CN105414484A - Fired mold precise casting technology for producing automobile H-shaped front shaft - Google Patents

Fired mold precise casting technology for producing automobile H-shaped front shaft Download PDF

Info

Publication number
CN105414484A
CN105414484A CN201510837080.0A CN201510837080A CN105414484A CN 105414484 A CN105414484 A CN 105414484A CN 201510837080 A CN201510837080 A CN 201510837080A CN 105414484 A CN105414484 A CN 105414484A
Authority
CN
China
Prior art keywords
wax
pattern
coating
formwork
carried out
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510837080.0A
Other languages
Chinese (zh)
Inventor
何家寨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaining Qunli Auto Parts Co Ltd
Original Assignee
Huaining Qunli Auto Parts Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaining Qunli Auto Parts Co Ltd filed Critical Huaining Qunli Auto Parts Co Ltd
Priority to CN201510837080.0A priority Critical patent/CN105414484A/en
Publication of CN105414484A publication Critical patent/CN105414484A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/02Sand moulds or like moulds for shaped castings
    • B22C9/04Use of lost patterns
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C3/00Selection of compositions for coating the surfaces of moulds, cores, or patterns
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C7/00Patterns; Manufacture thereof so far as not provided for in other classes
    • B22C7/02Lost patterns
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/22Moulds for peculiarly-shaped castings
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/28Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for plain shafts
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D2261/00Machining or cutting being involved

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Molds, Cores, And Manufacturing Methods Thereof (AREA)

Abstract

The invention relates to a fired mold precise casting technology for producing an automobile H-shaped front shaft. The automobile H-shaped front shaft is prepared according to the following processing steps that firstly, a wax mold is manufactured; secondly, multiple mold shell primary forming procedures of coating applying, sand scattering and coating hardening are carried out on the surface of the wax mold, dewaxing is carried out, and a mold shell is formed; thirdly, the mold shell is roasted; fourthly, made steel is poured in the mold shell, the analysis matching needs to be carried out on furnace burdens before steel making, the furnace front and furnace rear analysis needs to be carried out in the steel making process, necessary additives and deoxidizing agents are added, and accordingly the molten steel can meet the regulated chemical requirement; fifthly, the mold shell of an automobile H-shaped front shaft casting molded through casting is removed, and sand removing and casting head cutting are carried out; sixthly, grinding finishing and checking are carried out on the casting; seventhly, quenched-tempered heat treatment is carried out; eighthly, correcting and shot blasting treatment are carried out; and ninthly, metalworking treatment is carried out. According to the fired mold precise casting technology, equipment and die investment can be greatly reduced, the production cost is reduced accordingly, meanwhile, the new product development speed is high, and investment is small.

Description

A kind of investment precision casting technology producing automobile I-shaped front axle
Technical field
The present invention relates to the production and processing technology of automobile I-shaped front axle, particularly a kind of investment precision casting technology producing automobile I-shaped front axle.
Background technology
Automobile I-shaped front axle (hereinafter referred to as front axle) is the important safety part of automobile carrying.The front axle product of current domestic each manufacturer, be all adopt Forging Technology, 45# steel be forged into front axis blank, form through heat treatment, metalworking, its equipment investment, mould cost of investment are higher, and the speed of developing new product variety is comparatively slow, investment is larger.
Summary of the invention
The object of the present invention is to provide a kind of investment precision casting technology producing automobile I-shaped front axle, it not only can reduce equipment investment, mould investment greatly, thus reduces production cost, and developing new product variety speed is fast, small investment.
The technical solution used in the present invention is: a kind of investment precision casting technology producing automobile I-shaped front axle, and it is prepared according to following sequence of process steps:
(1) make wax-pattern according to automobile I-shaped front axle blank shape: comprise carry out successively casting, wax-pattern sizing, wax-pattern repairs and inspection, wax-pattern assembly welding and welding cap pouring port operation;
(2) formwork is made: 1. first carry out several daub, stucco the formwork preliminarily forming operation that coating is hardened in the wax-pattern surface that step (1) processing is obtained, 2. then dewax, formwork is separated with wax-pattern, forms independent formwork;
(3) formwork prepared of calcination steps (2);
(4) after making furnace lining, the chemical composition requirement that will reach according to molten steel after melting and the burn out rate of fusion process, the chemical composition requirement that before calculating melting, furnace charge will reach, carry out analysis to the charge composition for making steel afterwards to detect and proportioning, thus select the furnace charge of suitable proportioning and additive to carry out molten steel; When furnace charge is smelted into liquid phase, on-the-spot sample analysis is carried out to the chemical composition of molten steel, if molten steel reaches the chemical composition requirement of regulation, then add pre-deoxidant ferromanganese 0.8-1.0% and ferrosilicon 0.3-0.5%, proceed melting, if molten steel does not reach the chemical composition requirement of regulation, then add and make its necessary additive reaching regulation chemical composition and above-mentioned pre-deoxidant; When smelting temperature reaches 1800-200 DEG C, molten steel is come out of the stove into casting ladle, first adds 0.08% aluminium in order to molten steel final deoxidizing before entering casting ladle in casting ladle; Finally pouring molten steel is entered in the roasting formwork of step (3); Above percentage is mass percent;
(5) the automobile I-shaped front axle foundry goods of step (4) moulding by casting is sloughed formwork, carry out sand removal and cut dead head;
(6) foundry goods processed step (5) carries out polishing finishing and inspection;
(7) Tempering and Quenching is carried out to the foundry goods that step (6) processes;
(8) foundry goods that step (7) processes is corrected and bead;
(9) metal cutting process process is carried out to the foundry goods that step (8) processes.
Preferably, the raw materials weight portion of described wax-pattern is: antistatic additive 0.05%, light absorber 0.3%, surfactant 0.7%, paraffin 58.95%, stearic acid 40%.
Preferably, (1) make formwork time, the dope layer on wax-pattern surface is made up of one deck surface layer, three layers of transition zone and one deck enhancement Layer from the inside to the outside successively, the raw material weight number proportioning of each dope layer and technological requirement as follows:
1. surface layer: waterglass 2 parts, 9# silica flour 1.5-2 part, degreasing agent 0.3 part, defrother 0.08 part, the viscosity determined with the viscosimeter water clock time 50 seconds, firm time 35-40 minute, air-dry time be 30-50 minute summer, winter 80-100 minute; Wherein the density of waterglass is 1.27-1.29 gram per centimeter 3;
2. transition zone: waterglass 2 parts, 9# silica flour 1.2-1.5 part, the viscosity 10-15 second determined with the viscosimeter water clock time, firm time 10-25 minute, air-dry time is identical with surface layer; Wherein the density of waterglass is 1.29-1.31 gram per centimeter 3;
3. enhancement Layer: waterglass 2 parts, 8# silica flour 0.6 part, return the 8# silica flour 0.4 part of system, the viscosity 20-50 second determined with the viscosimeter water clock time, firm time is 20-30 minute summer, 120 minutes winters, and air-dry time is identical with surface layer; Wherein the density of waterglass is 1.34-1.36 gram per centimeter 3;
(2) daub when making formwork, stucco the process that coating is hardened carry out according to following steps order:
1. according to be coated with dope layer, by the related process requirement of corresponding dope layer in this claim (1) money, adjustment waterglass, makes it reach setting;
2. according to be coated with dope layer, by the related process requirement of corresponding dope layer in this claim (1) money, waterglass is taken and silica flour is poured in coating cylinder;
3. start mixer to stir, without till dry powder agglomerate in coating;
4. preliminary survey dope viscosity, if surface layer daub, also needs to add degreasing agent and defrother by the requirement of this claim (1) money;
5., after adjusting dope viscosity to this claim (1) money medium viscosity prescribed limit, stirring more than 20 minutes is continued;
6., after the coating be stirred will place 4 hours, waterglass and quartz powder materials just can be used after wetting, bubble floating effusion further;
7. wax-pattern dip-coating material, carries out successively according to following steps and requirement:
A. control wax-pattern and immerse the angle of coating and speed, not fractureing when soak with wax-pattern easily enters hole with pressure-off wax-pattern, coating and not easily causes again bubble for principle around the corner;
B., after wax-pattern immerses coating, move up and down lightly and carry out back rotation;
C. mention wax-pattern, avoid wax-pattern to come off from gate stick;
D. the little oil pike of the bubble on wax-pattern is pointed out, and add coating coating;
E., after mentioning wax-pattern, light drops down by coating and drips, and then limit is rotated, and limit is turned up and down, makes coating can be coated on wax-pattern surface equably;
8. stucco, comprises the following steps and requires:
A. make wax-pattern constantly come back rotation and turned upside down during stucco, coating and sand grains are evenly distributed, and anti-leak-stopping spreads;
B. stucco is complete shakes off unnecessary sand grains;
C. the necessary action of stucco is quick, in order to avoid the coating at water caltrop edge does not glue sand grains from doing, particularly important when summer or modulus of water glass height;
D. wherein the stucco proportioning of enhancement Layer is: the 3# quartz sand 80%+3# quartz sand 20% returning system, and wherein the order number of 3# quartz sand is 5/8;
9. coating sclerosis, comprises the following steps and requires:
A. the wax-pattern spreading sand is hung immerse be placed with in the sclerosis pond of curing agent, make coating surface immediately with waterglass generation sclerous reaction, quartz sand and powder are bonded together by the silicon dioxide colloid of generation securely;
B. firm time is with reference to this claim (1) money;
C. wax-pattern is often stirred to ensure each position homogeneous immersion;
10. air-dry, comprise the following steps and require:
A. after mentioning wax-pattern, stop the several seconds, allow curing agent trickle back and harden behind pond, then be placed on frame or ground;
B. the fan that begins to rehearse dries up moisture content;
C. air-dry time is with reference to this claim (1) money, makes formwork surface reach the degree of " not wetting in vain ";
If d. " in vain " is sent out on formwork surface, need spray or soak just can next coating of dip-coating after soaking;
If when e. having drop to retain bottom formwork, lengthen air-dry time;
F., when enhancement Layer coating has been tied, in formwork groove, add a reinforcing bar, and twine jail with thin wire, to strengthen form strength;
Air-dry good module is repeated above-mentioned coating, stucco, sclerosis, air-dry each operation, until after crust 5 layers, last dip-coating material is to prevent drop; After crust, place and within more than 8 hours, just carry out next step dewaxing;
(3) dewax, formwork is separated with wax-pattern, the process forming independent formwork is sequentially carried out according to the following steps:
1. in dewaxing pond, add the clear water accounting for tankage about 3/4, and add the sal-ammoniac accounting for water weight 6 ~ 8%, heated by water, water temperature controls within the scope of 90 ± 5 DEG C;
2., after removing the sand grains on wax-pattern formwork, the wax-pattern of band formwork is arranged in hanging basket;
3., when water temperature reaches 90 ~ 95 DEG C, hanging basket is put into pond;
4. after the wax-pattern mould material fusing in cup, before taking-up, be welded on the wooden stick for the formation of cap pouring port on wax-pattern, when no longer including lasting white wax pearl floating in cup, hanging basket mentioned;
5., when formwork proposes dewaxing pond, rock the water and floating wax poured out wherein, then tank enters hot water injection, finally formwork is placed upside down on clean ground;
6. the formwork having taken off wax is placed more than 8 hours, just carry out next step roasting.
Advantage of the present invention and beneficial effect are: than prior art, the present invention produces automobile I-shaped front axle rough casting owing to creatively adopting investment precision casting technology, again rough casting is heat-treated, metalworking to be to make product, therefore have the following advantages: (1) can reduce equipment investment, mould investment greatly, thus reduces production cost; (2) fast, the small investment of developing new product variety speed, adopt the time of other method developing new product variety greatly about half a year to one year, mould takes more than 200,000 yuan, and the time <3 utilizing the present invention to develop new product month, tool tool takes <0.5 ten thousand yuan; (3) product quality is good, has higher flexural strength and anti-fatigue life.
Detailed description of the invention
Be further described the specific embodiment of the present invention below in conjunction with embodiment, following examples only for technical scheme of the present invention is clearly described, and can not limit the scope of the invention with this.
Produce an investment precision casting technology for automobile I-shaped front axle, it is prepared according to following sequence of process steps:
(1) make wax-pattern according to automobile I-shaped front axle blank shape: comprise carry out successively casting, wax-pattern sizing, wax-pattern repairs and inspection, wax-pattern assembly welding and welding cap pouring port operation;
(2) formwork is made: 1. first carry out several daub, stucco the formwork preliminarily forming operation that coating is hardened in the wax-pattern surface that step (1) processing is obtained, 2. then dewax, formwork is separated with wax-pattern, forms independent formwork;
(3) formwork prepared of calcination steps (2);
(4) after making furnace lining, the chemical composition requirement that will reach according to molten steel after melting and the burn out rate of fusion process, the chemical composition requirement that before calculating melting, furnace charge will reach, carry out analysis to the charge composition for making steel afterwards to detect and proportioning, thus select the furnace charge of suitable proportioning and additive to carry out molten steel; When furnace charge is smelted into liquid phase, on-the-spot sample analysis is carried out to the chemical composition of molten steel, if molten steel reaches the chemical composition requirement of regulation, then add pre-deoxidant ferromanganese 0.8-1.0% and ferrosilicon 0.3-0.5%, proceed melting, if molten steel does not reach the chemical composition requirement of regulation, then add and make its necessary additive reaching regulation chemical composition and above-mentioned pre-deoxidant; When smelting temperature reaches 1800-200 DEG C, molten steel is come out of the stove into casting ladle, first adds 0.08% aluminium in order to molten steel final deoxidizing before entering casting ladle in casting ladle; Finally pouring molten steel is entered in the roasting formwork of step (3); Above percentage is mass percent;
(5) the automobile I-shaped front axle foundry goods of step (4) moulding by casting is sloughed formwork, carry out sand removal and cut dead head;
(6) foundry goods processed step (5) carries out polishing finishing and inspection;
(7) Tempering and Quenching is carried out to the foundry goods that step (6) processes;
(8) foundry goods that step (7) processes is corrected and bead;
(9) metal cutting process process is carried out to the foundry goods that step (8) processes.
In the present embodiment, the raw materials weight portion of described wax-pattern is: antistatic additive 0.05%, light absorber 0.3%, surfactant 0.7%, paraffin 58.95%, stearic acid 40%.
In the present embodiment, (1) make formwork time, the dope layer on wax-pattern surface is made up of one deck surface layer, three layers of transition zone and one deck enhancement Layer from the inside to the outside successively, the raw material weight number proportioning of each dope layer and technological requirement as follows:
1. surface layer: waterglass 2 parts, 9# silica flour 1.5-2 part, degreasing agent 0.3 part, defrother 0.08 part, the viscosity determined with the viscosimeter water clock time 50 seconds, firm time 35-40 minute, air-dry time be 30-50 minute summer, winter 80-100 minute; Wherein the density of waterglass is 1.27-1.29 gram per centimeter 3;
2. transition zone: waterglass 2 parts, 9# silica flour 1.2-1.5 part, the viscosity 10-15 second determined with the viscosimeter water clock time, firm time 10-25 minute, air-dry time is identical with surface layer; Wherein the density of waterglass is 1.29-1.31 gram per centimeter 3;
3. enhancement Layer: waterglass 2 parts, 8# silica flour 0.6 part, return the 8# silica flour 0.4 part of system, the viscosity 20-50 second determined with the viscosimeter water clock time, firm time is 20-30 minute summer, 120 minutes winters, and air-dry time is identical with surface layer; Wherein the density of waterglass is 1.34-1.36 gram per centimeter 3;
(2) daub when making formwork, stucco the process that coating is hardened carry out according to following steps order:
1. according to be coated with dope layer, by the related process requirement of corresponding dope layer in this claim (1) money, adjustment waterglass, makes it reach setting;
2. according to be coated with dope layer, by the related process requirement of corresponding dope layer in this claim (1) money, waterglass is taken and silica flour is poured in coating cylinder;
3. start mixer to stir, without till dry powder agglomerate in coating;
4. preliminary survey dope viscosity, if surface layer daub, also needs to add degreasing agent and defrother by the requirement of this claim (1) money;
5., after adjusting dope viscosity to this claim (1) money medium viscosity prescribed limit, stirring more than 20 minutes is continued;
6., after the coating be stirred will place 4 hours, waterglass and quartz powder materials just can be used after wetting, bubble floating effusion further;
7. wax-pattern dip-coating material, carries out successively according to following steps and requirement:
A. control wax-pattern and immerse the angle of coating and speed, not fractureing when soak with wax-pattern easily enters hole with pressure-off wax-pattern, coating and not easily causes again bubble for principle around the corner;
B., after wax-pattern immerses coating, move up and down lightly and carry out back rotation;
C. mention wax-pattern, avoid wax-pattern to come off from gate stick;
D. the little oil pike of the bubble on wax-pattern is pointed out, and add coating coating;
E., after mentioning wax-pattern, light drops down by coating and drips, and then limit is rotated, and limit is turned up and down, makes coating can be coated on wax-pattern surface equably;
8. stucco, comprises the following steps and requires:
A. make wax-pattern constantly come back rotation and turned upside down during stucco, coating and sand grains are evenly distributed, and anti-leak-stopping spreads;
B. stucco is complete shakes off unnecessary sand grains;
C. the necessary action of stucco is quick, in order to avoid the coating at water caltrop edge does not glue sand grains from doing, particularly important when summer or modulus of water glass height;
D. wherein the stucco proportioning of enhancement Layer is: the 3# quartz sand 80%+3# quartz sand 20% returning system, and wherein the order number of 3# quartz sand is 5/8;
9. coating sclerosis, comprises the following steps and requires:
A. the wax-pattern spreading sand is hung immerse be placed with in the sclerosis pond of curing agent, make coating surface immediately with waterglass generation sclerous reaction, quartz sand and powder are bonded together by the silicon dioxide colloid of generation securely;
B. firm time is with reference to this claim (1) money;
C. wax-pattern is often stirred to ensure each position homogeneous immersion;
10. air-dry, comprise the following steps and require:
A. after mentioning wax-pattern, stop the several seconds, allow curing agent trickle back and harden behind pond, then be placed on frame or ground;
B. the fan that begins to rehearse dries up moisture content;
C. air-dry time is with reference to this claim (1) money, makes formwork surface reach the degree of " not wetting in vain ";
If d. " in vain " is sent out on formwork surface, need spray or soak just can next coating of dip-coating after soaking;
If when e. having drop to retain bottom formwork, lengthen air-dry time;
F., when enhancement Layer coating has been tied, in formwork groove, add a reinforcing bar, and twine jail with thin wire, to strengthen form strength;
Air-dry good module is repeated above-mentioned coating, stucco, sclerosis, air-dry each operation, until after crust 5 layers, last dip-coating material is to prevent drop; After crust, place and within more than 8 hours, just carry out next step dewaxing;
(3) dewax, formwork is separated with wax-pattern, the process forming independent formwork is sequentially carried out according to the following steps:
1. in dewaxing pond, add the clear water accounting for tankage about 3/4, and add the sal-ammoniac accounting for water weight 6 ~ 8%, heated by water, water temperature controls within the scope of 90 ± 5 DEG C;
2., after removing the sand grains on wax-pattern formwork, the wax-pattern of band formwork is arranged in hanging basket;
3., when water temperature reaches 90 ~ 95 DEG C, hanging basket is put into pond;
4. after the wax-pattern mould material fusing in cup, before taking-up, be welded on the wooden stick for the formation of cap pouring port on wax-pattern, when no longer including lasting white wax pearl floating in cup, hanging basket mentioned;
5., when formwork proposes dewaxing pond, rock the water and floating wax poured out wherein, then tank enters hot water injection, finally formwork is placed upside down on clean ground;
6. the formwork having taken off wax is placed more than 8 hours, just carry out next step roasting.
The above is only preferred embodiments of the present invention; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the technology of the present invention principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (3)

1. produce an investment precision casting technology for automobile I-shaped front axle, it is characterized in that, it is prepared according to following sequence of process steps:
(1) make wax-pattern according to automobile I-shaped front axle blank shape: comprise carry out successively casting, wax-pattern sizing, wax-pattern repairs and inspection, wax-pattern assembly welding and welding cap pouring port operation;
(2) formwork is made: 1. first carry out several daub, stucco the formwork preliminarily forming operation that coating is hardened in the wax-pattern surface that step (1) processing is obtained, 2. then dewax, formwork is separated with wax-pattern, forms independent formwork;
(3) formwork prepared of calcination steps (2);
(4) after making furnace lining, the chemical composition requirement that will reach according to molten steel after melting and the burn out rate of fusion process, the chemical composition requirement that before calculating melting, furnace charge will reach, carry out analysis to the charge composition for making steel afterwards to detect and proportioning, thus select the furnace charge of suitable proportioning and additive to carry out molten steel; When furnace charge is smelted into liquid phase, on-the-spot sample analysis is carried out to the chemical composition of molten steel, if molten steel reaches the chemical composition requirement of regulation, then add pre-deoxidant ferromanganese 0.8-1.0% and ferrosilicon 0.3-0.5%, proceed melting, if molten steel does not reach the chemical composition requirement of regulation, then add and make its necessary additive reaching regulation chemical composition and above-mentioned pre-deoxidant; When smelting temperature reaches 1800-200 DEG C, molten steel is come out of the stove into casting ladle, first adds 0.08% aluminium in order to molten steel final deoxidizing before entering casting ladle in casting ladle; Finally pouring molten steel is entered in the roasting formwork of step (3); Above percentage is mass percent;
(5) the automobile I-shaped front axle foundry goods of step (4) moulding by casting is sloughed formwork, carry out sand removal and cut dead head;
(6) foundry goods processed step (5) carries out polishing finishing and inspection;
(7) Tempering and Quenching is carried out to the foundry goods that step (6) processes;
(8) foundry goods that step (7) processes is corrected and bead;
(9) metal cutting process process is carried out to the foundry goods that step (8) processes.
2. the investment precision casting technology of production automobile I-shaped front axle according to claim 1, it is characterized in that: the raw materials weight portion of described wax-pattern is: antistatic additive 0.05%, light absorber 0.3%, surfactant 0.7%, paraffin 58.95%, stearic acid 40%.
3. the investment precision casting technology of production automobile I-shaped front axle according to claim 1 and 2, is characterized in that:
(1) make formwork time, the dope layer on wax-pattern surface is made up of one deck surface layer, three layers of transition zone and one deck enhancement Layer from the inside to the outside successively, the raw material weight number proportioning of each dope layer and technological requirement as follows:
1. surface layer: waterglass 2 parts, 9# silica flour 1.5-2 part, degreasing agent 0.3 part, defrother 0.08 part, the viscosity determined with the viscosimeter water clock time 50 seconds, firm time 35-40 minute, air-dry time be 30-50 minute summer, winter 80-100 minute; Wherein the density of waterglass is 1.27-1.29 gram per centimeter 3;
2. transition zone: waterglass 2 parts, 9# silica flour 1.2-1.5 part, the viscosity 10-15 second determined with the viscosimeter water clock time, firm time 10-25 minute, air-dry time is identical with surface layer; Wherein the density of waterglass is 1.29-1.31 gram per centimeter 3;
3. enhancement Layer: waterglass 2 parts, 8# silica flour 0.6 part, return the 8# silica flour 0.4 part of system, the viscosity 20-50 second determined with the viscosimeter water clock time, firm time is 20-30 minute summer, 120 minutes winters, and air-dry time is identical with surface layer; Wherein the density of waterglass is 1.34-1.36 gram per centimeter 3;
(2) daub when making formwork, stucco the process that coating is hardened carry out according to following steps order:
1. according to be coated with dope layer, by the related process requirement of corresponding dope layer in this claim (1) money, adjustment waterglass, makes it reach setting;
2. according to be coated with dope layer, by the related process requirement of corresponding dope layer in this claim (1) money, waterglass is taken and silica flour is poured in coating cylinder;
3. start mixer to stir, without till dry powder agglomerate in coating;
4. preliminary survey dope viscosity, if surface layer daub, also needs to add degreasing agent and defrother by the requirement of this claim (1) money;
5., after adjusting dope viscosity to this claim (1) money medium viscosity prescribed limit, stirring more than 20 minutes is continued;
6., after the coating be stirred will place 4 hours, waterglass and quartz powder materials just can be used after wetting, bubble floating effusion further;
7. wax-pattern dip-coating material, carries out successively according to following steps and requirement:
A. control wax-pattern and immerse the angle of coating and speed, not fractureing when soak with wax-pattern easily enters hole with pressure-off wax-pattern, coating and not easily causes again bubble for principle around the corner;
B., after wax-pattern immerses coating, move up and down lightly and carry out back rotation;
C. mention wax-pattern, avoid wax-pattern to come off from gate stick;
D. the little oil pike of the bubble on wax-pattern is pointed out, and add coating coating;
E., after mentioning wax-pattern, light drops down by coating and drips, and then limit is rotated, and limit is turned up and down, makes coating can be coated on wax-pattern surface equably;
8. stucco, comprises the following steps and requires:
A. make wax-pattern constantly come back rotation and turned upside down during stucco, coating and sand grains are evenly distributed, and anti-leak-stopping spreads;
B. stucco is complete shakes off unnecessary sand grains;
C. the necessary action of stucco is quick, in order to avoid the coating at water caltrop edge does not glue sand grains from doing, particularly important when summer or modulus of water glass height;
D. wherein the stucco proportioning of enhancement Layer is: the 3# quartz sand 80%+3# quartz sand 20% returning system, and wherein the order number of 3# quartz sand is 5/8;
9. coating sclerosis, comprises the following steps and requires:
A. the wax-pattern spreading sand is hung immerse be placed with in the sclerosis pond of curing agent, make coating surface immediately with waterglass generation sclerous reaction, quartz sand and powder are bonded together by the silicon dioxide colloid of generation securely;
B. firm time is with reference to this claim (1) money;
C. wax-pattern is often stirred to ensure each position homogeneous immersion;
10. air-dry, comprise the following steps and require:
A. after mentioning wax-pattern, stop the several seconds, allow curing agent trickle back and harden behind pond, then be placed on frame or ground;
B. the fan that begins to rehearse dries up moisture content;
C. air-dry time is with reference to this claim (1) money, makes formwork surface reach the degree of " not wetting in vain ";
If d. " in vain " is sent out on formwork surface, need spray or soak just can next coating of dip-coating after soaking;
If when e. having drop to retain bottom formwork, lengthen air-dry time;
F., when enhancement Layer coating has been tied, in formwork groove, add a reinforcing bar, and twine jail with thin wire, to strengthen form strength;
Air-dry good module is repeated above-mentioned coating, stucco, sclerosis, air-dry each operation, until after crust 5 layers, last dip-coating material is to prevent drop; After crust, place and within more than 8 hours, just carry out next step dewaxing;
(3) dewax, formwork is separated with wax-pattern, the process forming independent formwork is sequentially carried out according to the following steps:
1. in dewaxing pond, add the clear water accounting for tankage about 3/4, and add the sal-ammoniac accounting for water weight 6 ~ 8%, heated by water, water temperature controls within the scope of 90 ± 5 DEG C;
2., after removing the sand grains on wax-pattern formwork, the wax-pattern of band formwork is arranged in hanging basket;
3., when water temperature reaches 90 ~ 95 DEG C, hanging basket is put into pond;
4. after the wax-pattern mould material fusing in cup, before taking-up, be welded on the wooden stick for the formation of cap pouring port on wax-pattern, when no longer including lasting white wax pearl floating in cup, hanging basket mentioned;
5., when formwork proposes dewaxing pond, rock the water and floating wax poured out wherein, then tank enters hot water injection, finally formwork is placed upside down on clean ground;
6. the formwork having taken off wax is placed more than 8 hours, just carry out next step roasting.
CN201510837080.0A 2015-11-24 2015-11-24 Fired mold precise casting technology for producing automobile H-shaped front shaft Pending CN105414484A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510837080.0A CN105414484A (en) 2015-11-24 2015-11-24 Fired mold precise casting technology for producing automobile H-shaped front shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510837080.0A CN105414484A (en) 2015-11-24 2015-11-24 Fired mold precise casting technology for producing automobile H-shaped front shaft

Publications (1)

Publication Number Publication Date
CN105414484A true CN105414484A (en) 2016-03-23

Family

ID=55493268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510837080.0A Pending CN105414484A (en) 2015-11-24 2015-11-24 Fired mold precise casting technology for producing automobile H-shaped front shaft

Country Status (1)

Country Link
CN (1) CN105414484A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106513575A (en) * 2016-09-29 2017-03-22 广西大学 Manufacturing method of precise casting mold
CN107398532A (en) * 2017-08-02 2017-11-28 无锡瑞昌精密铸造有限公司 The turbine technical field of producing poured into a mould using split crucible formwork
CN107414027A (en) * 2017-06-28 2017-12-01 宁波乾豪金属制品有限公司 Luggage carrier after a kind of
CN107433326A (en) * 2017-07-19 2017-12-05 宁波乾豪金属制品有限公司 A kind of pile punching ground auger
CN107442746A (en) * 2017-06-28 2017-12-08 宁波乾豪金属制品有限公司 A kind of traction rope sleeve
CN108817319A (en) * 2018-06-19 2018-11-16 霍山县忠福机电科技有限公司 A kind of hot water dewaxing's technique of low-temperature wax mould material sodium silicate shell
CN109014015A (en) * 2018-09-04 2018-12-18 霍山县忠福机电科技有限公司 A kind of waterglass casing tech by lost wax casting
CN109759805A (en) * 2019-03-29 2019-05-17 德阳天和机械制造有限责任公司 A kind of processing of iron ball rocker arm and quality testing integral type technique
CN111633189A (en) * 2020-06-13 2020-09-08 陈秀兰 High-precision casting process

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1326828A (en) * 2001-05-15 2001-12-19 北京北方恒利科技发展有限公司 Low melting point powder material for laser sintering fast forming precisely casting wax mold
CN1827256A (en) * 2006-04-14 2006-09-06 清华大学 Method for direct production of core in narrow groove and blind hole of wax mould
CN101147954A (en) * 2007-10-29 2008-03-26 福建省建阳市汽车锻压件厂 Investment precision casting technology for producing automobile I-shaped front axle
KR20090025712A (en) * 2007-09-07 2009-03-11 주식회사 영진정밀 Forming method for stainless pipe
CN102248124A (en) * 2011-06-17 2011-11-23 河南豫兴铸造有限公司 Technology for molding wax mould of single cast
CN103056294A (en) * 2012-12-06 2013-04-24 青岛美璞精工机械有限公司 Wax die molding technology of precision casting

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1326828A (en) * 2001-05-15 2001-12-19 北京北方恒利科技发展有限公司 Low melting point powder material for laser sintering fast forming precisely casting wax mold
CN1827256A (en) * 2006-04-14 2006-09-06 清华大学 Method for direct production of core in narrow groove and blind hole of wax mould
KR20090025712A (en) * 2007-09-07 2009-03-11 주식회사 영진정밀 Forming method for stainless pipe
CN101147954A (en) * 2007-10-29 2008-03-26 福建省建阳市汽车锻压件厂 Investment precision casting technology for producing automobile I-shaped front axle
CN102248124A (en) * 2011-06-17 2011-11-23 河南豫兴铸造有限公司 Technology for molding wax mould of single cast
CN103056294A (en) * 2012-12-06 2013-04-24 青岛美璞精工机械有限公司 Wax die molding technology of precision casting

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106513575A (en) * 2016-09-29 2017-03-22 广西大学 Manufacturing method of precise casting mold
CN107442746B (en) * 2017-06-28 2020-04-21 宁波乾豪金属制品有限公司 Preparation method of traction cable sleeve
CN107414027B (en) * 2017-06-28 2020-04-21 宁波乾豪金属制品有限公司 Preparation method of rear luggage rack
CN107414027A (en) * 2017-06-28 2017-12-01 宁波乾豪金属制品有限公司 Luggage carrier after a kind of
CN107442746A (en) * 2017-06-28 2017-12-08 宁波乾豪金属制品有限公司 A kind of traction rope sleeve
CN107433326B (en) * 2017-07-19 2020-04-21 宁波乾豪金属制品有限公司 Ground stake is punched and is used ground auger
CN107433326A (en) * 2017-07-19 2017-12-05 宁波乾豪金属制品有限公司 A kind of pile punching ground auger
CN107398532A (en) * 2017-08-02 2017-11-28 无锡瑞昌精密铸造有限公司 The turbine technical field of producing poured into a mould using split crucible formwork
CN108817319A (en) * 2018-06-19 2018-11-16 霍山县忠福机电科技有限公司 A kind of hot water dewaxing's technique of low-temperature wax mould material sodium silicate shell
CN109014015A (en) * 2018-09-04 2018-12-18 霍山县忠福机电科技有限公司 A kind of waterglass casing tech by lost wax casting
CN109759805A (en) * 2019-03-29 2019-05-17 德阳天和机械制造有限责任公司 A kind of processing of iron ball rocker arm and quality testing integral type technique
CN111633189A (en) * 2020-06-13 2020-09-08 陈秀兰 High-precision casting process
CN111633189B (en) * 2020-06-13 2021-06-04 常熟市耀华机械有限公司 Hanging coating machine for casting high-precision casting and casting process of casting

Similar Documents

Publication Publication Date Title
CN105414484A (en) Fired mold precise casting technology for producing automobile H-shaped front shaft
CN100488664C (en) Precision casting technology for producing automobile I-shaped front axle
CN102861873B (en) Casting method of gear
CN107937799B (en) A kind of burr cylinder jacket of centrifugal casting and preparation method thereof
CN101891444B (en) Reinforced layer coating for use in hot investment casting and preparation method thereof
CN105499505A (en) Manufacturing method for precision casting mould
CN102248124B (en) Technology for molding wax mould of single cast
CN103252449B (en) Composite stirs wing production method
CN104148583A (en) Investment casting method
CN106583661A (en) Manufacturing method for rear case body of gear case
CN106694853A (en) Method for casting motorcycle parts by use of low-pressure casting process
US4108931A (en) System of making molds for investment casting
CN106270370A (en) A kind of needle prick shape cylinder jacket and preparation method thereof
CN104759590A (en) Investment casting method
CN103266325A (en) Spotted copper ware manufacturing technology
RU2314891C1 (en) Mold making method for casting with use of investment patterns
CN1710227B (en) Method for manufacturing lock shaft parts for container
US4090995A (en) Process for hot resin coating of shell sands using salicylic acid
CN110039004A (en) A kind of production method of high intensity railway steel-casting
CN109136687A (en) A kind of production method of corrosion-resistant die casting
CN110625065B (en) Method for directly casting hole on Cr28 casting
CN107523744A (en) A kind of casting method of inexpensive bent axle
CN108637174A (en) A kind of investment casting method and system
CN104690212A (en) Pre-coated sand with uniform shell layer and unshelled performance and preparation method of pre-coated sand
CN109365748A (en) A kind of preparation method based on inorganic binder casting mold for Ti alloy casting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160323

WD01 Invention patent application deemed withdrawn after publication