CN105387627B - 一种提高风电消纳的蓄热式电采暖优化运行控制方法 - Google Patents

一种提高风电消纳的蓄热式电采暖优化运行控制方法 Download PDF

Info

Publication number
CN105387627B
CN105387627B CN201510702910.9A CN201510702910A CN105387627B CN 105387627 B CN105387627 B CN 105387627B CN 201510702910 A CN201510702910 A CN 201510702910A CN 105387627 B CN105387627 B CN 105387627B
Authority
CN
China
Prior art keywords
mrow
msub
heat
wind
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510702910.9A
Other languages
English (en)
Other versions
CN105387627A (zh
Inventor
李军徽
严干贵
王宗宝
封科
邢志同
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeast Electric Power University
Original Assignee
Northeast Dianli University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeast Dianli University filed Critical Northeast Dianli University
Priority to CN201510702910.9A priority Critical patent/CN105387627B/zh
Publication of CN105387627A publication Critical patent/CN105387627A/zh
Application granted granted Critical
Publication of CN105387627B publication Critical patent/CN105387627B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • F24H9/2007Arrangement or mounting of control or safety devices for water heaters
    • F24H9/2014Arrangement or mounting of control or safety devices for water heaters using electrical energy supply

Abstract

本发明针对我国风电供热运行方式单一,不能灵活、合理匹配弃风电量的问题,提出了一种提高风电消纳的蓄热式电采暖优化运行控制方法,其特点是,包括蓄热式电采暖提高风电消纳机理、评价指标及蓄热式电锅炉运行、蓄热式电锅炉的控制分析等步骤。该运行控制方法不仅能够满足用户负荷需求,而且能够消纳更多的弃风电量,具有科学合理,适用性强,更有效的充分利用能源,效果佳等优点。

Description

一种提高风电消纳的蓄热式电采暖优化运行控制方法
技术领域
本发明涉及风力发电技术领域,是一种提高风电消纳的蓄热式电采暖优化运行控制方法。
背景技术
我国“三北”地区风能资源丰富,冬季风电出力较大,然而为保证用户供热需求,热电联产机组“以热定电”运行,电网允许接纳风电能力不足,导致大量“弃风”。2014年,全国弃风率8%,年利用小时数1893h,“三北”地区较其他地区弃风较为严重,以吉林省为例,弃风率高达15%,年利用小时数1501h。利用蓄热式电采暖技术可替代传统燃煤锅炉供热,增加地区用电负荷,提高风电就地消纳能力。与电化学储能系统及其他储能技术相比,电热联合系统成本较低,更具工程实用性,是解决风电消纳难题的有效手段。
蓄热式电采暖技术是促进风电消纳的有效手段之一,由于热力系统具有较大的热惯性,蓄热式电锅炉是一种可时移的灵活负载,可作为电网运行的一种调控手段,增加电网灵活性,提高电网的风电接纳规模。当前我国风电供热运行方式单一,不能灵活、合理的匹配弃风电量。
发明内容
本发明所要解决的技术问题是,提出一种科学合理,适用性强的提高风电消纳的蓄热式电采暖优化运行控制方法,该运行控制方法综合考虑弃风功率、蓄热式电锅炉的技术特性等因素,不仅能够满足用户负荷需求,而且能够消纳更多的弃风电量。
解决其技术问题采用的方案是,一种提高风电消纳的蓄热式电采暖优化运行控制方法,其特征在于,它包括以下步骤:
1)蓄热式电采暖提高风电消纳机理
利用样板机功率衡量风电场弃风情况,弃风功率计算为(1)式:
式中:n为风电场风机台数,样板机为k台,第m台样板机功率为Pm(t),MW;Pqf(t)为弃风功率,MW;Pacc(t)为电网允许接纳风电空间,MW;
Pacc(t)=Peload(t)+Ploss(t)+Ptrans(t)-PG,min(t) (2)
式中:Peload(t)为电网负荷,MW;Ploss(t)为网损,MW;Ptrans(t)为联络线外送功率,MW;PG,min(t)为运行机组最小出力,MW;
代入(1)式得到弃风功率:
风电年满发利用小时数HW为:
式中:Pe为单台风电机组额定功率,MW;ΔT采样点时间间隔,h;
引入蓄热式电采暖后,风电场弃风功率为:
式中:P’qf(t)为引入蓄热式电采暖后的弃风功率,MW;Peh(t)为蓄热式电锅炉实时功率,MW;
引入蓄热式电采暖后,热力系统约束变为:
hdirect(t)+hdischarge(t)=hload(t) (6)
式中:hdirect(t)为蓄热式电锅炉直接供热功率,MW;hdischarge(t)为蓄热罐放热功率,MW;hload(t)为用户热负荷需求功率,MW;
引入蓄热式电采暖后,相应提高风电接纳电量为:
式中:Win为引入蓄热式电采暖之后电网可多接纳的风电电量;MWh;T0为供暖期起始时刻,s;T1为供热期终止时刻,s;
2)评价指标及蓄热式电锅炉系统运行
以提高消纳弃风、改善风电接纳能力为目标,使蓄热式电锅炉在满足热负荷需求前提下尽可能多的消纳弃风电量;构建两个评价指标:整个供暖期内消纳的总弃风电量Wuti及弃风电量占总消纳电量占比λuti、Wuti及λuti消纳越大则表示消纳弃风能力越大;
(1)整个供暖期内消纳的总弃风电量Wuti
蓄热式电锅炉的运行时段及运行功率受弃风功率的影响,假定蓄热式电锅炉运行功率由弃风功率Pqf(t)与非弃风功率Pfqf(t)提供,根据热负荷需求及弃风功率大小确定蓄热式电锅炉消纳的弃风电量Wuti
式中:Puti(t)为t时刻消纳的弃风功率,MW;T0为供暖期起始时刻,s;T1为供热期终止时刻,s;
(2)弃风电量占总消纳电量占比λuti
考虑到热负荷的热惯性对蓄热式电锅炉运行影响,将整个热力系统的热惯性等效为一个在一定变化范围内的可变热负荷,不同热惯性下蓄热式电锅炉灵活性不同,消纳的总电量及相应消纳弃风电量存在差异性,故引入弃风电量占总消纳电量占比来衡量系统消纳弃风电量情况,λuti的具体计算为(9)式
式中:Wtotal为蓄热式电锅炉消纳的总电量,MWh;Peh(t)为蓄热式电锅炉实时功率,MW;
(3)蓄热式电锅炉的固定控制
蓄热式电锅炉的固定控制是指,仅在夜间负荷低谷时段及部分负荷平段时间内运行,将电能转化为热能储存在蓄热罐中,并在其余时段放热进行供热;固定控制只能计及蓄热式电锅炉系统自身运行约束,特定运行时段、特定运行功率对蓄热罐进行蓄热、放热或对用户直接供热来消纳弃风电量;
蓄热式电锅炉的出力要受到蓄热罐放热、蓄热功率及容量限制,并且蓄热罐先在特定时段蓄热,蓄热罐蓄满热量后随热负荷需求进行放热,即蓄热罐的运行约束为:
式中:St为蓄热罐实时蓄热量,MWh;Se为蓄热罐最大蓄热能力,MWh;hcharge(t)为蓄热罐蓄热功率,MW;hloss(t)为蓄热式电锅炉热损失功率,由于储热装置热损失值很小,日损失不足1%,故建模时忽略其热损失;
式中:η为蓄热式电锅炉效率,%;R为蓄热式电锅炉台数,Pgl为单台蓄热式电锅炉额定功率,MW;
当蓄热罐热量为St=0时,热负荷需求由蓄热式电锅炉直接供热进行补充;
固定控制存在的一定缺陷,仅在特定时间内进行蓄热放热,未能考虑时序弃风功率的影响,未能充分利用蓄热式电锅炉的灵活性,也未能考虑整个热力系统所具有的较大热惯性,在居民供暖对于热蒸汽和热水的要求不是很高时,热网惯性相对较大,供热量和热负荷不必完全实时平衡,允许存在一定幅度的波动,对供热质量没有影响;若充分利用蓄热罐蓄热特性及热网热惯性,在满足供热需求及自身约束条件下,在弃风功率较高时,进行供热的同时蓄热,尽可能多消纳弃风电量,在弃风较少时,利用热惯性降低热负荷同时蓄热罐放热,尽可能少用非弃风电量,最终达到提高消纳弃风;
(4)蓄热式电锅炉的优化运行控制
优化运行控制既考虑了蓄热式电锅炉系统自身运行约束,又考虑时序弃风功率与热惯性对蓄热式电锅炉运行的影响,可将蓄热式电锅炉看作是一种灵活性较强的柔性负荷,将弃风功率及热负荷需求作为决策因素来控制蓄热式电锅炉功率及蓄热罐的蓄热、放热;受热惯性影响,热负荷可以不用满足实时供需平衡,在不影响用户舒适性的情况下,热负荷需求具有一定调节能力,故将热惯性等效为在一定范围内的可变热负荷,βt定义为热惯性比例,即热负荷允许波动范围,βt可取正值或负值,βt主要受供热管道的距离、热水流速、建筑物保温材料、室外温度的影响;
hdirect(t)+hdischarge(t)=(1+βt)hload(t) (12)
式中:hload(t)为用户热负荷需求功率,MW;
将蓄热式电锅炉作为一种柔性负荷,其运行约束变为:
0≤Peh(t)≤R·Pgl (13)
0≤Peh(t)≤Pqf(t) (14)
η·Peh(t)=hdirect(t)+hcharge(t) (15)
此时,蓄热罐的灵活性被完全释放,增加的运行约束:
0≤hcharge(t)≤hcharge,max (16)
0≤hdischarge(t)≤hdischarge,max (17)
式中:hcharge,max,hdischarge,max分别为蓄热罐蓄、放热最大功率,MW;
3)蓄热式电锅炉的控制分析
(1)蓄热罐蓄热:若当前t时刻弃风功率高于供热负荷需求,则蓄热式电锅炉在进行直接供热的同时蓄热罐还可进行蓄热,储存弃风电量;
其中,βt的正负取决于不同时段弃风功率大小,弃风功率较小时,βt取负值,热负荷需求向下波动,即热负荷需求降低,从而使得消纳非弃风电量最小;弃风功率较大时,βt取正值,即热需求向上波动,弃风电量消纳最大;不同时段弃风功率有差异,导致βt取值不同,βt大小为限值内的任意值;
(2)蓄热罐放热:若当前t时刻弃风功率不足以满足供热负荷,此时蓄热罐首先动作进行放热,判断蓄热罐蓄热量是否满足前瞻周期ΔT,即从t时刻起未来ΔT时间内的供热需求,若不满足则还需非弃风电量进行供热;
(3)蓄热罐状态不变:此时存在两种情况,情况一,若t时刻蓄热量为0MWh且无弃风,蓄热罐状态不变;情况二,若t时刻蓄热量为最大且弃风满足供热,此时蓄热罐状态亦不变,热负荷需求由弃风功率满足,在蓄热式电锅炉系统运行时,设采样周期与前瞻周期相同,也为ΔT=5min,运行周期为供暖期180天。
本发明的一种提高风电消纳的蓄热式电采暖优化运行控制方法,综合考虑弃风功率、蓄热式电锅炉的技术特性等因素,不仅能够满足用户负荷需求,而且能够消纳更多的弃风电量。具有科学合理,适用性强,更有效的充分利用能源,效果佳等优点。
附图说明
图1蓄热式电锅炉供暖示意图;
图2蓄热式电采暖提高电网风电消纳规模效果示意图;
图3运行控制方法流程图;
图4蓄热式电锅炉运行模式比较;
图5蓄热罐实时状态与弃风关系;
图6蓄热式电锅炉供热期运行模式比较;
图7不同热惯性系数βt下消纳弃风情况;
图8不同热惯性系数下弃风电量占比。
具体实施方式
下面利用附图和实施例对本发明的一种提高风电消纳的蓄热式电采暖优化运行控制方法作进一步说明。
结合吉林省洮南清洁供暖示范工程(具体技术参数如表1所示)进行算例分析,该示范工程共有9台蓄热式电锅炉,βt取0%~10%。
表1示范工程单台电锅炉主要技术参数
根据《城市热力网设计规范》,得到居民采暖热指标推荐值,取40W/m2(热指标中包括5%的管网损失在内)。从通常建筑采暖负荷分布分析,夜间热负荷最高,白天由于室外气温的增加热负荷较低。在整个采暖期内,最大热负荷只在从冷态进入热态时才出现。当室内温度达到18℃时,只需维持一定供热量即可满足室内温度要求,根据经验,本节中采用的小时热负荷系数分布如表2所示。
表2不同时段热负荷需求值
在上述计算条件下,应用本发明的一种提高风电消纳的蓄热式电采暖优化运行控制方法对实施例的蓄热式电锅炉控制结果如下:
1.蓄热式电采暖提高风电消纳机理
1)参照图4-图7;利用样板机功率衡量风电场弃风情况,计算弃风功率为(1)式:
式中:n为风电场风机台数,样板机为k台,第m台样板机功率为Pm(t),MW;Pqf(t)为弃风功率,MW;Pacc(t)为电网允许接纳风电空间,MW。
Pacc(t)=Peload(t)+Ploss(t)+Ptrans(t)-PG,min(t) (2)
式中:Peload(t)为电网负荷,MW;Ploss(t)为网损,MW;Ptrans(t)为联络线外送功率,MW;PG,min(t)为运行机组最小出力,MW。
代入(1)式得到弃风功率:
风电年满发利用小时数HW为:
式中:Pe为单台风电机组额定功率,MW;ΔT采样点时间间隔,h。
引入蓄热式电采暖后,风电场弃风功率为:
式中:P’qf(t)为引入蓄热式电采暖后的弃风功率,MW;Peh(t)为蓄热式电锅炉实时功率,MW。
引入蓄热式电采暖后,热力系统约束变为:
hdirect(t)+hdischarge(t)=hload(t) (6)
式中:hdirect(t)为蓄热式电锅炉直接供热功率,MW;hdischarge(t)为蓄热罐放热功率,MW;hload(t)为用户热负荷需求功率,MW。
引入蓄热式电采暖后,相应提高风电接纳电量为:
式中:Win为引入蓄热式电采暖之后电网可多接纳的风电电量;MWh;T0为供暖期起始时刻,s;T1为供热期终止时刻,s。
2)评价指标
本发明以提高消纳弃风、改善风电接纳能力为目标,使蓄热式电锅炉在满足热负荷需求前提下尽可能多的消纳弃风电量;为了定量说明所提出的运行控制方法对消纳弃风电量的效果,下面构建了两个评价指标:整个供暖期内消纳的总弃风电量Wuti及弃风电量占总消纳电量占比λut、Wuti及λuti消纳越大则表示消纳弃风能力越大。
1.1相关指标的定义及说明
①整个供暖期内消纳的总弃风电量Wuti
蓄热式电锅炉系统的运行时段及运行功率受弃风功率的影响,假定蓄热式电锅炉运行功率由弃风功率Pqf(t)与非弃风功率Pfqf(t)提供,根据热负荷需求及弃风功率大小确定蓄热式电锅炉系统消纳的弃风电量Wuti
式中:Puti(t)为t时刻消纳的弃风功率,MW;T0为供暖期起始时刻,s;T1为供热期终止时刻,s;另外非弃风功率为Pfqf(t),MW。
②弃风电量占总消纳电量占比λuti
考虑到热负荷的热惯性对蓄热式电锅炉运行影响,将整个热力系统的热惯性等效为一个在一定变化范围内的可变热负荷,不同热惯性下蓄热式电锅炉灵活性不同,消纳的总电量及相应消纳弃风电量存在差异性,故引入弃风电量占总消纳电量占比来衡量系统消纳弃风电量情况,λuti的具体计算,如式
式中:Wtotal为蓄热式电锅炉系统消纳的总电量,MWh;Peh(t)为蓄热式电锅炉实时功率,MW。1.2蓄热式电锅炉运行控制
为了提高风电消纳弃风能力,改善风电接纳能力,在固定控制模式基础上提出一种优化控制方法:
①蓄热式电锅炉的固定控制
固定控制方法指蓄热式电锅炉系统仅在夜间负荷低谷时段及部分负荷平段时间内运行,将电能转化为热能储存在蓄热罐中,并在其余时段放热进行供热;
固定控制方法只能计及蓄热式电锅炉自身运行约束,特定运行时段、特定运行功率对蓄热罐进行蓄热、放热或对用户直接供热来消纳弃风电量;
蓄热式电锅炉的出力要受到蓄热罐放热、蓄热功率及容量限制,并且蓄热罐先在特定时段蓄热,蓄热罐蓄满热量后随热负荷需求进行放热,即蓄热罐的运行约束为:
式中:St为蓄热罐实时蓄热量,MWh;Se为蓄热罐最大蓄热能力,MWh;hcharge(t)为蓄热罐蓄热功率,MW;hloss(t)为蓄热式电锅炉热损失功率,由于储热装置热损失值很小,日损失不足1%,故建模时忽略其热损失;
式中:η为蓄热式电锅炉效率,%;R为蓄热式电锅炉台数,Pgl为单台蓄热式电锅炉额定功率,MW。
当蓄热罐热量为St=0时,热负荷需求由蓄热式电锅炉直接供热进行补充;
固定控制模式存在的一定缺陷,仅在特定时间内进行蓄热放热,没有考虑弃风功率的影响,未能充分利用蓄热式电锅炉的灵活性;除此之外,该策略未能考虑整个热力系统所具有的较大热惯性,在居民供暖对于热蒸汽和热水的要求不是很高,热网惯性相对较大,供热量和热负荷不必完全实时平衡,允许存在一定幅度的波动,对供热质量没有影响;若充分利用蓄热罐蓄热特性及热网热惯性,在满足供热需求及自身约束条件下,在弃风功率较高时进行供热的同时蓄热,尽可能多消纳弃风电量,在弃风较少时,利用热惯性降低热负荷同时蓄热罐放热,尽可能少用非弃风电量,最终达到提高消纳弃风的目的。
②蓄热式电锅炉的优化运行控制
优化运行控制方法既考虑了蓄热式电锅炉系统自身运行约束,又考虑了弃风功率与热惯性对蓄热式电锅炉运行的影响,可将蓄热式电锅炉看作是一种灵活性较强的柔性负荷,将弃风功率及热负荷需求作为决策因素来控制蓄热式电锅炉功率及蓄热罐的蓄热、放热;
受热惯性影响,热负荷可以不用满足实时供需平衡,在不影响用户舒适性的情况下,热负荷需求具有一定调节能力,本发明将热惯性等效为在一定范围内的可变热负荷,βt定义为热惯性比例,即热负荷允许波动范围,βt可取正值或负值。理论上讲,βt主要受供热管道的距离、热水流速、建筑物保温材料、室外温度的影响;
hdirect(t)+hdischarge(t)=(1+βt)hload(t) (12)
式中:hload(t)为用户热负荷需求功率,MW。
蓄热式电锅炉可作为一种柔性负荷,其运行约束变为:
0≤Peh(t)≤R·Pgl (13)
0≤Peh(t)≤Pqf(t) (14)
η·Peh(t)=hdirect(t)+hcharge(t) (15)
此时,蓄热罐的灵活性被完全释放,增加的运行约束:
0≤hcharge(t)≤hcharge,max (16)
0≤hdischarge(t)≤hdischarge,max (17)
式中:hcharge,max,hdischarge,max分别为蓄热罐蓄、放热最大功率,MW。
蓄热式电锅炉的控制分析如下:
(1)蓄热罐蓄热:若当前t时刻弃风功率高于供热负荷需求,则蓄热式电锅炉在进行直
接供热的同时蓄热罐还可进行蓄热,储存弃风电量;
其中,βt的正负取决于不同时段弃风功率大小,弃风功率较小时,βt取负值,热负荷需求向下波动,即热负荷需求降低,从而使得消纳非弃风电量最小;弃风功率较大时,βt取正值,即热需求向上波动,弃风电量消纳最大;不同时段弃风功率有差异,导致βt取值不同,βt大小为限值内的任意值。
(2)蓄热罐放热:若当前t时刻弃风功率不足以满足供热负荷,此时蓄热罐首先动作进行放热,判断蓄热罐蓄热量是否满足前瞻周期ΔT(即从t时刻起未来ΔT时间内)内的供热需求,若不满足则还需非弃风电量进行供热;
(3)蓄热罐状态不变:此时存在两种情况,①若t时刻蓄热量为0MWh且无弃风,蓄热罐状态不变;②若t时刻蓄热量为最大且弃风满足供热,此时蓄热罐状态亦不变,热负荷需求由弃风功率满足。
t为0%时蓄热式电锅炉消纳弃风情况
2.1蓄热式电锅炉日消纳弃风
图4给出了蓄热式电锅炉原有运行模式状态与优化运行模式消纳弃风情况对比,新的控制模式下蓄热式电锅炉可对弃风电量进行实时追踪并有效消纳,由于蓄热式电锅炉额定功率约束,最大消纳弃风功率为16.2MW,对弃风电量进行实时消纳。
图5(A)为2013年11月18,19日连续两天蓄热罐实时状态与热负荷需求关系。18日0点到3点,图5(B)中可以看出,该时段弃风电量为0,由于此时蓄热罐热量足以维持到下一弃风时刻,18日3点出现大量弃风,在满足供热需求的前提下,进行蓄热,8点蓄热罐热量达到饱和,下一时刻弃风功率满足供热功率,使用弃风电量,当下一时刻弃风量为0时,蓄热罐进行放热满足热负荷需求。
2.2蓄热式电锅炉整个供热期消纳弃风
图6可以看出,蓄热式电锅炉固定控制模式,即夜间负荷低谷时段及部分平段满负荷运行,消纳弃风电量能力具有局限性,新的控制模式下蓄热式电锅炉灵活性增强,消纳弃风电量显著增加。表3为整个供热期180天蓄热式电锅炉优化运行前后消纳弃风电量。
表3两种控制模式对比(供热期)
3不同βt下蓄热式电锅炉消纳弃风能力分析
所谓消纳的总电量,即整个供热期内蓄热式电锅炉系统所消耗的总用电量。从图7可以看出,蓄热式电锅炉消纳的总电量呈现先减后增趋势,这是因为不同βt下热力系统热惯性存在差异性,βt越大热负荷调节范围越大,弃风较小时消纳风电较少,弃风较大时消纳风电较多,热负荷需求总量发生变化,从而导致消纳的总电量发生变化。当βt低于7.5%时,消纳的总电量呈下降趋势,说明整个供热期内热力系统向下波动总量高于向上波动总量;而当βt高于7.5%时,整个供热期内热力系统向下波动总量低于向上波动总量,从而使消纳的总电量增加。βt为7.5%时,消纳总电量最少,如电价恒定,此时最为经济。
蓄热式电锅炉消纳的弃风电量不断升高,这是由于蓄热罐起到“缓冲”作用,进一步促进弃风电量的消纳。热惯性系数为10%较0时新增消纳弃风电量1542MWh。
如图8所示,在满足供热负荷需求下,随着热惯性不断增强,弃风电量占总电量占比先增后减,当βt为8.5%时,占比最高为81.26%,此时热惯性与蓄热罐“缓冲”作用共同消纳弃风电量效果最好。
本发明实施例中的计算条件、图例、表等仅用于对本发明作进一步的说明,并非穷举,并不构成对权利要求保护范围的限定,本领域技术人员根据本发明实施例获得的启示,不经过创造性劳动就能够想到其它实质上等同的替代,均在本发明保护范围内。

Claims (1)

1.一种提高风电消纳的蓄热式电采暖优化运行控制方法,其特征在于,它包括以下步骤:
1)蓄热式电采暖提高风电消纳机理
利用样板机功率衡量风电场弃风情况,弃风功率计算为(1)式:
<mrow> <msub> <mi>P</mi> <mrow> <mi>q</mi> <mi>f</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>=</mo> <mi>n</mi> <mo>&amp;CenterDot;</mo> <mfrac> <mrow> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>m</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>k</mi> </munderover> <msub> <mi>P</mi> <mi>m</mi> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> </mrow> <mi>k</mi> </mfrac> <mo>-</mo> <msub> <mi>P</mi> <mrow> <mi>a</mi> <mi>c</mi> <mi>c</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>)</mo> </mrow> </mrow>
式中:n为风电场风机台数,样板机为k台,第m台样板机功率为Pm(t),MW;Pqf(t)为弃风功率,MW;Pacc(t)为电网允许接纳风电空间,MW;
Pacc(t)=Peload(t)+Ploss(t)+Ptrans(t)-PG,min(t) (2)
式中:Peload(t)为电网负荷,MW;Ploss(t)为网损,MW;Ptrans(t)为联络线外送功率,MW;PG,min(t)为运行机组最小出力,MW;
代入(1)式得到弃风功率:
<mrow> <msub> <mi>P</mi> <mrow> <mi>q</mi> <mi>f</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>=</mo> <mi>n</mi> <mo>&amp;CenterDot;</mo> <mfrac> <mrow> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>m</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>k</mi> </munderover> <msub> <mi>P</mi> <mi>m</mi> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> </mrow> <mi>k</mi> </mfrac> <mo>+</mo> <msub> <mi>P</mi> <mrow> <mi>G</mi> <mo>.</mo> <mi>min</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>-</mo> <msub> <mi>P</mi> <mrow> <mi>e</mi> <mi>l</mi> <mi>o</mi> <mi>a</mi> <mi>d</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>-</mo> <msub> <mi>P</mi> <mrow> <mi>l</mi> <mi>o</mi> <mi>s</mi> <mi>s</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>-</mo> <msub> <mi>P</mi> <mrow> <mi>t</mi> <mi>r</mi> <mi>a</mi> <mi>n</mi> <mi>s</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>3</mn> <mo>)</mo> </mrow> </mrow>
风电年满发利用小时数HW为:
<mrow> <mi>H</mi> <mi>W</mi> <mo>=</mo> <mfrac> <mrow> <munder> <mo>&amp;Sigma;</mo> <mi>t</mi> </munder> <msub> <mi>P</mi> <mrow> <mi>a</mi> <mi>c</mi> <mi>c</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>&amp;CenterDot;</mo> <mi>&amp;Delta;</mi> <mi>T</mi> </mrow> <mrow> <munder> <mo>&amp;Sigma;</mo> <mi>t</mi> </munder> <mi>n</mi> <mo>&amp;CenterDot;</mo> <msub> <mi>P</mi> <mi>e</mi> </msub> </mrow> </mfrac> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>4</mn> <mo>)</mo> </mrow> </mrow>
式中:Pe为单台风电机组额定功率,MW;ΔT采样点时间间隔,h;
引入蓄热式电采暖后,风电场弃风功率为:
<mrow> <msubsup> <mi>P</mi> <mrow> <mi>q</mi> <mi>f</mi> </mrow> <mo>&amp;prime;</mo> </msubsup> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>=</mo> <mi>n</mi> <mo>&amp;CenterDot;</mo> <mfrac> <mrow> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>m</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>k</mi> </munderover> <msub> <mi>P</mi> <mi>m</mi> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> </mrow> <mi>k</mi> </mfrac> <mo>+</mo> <msub> <mi>P</mi> <mrow> <mi>G</mi> <mo>,</mo> <mi>m</mi> <mi>i</mi> <mi>n</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>-</mo> <msub> <mi>P</mi> <mrow> <mi>e</mi> <mi>l</mi> <mi>o</mi> <mi>a</mi> <mi>d</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>-</mo> <msub> <mi>P</mi> <mrow> <mi>l</mi> <mi>o</mi> <mi>s</mi> <mi>s</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>-</mo> <msub> <mi>P</mi> <mrow> <mi>t</mi> <mi>r</mi> <mi>a</mi> <mi>n</mi> <mi>s</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>-</mo> <msub> <mi>P</mi> <mrow> <mi>e</mi> <mi>h</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>5</mn> <mo>)</mo> </mrow> </mrow>
式中:P’qf(t)为引入蓄热式电采暖后的弃风功率,MW;Peh(t)为蓄热式电锅炉实时功率,MW;
引入蓄热式电采暖后,热力系统约束变为:
hdirect(t)+hdischarge(t)=hload(t) (6)
式中:hdirect(t)为蓄热式电锅炉直接供热功率,MW;hdischarge(t)为蓄热罐放热功率,MW;hload(t)为用户热负荷需求功率,MW;
引入蓄热式电采暖后,相应提高风电接纳电量为:
<mrow> <msub> <mi>W</mi> <mrow> <mi>i</mi> <mi>n</mi> </mrow> </msub> <mo>=</mo> <msubsup> <mo>&amp;Integral;</mo> <mrow> <mi>T</mi> <mn>0</mn> </mrow> <mrow> <mi>T</mi> <mn>1</mn> </mrow> </msubsup> <mrow> <mo>(</mo> <msub> <mi>P</mi> <mrow> <mi>q</mi> <mi>f</mi> </mrow> </msub> <mo>(</mo> <mi>t</mi> <mo>)</mo> <mo>-</mo> <msubsup> <mi>P</mi> <mrow> <mi>q</mi> <mi>f</mi> </mrow> <mo>&amp;prime;</mo> </msubsup> <mo>(</mo> <mi>t</mi> <mo>)</mo> <mo>)</mo> </mrow> <mi>d</mi> <mi>t</mi> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>7</mn> <mo>)</mo> </mrow> </mrow>
式中:Win为引入蓄热式电采暖之后电网可多接纳的风电电量;MWh;T0为供暖期起始时刻,s;T1为供热期终止时刻,s;
2)评价指标及蓄热式电锅炉系统运行
以提高消纳弃风、改善风电接纳能力为目标,使蓄热式电锅炉在满足热负荷需求前提下尽可能多的消纳弃风电量;构建两个评价指标:整个供暖期内消纳的总弃风电量Wuti及弃风电量占总消纳电量占比λuti、Wuti及λuti消纳越大则表示消纳弃风能力越大;
(1)整个供暖期内消纳的总弃风电量Wuti
蓄热式电锅炉的运行时段及运行功率受弃风功率的影响,假定蓄热式电锅炉运行功率由弃风功率Pqf(t)与非弃风功率Pfqf(t)提供,根据热负荷需求及弃风功率大小确定蓄热式电锅炉消纳的弃风电量Wuti
<mrow> <msub> <mi>W</mi> <mrow> <mi>u</mi> <mi>t</mi> <mi>i</mi> </mrow> </msub> <mo>=</mo> <msubsup> <mo>&amp;Integral;</mo> <mrow> <mi>T</mi> <mn>0</mn> </mrow> <mrow> <mi>T</mi> <mn>1</mn> </mrow> </msubsup> <msub> <mi>P</mi> <mrow> <mi>u</mi> <mi>t</mi> <mi>i</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mi>d</mi> <mi>t</mi> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>8</mn> <mo>)</mo> </mrow> </mrow>
式中:Puti(t)为t时刻消纳的弃风功率,MW;T0为供暖期起始时刻,s;T1为供热期终止时刻,s;
(2)弃风电量占总消纳电量占比λuti
考虑到热负荷的热惯性对蓄热式电锅炉运行影响,将整个热力系统的热惯性等效为一个在一定变化范围内的可变热负荷,不同热惯性下蓄热式电锅炉灵活性不同,消纳的总电量及相应消纳弃风电量存在差异性,故引入弃风电量占总消纳电量占比来衡量系统消纳弃风电量情况,λuti的具体计算为(9)式
<mrow> <msub> <mi>&amp;lambda;</mi> <mrow> <mi>u</mi> <mi>t</mi> <mi>i</mi> </mrow> </msub> <mo>=</mo> <mfrac> <msub> <mi>W</mi> <mrow> <mi>u</mi> <mi>t</mi> <mi>i</mi> </mrow> </msub> <msub> <mi>W</mi> <mrow> <mi>t</mi> <mi>o</mi> <mi>t</mi> <mi>a</mi> <mi>l</mi> </mrow> </msub> </mfrac> <mo>=</mo> <mfrac> <mrow> <msubsup> <mo>&amp;Integral;</mo> <mrow> <mi>T</mi> <mn>0</mn> </mrow> <mrow> <mi>T</mi> <mn>1</mn> </mrow> </msubsup> <msub> <mi>P</mi> <mrow> <mi>u</mi> <mi>t</mi> <mi>i</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mi>d</mi> <mi>t</mi> </mrow> <mrow> <msubsup> <mo>&amp;Integral;</mo> <mrow> <mi>T</mi> <mn>0</mn> </mrow> <mrow> <mi>T</mi> <mn>1</mn> </mrow> </msubsup> <msub> <mi>P</mi> <mrow> <mi>e</mi> <mi>h</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mi>d</mi> <mi>t</mi> </mrow> </mfrac> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>9</mn> <mo>)</mo> </mrow> </mrow>
式中:Wtotal为蓄热式电锅炉消纳的总电量,MWh;Peh(t)为蓄热式电锅炉实时功率,MW;
(3)蓄热式电锅炉的固定控制
蓄热式电锅炉的固定控制是指,仅在夜间负荷低谷时段及部分负荷平段时间内运行,将电能转化为热能储存在蓄热罐中,并在其余时段放热进行供热;固定控制只能计及蓄热式电锅炉系统自身运行约束,特定运行时段、特定运行功率对蓄热罐进行蓄热、放热或对用户直接供热来消纳弃风电量;
蓄热式电锅炉的出力要受到蓄热罐放热、蓄热功率及容量限制,并且蓄热罐先在特定时段蓄热,蓄热罐蓄满热量后随热负荷需求进行放热,即蓄热罐的运行约束为:
<mrow> <mtable> <mtr> <mtd> <mrow> <msubsup> <mo>&amp;Integral;</mo> <mi>t</mi> <mrow> <mi>t</mi> <mo>+</mo> <mi>&amp;Delta;</mi> <mi>t</mi> </mrow> </msubsup> <mrow> <mo>&amp;lsqb;</mo> <mrow> <msub> <mi>h</mi> <mrow> <mi>c</mi> <mi>h</mi> <mi>arg</mi> <mi>e</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>-</mo> <msub> <mi>h</mi> <mrow> <mi>d</mi> <mi>i</mi> <mi>s</mi> <mi>c</mi> <mi>h</mi> <mi>arg</mi> <mi>e</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>-</mo> <msub> <mi>h</mi> <mrow> <mi>l</mi> <mi>o</mi> <mi>s</mi> <mi>s</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> </mrow> <mo>&amp;rsqb;</mo> </mrow> <mi>d</mi> <mi>t</mi> <mo>=</mo> <msub> <mi>S</mi> <mrow> <mi>t</mi> <mo>+</mo> <mi>&amp;Delta;</mi> <mi>t</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>S</mi> <mi>t</mi> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <mn>0</mn> <mo>&amp;le;</mo> <msub> <mi>S</mi> <mi>t</mi> </msub> <mo>&amp;le;</mo> <msub> <mi>S</mi> <mi>e</mi> </msub> </mrow> </mtd> </mtr> </mtable> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>10</mn> <mo>)</mo> </mrow> </mrow> 式中:St为蓄热罐 实时蓄热量,MWh;Se为蓄热罐最大蓄热能力,MWh;hcharge(t)为蓄热罐蓄热功率,MW;hloss(t) 为蓄热式电锅炉热损失功率,由于储热装置热损失值很小,日损失不足1%,故建模时忽略 其热损失;
<mrow> <mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <mrow> <msub> <mi>h</mi> <mrow> <mi>c</mi> <mi>h</mi> <mi>arg</mi> <mi>e</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>=</mo> <mi>&amp;eta;</mi> <mo>&amp;CenterDot;</mo> <mi>R</mi> <mo>&amp;CenterDot;</mo> <msub> <mi>P</mi> <mrow> <mi>g</mi> <mi>l</mi> </mrow> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>h</mi> <mrow> <mi>d</mi> <mi>i</mi> <mi>s</mi> <mi>c</mi> <mi>h</mi> <mi>arg</mi> <mi>e</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>=</mo> <msub> <mi>h</mi> <mrow> <mi>l</mi> <mi>o</mi> <mi>a</mi> <mi>d</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> </mrow> </mtd> </mtr> </mtable> </mfenced> <mo>,</mo> <mrow> <mo>(</mo> <mrow> <mn>0</mn> <mo>&amp;le;</mo> <msub> <mi>S</mi> <mi>t</mi> </msub> <mo>&amp;le;</mo> <msub> <mi>S</mi> <mi>e</mi> </msub> </mrow> <mo>)</mo> </mrow> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>11</mn> <mo>)</mo> </mrow> </mrow>
式中:η为蓄热式电锅炉效率,%;R为蓄热式电锅炉台数,Pgl为单台蓄热式电锅炉额定功率,MW;
当蓄热罐热量为St=0时,热负荷需求由蓄热式电锅炉直接供热进行补充;
固定控制存在的一定缺陷,仅在特定时间内进行蓄热放热,未能考虑时序弃风功率的影响,未能充分利用蓄热式电锅炉的灵活性,也未能考虑整个热力系统所具有的较大热惯性,在居民供暖对于热蒸汽和热水的要求不是很高时,热网惯性相对较大,供热量和热负荷不必完全实时平衡,允许存在一定幅度的波动,对供热质量没有影响;若充分利用蓄热罐蓄热特性及热网热惯性,在满足供热需求及自身约束条件下,在弃风功率较高时,进行供热的同时蓄热,尽可能多消纳弃风电量,在弃风较少时,利用热惯性降低热负荷同时蓄热罐放热,尽可能少用非弃风电量,最终达到提高消纳弃风;
(4)蓄热式电锅炉的优化运行控制
优化运行控制既考虑了蓄热式电锅炉系统自身运行约束,又考虑时序弃风功率与热惯性对蓄热式电锅炉运行的影响,可将蓄热式电锅炉看作是一种灵活性较强的柔性负荷,将弃风功率及热负荷需求作为决策因素来控制蓄热式电锅炉功率及蓄热罐的蓄热、放热;受热惯性影响,热负荷可以不用满足实时供需平衡,在不影响用户舒适性的情况下,热负荷需求具有一定调节能力,故将热惯性等效为在一定范围内的可变热负荷,βt定义为热惯性比例,即热负荷允许波动范围,βt可取正值或负值,βt主要受供热管道的距离、热水流速、建筑物保温材料、室外温度的影响;
hdirect(t)+hdischarge(t)=(1+βt)hload(t) (12)
式中:hload(t)为用户热负荷需求功率,MW;
将蓄热式电锅炉作为一种柔性负荷,其运行约束变为:
0≤Peh(t)≤R·Pgl (13)
0≤Peh(t)≤Pqf(t) (14)
η·Peh(t)=hdirect(t)+hcharge(t) (15)
此时,蓄热罐的灵活性被完全释放,增加的运行约束:
0≤hcharge(t)≤hcharge,max (16)
0≤hdischarge(t)≤hdischarge,max (17)
式中:hcharge,max,hdischarge,max分别为蓄热罐蓄、放热最大功率,MW;
3)蓄热式电锅炉的控制分析
(1)蓄热罐蓄热:若当前t时刻弃风功率高于供热负荷需求,则蓄热式电锅炉在进行直接供热的同时蓄热罐还可进行蓄热,储存弃风电量;
<mrow> <mtable> <mtr> <mtd> <mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <mrow> <msub> <mi>h</mi> <mrow> <mi>c</mi> <mi>h</mi> <mi>arg</mi> <mi>e</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>=</mo> <mi>&amp;eta;</mi> <mo>&amp;CenterDot;</mo> <msub> <mi>P</mi> <mrow> <mi>e</mi> <mi>h</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>-</mo> <msub> <mi>h</mi> <mrow> <mi>l</mi> <mi>o</mi> <mi>a</mi> <mi>d</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>&amp;CenterDot;</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>+</mo> <msub> <mi>&amp;beta;</mi> <mi>t</mi> </msub> <mo>)</mo> </mrow> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>P</mi> <mrow> <mi>u</mi> <mi>t</mi> <mi>i</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>=</mo> <msub> <mi>P</mi> <mrow> <mi>e</mi> <mi>h</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> </mrow> </mtd> </mtr> </mtable> </mfenced> </mtd> </mtr> <mtr> <mtd> <mrow> <mo>(</mo> <mrow> <msub> <mi>h</mi> <mrow> <mi>l</mi> <mi>o</mi> <mi>a</mi> <mi>d</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mrow> <mo>(</mo> <mrow> <mn>1</mn> <mo>+</mo> <msub> <mi>&amp;beta;</mi> <mi>t</mi> </msub> </mrow> <mo>)</mo> </mrow> <mo>&amp;le;</mo> <mi>&amp;eta;</mi> <mo>&amp;CenterDot;</mo> <msub> <mi>P</mi> <mrow> <mi>e</mi> <mi>h</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>&amp;le;</mo> <msub> <mi>P</mi> <mrow> <mi>q</mi> <mi>f</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> </mrow> <mo>)</mo> </mrow> </mtd> </mtr> </mtable> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>18</mn> <mo>)</mo> </mrow> </mrow>
其中,βt的正负取决于不同时段弃风功率大小,弃风功率较小时,βt取负值,热负荷需求向下波动,即热负荷需求降低,从而使得消纳非弃风电量最小;弃风功率较大时,βt取正值,即热需求向上波动,弃风电量消纳最大;不同时段弃风功率有差异,导致βt取值不同,βt大小为限值内的任意值;
(2)蓄热罐放热:若当前t时刻弃风功率不足以满足供热负荷,此时蓄热罐首先动作进行放热,判断蓄热罐蓄热量是否满足前瞻周期ΔT,即从t时刻起未来ΔT时间内的供热需求,若不满足则还需非弃风电量进行供热;
<mrow> <mtable> <mtr> <mtd> <mrow> <msub> <mi>h</mi> <mrow> <mi>d</mi> <mi>i</mi> <mi>s</mi> <mi>c</mi> <mi>h</mi> <mi>arg</mi> <mi>e</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>=</mo> <mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <mrow> <msub> <mi>h</mi> <mrow> <mi>l</mi> <mi>o</mi> <mi>a</mi> <mi>d</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>&amp;CenterDot;</mo> <mrow> <mo>(</mo> <mrow> <mn>1</mn> <mo>+</mo> <msub> <mi>&amp;beta;</mi> <mi>t</mi> </msub> </mrow> <mo>)</mo> </mrow> <mo>,</mo> <mrow> <mo>(</mo> <mrow> <msub> <mi>P</mi> <mrow> <mi>q</mi> <mi>f</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>=</mo> <mn>0</mn> </mrow> <mo>)</mo> </mrow> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>h</mi> <mrow> <mi>l</mi> <mi>o</mi> <mi>a</mi> <mi>d</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>&amp;CenterDot;</mo> <mrow> <mo>(</mo> <mrow> <mn>1</mn> <mo>+</mo> <msub> <mi>&amp;beta;</mi> <mi>t</mi> </msub> </mrow> <mo>)</mo> </mrow> <mo>-</mo> <mi>&amp;eta;</mi> <mo>&amp;CenterDot;</mo> <msub> <mi>P</mi> <mrow> <mi>e</mi> <mi>h</mi> </mrow> </msub> </mrow> </mtd> </mtr> </mtable> </mfenced> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <mo>(</mo> <mrow> <mo>(</mo> <mrow> <mn>0</mn> <mo>&lt;</mo> <msub> <mi>P</mi> <mrow> <mi>q</mi> <mi>f</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>&lt;</mo> <msub> <mi>h</mi> <mrow> <mi>l</mi> <mi>o</mi> <mi>a</mi> <mi>d</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>&amp;CenterDot;</mo> <mrow> <mo>(</mo> <mrow> <mn>1</mn> <mo>+</mo> <msub> <mi>&amp;beta;</mi> <mi>t</mi> </msub> </mrow> <mo>)</mo> </mrow> </mrow> <mo>)</mo> </mrow> </mrow> </mtd> </mtr> </mtable> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>19</mn> <mo>)</mo> </mrow> </mrow>
(3)蓄热罐状态不变:此时存在两种情况,情况一,若t时刻蓄热量为0MWh且无弃风,蓄热罐状态不变;情况二,若t时刻蓄热量为最大且弃风满足供热,此时蓄热罐状态亦不变,热负荷需求由弃风功率满足,在蓄热式电锅炉系统运行时,设采样周期与前瞻周期相同,也为ΔT=5min,运行周期为供暖期180天。
CN201510702910.9A 2015-10-24 2015-10-24 一种提高风电消纳的蓄热式电采暖优化运行控制方法 Active CN105387627B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510702910.9A CN105387627B (zh) 2015-10-24 2015-10-24 一种提高风电消纳的蓄热式电采暖优化运行控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510702910.9A CN105387627B (zh) 2015-10-24 2015-10-24 一种提高风电消纳的蓄热式电采暖优化运行控制方法

Publications (2)

Publication Number Publication Date
CN105387627A CN105387627A (zh) 2016-03-09
CN105387627B true CN105387627B (zh) 2018-04-10

Family

ID=55420198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510702910.9A Active CN105387627B (zh) 2015-10-24 2015-10-24 一种提高风电消纳的蓄热式电采暖优化运行控制方法

Country Status (1)

Country Link
CN (1) CN105387627B (zh)

Families Citing this family (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105844097B (zh) * 2016-03-23 2018-11-09 大连理工大学 含配置蓄热罐热电厂的电力系统弃风功率计算方法
CN106026081B (zh) * 2016-06-22 2021-10-29 中国电力科学研究院 一种使用弃风电供暖的实时调度方法
CN106196237A (zh) * 2016-06-29 2016-12-07 成都城电电力工程设计有限公司 一种适用于弃风消纳的气电一体化供暖系统及其实现方法
CN106197763B (zh) * 2016-07-28 2019-01-08 国网北京市电力公司 储热体储热量的确定方法和装置
CN106300412B (zh) * 2016-08-16 2019-03-19 南瑞(武汉)电气设备与工程能效测评中心 蓄热电锅炉实时消纳弃风电量能力的评估方法
CN106839082B (zh) * 2016-12-23 2019-09-17 北京天诚同创电气有限公司 风电供暖调控系统及调控方法
CN106969399A (zh) * 2017-03-29 2017-07-21 赫普热力发展有限公司 一种清洁能源发电的消纳调峰系统及其消纳调峰方法
CN107069786B (zh) * 2017-03-30 2021-04-06 中国电力科学研究院 一种提升风电消纳的系统及方法
CN108736507B (zh) * 2017-04-25 2021-05-18 中国电力科学研究院 一种提升风电就地消纳的蓄热式电锅炉优化方法和装置
CN107218639B (zh) * 2017-04-28 2020-02-07 大唐东北电力试验研究所有限公司 热电联产机组采用蓄热罐方式深度调峰的优化控制方法
CN107256436B (zh) * 2017-05-05 2022-07-22 国家电网公司 蓄热电锅炉与清洁能源的预测匹配和消纳控制方法
CN107039990B (zh) * 2017-06-14 2019-08-23 哈尔滨工业大学 一种提高风电消纳能力的多热源协调调度策略制定方法
CN107632520B (zh) * 2017-07-31 2021-02-26 中国电力科学研究院 一种风电消纳潜力模型优化控制方法及系统
CN107918815B (zh) * 2017-12-14 2022-06-03 国网电力科学研究院(武汉)能效测评有限公司 一种蓄热电锅炉消纳可再生能源日内调度指令执行方法
CN108258721A (zh) * 2017-12-30 2018-07-06 国家电网公司华北分部 一种机组安全约束下的风电消纳能力获取方法和系统
CN108375059B (zh) * 2018-01-16 2019-09-24 南京友智科技有限公司 一种高压电极锅炉系统的调峰控制方法
CN108390417B (zh) * 2018-03-09 2019-06-07 国网辽宁省电力有限公司 一种agc的柔性负荷调度控制方法
CN108711849B (zh) * 2018-06-01 2020-08-18 国网经济技术研究院有限公司 一种热电机组配置蓄热装置的设计方法
CN108628176B (zh) * 2018-06-29 2021-03-19 国网山东省电力公司电力科学研究院 一种计及热网柔性的热电联合优化调度方法
CN109583696B (zh) * 2018-10-29 2021-10-26 东北电力大学 基于rbf神经网络的单个电采暖设备调节能力评估方法
CN109543235B (zh) * 2018-10-29 2023-04-18 东北电力大学 一种基于参数库构建的分散式电采暖负荷建模系统及其建模方法
CN111156585B (zh) * 2018-11-07 2021-09-07 国网冀北电力有限公司 风电供暖系统能量流控制方法和装置
CN109685319B (zh) * 2018-11-26 2022-03-18 东北电力大学 一种基于蓄热式电锅炉电-热时移特性的弃风消纳方法
CN109766346B (zh) * 2019-01-25 2022-11-18 长春工程学院 一种高寒地区固体蓄热式电锅炉短期功率消耗预测方法
CN110287509B (zh) * 2019-04-25 2021-05-04 浙江大学 城市热网的柔性分析与结构缺陷诊断及定位方法和系统
CN110544033B (zh) * 2019-08-29 2022-12-16 大连理工大学 热电厂灵活性改造后的电力系统风电消纳评估方法
CN111400641B (zh) * 2019-11-29 2024-03-22 国网天津市电力公司电力科学研究院 一种含蓄热式电采暖的综合能源系统日前优化调度方法
CN112103989B (zh) * 2019-12-09 2023-07-04 沈阳工业大学 一种考虑多类型负荷调控能力的新能源消纳贡献量化方法
CN113864854B (zh) * 2021-10-12 2022-07-19 华北电力大学 一种蓄热式电采暖参与风电消纳的多目标优化方法及系统

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103107560A (zh) * 2011-11-15 2013-05-15 华北电力科学研究院有限责任公司 一种基于供热机组参与电网调峰的风电接入方法及系统
CN203504203U (zh) * 2013-10-14 2014-03-26 吉林省电力科学研究院有限公司 利用建筑物蓄热潜能参与电网深度调峰的辅助装置
CN104216368A (zh) * 2014-08-28 2014-12-17 天津大学 一种基于需求响应的分布式联供系统优化运行控制方法
CN104504451A (zh) * 2014-11-04 2015-04-08 国家电网公司 一种多状态运行热电厂的火电系统日前机组组合优化方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103107560A (zh) * 2011-11-15 2013-05-15 华北电力科学研究院有限责任公司 一种基于供热机组参与电网调峰的风电接入方法及系统
CN203504203U (zh) * 2013-10-14 2014-03-26 吉林省电力科学研究院有限公司 利用建筑物蓄热潜能参与电网深度调峰的辅助装置
CN104216368A (zh) * 2014-08-28 2014-12-17 天津大学 一种基于需求响应的分布式联供系统优化运行控制方法
CN104504451A (zh) * 2014-11-04 2015-04-08 国家电网公司 一种多状态运行热电厂的火电系统日前机组组合优化方法

Also Published As

Publication number Publication date
CN105387627A (zh) 2016-03-09

Similar Documents

Publication Publication Date Title
CN105387627B (zh) 一种提高风电消纳的蓄热式电采暖优化运行控制方法
CN109858759B (zh) 一种工业园区综合能源平衡调度方法
CN106960282B (zh) 一种气电综合能源配网系统的协调运行方法
CN105656064B (zh) 利用供热时滞性实现热电机组参与系统调峰调度的方法
CN102506519B (zh) 热电联产机组与风力发电联合供热系统及调度方法
CN108009683A (zh) 一种大容量直控负荷提高风电接纳能力的调度方法
CN106593771B (zh) 一种热电联产系统中的电热解耦系统及其控制方法
CN110110913A (zh) 大型园区综合能源系统能源站优化配置方法
CN108631343A (zh) 一种多能互补能源互联网优化调度方法
CN107067116A (zh) 一种多区域电热综合系统经济环境联合调度求解方法
CN108206543A (zh) 一种基于能源梯级利用的能源路由器及其运行优化方法
CN107332286A (zh) 一种含储热的热电联产与风电协调调度方法
CN109523065A (zh) 一种基于改进量子粒子群算法的微能源网优化调度方法
CN103580063A (zh) 一种基于需方响应消纳大规模并网风电的方法
Cui et al. Effect of device models on the multiobjective optimal operation of CCHP microgrids considering shiftable loads
CN111191353B (zh) 考虑热惯性的电-热综合能源系统协调运行方法
CN103199555A (zh) 一种负荷侧资源参与电力系统二次调频的控制方法
CN103197547A (zh) 一种粒子群寻优的调峰炉热力站供热负荷优化调度方法
CN112329988A (zh) 一种基于园区可调能力分析的需求侧响应计算方法
CN111030101B (zh) 一种基于多元化大数据清洁能源消纳联动调控方法及系统
CN111146819B (zh) 一种考虑热网特性的电热联合系统辅助服务调度方法
CN113033900A (zh) 一种园区级综合能源系统容量优化配置方法和系统
CN106440902B (zh) 一种基于冷热电联产的储热调节系统及其调节方法
CN108494014A (zh) 一种混合能源热电联产经济性优化管理方法
CN110544033B (zh) 热电厂灵活性改造后的电力系统风电消纳评估方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant