CN105414921B - Rocker switch installation equipment - Google Patents
Rocker switch installation equipment Download PDFInfo
- Publication number
- CN105414921B CN105414921B CN201511011301.5A CN201511011301A CN105414921B CN 105414921 B CN105414921 B CN 105414921B CN 201511011301 A CN201511011301 A CN 201511011301A CN 105414921 B CN105414921 B CN 105414921B
- Authority
- CN
- China
- Prior art keywords
- cylinder
- base
- platform
- rocker
- movable drill
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P19/00—Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Automatic Assembly (AREA)
Abstract
Description
技术领域technical field
本发明涉及工业自动化设备技术领域,尤其涉及一种摇杆开关安装设备。The invention relates to the technical field of industrial automation equipment, in particular to a rocker switch installation equipment.
背景技术Background technique
摇杆开关广泛的被人们使用,摇杆开关内都会设置一个传动条,摇杆开关的侧壁上都会开有一个圆孔,传动条伸出圆孔,通过插片与摇杆开关外部的动片刷子连接。The rocker switch is widely used by people. There will be a transmission strip inside the rocker switch. There will be a round hole on the side wall of the rocker switch. The transmission strip will protrude from the round hole. Sheet brushes are attached.
摇杆装配是将摇杆装入开关的底壳内,传统是通过人工进行组装,但人工操费时、费力,摇杆难以卡入底壳内,生产效率低。Rocker assembly is to put the rocker into the bottom case of the switch. Traditionally, it is assembled manually, but manual operation is time-consuming and laborious. It is difficult for the rocker to be inserted into the bottom case, and the production efficiency is low.
因此亟须一种能够快速有效完成摇杆装配的自动化设备。Therefore urgently need a kind of automation equipment that can complete rocker assembly quickly and effectively.
发明内容Contents of the invention
本发明的目的在于针对现有技术的不足提供一种摇杆开关安装设备,本发明采用自动化进行摇杆组装,代替人工操作,一次可同时安装多个摇杆,省时省力,提高生产效率,减少人工成本。The purpose of the present invention is to provide a rocker switch installation device for the deficiencies of the prior art. The present invention uses automation to assemble the rocker instead of manual operation, and can install multiple rockers at the same time, saving time and effort, and improving production efficiency. Reduce labor costs.
本发明是通过以下技术方案来实现的,一种摇杆开关安装设备,包括平台,所述平台设置有开关组装装置和摇杆夹取装置,所述开关组装装置包括第一移动机构,所述第一移动机构包括第一移动基台和驱动第一移动基台沿平台移动的第一驱动机构,所述第一移动基台的上端设置有组装机构,所述组装机构包括组装基台,所述组装基台设置有若干个用于安置开关底壳的第一工位和若干个用于安置摇杆的第二工位,所述第一工位和所述第二工位对应设置,所述摇杆夹取装置包括夹取机构和驱动夹取机构上下移动的第三驱动机构,所述夹取机构设置于组装基台的上方。The present invention is achieved through the following technical solutions. A rocker switch installation device includes a platform, the platform is provided with a switch assembly device and a rocker clamping device, the switch assembly device includes a first moving mechanism, the The first moving mechanism includes a first mobile base and a first drive mechanism that drives the first mobile base to move along the platform, an assembly mechanism is provided on the upper end of the first mobile base, and the assembly mechanism includes an assembly base, so The assembly base is provided with several first stations for placing the switch bottom case and several second stations for placing the rocker, the first stations and the second stations are set correspondingly, so The rocker clamping device includes a clamping mechanism and a third driving mechanism that drives the clamping mechanism to move up and down, and the clamping mechanism is arranged above the assembly base.
作为优选,所述平台设置有第一滑轨,所述第一移动基台的底部设置有第一滑块,所述第一滑块与第一滑轨滑动连接。Preferably, the platform is provided with a first slide rail, the bottom of the first mobile base is provided with a first slide block, and the first slide block is slidably connected with the first slide rail.
作为优选,所述第一驱动机构包括第一气缸,所述第一气缸的缸体固定设置于平台的上端,所述第一气缸的活塞杆与第一移动基台固定连接。Preferably, the first driving mechanism includes a first air cylinder, the cylinder body of the first air cylinder is fixedly arranged on the upper end of the platform, and the piston rod of the first air cylinder is fixedly connected with the first mobile base.
作为优选,所述平台的上端还设置有用于限制第一移动基台移动距离的限位块。Preferably, the upper end of the platform is further provided with a limit block for limiting the moving distance of the first mobile base station.
作为优选,所述限位块设置有两个,分别设置于第一气缸的两侧。Preferably, there are two limiting blocks, which are respectively arranged on both sides of the first cylinder.
作为优选,所述组装机构还包括第二移动机构,所述第二移动机构包括第二移动基台,所述组装基台设置于第二移动基台的上端,所述第一移动基台的顶部设置有第二滑轨,所述第二移动基台的底部设置有第二滑块,所述第二滑块与第二滑轨滑动连接,所述第二移动机构还包括驱动第二移动基台沿第一移动基台滑动的第二驱动机构。Preferably, the assembly mechanism further includes a second moving mechanism, the second moving mechanism includes a second mobile base, the assembly base is arranged on the upper end of the second mobile base, and the first mobile base The top is provided with a second slide rail, the bottom of the second mobile base is provided with a second slide block, and the second slide block is slidably connected with the second slide rail, and the second moving mechanism also includes driving a second mobile A second drive mechanism for the base to slide along the first mobile base.
作为优选,所述第二驱动机构包括第二气缸,所述第一移动基台的上端设置有连接块,所述第二气缸的活塞杆与连接块固定连接,所述第二气缸的缸体与第二移动基台固定连接。Preferably, the second driving mechanism includes a second air cylinder, the upper end of the first mobile base is provided with a connecting block, the piston rod of the second air cylinder is fixedly connected with the connecting block, and the cylinder body of the second air cylinder It is fixedly connected with the second mobile base station.
作为优选,所述第二移动基台的上端设置有第三滑轨,所述组装基台的底部设置有第三滑块,所述第三滑块与第三滑轨滑动连接,所述第二移动基台的上端还设置有第三气缸,所述第三气缸的活塞杆与组装基台固定连接。Preferably, the upper end of the second mobile base is provided with a third slide rail, the bottom of the assembly base is provided with a third slide block, the third slide block is slidably connected with the third slide rail, and the first The upper ends of the two mobile bases are also provided with a third air cylinder, and the piston rod of the third air cylinder is fixedly connected with the assembly base.
作为优选,所述第三驱动机构包括第四气缸,所述夹取机构包括连接板,所述连接板设置有若干个用于夹取摇杆的机械手,所述连接板与第四气缸的活塞杆固定连接。Preferably, the third drive mechanism includes a fourth cylinder, and the clamping mechanism includes a connecting plate, and the connecting plate is provided with several manipulators for clamping the rocker, and the connecting plate and the piston of the fourth cylinder Rod fixed connection.
作为优选,所述平台的前端设置有两个控制按钮,两个控制按钮分别与开关组装装置、摇杆夹取装置电连接。Preferably, two control buttons are provided on the front end of the platform, and the two control buttons are respectively electrically connected to the switch assembly device and the rocker clamping device.
本发明的有益效果:一种摇杆开关安装设备,包括平台,所述平台设置有开关组装装置和摇杆夹取装置,所述开关组装装置包括第一移动机构,所述第一移动机构包括第一移动基台和驱动第一移动基台沿平台移动的第一驱动机构,所述第一移动基台的上端设置有组装机构,所述组装机构包括组装基台,所述组装基台设置有若干个用于安置开关底壳的第一工位和若干个用于安置摇杆的第二工位,所述第一工位和所述第二工位对应设置,所述摇杆夹取装置包括夹取机构和驱动夹取机构上下移动的第三驱动机构,所述夹取机构设置于组装基台的上方,将底壳放在第一工位上,摇杆放置在第二工位上,第一移动机构驱动驱动第一移动基台移动,使得组装基台上的第二工位移动至夹取机构的正下方,第三驱动机构首先驱动夹取机构下移,将第二工位上的摇杆夹起,然后第一移动机构再驱动驱动第一移动基台移动,使得组装基台上的第一工位移动至夹取机构的正下方,第三驱动机构再驱动夹取机构下移,将摇杆装入底壳内,本发明采用自动化进行摇杆组装,代替人工操作,一次可同时安装多个摇杆,省时省力,提高生产效率,减少人工成本。Beneficial effects of the present invention: a rocker switch installation device includes a platform, the platform is provided with a switch assembly device and a rocker clamping device, the switch assembly device includes a first moving mechanism, and the first moving mechanism includes The first mobile base and the first drive mechanism that drives the first mobile base to move along the platform, the upper end of the first mobile base is provided with an assembly mechanism, the assembly mechanism includes an assembly base, and the assembly base is set There are several first stations for placing the switch bottom case and several second stations for placing the rocker, the first station and the second station are set correspondingly, and the rocker clamps The device includes a clamping mechanism and a third drive mechanism that drives the clamping mechanism to move up and down, the clamping mechanism is arranged above the assembly base, the bottom case is placed on the first station, and the rocker is placed on the second station Above, the first moving mechanism drives the first mobile base to move, so that the second station on the assembly base moves to directly below the clamping mechanism, and the third driving mechanism first drives the clamping mechanism to move down to move the second station The rocker on the position is clamped, and then the first moving mechanism drives the first mobile base to move, so that the first station on the assembly base moves to the right below the clamping mechanism, and the third driving mechanism drives the clamping The mechanism moves down, and the rocker is loaded into the bottom shell. The invention uses automation to assemble the rocker, instead of manual operation, and can install multiple rockers at the same time, saving time and effort, improving production efficiency, and reducing labor costs.
附图说明Description of drawings
图1为本发明的立体结构示意图。Fig. 1 is a schematic diagram of the three-dimensional structure of the present invention.
图2为本发明开关组装装置的立体结构示意图。Fig. 2 is a schematic perspective view of the switch assembly device of the present invention.
图3为本发明开关组装装置另一视角的立体结构示意图。Fig. 3 is a perspective view of the three-dimensional structure of the switch assembly device of the present invention.
图4为本发明开关组装装置的剖面立体结构示意图。Fig. 4 is a schematic diagram of a cross-sectional three-dimensional structure of the switch assembly device of the present invention.
图5为本发明开关组装装置隐藏组装基台后的立体结构示意图。Fig. 5 is a schematic diagram of the three-dimensional structure of the switch assembly device of the present invention with the assembly base hidden.
图6为本发明开关组装装置隐藏第一移动基台后的立体结构示意图。Fig. 6 is a schematic perspective view of the three-dimensional structure of the switch assembly device of the present invention with the first mobile base hidden.
图7为本发明摇杆夹取装置的立体结构示意图。Fig. 7 is a schematic perspective view of the three-dimensional structure of the rocker clamping device of the present invention.
附图标记为:The reference signs are:
1—开关组装装置 11—第一移动基台1—Switch assembly device 11—The first mobile abutment
111—第一滑块 112—第二滑轨111—the first slide block 112—the second slide rail
12—组装基台 121—第一工位12—Assembly abutment 121—First station
122—第二工位 123—第三滑块122—the second station 123—the third slider
13—第一气缸 14—第二移动基台13—the first cylinder 14—the second mobile abutment
141—第二滑块 142—第三滑轨141—the second slide block 142—the third slide rail
15—第二气缸 16—连接块15—Second Cylinder 16—Connection Block
17—第三气缸 2—摇杆夹取装置17—the third cylinder 2—rocker clamping device
21—夹取机构 211—连接板21—clamping mechanism 211—connecting plate
212—机械手 22—第四气缸212—manipulator 22—the fourth cylinder
3—第一滑轨 4—限位块3—the first slide rail 4—limiting block
5—控制按钮。5—Control button.
具体实施方式detailed description
下面结合附图1至附图7,以及具体实施方式对本发明做进一步地说明。The present invention will be further described below in conjunction with accompanying drawings 1 to 7 and specific embodiments.
如图1至图7所示,一种摇杆开关安装设备,包括平台,所述平台设置有开关组装装置1和摇杆夹取装置2,所述开关组装装置1包括第一移动机构,所述第一移动机构包括第一移动基台11和驱动第一移动基台11沿平台移动的第一驱动机构,所述第一移动基台11的上端设置有组装机构,所述组装机构包括组装基台12,所述组装基台12设置有若干个用于安置开关底壳的第一工位121和若干个用于安置摇杆的第二工位122,所述第一工位121和所述第二工位122对应设置,所述摇杆夹取装置2包括夹取机构21和驱动夹取机构21上下移动的第三驱动机构,所述夹取机构21设置于组装基台12的上方。As shown in Figures 1 to 7, a rocker switch installation device includes a platform, the platform is provided with a switch assembly device 1 and a rocker clamping device 2, the switch assembly device 1 includes a first moving mechanism, the The first moving mechanism includes a first mobile base 11 and a first driving mechanism that drives the first mobile base 11 to move along the platform. An assembly mechanism is provided on the upper end of the first mobile base 11, and the assembly mechanism includes an assembly The base 12, the assembly base 12 is provided with several first stations 121 for placing the switch bottom case and several second stations 122 for placing the rocker, the first stations 121 and all The second station 122 is provided correspondingly. The rocker clamping device 2 includes a clamping mechanism 21 and a third driving mechanism that drives the clamping mechanism 21 to move up and down. The clamping mechanism 21 is arranged above the assembly base 12 .
本实施例装配时,将底壳放在第一工位121上,摇杆放置在第二工位122上,第一移动机构驱动驱动第一移动基台11移动,使得组装基台12上的第二工位122移动至夹取机构21的正下方,第三驱动机构首先驱动夹取机构21下移,将第二工位122上的摇杆夹起,然后第一移动机构再驱动驱动第一移动基台11移动,使得组装基台12上的第一工位121移动至夹取机构21的正下方,第三驱动机构再驱动夹取机构21下移,将摇杆装入底壳内,本发明采用自动化进行摇杆组装,代替人工操作,一次可同时安装多个摇杆,省时省力,提高生产效率,减少人工成本。When assembling this embodiment, the bottom shell is placed on the first station 121, the rocker is placed on the second station 122, and the first moving mechanism drives the first mobile base 11 to move, so that the assembly base 12 The second station 122 moves to directly below the clamping mechanism 21, and the third driving mechanism first drives the clamping mechanism 21 to move down to clamp the rocker on the second station 122, and then the first moving mechanism drives the second A mobile base 11 moves, so that the first station 121 on the assembly base 12 moves to directly below the clamping mechanism 21, and the third driving mechanism drives the clamping mechanism 21 to move down, and the rocker is loaded into the bottom case , the present invention uses automation to assemble the rocker, instead of manual operation, multiple rockers can be installed at the same time, saving time and effort, improving production efficiency, and reducing labor costs.
如图4所示,本实施例中,所述平台设置有第一滑轨3,所述第一移动基台11的底部设置有第一滑块111,所述第一滑块111与第一滑轨3滑动连接,所述第一驱动机构包括第一气缸13,所述第一气缸13的缸体固定设置于平台的上端,所述第一气缸13的活塞杆与第一移动基台11固定连接,第一气缸13驱动第一移动基台11沿第一滑轨3往返滑动。As shown in Figure 4, in this embodiment, the platform is provided with a first slide rail 3, the bottom of the first mobile base 11 is provided with a first slider 111, and the first slider 111 is connected to the first The slide rail 3 is slidingly connected, and the first driving mechanism includes a first cylinder 13, the cylinder body of the first cylinder 13 is fixedly arranged on the upper end of the platform, and the piston rod of the first cylinder 13 is connected to the first mobile base 11 Fixedly connected, the first cylinder 13 drives the first mobile base 11 to slide back and forth along the first slide rail 3 .
如图3所示,本实施例中,所述平台的上端还设置有用于限制第一移动基台11移动距离的限位块4,所述限位块4设置有两个,分别设置于第一气缸13的两侧,限位块4用于限制第一移动基台11的移动距离,使得组装基台12上的第一工位121准确的停在夹取机构21的正下方,当限位块4与第一移动基台11抵接时,第一气缸13停止驱动第一移动基台11位移,等装配完后,第一气缸13再驱动第一移动基台11复位。As shown in Figure 3, in this embodiment, the upper end of the platform is also provided with a limit block 4 for limiting the moving distance of the first mobile base 11, and the limit block 4 is provided with two, respectively arranged on the first mobile base 11. On both sides of a cylinder 13, the limit block 4 is used to limit the moving distance of the first mobile base 11, so that the first station 121 on the assembly base 12 is accurately stopped directly below the clamping mechanism 21, when limited When the block 4 abuts against the first mobile base 11, the first air cylinder 13 stops driving the first mobile base 11 to move, and after the assembly is completed, the first air cylinder 13 drives the first mobile base 11 to reset.
为了进一步保证组装基台12的定位精确,如图5所示,本实施例中,所述组装机构还包括第二移动机构,所述第二移动机构包括第二移动基台14,所述组装基台12设置于第二移动基台14的上端,所述第一移动基台11的顶部设置有第二滑轨112,所述第二移动基台14的底部设置有第二滑块141,所述第二滑块141与第二滑轨112滑动连接,所述第二移动机构还包括驱动第二移动基台14沿第一移动基台11滑动的第二驱动机构,所述第二驱动机构包括第二气缸15,所述第一移动基台11的上端设置有连接块16,所述第二气缸15的活塞杆与连接块16固定连接,所述第二气缸15的缸体与第二移动基台14固定连接,当第一气缸13驱动第一移动基台11位移,组装基台12上的第一工位121准确的停在夹取机构21的正下方后,第二气缸15再驱动第二移动基台14移动,使得组装基台12上的第二工位122移动至夹取机构21的正下方,夹取机构21再夹起第二工位122上的摇杆,第二气缸15再驱动第二移动基台14复位,组装基台12上的第一工位121又重新移动至夹取机构21的正下方,此时,夹取机构21再将摇杆装配至第一工位121上的底壳内。In order to further ensure the accurate positioning of the assembly base 12, as shown in FIG. The base 12 is arranged on the upper end of the second mobile base 14, the top of the first mobile base 11 is provided with a second slide rail 112, and the bottom of the second mobile base 14 is provided with a second slider 141, The second slider 141 is slidably connected to the second slide rail 112, and the second moving mechanism also includes a second driving mechanism that drives the second moving base 14 to slide along the first moving base 11, and the second driving The mechanism includes a second air cylinder 15, the upper end of the first mobile base 11 is provided with a connecting block 16, the piston rod of the second air cylinder 15 is fixedly connected with the connecting block 16, and the cylinder body of the second air cylinder 15 is connected with the first moving base 15. The two mobile bases 14 are fixedly connected. When the first cylinder 13 drives the displacement of the first mobile base 11 and the first station 121 on the assembly base 12 stops exactly under the clamping mechanism 21, the second cylinder 15 Then drive the second mobile base 14 to move, so that the second station 122 on the assembly base 12 moves to directly below the clamping mechanism 21, and the clamping mechanism 21 clamps the rocker on the second station 122 again. The second cylinder 15 drives the second mobile base 14 to reset, and the first station 121 on the assembly base 12 moves to the right below the clamping mechanism 21 again. At this time, the clamping mechanism 21 assembles the rocker to the second In the bottom case on a station 121.
摇杆在装配时,是将摇杆压入底壳对应的卡槽内,为了能够使摇杆顺畅的卡入底壳,而且还要保证不损坏底壳,如图4和图6所示,本实施例中,所述第二移动基台14的上端设置有第三滑轨142,所述组装基台12的底部设置有第三滑块123,所述第三滑块123与第三滑轨142滑动连接,所述第二移动基台14的上端还设置有第三气缸17,所述第三气缸17的活塞杆与组装基台12固定连接,夹取机构21将摇杆卡入底壳内,当摇杆的一部分卡入底壳内卡槽内时,第三气缸17会驱动组装基台12向前移动一小段距离,使得底壳内的开槽与摇杆之间的间隔变大,则摇杆能够很顺畅的卡入底壳内。When the rocker is assembled, the rocker is pressed into the corresponding slot of the bottom case. In order to make the rocker smoothly snap into the bottom case and ensure that the bottom case is not damaged, as shown in Figure 4 and Figure 6, In this embodiment, the upper end of the second mobile base 14 is provided with a third slide rail 142, the bottom of the assembly base 12 is provided with a third slider 123, and the third slider 123 and the third slide The rail 142 is slidingly connected, and the upper end of the second mobile base 14 is also provided with a third cylinder 17, the piston rod of the third cylinder 17 is fixedly connected with the assembly base 12, and the clamping mechanism 21 snaps the rocker into the bottom. In the shell, when a part of the rocker is stuck in the slot in the bottom shell, the third cylinder 17 will drive the assembly base 12 to move forward for a short distance, so that the distance between the slot in the bottom shell and the rocker becomes smaller. If it is large, the rocker can be smoothly inserted into the bottom case.
如图7所示,本实施例中,所述第三驱动机构包括第四气缸22,所述夹取机构21包括连接板211,所述连接板211设置有若干个用于夹取摇杆的机械手212,所述连接板211与第四气缸22的活塞杆固定连接。As shown in Fig. 7, in this embodiment, the third driving mechanism includes a fourth cylinder 22, and the clamping mechanism 21 includes a connecting plate 211, and the connecting plate 211 is provided with several pinches for clamping the rocker. The manipulator 212 , the connecting plate 211 is fixedly connected with the piston rod of the fourth cylinder 22 .
为了保证工人在操作中的安全,如图1所示,本实施例中,所述平台的前端设置有两个控制按钮5,两个控制按钮5分别与开关组装装置1、摇杆夹取装置2电连接,操作工人必须同时按下两个控制按钮5,设备才工作,防止操作工人在放工件时,不小心碰到其中一个控制按钮5,使设备突然启动,造成工伤事故。In order to ensure the safety of workers during operation, as shown in Figure 1, in this embodiment, the front end of the platform is provided with two control buttons 5, and the two control buttons 5 are respectively connected with the switch assembly device 1 and the rocker clamping device. 2 electrical connection, the operator must press the two control buttons 5 at the same time before the equipment works, preventing the operator from accidentally touching one of the control buttons 5 when placing the workpiece, causing the equipment to start suddenly and causing industrial accidents.
本发明工作原理:首先将底壳放在第一工位121上,摇杆放置在第二工位122上,第一气缸13驱动第一移动基台11向后滑动,第一移动基台11碰到限位块4后停止移动,然后第二气缸15再驱动第二移动基台14向后移动,使得组装基台12上的第二工位122移动至夹取机构21的正下方,第四气缸22驱动机械手212下移将第二工位122上的摇杆夹起,第二气缸15再驱动第二移动基台14复位,第一工位121回到夹取机构21的正下方,第四气缸22再驱动机械手212下移将摇杆卡入第一工位121上的底壳内,为了能够使摇杆顺畅的卡入底壳,而且还要保证不损坏底壳,当摇杆的一部分卡入底壳内卡槽内时,第三气缸17会驱动组装基台12向前移动一小段距离,使得底壳内的开槽与摇杆之间的间隔变大,则摇杆能够很顺畅的卡入底壳内,组装完后,第一气缸13驱动第一移动基台11复位,操作工人将装配好的工件取出即可。The working principle of the present invention is as follows: first, the bottom case is placed on the first station 121, the rocker is placed on the second station 122, the first cylinder 13 drives the first mobile base 11 to slide backward, and the first mobile base 11 Stop moving after touching the limit block 4, and then the second cylinder 15 drives the second mobile base 14 to move backward, so that the second station 122 on the assembly base 12 moves to the right below the clamping mechanism 21, the second The four cylinders 22 drive the manipulator 212 to move down to clamp the rocker on the second station 122, the second cylinder 15 drives the second mobile base 14 to reset, and the first station 121 returns to the right below the clamping mechanism 21, The fourth cylinder 22 then drives the manipulator 212 to move down to snap the rocker into the bottom shell on the first station 121. In order to make the rocker smoothly snap into the bottom shell and ensure that the bottom shell is not damaged, when the rocker When a part of the bottom shell is stuck into the slot in the bottom shell, the third cylinder 17 will drive the assembly base 12 to move forward for a short distance, so that the distance between the slot in the bottom shell and the rocker becomes larger, and the rocker can It is smoothly snapped into the bottom shell. After assembly, the first cylinder 13 drives the first mobile base 11 to reset, and the operator takes out the assembled workpiece.
以上内容仅为本发明的较佳实施例,对于本领域的普通技术人员,依据本发明的思想,在具体实施方式及应用范围上均会有改变之处,本说明书内容不应理解为对本发明的限制。The above content is only a preferred embodiment of the present invention. For those of ordinary skill in the art, according to the idea of the present invention, there will be changes in the specific implementation and application scope. limits.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201511011301.5A CN105414921B (en) | 2015-12-30 | 2015-12-30 | Rocker switch installation equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201511011301.5A CN105414921B (en) | 2015-12-30 | 2015-12-30 | Rocker switch installation equipment |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN105414921A CN105414921A (en) | 2016-03-23 |
| CN105414921B true CN105414921B (en) | 2017-10-20 |
Family
ID=55493691
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201511011301.5A Expired - Fee Related CN105414921B (en) | 2015-12-30 | 2015-12-30 | Rocker switch installation equipment |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105414921B (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105965433B (en) * | 2016-05-30 | 2017-12-08 | 常州市松泽电器有限公司 | Automatic switch tears housing apparatus open |
| CN107984195A (en) * | 2017-12-26 | 2018-05-04 | 劳士领汽车配件(昆山)有限公司 | It is pressed steel screw bushing relocation mechanism and its pressing method |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6986440B2 (en) * | 2003-09-09 | 2006-01-17 | Airway Automation, Inc. | Escapement system |
| KR101139312B1 (en) * | 2010-02-01 | 2012-04-26 | (주)효진산업 | Fixing apparatus valve for hose high-pressure |
| CN203045291U (en) * | 2012-12-07 | 2013-07-10 | 东莞市焦点自动化科技有限公司 | An automatic assembly device for micro switch shrapnel |
| CN104858642A (en) * | 2015-05-11 | 2015-08-26 | 吴中区横泾嘉运模具厂 | Package bottom plate installing mechanism for thermal protection switch assembling machine of water heater |
| CN205380411U (en) * | 2015-12-30 | 2016-07-13 | 东莞辰达电器有限公司 | A rocker switch installation device |
-
2015
- 2015-12-30 CN CN201511011301.5A patent/CN105414921B/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| CN105414921A (en) | 2016-03-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207078624U (en) | Tool endless-walk mechanism | |
| CN103212965A (en) | Sealing ring pressing mechanism | |
| CN105414921B (en) | Rocker switch installation equipment | |
| CN103920835B (en) | Automatic wire rope cutting device | |
| CN209256743U (en) | A cell centering clamping mechanism | |
| CN205380411U (en) | A rocker switch installation device | |
| CN204413917U (en) | Can be automatically switched the checkout equipment of joint | |
| CN204349194U (en) | A kind of Wiring harness terminal automatic assembling | |
| CN211219424U (en) | Clamp quick-change switching frame without manual operation | |
| CN205165523U (en) | Positive nail machine mold mechanism | |
| CN203680221U (en) | Piston ring assembly machine | |
| CN206263906U (en) | Frock turning device and it is provided with the tool locating tipping arrangement of the turning device | |
| CN110977307A (en) | A clamp quick-change switch frame that does not require manual operation | |
| CN104511865B (en) | The checkout equipment of joint can automatically switch | |
| CN202412095U (en) | Pneumatic type automatic workpiece positioning mechanism | |
| CN216264463U (en) | Automatic change tow chain equipment mechanism | |
| CN204209382U (en) | A kind of buckle of assembling automatically frock | |
| CN205111823U (en) | Duplex position reciprocating motion formula material platform equipment | |
| CN204230352U (en) | A kind of rectangular cell elasticity positioning compression fixture | |
| CN213439401U (en) | A PCB board automatic press-fit measuring device | |
| CN207577699U (en) | Applied to the air clamper on laser cutting machine workbench | |
| CN208853596U (en) | A kind of automatic punching machine shifting apparatus | |
| CN207771817U (en) | A three-axis manipulator | |
| CN109926780B (en) | Multi-plane synchronous welding tool | |
| CN203887512U (en) | Jig for assembling iron part and spring of mouse |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder |
Address after: 523160 Hongmei town second industrial area, Dongguan, Guangdong Patentee after: DEFOND ELECTECH Co.,Ltd. Address before: 523160 Hongmei town second industrial area, Dongguan, Guangdong Patentee before: Dongguan Chenda Electric Co.,Ltd. |
|
| CP01 | Change in the name or title of a patent holder | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171020 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |