CN105421340A - Tubular pile with unfolding blades and construction method of tubular pile - Google Patents

Tubular pile with unfolding blades and construction method of tubular pile Download PDF

Info

Publication number
CN105421340A
CN105421340A CN201510923432.4A CN201510923432A CN105421340A CN 105421340 A CN105421340 A CN 105421340A CN 201510923432 A CN201510923432 A CN 201510923432A CN 105421340 A CN105421340 A CN 105421340A
Authority
CN
China
Prior art keywords
blade
pile
stake
cavity
female
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510923432.4A
Other languages
Chinese (zh)
Inventor
陈明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510923432.4A priority Critical patent/CN105421340A/en
Priority to PCT/CN2015/098185 priority patent/WO2017096643A1/en
Publication of CN105421340A publication Critical patent/CN105421340A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/48Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds

Abstract

The invention discloses a tubular pile with unfolding blades. The tubular pile comprises a prefabricated tubular pile, wherein the prefabricated tubular pile is pressed into a soil layer through hammering or static pressure and comprises a mother pile and a pile tip; a cavity extending from the pile tail to the pile tip is formed in the pile body of the mother pile; a layer or a plurality of layers of blade jacking holes communicated with the cavity are formed in the pile wall of the mother pile in the length direction of the pile body; blades which can rotate around rotating devices and rotate towards the direction far away from the cavity are arranged at the upper edge far away from the cavity of each blade jacking hole; and a force applying part used for jacking the blades out of the blade jacking holes is arranged in the cavity. The construction method of the prefabricated tubular pile can be referred in an instruction book; and compared with a conventional prefabricated pile, the pile body is provided with unfoldable blades, so that the end-bearing effect of the pile is greatly improved, the bearing capacity of the pile is increased by multiple times or even tens of times, the number of used piles and the pile length can be greatly reduced, and the comprehensive benefits are extremely remarkable.

Description

Band launches pile tube and the construction method thereof of blade
Technical field
The present invention relates to industry and residential construction area, especially relating to a kind of pile tube and construction method thereof with launching blade.
Background technology
Traditional precast concrete square pile with and pile tube, the bearing capacity of usual stake depends on the frictional force of a sidewall and the bottom bearing at pile top place.Due to the restriction of pile body and soil layer bearing capacity, when especially soil layer soil structure is poor, the bearing capacity of stake own is little.For meeting requirement for bearing capacity, usually can pass through increase the quantity of stake or add the length of timber pile self, very unreasonable economically.Further, because pile body is long in pile driving process, easily cause pile body breaking, pile body inclining, pile sinking does not reach designing requirement; Further, the restriction owing to transporting, time usual work is prefabricated, long stake is all segmentation prefabricating, after being transported to scene, needs spreading at pile driving process pile by merogenesis, causes a large amount of human and material resources costs; And pile body is spreading at the scene, quality affects by field condition, weather and the factor such as artificial, and pile extension place often has the phenomenon of the cracking that gets loose; The extensive mode of construction of tradition seriously hinders the construction of low-carbon (LC), harmonious society.
In sum, providing a kind of new preformed pile and construction, improve pile body structure feature simultaneously, in order to solve the drawback of traditional preformed pile, is the certainty of construction process development.
Summary of the invention
Object of the present invention is exactly to solve the problem, and provides a kind of pile tube and construction method thereof with launching blade.
For solving the problems of the technologies described above, embodiments of the present invention provide the pile tube that band launches blade, it comprises by the prefabricated tubulose stake in hammering or static pressure underground layer, prefabricated tubulose stake comprises female stake and pile top, the pile body of female stake has the cavity extending to pile top from stake tail, the pile lining of female stake is provided with along pile body length direction the blade that one deck or multilayer communicate with cavity and backs down hole, blade backs down that hole is provided with by tumbler away from the upper edge of cavity side can around this tumbler towards the blade rotated away from cavity direction, cavity is provided with force-applying piece blade top being backed down hole from blade.
Further, blade comprises:
Be installed on the intra vane that blade backs down hole, it has and extends and projection for coordinating with force-applying piece towards cavity;
Be installed on blade and back down the outer leafs of hole away from cavity side;
The top of intra vane, outer leafs side is in opposite directions connected to tumbler.
Further, protruding top adopts arc-shaped recliner face structure.
Further, blade along female stake pile body circumferentially.
Further, force-applying piece has the front end of circular arc.
Further, force-applying piece is steel pipe.
Further, blade back down hole in female stake symmetrically mode arrange.
Utilize band to launch the construction method of the pile tube of blade, it comprises:
Step one, preform carrier stake
Female stake is reserved internal cavities, meanwhile, the blade open holes of predetermined quantity is set along female stake pile body cross section and length direction pile lining;
Step 2, prefabricated and additional blades
According to predetermined reserved prefabricated blade, utilize tumbler to be attached to outside the blade open holes of female stake in the openable blade of customization, thus blade and female stake are connected as a single entity, and the non-closed condition of the original state of blade;
Step 3, female stake press-in soil layer
Under the state that female stake is closed at blade, by hammering or static pressure, squeeze in soil layer;
Step 4, opens blade
After female stake is pressed into designated depth, inserts the stake heart with force-applying piece, and by blade open holes, blade is backed down;
Step 5, mounted blade
After step 4 completes, continue female stake down hammering or static pressure, blade is backed down by its lower soil body completely along with the decline of pile body, finally forms the stake with the wing, whole prefabricated tubulose oil and pile body many places are held out against.
The present invention has following beneficial effect:
(1) on bearing capacity of pile, by being attached to one or more layers blade of female stake sidewall, participate in the middle of a self-bearing capacity, whole pile and soil body many places are held out against, compared with traditional concrete precast pile, several times even decades of times improve the supporting capacity of stake with Shangdi, and workmanship is improved simultaneously, safety significantly promotes, and comprehensive benefit is extremely remarkable.
(2) in preformed pile quantity and material, by improving, pile body supporting capacity is greatly improved, and for structure, available less preformed pile quantity, go to resist larger load, material usage greatly reduces, and meets low-carbon (LC) society.
(3) simultaneously, the minimizing of preformed pile quantity, greatly reduces the machine-team time of pile foundation equipment, and workman's site work amount greatly reduces, and labor cost is controlled further; .
(4) change traditional concrete precast pile force way and feature, give full play to the feature of each layer bearing capacity of the soil body, make pile body each several part stressed evenly with rationally, thus reduce female pile length further.
(4) band launches the tubulose pilework of blade, because supporting capacity improves further, thus make the long reduction of stake, single pile is carried and is become possibility, makes pile body under normal circumstances without the need to spreading, just can bear larger load, reduce site work amount, and reduce further by the impact of the factor such as weather, manpower, substantially reduce the construction period, economic benefit is very remarkable.
Accompanying drawing explanation
Fig. 1 is the pile tube stereogram that band launches blade;
Fig. 2 is that the pile tube Leaf of band expansion blade opens schematic diagram;
Fig. 3 is the construction method Leaf installment state figure that band launches the pile tube of blade;
Fig. 4 is that in the construction method of the pile tube of band expansion blade, female stake enters soil layer state diagram;
Fig. 5 is that the construction method king-pile heart of the pile tube of band expansion blade inserts force-applying piece and opens the state diagram of blade;
Fig. 6 is that the construction method Leaf of the pile tube of band expansion blade launches completely, enters stress figure.
Detailed description of the invention
For making the object, technical solutions and advantages of the present invention clearly, below in conjunction with accompanying drawing, the embodiments of the present invention are explained in detail.But, persons of ordinary skill in the art may appreciate that in each embodiment of the present invention, proposing many ins and outs to make reader understand the application better.But, even without these ins and outs with based on the many variations of following embodiment and amendment, each claim of the application technical scheme required for protection also can be realized.
As shown in Figure 1, band launches the pile tube of blade, it comprises by the prefabricated tubulose stake in hammering or static pressure underground layer, this prefabricated tubulose stake includes but are not limited to the square tube shown in figure, it can also be pipe, the shapes such as polygon, prefabricated tubulose stake comprises female stake 1 and pile top 5, female stake is precast unit, the pile body of female stake has the cavity 2 extending to pile top from stake tail, this cavity and the stake heart coaxial, the pile lining of female stake is provided with along pile body length direction the blade that one deck or multilayer communicate with cavity and backs down hole 3, it is reserved when preform carrier stake that this blade backs down hole, the quantity that blade backs down hole setting can be all two-layer as illustrated in the drawing, blade back down hole in female stake symmetrically mode arrange, for square tube, every layer of blade to back down in hole blade between two back down hole symmetrically mode arrange, blade backs down that hole is provided with by tumbler 6 away from the upper edge of cavity side can around this tumbler towards the blade 4 rotated away from cavity direction, blade along female stake pile body circumferentially, the length of blade sets as required, the blade arranged by tumbler has " anti-flip designs " function, namely when blade by soil body top to horizontal level time, possess enough resistance anti-cantings, thus generation Compressive Bearing Capacity, cavity is provided with the force-applying piece 7 blade top being backed down hole from blade, force-applying piece has the front end of circular arc, particularly will, this force-applying piece can be the steel pipe with circular arc front end.Blade is backed down by the soil body under it along with the decline of pile body by steel pipe by blade after prefabricated tubulose stake press-in soil layer certain depth, finally forms the bearing peg with " wing ", whole prefabricated tubulose oil and pile body many places are held out against.
See Fig. 2, blade comprises: be installed on the intra vane 40 that blade backs down hole, and it has and extends and projection 400 for coordinating with force-applying piece towards cavity, protruding employing arc-shaped recliner face, top structure; Be installed on blade and back down the outer leafs 41 of hole away from cavity side; The top of intra vane, outer leafs side is in opposite directions connected to tumbler 6.
The construction method utilizing band to launch the pile tube of blade is described in detail in detail below:
This construction method comprises step:
(1) preform carrier stake: female stake is reserved internal cavities, meanwhile, arranges the blade open holes of predetermined quantity along female stake pile body cross section and length direction pile lining.
(2) prefabricated and additional blades: see Fig. 3, according to predetermined reserved prefabricated blade, utilize tumbler to be attached to outside the blade open holes of female stake in the openable blade of customization, thus blade and female stake are connected as a single entity, and the non-closed condition of the original state of blade.
(3) female stake press-in soil layer: see Fig. 4, under the state of female stake being closed at blade, by hammering or static pressure, squeezes in soil layer.
(4) open blade: see Fig. 5, after female stake is pressed into designated depth, inserts the stake heart with force-applying piece, and by blade open holes, blade is backed down.
(5) mounted blade: see Fig. 6, after step (4) completes, continue female stake down hammering or static pressure, blade is backed down by its lower soil body completely along with the decline of pile body, finally form the stake with the wing, whole prefabricated tubulose oil and pile body many places are held out against.
Persons of ordinary skill in the art may appreciate that the respective embodiments described above realize specific embodiments of the invention, and in actual applications, various change can be done to it in the form and details, and without departing from the spirit and scope of the present invention.

Claims (8)

1. band launches the pile tube of blade, it comprises by the prefabricated tubulose stake in hammering or static pressure underground layer, described prefabricated tubulose stake comprises female stake and pile top, the pile body of described female stake has the cavity extending to pile top from stake tail, it is characterized in that, the pile lining of described female stake is provided with along pile body length direction the blade that one deck or multilayer communicate with cavity and backs down hole, described blade backs down that hole is provided with by tumbler away from the upper edge of cavity side can around this tumbler towards the blade rotated away from cavity direction, described cavity is provided with force-applying piece blade top being backed down hole from blade.
2. band according to claim 1 launches the pile tube of blade, and it is characterized in that, described blade comprises:
Be installed on the intra vane that blade backs down hole, it has and extends and projection for coordinating with force-applying piece towards cavity;
Be installed on blade and back down the outer leafs of hole away from cavity side;
The top of described intra vane, outer leafs side is in opposite directions connected to described tumbler.
3. band according to claim 1 launches the pile tube of blade, it is characterized in that, the top of described projection adopts arc-shaped recliner face structure.
4. band according to claim 1 launches the pile tube of blade, and it is characterized in that, described blade along female stake pile body circumferentially.
5. band according to claim 1 launches the pile tube of blade, and it is characterized in that, described force-applying piece has the front end of circular arc.
6. band according to claim 1 launches the pile tube of blade, and it is characterized in that, described force-applying piece is steel pipe.
7. band according to claim 1 launches the pile tube of blade, it is characterized in that, described blade back down hole in female stake symmetrically mode arrange.
8. utilize a construction method for the pile tube of described band expansion blade as arbitrary in claim 1-8, it is characterized in that, this construction method comprises:
Step one, preform carrier stake
Female stake is reserved internal cavities, meanwhile, the blade open holes of predetermined quantity is set along female stake pile body cross section and length direction pile lining;
Step 2, prefabricated and additional blades
According to predetermined reserved prefabricated blade, utilize tumbler to be attached to outside the blade open holes of female stake in the openable blade of customization, thus blade and female stake are connected as a single entity, and the non-closed condition of the original state of blade;
Step 3, female stake press-in soil layer
Under the state that female stake is closed at blade, by hammering or static pressure, squeeze in soil layer;
Step 4, opens blade
After female stake is pressed into designated depth, inserts the stake heart with force-applying piece, and by blade open holes, blade is backed down;
Step 5, mounted blade
After step 4 completes, continue female stake down hammering or static pressure, blade is backed down by its lower soil body completely along with the decline of pile body, finally forms the stake with the wing, whole prefabricated tubulose oil and pile body many places are held out against.
CN201510923432.4A 2015-12-11 2015-12-11 Tubular pile with unfolding blades and construction method of tubular pile Pending CN105421340A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201510923432.4A CN105421340A (en) 2015-12-11 2015-12-11 Tubular pile with unfolding blades and construction method of tubular pile
PCT/CN2015/098185 WO2017096643A1 (en) 2015-12-11 2015-12-22 Tubular pile having unfolding blades and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510923432.4A CN105421340A (en) 2015-12-11 2015-12-11 Tubular pile with unfolding blades and construction method of tubular pile

Publications (1)

Publication Number Publication Date
CN105421340A true CN105421340A (en) 2016-03-23

Family

ID=55499851

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510923432.4A Pending CN105421340A (en) 2015-12-11 2015-12-11 Tubular pile with unfolding blades and construction method of tubular pile

Country Status (2)

Country Link
CN (1) CN105421340A (en)
WO (1) WO2017096643A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107354941A (en) * 2017-08-30 2017-11-17 成都智宸科技有限公司 A kind of strong building stake of stability
CN108411930A (en) * 2018-03-21 2018-08-17 山东科技大学 A kind of novel steel tube pile foundation
CN109440765A (en) * 2018-11-06 2019-03-08 佛山科学技术学院 A kind of unidirectional strenthening member
CN115162324A (en) * 2022-09-05 2022-10-11 中交第三航务工程局有限公司江苏分公司 Precast pile structure suitable for multiple soil layers and static pile pressing construction method thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113502813A (en) * 2021-06-29 2021-10-15 华能灌云清洁能源发电有限责任公司 Pile sinking

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2584668Y (en) * 2002-08-28 2003-11-05 天津大学 Concrete vertical bearing pile with overhanging wedge fin
JP2004324321A (en) * 2003-04-28 2004-11-18 Yuji Tadano Enlarged diameter friction pile
CN101899829A (en) * 2010-07-22 2010-12-01 浙江中隧桥波形钢腹板有限公司 Evaginable wing plate hollow steel pipe pile
CN201835276U (en) * 2010-03-01 2011-05-18 张继红 Prefabricated reaming pile
CN205369219U (en) * 2015-12-11 2016-07-06 陈明 Tubular pile of blade is expanded in area

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2584668Y (en) * 2002-08-28 2003-11-05 天津大学 Concrete vertical bearing pile with overhanging wedge fin
JP2004324321A (en) * 2003-04-28 2004-11-18 Yuji Tadano Enlarged diameter friction pile
CN201835276U (en) * 2010-03-01 2011-05-18 张继红 Prefabricated reaming pile
CN101899829A (en) * 2010-07-22 2010-12-01 浙江中隧桥波形钢腹板有限公司 Evaginable wing plate hollow steel pipe pile
CN205369219U (en) * 2015-12-11 2016-07-06 陈明 Tubular pile of blade is expanded in area

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107354941A (en) * 2017-08-30 2017-11-17 成都智宸科技有限公司 A kind of strong building stake of stability
CN108411930A (en) * 2018-03-21 2018-08-17 山东科技大学 A kind of novel steel tube pile foundation
CN109440765A (en) * 2018-11-06 2019-03-08 佛山科学技术学院 A kind of unidirectional strenthening member
CN115162324A (en) * 2022-09-05 2022-10-11 中交第三航务工程局有限公司江苏分公司 Precast pile structure suitable for multiple soil layers and static pile pressing construction method thereof
CN115162324B (en) * 2022-09-05 2022-11-25 中交第三航务工程局有限公司江苏分公司 Precast pile structure suitable for multiple soil layers and static pile pressing construction method thereof

Also Published As

Publication number Publication date
WO2017096643A1 (en) 2017-06-15

Similar Documents

Publication Publication Date Title
CN105544525A (en) Uplift pile with unfolding barb and construction method thereof
CN105421340A (en) Tubular pile with unfolding blades and construction method of tubular pile
CN205329681U (en) Resistance to plucking tubular pile of barb is expanded in area
CN110486018B (en) Lattice type composite shaft structure and construction method
CN100494581C (en) Pipe pile hole maker with concrete bottom sealing, pipe cover and wings and construction process thereof
CN103244130A (en) Quick excavation and expanding construction method of herringbone tunnel section
CN109577989B (en) Novel deep mine shaft wall structure and construction method
CN104061000B (en) Touch wall sinking passage formula tunnel partition wall and method of construction thereof
CN206319886U (en) Tunnel lining structure
CN105386440A (en) Bottom-expanded pipe pile with unfolded blades and pile driving method thereof
CN107142952A (en) Construction method of interlocking pile and the occlusion pipe applied to this method
CN105649073A (en) Static root drilling type construction method for planting piles
CN111364532B (en) Existing pile foundation reinforcement method based on slurry control
CN105133641B (en) Thin-wall continuous-wall-type foundation reinforcing structure and method
CN103147778A (en) Method for lane development and support in extremely crushed rock stratum
CN105156114A (en) Enlarging repair and reinforcement method of roadways at crossing
CN208934258U (en) A kind of prefabricated assembled steel core concrete column connected structure part
CN205532623U (en) Be applicable to special ground shield tunnel segment ring
CN202360116U (en) U-shaped shed roadway junction support device
CN101725147B (en) Construction process of first-inserting last-jetting type steel churning pile enclosing structure under low net space
CN203429646U (en) Slope surface supporting module
CN114075994A (en) Artificial retaining dam for coal mine underground reservoir
CN205369219U (en) Tubular pile of blade is expanded in area
CN104131535B (en) A kind of composite reinforced earth and rockfill dam earthquake resistant structure of high polymer and construction method thereof
CN201100129Y (en) Single-hole dual-layer overlapping tunnel structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160323