(4)Traditional punching apparatus is heavy, expends people's muscle power, and portable construction of the present invention is easily operated, mechanization punching, Only artificially it need to move and switch, and hanger rod mounting device is supported the use, and further increases the efficiency of hanger erection, province Shi Shengli, efficiency of construction is high.
(5)Whole device is installed, dismounting is easy, easily stores storage, will not excessive space-consuming.
(6)Mechanized operation, safer, safety coefficient of constructing is high.
(7)Cost is low, and material therefor is job site common used material, such as square steel tube, angle steel, round steel pipe, bolt, impact Bore etc., the aluminium alloy extrusions of hanger erection system is conventional general section bar, is gathered materials on the spot;The assembling of all components is adopted With welding and bolt connection, all workmens in job site are operable, can be saved in artificial, material, equipment use About cost.
(8)Realize punching, hanger erection, suspension rod and transmit the purpose that is combined with integration of three functions, solve suspension rod biography Send problem, it is not necessary to individually consider suspension rod again the problem of be sent to construction part, optimize working procedure, improve efficiency of construction, Cost of labor is saved.
(10)The ground for realizing suspension rod is installed, and hanger erection height is high, and space peace 8~10 meters high can be achieved Dress, saves the measure schemes such as scaffold OR gate subrack, cost-effective.
It the composite can be widely applied to suspension rod punching installation.
Brief description of the drawings
The present invention will be further described in detail below in conjunction with the accompanying drawings.
Fig. 1 is the structural representation of the present invention.
Fig. 2 is Fig. 1 right side structural representation.
Fig. 3 is Fig. 1 left view structural representation.
Fig. 4 is Fig. 1 overlooking the structure diagram.
Fig. 5 is the structural representation of impact drill of the present invention.
Fig. 6 is the side structure schematic view of impact drill of the present invention.
Fig. 7 is the main structure diagram of connector of the present invention.
Fig. 8 is the overlooking the structure diagram of connector of the present invention.
Fig. 9 is the side structure schematic view of connector of the present invention.
Figure 10 is the main structure diagram of magnet cushion block of the present invention.
Figure 11 is the overlooking the structure diagram of magnet cushion block of the present invention.
Figure 12 is the side structure schematic view of magnet cushion block of the present invention.
Reference:1- double ladders, 1.1- movements universal wheel, 2- hand-operating devices, 2.1- manual joysticks are spacing Pin, the connection of 2.2- control sticks connects bearing, 2.3- steel wire ropes, 2.4- wire rope rotatings groove, 2.5- fixed pulleys, 2.6- steel wire ropes The secondary elevating lever of plate, 2.7- Manual operation handles, 2.8- action bars, 3- lowering or hoisting gears, 3.1-, 3.2- impact drill groups frame, 3.3- master Elevating lever, 3.4- impact drills collet, 3.5- impact drills fixed cover, 3.6- impact drills limiter, 4- hanger rod mounting devices, 4.1- Vertical duct, 4.2- install handle, 4.3- conduit couplings, the first U-shapeds of 4.3.1- connector, the second U-shapeds of 4.3.2- connector, 4.3.3- backing plate, 5- suspension rods lowering or hoisting gear, 5.1- suspension rods lift roller, 5.2- suspension rods feed belt, 5.3- magnet, 5.4- pads Block, 5.5- rollers installing plate, 5.6- suspension rods lifting handle, 5.7- suspension rods lifting bottom roller, 5.8- bottom rollers installing plate, 6- are hung Bar, 7- impact drills, 8- impact drills switch, 9- suspension rod spiders.
Embodiment
Embodiment is shown in Figure 1, and this liftable laser positioning high spatial suspension rod punches erecting device, including double ladder 1st, the vertical lowering or hoisting gear 3 being connected on double ladder and the impact drill 7 being connected at the top of lowering or hoisting gear, the impact drill 7 are rushed Hit brill switch 8 to be connected on double ladder, hand-operating device 2, the liter are connected between the lowering or hoisting gear 3 and double ladder 1 Suspension rod lowering or hoisting gear 5 and hanger rod mounting device 4 are also associated between falling unit 3 and double ladder 1.
Referring to shown in Fig. 1, Fig. 4, the double ladder is connected and composed by two single straight ladders, and the upper end of two single straight ladders is by closing Page is hinged, lower end is connected with mobile universal wheel 1.1, and the mobile universal wheel is provided with fixing lock.
Referring to shown in Fig. 2, Fig. 3, the lowering or hoisting gear 3 includes main elevating lever 3.3, the pair being socketed in main elevating lever 3.3 Elevating lever 3.1, the impact drill group frame 3.2 for being connected to the secondary upper end of elevating lever 3.1, the impact drill being connected on impact drill group frame 3.2 Collet 3.4, the impact drill fixed cover 3.5 for being connected to the upper end of impact drill collet 3.4 and it is connected to rushing for the side of impact drill collet 3.4 Hit brill limiter 3.6;The top of the main elevating lever is connected to the top of double ladder, middle part and is connected to control stick connects bearing Middle part, the main elevating lever is square tube;The main elevating lever to side by middle part is provided with a narrow slot and one to end downwards Bar sipes, the narrow slot and sipes are parallel to each other, and realize oscilaltion and and steel wire of the secondary elevating lever inside main elevating lever The connection of rope, hanger rod mounting device and suspension rod lowering or hoisting gear.
Referring to shown in Fig. 5, Fig. 6, the impact drill collet is welded by angle steel and semicircle steel pipe;Impact drill is spacing Device is round bar, is welded on impact drill collet, for keyhole depth;Impact drill fixed cover be used for connect impact drill collet and Impact drill.
Referring to shown in Fig. 5, Fig. 6, the impact drill group frame include horizon bar, L shaped plate and be connected to horizon bar and L shaped plate it Between triangle floor, the horizon bar is connected laterally at the bottom of impact drill collet, and a limb of the L shaped plate is connected by bolt It is connected on the lower surface of horizon bar, another limb and is bolted upper side in secondary elevating lever;The horizon bar is and pair rises Bar identical aluminium alloy extrusions drops, cross sectional shape is identical, required length is different, if according to traditional structure, typically Formed using zinc-plated ironware Site Welding, installation deviation rate can be larger, it is not high with the impact drill goodness of fit, and use impact drill group frame If, because impact drill group frame is standard Al-alloy parts, specification matches with impact drill, and the goodness of fit is high, installs more firm.
Referring to shown in Fig. 2, Fig. 3, Fig. 4, the hand-operating device 2 includes manual joystick spacer pin 2.1, control stick and connected Connect bearing 2.2, steel wire rope 2.3, wire rope rotating groove 2.4, fixed pulley 2.5, steel wire rope connecting plate 2.6, Manual operation handle 2.7 With action bars 2.8.
Shown in Figure 4, the control stick connects bearing 2.2 is fixed on corresponding pedal in the middle part of two single straight ladders of double ladder On;The action bars 2.8 is connected in control stick connects bearing 2.2, one end is connected with Manual operation handle 2.7;It is described Manual joystick spacer pin 2.1 is parallel to the pin joint of action bars 2.8 in control stick connects bearing 2.2.
Referring to shown in Fig. 2, Fig. 3, the fixed pulley 2.5 is connected to the upper end that narrow slot side is provided with main elevating lever 3.3; The narrow slot of the steel wire rope connecting plate 2.6 through main elevating lever 3.3 is connected to the bottom of secondary elevating lever 3.1;The steel wire rope Connecting plate is slidably connected with main elevating lever, connecting hole is provided with steel wire rope connecting plate, for connecting steel wire ropes;The steel wire rope rotation Turn trough 2.4 is connected on action bars 2.8, the lower section of steel wire rope connecting plate 2.6;One end of the steel wire rope 2.3 is connected to steel wire Restrict on connecting plate 2.6, the other end is wrapped on wire rope rotating groove 2.4 through fixed pulley.
Referring to shown in Fig. 2, Fig. 3, the hanger rod mounting device 4 includes vertical duct 4.1 and is connected to vertical duct lower end Installation handle 4.2, the upper/lower terminal of the vertical duct 4.1 is connected by conduit coupling 4.3 with secondary elevating lever 3.1, The conduit coupling 4.3 of wherein upper end is connected to the upper end of secondary elevating lever 3.1, and the conduit coupling 4.3 of lower end passes through main liter The sipes of drop bar 3.3 is connected to the bottom of secondary elevating lever 3.1;The conduit coupling of lower end is flexibly connected with main elevating lever.
Referring to shown in Fig. 7, Fig. 8, Fig. 9, the conduit coupling 4.3 includes the first U-shaped connector 4.3.1, is docked at the Second U-shaped connector 4.3.2 of one U-shaped connector 4.3.1 front ends and it is connected to the first U-shaped connector 4.3.1 rear ends and is risen with secondary Backing plate 4.3.3 between bar 3.1 drops;The medial surface of the second U-shaped connector 4.3.2 is the arc agreed with vertical duct 4.1 Shape face;First U-shaped connector and the second U-shaped connector are bolted, the first U-shaped connector and the second U-shaped connector The side plate of the corresponding through hole being provided with through bolt in side plate front end, the first U-shaped connector and the second U-shaped connector homonymy passes through spiral shell Tether and connect, the backing plate is connected by bolt with secondary elevating lever, and the through hole through bolt is provided with backing plate;Second U-shaped connects The width of the openend of fitting is less than in the diameter of vertical duct, the deep-slotted chip breaker that vertical duct is limited in the second U-shaped connector.
The stopper slot of ring, conduit coupling are being provided with conduit coupling link position on the outer wall of the vertical duct The end of the bolt of the first U-shaped connector of middle connection and the second U-shaped connector is stuck in stopper slot, and limitation vertical duct can not phase For conduit coupling it is vertically movable but can in the horizontal direction circumference rotate.
Referring to shown in Fig. 2, Fig. 3, the suspension rod lowering or hoisting gear 5 includes the upper roller installing plate for being connected to secondary elevating lever top 5.5th, the suspension rod being connected on upper roller installing plate 5.5 lifts upper roller 5.1, is connected to secondary elevating lever through main elevating lever sipes The bottom roller installing plate 5.8 of bottom, the suspension rod being connected on bottom roller installing plate 5.8 lifting bottom roller 5.7 and suspension rod are lifted Bottom roller 5.7 connect suspension rod lifting handle 5.6, be connected to suspension rod lifting upper roller 5.1 and suspension rod lifting bottom roller 5.7 between Suspension rod feed belt 5.2 and uniform intervals be connected to magnet 5.3 and cushion block 5.4 on suspension rod feed belt 5.2;Under wherein Roller installing plate is flexibly connected with main elevating lever.
Referring to shown in Figure 10, Figure 11, Figure 12, the magnet and cushion block have multiple and uniform intervals to be distributed, it is ensured that suspension rod stream Water is transmitted, and the magnet pasting is on suspension rod feed belt, and the cushion block back side is connected on magnet, and the front of the cushion block is The arc-shaped concave agreed with vertical duct outer wall, with the motion of suspension rod feed belt, magnet and cushion block can be along vertical ducts The outer wall movement in road 4.1.
The suspension rod feed belt 5.2 is parallel to vertical duct 4.1 and upper and lower ends respectively by the first U-shaped connector 4.3.1 passed through between biside plate.
Connected between the suspension rod 6 and vertical duct 4.1 by suspension rod spider 9, the upper port of the suspension rod spider 9 be with The interior hexagonal slotted eye that outer-hexagonal nut agrees with suspension rod 6, the hole depth of the interior hexagonal slotted eye is less than the height of outer-hexagonal nut;
The vertical duct is tube and pipe of aluminium alloy, and suspension rod spider 9 is socketed in vertical duct 4.1 and both gaps coordinate, The outer wall of suspension rod spider 9 and the groove and projection for having mutual cooperation on the inwall of vertical duct 4.1, the suspension rod spider 9 and magnetic Iron 5.3 is connected by attraction.
The manual joystick limiter, control stick connects bearing, wire rope rotating groove, Manual operation handle, main lifting Bar, impact drill collet and impact drill limiter are made by steel.
The steel wire rope connecting plate, impact drill group frame, secondary elevating lever, vertical duct, install handle, suspension rod lifting handle, Suspension rod lifting roller, roller installing plate and suspension rod spider are made by aluminium alloy.
A kind of liftable laser positioning high spatial suspension rod described in application punches the construction method of erecting device, including punching Construction and hanger erection construction.
What punching was constructed comprises the following steps that:
Step one, the point position determined according to early stage surveying setting-out, mobile double ladder 1 to puncture site, by mobile universal wheel 1.1 are locked by fixing lock.
Step 2, operates hand-operating device 2, rotation manual operation handle 2.7 is by steel wire rope 2.3 by secondary elevating lever 3.1 liftings are reduced to punching correct position, extract manual joystick spacer pin 2.1 manual joystick handle 2.7 is spacing.
Step 3: starting impact drill switch 8, manual joystick spacer pin 2.1, rotation manual joystick lever 2.7 are withdrawn Drilling, when impact drill limiter 3.6 touches floor, drilling terminates.
Step 4, the mobile universal wheel 1.1 of unblock, repeat step one is to step 3, until all punching construction is completed.
What hanger erection was constructed comprises the following steps that:
Step one, double ladder 1 is moved to hanger erection position, and mobile universal wheel 1.1 is locked by fixing lock.
Step 2, operates hand-operating device 2, rotation manual operation handle 2.7 is by steel wire rope 2.3 by secondary elevating lever 3.1 liftings are reduced to the correct position for installing suspension rod, the i.e. position substantially close to furred ceiling, extract manual joystick spacer pin 2.1 is spacing by manual joystick handle 2.7, and now suspension rod lifting handle position is substantially at the manually operated suitable position of operating personnel Put.
Step 3, operation suspension rod lowering or hoisting gear 5, rotates suspension rod lifting handle 5.6, makes to be connected on suspension rod feed belt One magnet 5.3 is close to the bottom of vertical duct 4.1.
Step 4, suspension rod 6 is placed in suspension rod spider 9 and loads it from the bottom of vertical duct 4.1, mobile suspension rod At the position of spider 9 to magnet 5.3, make magnet that suspension rod spider be adsorbed into firm by attraction.
Step 5, rotates suspension rod lifting handle 5.6, with the transmission of suspension rod feed belt 5.2, is propped up by magnet adsorption suspension rod Set 9 rises along vertical duct, so as to drive suspension rod to rise to the top of vertical duct 4.1, reaches hanger erection position.
Step 6, left and right horizontal direction rotational installation handle 4.2, vertical duct is rotated with, and drives matched hang Bar spider is rotated together, so as to drive suspension rod 6 to rotate, suspension rod 6 is rotatablely installed on furred ceiling.
After the completion of step 7, hanger erection, manual joystick spacer pin 2.1 is withdrawn, rotation manual operation handle 2.7 makes Secondary elevating lever 3.1 drops to suspension rod 6 and departs from vertical duct 4.1.
Step 8, rotates suspension rod lifting handle 5.6, now, and suspension rod spider 9 departs from suspension rod 6 with magnet 5.3 together by suspension rod Feed belt 5.2 is sent to the bottom of vertical duct 4.1, completes hanger erection construction.

Claims (10)

1. a kind of liftable laser positioning high spatial suspension rod punches erecting device, including double ladder(1), be vertically connected to double ladder On lowering or hoisting gear(3)With the impact drill being connected at the top of lowering or hoisting gear(7), the impact drill(7)Impact drill switch(8)Even It is connected on double ladder, the lowering or hoisting gear(3)With double ladder(1)Between be connected with hand-operating device(2), it is characterised in that: The lowering or hoisting gear(3)With double ladder(1)Between be also associated with suspension rod lowering or hoisting gear(5)And hanger rod mounting device(4);
The lowering or hoisting gear(3)Including main elevating lever(3.3), be socketed in main elevating lever(3.3)Interior secondary elevating lever(3.1), even It is connected on secondary elevating lever(3.1)The impact drill group frame of upper end(3.2), be connected to impact drill group frame(3.2)On impact drill collet (3.4), be connected to impact drill collet(3.4)The impact drill fixed cover of upper end(3.5)Be connected to impact drill collet(3.4)Sideways Impact drill limiter(3.6);
The main elevating lever(3.3)Side one narrow slot and a sipes are provided with to end by middle part or top downwards;
The suspension rod lowering or hoisting gear(5)Upper roller installing plate including being connected to secondary elevating lever top(5.5), be connected to upper roller Installing plate(5.5)On suspension rod lifting upper roller(5.1), be connected to through main elevating lever sipes the lower rolling of secondary elevating lever bottom Take turns installing plate(5.8), be connected to bottom roller installing plate(5.8)On suspension rod lifting bottom roller(5.7)And suspension rod lifts bottom roller (5.7)The suspension rod lifting handle of connection(5.6), be connected to suspension rod lifting upper roller(5.1)Bottom roller is lifted with suspension rod(5.7)It Between suspension rod feed belt(5.2)And uniform intervals are connected to suspension rod feed belt(5.2)On magnet(5.3)And cushion block (5.4);
The suspension rod feed belt(5.2)Parallel to vertical duct(4.1)And upper and lower ends are respectively by the first U-shaped connector (4.3.1)Biside plate between pass through.
2. liftable laser positioning high spatial suspension rod according to claim 1 punches erecting device, it is characterised in that:It is described Double ladder is connected and composed by two single straight ladders, and the upper ends of two single straight ladders is hinged by hinge, lower end is connected with mobile universal wheel (1.1).
3. liftable laser positioning high spatial suspension rod according to claim 1 punches erecting device, it is characterised in that:It is described Impact drill group frame includes horizon bar, L shaped plate and the triangle floor being connected between horizon bar and L shaped plate, and the horizon bar is horizontal To the bottom for being connected to impact drill collet, lower surface, another limb that a limb of the L shaped plate is bolted in horizon bar lead to Cross the upper side for being bolted to secondary elevating lever.
4. the liftable laser positioning high spatial suspension rod punching erecting device according to claims 1 to 3 any one, it is special Levy and be:The hand-operating device(2)Including manual joystick spacer pin(2.1), control stick connects bearing(2.2), steel wire Rope(2.3), wire rope rotating groove(2.4), fixed pulley(2.5), steel wire rope connecting plate(2.6), Manual operation handle(2.7)And behaviour Make bar(2.8);
The control stick connects bearing(2.2)It is fixed in the middle part of two single straight ladders of double ladder on corresponding pedal;
The action bars(2.8)It is connected to control stick connects bearing(2.2)Upper, one end is connected with Manual operation handle (2.7);
The manual joystick spacer pin(2.1)Parallel to action bars(2.8)Pin joint is in control stick connects bearing(2.2)On;
The fixed pulley(2.5)It is connected to main elevating lever(3.3)On be provided with the upper end of narrow slot side;
The steel wire rope connecting plate(2.6)Through main elevating lever(3.3)Narrow slot be connected to secondary elevating lever(3.1)Bottom;
The wire rope rotating groove(2.4)It is connected to action bars(2.8)Upper, steel wire rope connecting plate(2.6)Lower section;
The steel wire rope(2.3)One end be connected to steel wire rope connecting plate(2.6)The upper, other end is wrapped in steel wire through fixed pulley Rope swivelling chute(2.4)On.
5. liftable laser positioning high spatial suspension rod according to claim 4 punches erecting device, it is characterised in that:It is described Hanger rod mounting device(4)Including vertical duct(4.1)With the installation handle for being connected to vertical duct lower end(4.2), it is described vertical Pipeline(4.1)Upper/lower terminal pass through conduit coupling(4.3)With secondary elevating lever(3.1)The pipeline of connection, wherein upper end connects Fitting(4.3)It is connected to secondary elevating lever(3.1)Upper end, the conduit coupling of lower end(4.3)Through main elevating lever(3.3)'s Sipes is connected to secondary elevating lever(3.1)Bottom.
6. liftable laser positioning high spatial suspension rod according to claim 5 punches erecting device, it is characterised in that:It is described Conduit coupling(4.3)Including the first U-shaped connector(4.3.1), relative be plugged on the first U-shaped connector(4.3.1)Front end Second U-shaped connector(4.3.2)Be connected to the first U-shaped connector(4.3.1)Rear end and secondary elevating lever(3.1)Between backing plate (4.3.3);The second U-shaped connector(4.3.2)Medial surface be and vertical duct(4.1)The arcwall face that outline agrees with.
7. liftable laser positioning high spatial suspension rod according to claim 6 punches erecting device, it is characterised in that:It is described The first U is connected on the outer wall of vertical duct in the stopper slot of ring, conduit coupling are provided with conduit coupling link position The end of the bolt of shape connector and the second U-shaped connector is stuck in stopper slot.
8. the liftable laser positioning high spatial suspension rod punching erecting device according to claim 6 or 7, it is characterised in that: The first U-shaped connector and the second U-shaped connector are bolted, the side of the first U-shaped connector and the second U-shaped connector The side plate of the corresponding through hole being provided with through bolt of front edge of board, the first U-shaped connector and the second U-shaped connector homonymy passes through bolt Connection, the backing plate is connected by bolt with secondary elevating lever, and the through hole through bolt is provided with backing plate;
The width of the openend of the second U-shaped connector is less than the diameter of vertical duct, and vertical duct is limited in into the second U-shaped In the deep-slotted chip breaker of connector.
9. liftable laser positioning high spatial suspension rod according to claim 8 punches erecting device, it is characterised in that:It is described Vertical duct(4.1)Pass through suspension rod spider(9)With suspension rod(6)Connection, the suspension rod spider(9)Upper port be and suspension rod(6) The interior hexagonal slotted eye that upper outer-hexagonal nut agrees with, the hole depth of the interior hexagonal slotted eye is less than the height of outer-hexagonal nut;
The suspension rod spider(9)It is socketed in vertical duct(4.1)Interior and both gaps coordinate, suspension rod spider(9)Outer wall with it is perpendicular To pipeline(4.1)Inwall on have the groove and projection of mutual cooperation, the suspension rod spider(9)With magnet(5.3)By attracting Power is connected.
10. the liftable laser positioning high spatial suspension rod punching erecting device described in a kind of application claim 1 to 9 any one Construction method, it is characterised in that:
What punching was constructed comprises the following steps that:
Step one, the point position determined according to early stage surveying setting-out, mobile double ladder(1)To puncture site, by mobile universal wheel (1.1)Lock;
Step 2, operates hand-operating device(2), rotation manual operation handle(2.7)Pass through steel wire rope(2.3)By secondary elevating lever (3.1)Punching correct position is lifted or be reduced to, manual joystick spacer pin is extracted(2.1)By manual joystick handle(2.7) It is spacing;
Step 3: starting impact drill switch(8), withdraw manual joystick spacer pin(2.1), rotation manual joystick lever (2.7)Drilling, when impact drill limiter(3.6)When touching floor, drilling terminates;
Step 4, the mobile universal wheel of unblock(1.1), repeat step one is to step 3, until all punching construction is completed;
What hanger erection was constructed comprises the following steps that:
Step one, by double ladder(1)Hanger erection position is moved to, and locks mobile universal wheel(1.1);
Step 2, operates hand-operating device(2), rotation manual operation handle(2.7)Pass through steel wire rope(2.3)By secondary elevating lever 3.1 liftings are reduced to the correct position for installing suspension rod, extract manual joystick spacer pin(2.1)By manual joystick handle (2.7)It is spacing;
Step 3, operates suspension rod lowering or hoisting gear(5), rotate suspension rod lifting handle(5.6), make to be connected on suspension rod feed belt One magnet(5.3)Close to vertical duct(4.1)Bottom;
Step 4, by suspension rod(6)It is placed on suspension rod spider(9)It is interior and by it from vertical duct(4.1)Bottom load, movement hang Bar spider(9)Position to magnet(5.3)Place;
Step 5, rotates suspension rod lifting handle(5.6), in suspension rod feed belt(5.2)Drive under suspension rod rise to vertical duct Road(4.1)Top, reach installation of ceiling position;
Step 6, left and right horizontal direction rotational installation handle(4.2), pass through vertical duct(4.1)By suspension rod(6)It is rotatablely installed On furred ceiling;
After the completion of step 7, hanger erection, manual joystick spacer pin is withdrawn(2.1), rotation manual operation handle(2.7), make Secondary elevating lever(3.1)Drop to suspension rod(6)Depart from vertical duct(4.1);
Step 8, rotates suspension rod lifting handle(5.6), now, suspension rod spider(9)Depart from suspension rod(6)With magnet(5.3)Together by Suspension rod feed belt(5.2)It is sent to vertical duct(4.1)Bottom.
CN201610050451.5A 2016-01-26 2016-01-26 A kind of liftable laser positioning high spatial suspension rod punching erecting device and construction method Active CN105442817B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610050451.5A CN105442817B (en) 2016-01-26 2016-01-26 A kind of liftable laser positioning high spatial suspension rod punching erecting device and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610050451.5A CN105442817B (en) 2016-01-26 2016-01-26 A kind of liftable laser positioning high spatial suspension rod punching erecting device and construction method

Publications (2)

Publication Number Publication Date
CN105442817A CN105442817A (en) 2016-03-30
CN105442817B true CN105442817B (en) 2017-10-03

Family

ID=55553407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610050451.5A Active CN105442817B (en) 2016-01-26 2016-01-26 A kind of liftable laser positioning high spatial suspension rod punching erecting device and construction method

Country Status (1)

Country Link
CN (1) CN105442817B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106426005B (en) * 2016-11-01 2019-05-24 冼全喜 A kind of lift smallpox plate punching machine
CN108747987A (en) * 2018-07-12 2018-11-06 广州光强障碍灯航空设备有限公司 A kind of overhead helideck guardrail net hole-drilling system
CN113482368B (en) * 2021-06-25 2022-07-26 中建一局集团第五建筑有限公司 Suspender punching and mounting integrated machine and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH084321A (en) * 1994-06-23 1996-01-09 Nobuhiro Kitagawa Bearing device for top board and the like
CN103521807A (en) * 2013-10-30 2014-01-22 中建三局装饰有限公司 Liftable laser positioning high-space suspender perforation mounting device and operation method
CN104110119A (en) * 2014-03-26 2014-10-22 王浩 Simple device and mounting method for positioning ceiling suspenders in building construction
CN204252496U (en) * 2014-10-29 2015-04-08 中建五局第三建设有限公司 The convenient erecting device of construction work suspension rod
CN204686104U (en) * 2015-04-03 2015-10-07 马宏文 A kind of lift furred ceiling card punch

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110255929A1 (en) * 2010-04-15 2011-10-20 Buchner David J Universal Drill Stand
US20140053498A1 (en) * 2012-08-25 2014-02-27 Albert Gonzales Drywall ceiling device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH084321A (en) * 1994-06-23 1996-01-09 Nobuhiro Kitagawa Bearing device for top board and the like
CN103521807A (en) * 2013-10-30 2014-01-22 中建三局装饰有限公司 Liftable laser positioning high-space suspender perforation mounting device and operation method
CN104110119A (en) * 2014-03-26 2014-10-22 王浩 Simple device and mounting method for positioning ceiling suspenders in building construction
CN204252496U (en) * 2014-10-29 2015-04-08 中建五局第三建设有限公司 The convenient erecting device of construction work suspension rod
CN204686104U (en) * 2015-04-03 2015-10-07 马宏文 A kind of lift furred ceiling card punch

Also Published As

Publication number Publication date
CN105442817A (en) 2016-03-30

Similar Documents

Publication Publication Date Title
CN103521807B (en) A kind of liftable laser positioning high spatial suspension rod punching erecting device and method of operating
CN104563912B (en) A kind of well drilling pipe column automation operating system
CN105442817B (en) A kind of liftable laser positioning high spatial suspension rod punching erecting device and construction method
CN110043203A (en) A kind of automated drilling rig and the method using automated drilling rig progress tubing string movement
CN106948646B (en) Power grid electric pole sets up Self-loading-unloading tool car construction method
CN109322628B (en) Unmanned operation equipment for small workover wellhead
CN204877287U (en) Height -adjustable removes assembled roof construction auxiliary device
CN105275415A (en) Full-automatic continuous drilling rig
US4595062A (en) Well casing jack mechanism
CN202673195U (en) Device for connecting drill pipes with three-joint unit
CN109667554A (en) Drilling machine independently establishes the device of root and establishes method for root
CN205743770U (en) A kind of collapsible dynamic catwalk device
CN102720447A (en) Motive power catwalk pipe wane and pipe loading method of motive power catwalk pipe wane
CN203696028U (en) Liftable laser-positioning high-space suspender punching device
CN205638216U (en) Oil -well rig tubular column automated processing system
CN206769848U (en) Thribble automatic discharge device
CN209067105U (en) A kind of digital multifunctional mounted drilling rig
US11053757B2 (en) Remotely controllable reel with conveyance for a well
CN206677242U (en) A kind of boring device of top plate
CN106583782B (en) Heavy caliber pipe-jacking anti-drag mud hole drill aperture apparatus and its construction method
CN103291210A (en) Gate-type double-tower gear-driven drilling machine
CN206319628U (en) One kind building assembled wallboard fitting machine
CN209200493U (en) A kind of steering support device of transformer
CN104675339B (en) Automatic conveying system for drill drill of drilling machine
CN210774856U (en) Hydrogeology probing is with footpath pumping device many times

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 518000 Zhongshi building, Luofang road crossing, Luohu District, Shenzhen City, Guangdong Province

Patentee after: CHINA CONSTRUCTION SHENZHEN DECORATION CO.,LTD.

Address before: 100097 A seat, 13 Feng Feng Road, Fengtai District science and Technology Park, Beijing, China

Patentee before: DECORATION Co.,Ltd. OF CHINA CONSTRUCTION 3RD ENGINEERING BUREAU

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200519

Address after: 518000 floor 3, Zhongshi building, No. 16, Jinger Road, Huangbei street, Luohu District, Shenzhen City, Guangdong Province

Patentee after: CHINA STATE ONSTRUCTION LIGHTING Co.,Ltd.

Address before: 518000 Zhongshi building, Luofang road crossing, Luohu District, Shenzhen City, Guangdong Province

Patentee before: CHINA CONSTRUCTION SHENZHEN DECORATION Co.,Ltd.