Summary of the invention
The invention provides the hatching m of fertilized egg in a kind of Micropterus salmoides numerous process morning, the method effectively can improve the incubation rate of fish fertilized egg.
In order to realize object of the present invention, present invention employs following technical scheme:
The hatching m of fertilized egg in a kind of Micropterus salmoides numerous process morning, comprise and build hatching greenhouse, the artificial fish nest being attached with fertilized egg is put into the hatchery in hatching greenhouse, supportingly in described hatching greenhouse set up temperature control system, control hatchery water temperature at 23-28 DEG C.
Further technical scheme: set up supporting Spawning water filtration system in upstream, described hatchery, set up water flowing out structure in downstream, hatchery.
Further technical scheme: described hatching greenhouse comprises described hatchery, and supported by the steel structure above hatchery, cover the greenhouse body that jointly forms of light transmission film that steel structure supports outside; Described hatchery comprises some mutually isolated hatching units.
Further technical scheme: described steel structure supports the draw-in groove be provided with for fixing light transmission film, and described light transmission film is pressed in draw-in groove by the press strip of S shape.
Further technical scheme: described hatchery upper lifting has bulb, the display panel of described temperature control system is suspended in the top of hatchery; The equipment carrying out micro-pore oxygenation in described hatchery is configured with in this greenhouse; Described greenhouse is originally external is coated with sunshade net; Described greenhouse body is provided with the window that user is ventilated.
Further technical scheme: described Spawning water filtration system comprises filter element, described filter element comprises the single filter net, cascade filtration net, three-stage filtration net, the level Four screen pack that reduce gradually along the aperture of filter screen that water body circulating direction tackles setting successively, the side being positioned at three-stage filtration net and/or level Four screen pack is provided with water body agitating device, and described agitating device is paddle aerator.
Further technical scheme: described filter element also comprises water pump, drinking-water pipe, water body is passed through drinking-water pipe suction hatchery from cistern by described water pump, and described single filter net, cascade filtration net lay respectively at water inlet, the water outlet of drinking-water pipe; Described three-stage filtration net, level Four screen pack are arranged in hatchery, and described paddle aerator is arranged away from the side of three-stage filtration net in level Four screen pack.
Further technical scheme: described cascade filtration screen distance is 100-180 order, described cascade filtration net is string bag structure, and string bag muzzle is located at the delivery port of drinking-water pipe; Described three-stage filtration screen distance is 180 orders, and level Four screen pack aperture is 200 orders; Described three-stage filtration net and level Four screen pack are all fixed on corresponding support, support for fixing three-stage filtration net and support for fixing level Four screen pack are fixedly connected, and for fixing level Four screen pack support also be arranged on the support of level Four screen pack away from three-stage filtration net side and be fixedly connected; Described three-stage filtration net, level Four screen pack length are 10-60 rice; Described paddle aerator has several, and the arragement direction along level Four screen pack is arranged successively.
Further technical scheme: described water flowing out structure comprise be positioned at hatchery and with vertical pipeline section vertically arranged at the bottom of pond, hatchery, the top of described vertical pipeline section is sheathed is connected with metal webmaster; The tube wall of described metal webmaster is enclosed within outside the tube wall of vertical pipeline section, and is fixed by clip between metal webmaster and vertical pipeline section; Described water flowing out structure also comprises the movable pipeline section be communicated with vertical pipeline section be positioned at outside hatchery, angle adjustable between described movable pipeline section axis and horizontal plane, the maximum vertical height of described movable pipeline section middle water level is lower than the height sum of vertical pipeline section and metal webmaster.
Further technical scheme: described metal webmaster is made up of stainless steel material; Described vertical pipeline section is communicated with by the horizontal pipeline section running through hatchery pool wall with between movable pipeline section, described movable pipeline section is communicated with horizontal pipeline section by the first union elbow, and the first described union elbow is around horizontal pipeline section axial rotation and the rotation of drive activity pipeline section; Described vertical pipeline section is communicated with horizontal pipeline section by the second union elbow.
Beneficial effect of the present invention is:
(1) practice shows that the present invention sets up temperature-controlling system in hatchery, and when controlling hatchery water temperature 25-28 DEG C, effectively can prevent Micropterus salmoides fertilized egg from infecting saprolegniasis, substantially increase the hatching survival rate of fertilized egg.
(2) due to the present invention hatch in greenhouse adopt steel structure support for supporting greenhouse body, so its structure is compared to traditional support made of bamboo pole etc., structure is more firm, and life cycle is longer.Light transmission film energy printing opacity and naturally heat up, be beneficial to incubating oosperm; In fry rearing process in addition, sunlight can sterilization, and can accelerate the growth of fry.The hatching inside greenhouse space of said structure is large in addition, can hold enough large hatchery, easy to operate.Multiple hatching unit is beneficial to by the fertilized egg of different batches separately, is beneficial to and improves hatching survival rate.The coordinating of draw-in groove and press strip very cleverly light transmission film is fixed on steel structure to support, the cell wall of described draw-in groove is formed the structure of bending in groove by notch, is beneficial to press strip and light transmission film is pushed down and is placed in draw-in groove blocks.This hatching greenhouse is built very convenient, and Stability Analysis of Structures is firm.When taming and dociling food after fry membrane, utilize the phototaxis of fry, by bulb, fry is focused among a small circle, good concentrated bait of throwing something and feeding, be beneficial to improve and tame and docile food effect.
(3) in the present invention, Spawning water filtration system, when ensureing good filtration effect, by setting up agitating device, solving the blockage problem of filter screen, can ensure the supply requirement of a large amount of breeding water.The Fully-mechanized operation of this filtration system, saves manpower, easy to operate, improves filtration operating efficiency.Agitating device selects paddle aerator, and can be not only water oxygenation, can also avoid filter net jam, result of use be obvious.Filtering step by step of single filter net, cascade filtration net, three-stage filtration net, level Four screen pack further ensure that the requirement of fish reproduction water to water quality.
(4) in the present invention, water flowing out structure is simple, and while guaranteeing that water yield is larger, fry also can effectively be stopped, and prevents fry from escaping, and changing water process can carry out fast.Angle adjustable between the axis of the movable pipeline section be communicated with vertical pipeline section in water flowing out structure and horizontal plane, thus the adjustment to hatchery middle water level height can be realized.
Embodiment
This hatching m comprises builds hatching greenhouse, the artificial fish nest being attached with fertilized egg is put into the hatchery in hatching greenhouse, supportingly in described hatching greenhouse sets up temperature control system, control hatchery water temperature at 23-28 DEG C.Practice show to set up temperature-controlling system in hatchery, and control hatchery water temperature 23 DEG C, 25 DEG C, 28 DEG C time, can effectively prevent Micropterus salmoides fertilized egg infect saprolegniasis, substantially increase the hatching survival rate of fertilized egg.It should be noted that: in fact during production operation, only just the water temperature in hatchery is controlled at 23-28 DEG C when the outdoor water temperature height of post-reproductive; Because in breeding in earlier stage, the water temperature of spawning pond is approximately 18 DEG C, if gradually water temperature is raised to 23-28 DEG C, the temperature difference is too large, the temperature heated up gradually of general temperature-controlling system the hatching of fertilized egg may be affected, so can not allow hatchery and the spawning pond temperature difference differ by more than 5 DEG C.
For ensureing hatching water quality, and stop that harmful organisms enters hatchery 120, the present invention sets up supporting Spawning water filtration system in upstream, described hatchery 120, sets up water flowing out structure 123 in downstream, hatchery 120, and water flowing out structure is also for changing hatchery in water or water operation process.
Now by reference to the accompanying drawings to hatching greenhouse in the present invention, Spawning water filtration system, water flowing out structure be described further:
Hatching greenhouse, as shown in Figure 1,2,3, 4:
This hatching greenhouse comprises hatchery 120, and this hatching greenhouse also comprises steel structure above by hatchery 120 and supports 131 and cover steel structure and support the greenhouse body 130 that the light transmission film 132 outside 131 forms jointly.Because the present invention adopts steel structure to support 131 for supporting light transmission film 132, so its structure is compared to traditional support made of bamboo pole etc., structure is more firm, and life cycle is longer.Light transmission film 132 can printing opacity and naturally intensification, be beneficial to incubating oosperm; In fry rearing process in addition, sunlight can sterilization, and can accelerate the growth of fry.The hatching inside greenhouse space of said structure is large in addition, can hold enough large hatchery, easy to operate.
Described hatchery 120 comprises some mutually isolated hatching units 121.Such as Micropterus salmoides is when breeding, first day is together with the fertilized egg of second day can not be put, because the difference fertilized egg of a day, larger in advanced fry difference, large fry robs food with little fry, can form vicious circle, finally large fry can eat up little fry, and even sometimes large fry eats little fry, little fry can be stuck in the throat of large fry, article two, fish all can be dead, so need a lot of hatching unit, is beneficial to by the fertilized egg of different batches separately.When our actual use, sometimes due to reasons such as weather, the fertilized egg of collecting is less, when being placed on that in a hatching unit, in pond, space is still wasted very much, hatching unit is divided into less incubation division by the close eye net can putting about 2 in a hatching unit, for putting the fertilized egg of different batches.Can certainly hatching unit just be done a little bit smaller when building at first.
Described upstream, hatchery 120 is provided with the water injection pipe 122 injecting flowing water in hatchery 120, and downstream, hatchery 120 is provided with water flowing out structure 123.Such hatchery 120 Inlet and outlet water is convenient, is beneficial to and changes water.Such as Micropterus salmoides incubation temperature is generally best when 25-28 DEG C, the generation of saprolegniasis can be reduced this time, but in the later stage, after fry membrane, need cool to and differ at about 2 DEG C with outer pool water temperature, utilize said structure to carry out to hatchery 120 object that can realize lowering the temperature gradually of washing by water.
As shown in Figure 3,4: described steel structure support 131 is provided with the draw-in groove 131a for fixing light transmission film, and described light transmission film is pressed in draw-in groove 131a by the press strip 131b of S shape.Light transmission film is fixed on steel structure and supports on 131 by this structure very cleverly, and the cell wall of described draw-in groove 131a is formed the structure of bending in groove by notch, is beneficial to press strip 131b and is pushed down by light transmission film and be placed in draw-in groove 131a and block.This greenhouse is built very convenient, and Stability Analysis of Structures is firm.
Described hatchery 120 upper lifting has bulb 140.When taming and dociling food after fry membrane, utilize the phototaxis of fry, by bulb 140, fry is focused among a small circle, good concentrated bait of throwing something and feeding, be beneficial to improve and tame and docile food effect.
Be configured with the temperature control system measuring water temperature in hatchery 120 in this greenhouse, the display panel 150 of described temperature control system is suspended in the top of hatchery 120.Temperature control system can control the temperature in hatchery, controls the hatching of fertilized egg.Display panel 150 is beneficial to keeper and watches temperature, adjusts accordingly in time to hatching house's temperature.
The equipment carrying out micro-pore oxygenation in described hatchery 120 is configured with in this greenhouse.Micro-pore oxygenation equipment is beneficial to the hatching of fertilized egg; Because fish fertilized egg is generally produce on fish nest, micro-pore oxygenation equipment can increase with fertilized egg fish nest lay density, be beneficial to and improve hatchery availability.
Described greenhouse is originally external is coated with sunshade net 133.At sunny hot weather, for preventing hatching house's temperature too high, sunshade net can be pulled on and lower the temperature; When hatching house needs to heat up, sunshade net can be drawn, very easy to use.
Described greenhouse body 130 is provided with the window 134 that user is ventilated.At the noon of sunny hot weather, if temperature is too high in greenhouse body 130, can also, by opening front and back window 134, carry out aeration-cooling.
Spawning water filtration system, as shown in Figure 5,6:
This Spawning water filtration system comprises filter element 160, and the filter screen side of described filter element 160 is provided with water body agitating device.Generally, water body is when passing through the filter screen in filter element 160, the foreign material that on wire side, easily attachment is a large amount of, easily cause the blocking of mesh, and by arranging water body agitating device at filter screen side, so this agitating device just has certain agitaion to the water body of filter screen side, foreign material in water body also can be in agitated conditions all the time under the effect of agitating device, so water body is when by filter screen, the blocking of mesh is caused on foreign material would not be attached to filter screen surface with water body flow, even if foreign material are attached to after on wire side, by the effect of agitating device, foreign material also can be washed down, the problem that mesh blocks can not be caused.
Described agitating device is paddle aerator 170.Water can also be carried out aeration by paddle aerator 170 while providing enough oxygen to fish reproduction water body, and poisonous and harmful substance in water body is volatilized away, reduces concentration of narmful substance, increases water quality.The turning effort of its impeller of aerator 170 can also make water body be in agitated conditions, and in anti-water-stop body, foreign material are attached to the wire side of filter screen, avoid the blocking of sieve meshes.Paddle aerator 170 avoids traditional artificial swiped through journey, reduces the human cost of cultivation.
Described filter element 160 comprises the single filter net 161, cascade filtration net 162, three-stage filtration net 163, the level Four screen pack 164 that reduce gradually along the aperture of filter screen that water body circulating direction tackles setting successively.Here single filter net 161 is mainly used for tackling larger fish, shrimp, foreign material, prevents from destroying water pumper, and its mesh should be maximum; Cascade filtration net 162 is mainly used in tackling zooplankton; Three-stage filtration net 163 is mainly used in tackling impurity tiny in water body, such as little trash fish and fish-egg; Level Four screen pack 164 filters minute impurities in water body further, and its mesh is minimum, finally guarantees to filter the breeding requirement that the water body obtained meets perch.
Described agitating device is positioned at the side of three-stage filtration net 163 and/or level Four screen pack 164.Because impurity tiny in water body more easily causes the blocking of mesh, so arrange agitating device at the side of the relative less three-stage filtration net 163 of aperture of filter screen, level Four screen pack 164, can effectively avoid the mesh of three-stage filtration net 163, level Four screen pack 164 block by tiny impurity, eliminate the operation of artificial brush net, save manpower, improve filter efficiency.Here paddle aerator 170 arrange should not from screen pack too away from, otherwise do not reach the effect of washing away booty.
Filter element 160 also comprises water pump, drinking-water pipe 165, and water body is passed through drinking-water pipe 165 suction hatchery 120 from cistern 180 by described water pump, and described single filter net 161, cascade filtration net 162 lay respectively at water inlet, the water outlet of drinking-water pipe 165; Described three-stage filtration net 163, level Four screen pack 164 are arranged in hatchery, and described paddle aerator 170 is arranged away from the side of three-stage filtration net 163 in level Four screen pack 164.Here cistern 180 is generally river, ditch, and single filter net 161 to be arranged in river or ditch and to have the position of a segment distance from drinking-water pipe front end.Single filter net 161 is by the effect of water pump, water body to be filtered in cistern 180 filters through single filter net 161 successively, enter drinking-water pipe 165, cascade filtration net 162 filters, enter hatchery, because three-stage filtration net 163, level Four screen pack 164 are arranged in hatchery, so hatchery is divided into two parts region, above-mentioned filtration treatment water body flows through three-stage filtration net 163 by hatchery one side region, level Four screen pack 164 obtains refiltering process, finally make the water body flowing into hatchery opposite side can be used for fish reproduction.In level Four screen pack 164, arrange that paddle aerator 170 can reach the object avoiding foreign material to block mesh away from the side of three-stage filtration net 163, if water volume flow rate is comparatively slow, paddle aerator 170 here can select power a little bit smaller simultaneously.The water pump drawn water is generally 3kw mono-, can determine water pump size and quantity according to water consumption.Here cistern 180 is when building, and delivery port position is higher than hatchery 120, to ensure that water can automatic stream hatchery 120, simultaneously by Valve controlling current size.
Described cascade filtration net 162 aperture is 100-180 order, and described cascade filtration net 162 is string bag structure, and string bag muzzle is located at the delivery port of drinking-water pipe 165.Namely form cascade filtration net 162 at the string bag of water outlet muzzle one deck interception zooplankton of drinking-water pipe 165, the described string bag generally has 5 meters long.The mesh of the string bag is generally between 100-180 order, and mesh can not be too close, and too close fast owing to intaking, the string bag will soon be full of by zooplankton.So the selection of mesh size normally plays critical effect in order to what filter.
Preferably, described three-stage filtration net 163 aperture is 180 orders, and level Four screen pack 164 aperture is 200 orders.Here the selection of mesh size mainly in order to purify water further, be met breeding use water quality.
Described three-stage filtration net 163 and level Four screen pack 164 are all fixed on corresponding support, support for fixing three-stage filtration net 163 and support for fixing level Four screen pack 164 are fixedly connected, and for fixing level Four screen pack 164 support also be arranged on the support of level Four screen pack 164 away from three-stage filtration net 163 side and be fixedly connected.Support and support can be made up of steel frame construction, and support and support can make screen pack be well fixed support in hatchery, make screen pack not easily be washed upside down by current or wash away, Stability Analysis of Structures, are beneficial to normally carrying out of Spawning water filter operation.
Described three-stage filtration net 163, level Four screen pack 164 length are 10-60 rice.Three-stage filtration net 163 and level Four screen pack 164 very long, be generally the length on 120 1 limits, hatchery, using is at most generally 50-60 rice, also can carry out some adjustment according to hatchery size when allowing.Traditional screen pack is very short, short in 1 meter, long only several meters, because mating period water consumption is large, short screen pack due to discharge large, the booty of unit are accumulation is just many, and screen pack just can block very soon, is difficult to provide in time a large amount of breeding water.And the screen pack length of the present invention's design is longer, when same water consumption, the discharge of unit are is little, the booty of accumulation is just few, be difficult to blocking, lay paddle aerator simultaneously in the water outlet side of filtering, its ripples stirred, the spray can be good at cleaning booty, which save manpower, sufficient breeding water can be ensured again simultaneously.
Described paddle aerator 170 has several, and the arragement direction along level Four screen pack 164 is arranged successively.According to the size of hatchery and screen pack, the quantity of the paddle aerator 170 needed can be selected, filtration water body can be reached, avoid the object blocked.
Hatchery water flowing out structure, as shown in Figure 7:
This hatchery water flowing out structure comprise be positioned at hatchery 120 and with vertical pipeline section 123a vertically arranged at the bottom of pond, hatchery, the top of described vertical pipeline section 123a is sheathed is connected with metal webmaster 123c.Here metal webmaster 123c is the parts in pipe body shape be made by metal mesh sheet.In bath, fluvial processes, current enter in hatching by the water injection pipe 122 of upstream, hatchery 120, then discharged by the water flowing out structure 123 in downstream, hatchery, ensure when changing water that hatchery middle water level is higher than vertical pipeline section 123a, simultaneously lower than metal webmaster 123c, above-mentioned water flowing out structure is simple, as anti-escape device, metal webmaster 123c not only can guarantee that water yield is larger while, fry also can effectively be stopped, and changing water process can carry out fast.Wherein the mesh size of metal webmaster 123c can difference to some extent according to different fish, and minimum mesh should ensure that fry can not be flowed out or be stuck.
Wherein, the tube wall of described metal webmaster 123c is enclosed within outside the tube wall of vertical pipeline section 123a, and is fixed by clip between metal webmaster 123c and vertical pipeline section 123a.Install, unpick and wash conveniently.
More specifically scheme is: this system also comprises the movable pipeline section 123b be communicated with vertical pipeline section 123a be positioned at outside hatchery, angle adjustable between described movable pipeline section 123b axis and horizontal plane, the maximum vertical height of described movable pipeline section 123b middle water level is lower than the height sum of vertical pipeline section 123a and metal webmaster 123c.The height of metal webmaster 123c determines the mobility scale of water level in hatchery, and the height of general mesh sheet is about 15cm, also can adjust according to actual needs.The height of metal webmaster 123c coordinates the height of the movable pipeline section 123b outside hatchery, the maximum vertical height of the outer movable pipeline section 123b middle water level in hatchery 120 should add the height of metal webmaster 123c lower than vertical pipeline section 123a, otherwise in hatchery, water level can higher than the height of metal webmaster 123c, and fry directly can be flowed out from the top of metal webmaster 123c.Movable pipeline section 123b outside hatchery 120 can be movable, and the angle that namely can adjust between movable pipeline section 123b and horizontal plane just can regulate the water level height in hatchery.
Described metal webmaster 123c is made up of stainless steel material.Can ensureing that metal webmaster 123c can not get rusty because of contacting with water for a long time like this, increasing the service life.
Described vertical pipeline section 123a is communicated with by the horizontal pipeline section 123d running through hatchery pool wall with between movable pipeline section 123b, described movable pipeline section 123b is communicated with horizontal pipeline section 123d by the first union elbow 123e, the first described union elbow 123e around horizontal pipeline section 123d axial rotation and drive activity pipeline section 123b rotate.Namely the movable pipeline section 123b outside hatchery can be rotated around the rotation of horizontal pipeline section 123d axis by the first union elbow 123e, when movable pipeline section 123b is in heeling condition, just can regulate the water level in hatchery.
Described vertical pipeline section 123a is communicated with horizontal pipeline section 123d by the second union elbow 123f.In the very dirty needs cleaning of metal webmaster 123c or when changing, such structure is convenient takes out in the lump by vertical pipeline section 123a and with its connection metal webmaster 123c, control the angle of inclination of the movable pipeline section 123b outside hatchery simultaneously, water in hatchery can not flow out, and fry also can not run away.