CN105386596A - Template mounting and reinforcing device - Google Patents

Template mounting and reinforcing device Download PDF

Info

Publication number
CN105386596A
CN105386596A CN201510821174.9A CN201510821174A CN105386596A CN 105386596 A CN105386596 A CN 105386596A CN 201510821174 A CN201510821174 A CN 201510821174A CN 105386596 A CN105386596 A CN 105386596A
Authority
CN
China
Prior art keywords
template
steel pipes
steel pipe
mountain
reinforcing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510821174.9A
Other languages
Chinese (zh)
Inventor
蔡季勃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Xinhuayou Construction Group Co Ltd
Original Assignee
Qingdao Xinhuayou Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Xinhuayou Construction Group Co Ltd filed Critical Qingdao Xinhuayou Construction Group Co Ltd
Priority to CN201510821174.9A priority Critical patent/CN105386596A/en
Publication of CN105386596A publication Critical patent/CN105386596A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to a template mounting and reinforcing device. The template mounting and reinforcing device comprises a template, steel pipes, screw rods, mountain-shaped clamps and screw caps, wherein two parallel steel pipes are respectively arranged at the two sides of the template; the steel pipes at the two sides of the template are connected through the screw rods, the mountain-shaped clamps and the screw caps; and the two ends of two steel pipes at the same side of the template are fixedly connected. The middle parts of two steel pipes at the same side of the template are also fixedly connected. The template mounting and reinforcing device improves a traditional single steel pipe to double steel pipes, and the double steel pipes are connected through the screw rods, the mountain-shaped clamps and the screw caps to form a template reinforcing system, so that the problems of difficult installation, easy falling of the steel pipes and waste sale in a traditional shaped template reinforcing system, the installation is simple, safe and reliable, the purposes of material saving and energy saving are achieved, and the engineering benefit is wholly increased.

Description

A kind of model sheetinstallat bracing means
Technical field
The present invention relates to measurement mechanism and the measuring method of horizontal absolute altitude in a kind of building operations.
Background technology
In traditional work progress, in outer wall template and fine strain of millet side template strengthening process, because need two steel pipes do not associated and reinforced by screw rod, mountain type card, nut together, in carpenter's formwork reinforcement process, as easy as rolling off a log generation steel pipe comes off hidden danger, cause falling object from high altitude phenomenon, very easily security incident occurs.In the engineering later stage, projects often there is the steel pipe being less than 1m cannot return leasing company, or in the leftover bits and pieces of steel bar meter generation, a lot of long reinforcing bar at about 1 meter diameter more than 20.Can only sell at a low price as waste material.Uneconomical economically.
Summary of the invention
The problem to be solved in the present invention is to provide a kind of simple and can guarantee measurement mechanism and the measuring method of horizontal absolute altitude in the accurate building operations of measurement result.
For solving the problems of the technologies described above, model sheetinstallat bracing means of the present invention, comprise template, steel pipe, screw rod, mountain type card and nut, described template both sides respectively arrange two parallel steel pipes, and the steel pipe of template both sides is connected with nut by screw rod, mountain type card, and the two ends of two steel pipes of described template the same side are fixedly connected with.
The middle part of two steel pipes of described template the same side is also fixedly connected with.
The present invention, by the improvement to existing single steel pipe, forms two steel pipe, by screw rod, mountain type card, nut connects, form formwork reinforcement system, overcome traditional typified form reinforcement system and install difficulty, steel pipe easily comes off, and the problem that waste material is sold cheap, install simple, safe and reliable, reach saving material, the object of energy conservation, improves project benefit on the whole.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the present invention is further detailed explanation.
Fig. 1 is the structural representation of two steel pipes of model sheetinstallat bracing means of the present invention.
Fig. 2 be two steel pipe longer time structural representation.
Fig. 3 is the sectional view that model sheetinstallat bracing means of the present invention is applied in girder construction.
Fig. 4 is the elevation that model sheetinstallat bracing means of the present invention is applied in girder construction.
Fig. 5 is the sectional view that model sheetinstallat bracing means of the present invention is applied on exterior wall.
Fig. 6 is the elevation that model sheetinstallat bracing means of the present invention is applied on exterior wall.
Detailed description of the invention
As depicted in figs. 1 and 2, model sheetinstallat bracing means of the present invention, comprise template 1, steel pipe 2, screw rod 3, mountain type card 4 and nut 5, template 1 both sides respectively arrange two parallel steel pipes 2, and the steel pipe 2 of template 1 both sides is connected with nut 5 by screw rod 3, mountain type card 4, and the two ends of two steel pipes 2 of template 1 the same side are connected by full weld point 6.The lumps of wood 7 is set between two steel pipe and template.
Two steel pipe also usable diameter is greater than the bi-steel replacement of 20mm.
Two steel pipe diameter 12mm reinforcing bar full welds; If two steel pipe length are less than 1 meter, with reinforcement welding steel pipe top, the end of more than diameter 12mm, if be greater than one meter, with bar connecting steel pipe top, the end of more than diameter 12mm, middle part; Be advisable with 50mm in connecting reinforcement distance end; In two steel pipes, spacing is 18mm to 25mm, is advisable can put on Screw arbor with nut at both-ends.After engineering terminates, in the light of actual conditions, two steel pipe can excise connecting reinforcement, and polishing tie point place, becomes two steel pipes do not associated.
The two steel pipe of the present invention is improvement to original formwork reinforcement system and extension.Unwrapping wire, join mould at the end of, after determining split bolt position, jewel hole, sleeve pipe, wears split bolt.Then install two steel pipe, mountain type card, nut is reinforced.Add support system.
Implementation process is as described below:
1, see figures.1.and.2, building site is less than the steel pipe of 1 meter, reinforcing bar waste material or according to actual needs, determining that outer wall template is reinforced needs actual steel pipe amount, processes as required.Connecting reinforcement needs full weld on Steel Tube Joint.
2, for beam, with reference to Fig. 3 and Fig. 4, join after mould terminates, determine Screw arbor with nut at both-ends position, jewel hole, cover pvc pipe, after wearing split bolt.Two steel pipe is installed, mountain type card is installed, nut.Correct.
3, for exterior wall, join after mould terminates with reference to Fig. 5 and Fig. 6, determine Screw arbor with nut at both-ends position, jewel hole, cover pvc pipe, after wearing split bolt.Two steel pipe is installed, mountain type card is installed, nut.Correct.

Claims (2)

1. a model sheetinstallat bracing means, comprise template, steel pipe, screw rod, mountain type card and nut, described template both sides respectively arrange two parallel steel pipes, the steel pipe of template both sides is connected with nut by screw rod, mountain type card, it is characterized in that: the two ends of two steel pipes of described template the same side are fixedly connected with.
2., according to horizontal absolute altitude pilot measurement device according to claim 1, it is characterized in that: the middle part of two steel pipes of described template the same side is also fixedly connected with.
CN201510821174.9A 2015-11-23 2015-11-23 Template mounting and reinforcing device Pending CN105386596A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510821174.9A CN105386596A (en) 2015-11-23 2015-11-23 Template mounting and reinforcing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510821174.9A CN105386596A (en) 2015-11-23 2015-11-23 Template mounting and reinforcing device

Publications (1)

Publication Number Publication Date
CN105386596A true CN105386596A (en) 2016-03-09

Family

ID=55419316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510821174.9A Pending CN105386596A (en) 2015-11-23 2015-11-23 Template mounting and reinforcing device

Country Status (1)

Country Link
CN (1) CN105386596A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201605801U (en) * 2010-02-09 2010-10-13 广东浩和建筑有限公司 Fair-faced concrete wall template system
CN202000662U (en) * 2011-01-27 2011-10-05 中建三局建设工程股份有限公司 System for reinforcing profile steel concrete column template
CN202194372U (en) * 2011-04-13 2012-04-18 中化二建集团有限公司 All-steel template for building construction
CN203547123U (en) * 2013-09-11 2014-04-16 中国华冶科工集团有限公司 Supporting device for deformation joint template
CN203755662U (en) * 2014-03-25 2014-08-06 中国建筑第四工程局有限公司 Split fixing device for beam column form

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201605801U (en) * 2010-02-09 2010-10-13 广东浩和建筑有限公司 Fair-faced concrete wall template system
CN202000662U (en) * 2011-01-27 2011-10-05 中建三局建设工程股份有限公司 System for reinforcing profile steel concrete column template
CN202194372U (en) * 2011-04-13 2012-04-18 中化二建集团有限公司 All-steel template for building construction
CN203547123U (en) * 2013-09-11 2014-04-16 中国华冶科工集团有限公司 Supporting device for deformation joint template
CN203755662U (en) * 2014-03-25 2014-08-06 中国建筑第四工程局有限公司 Split fixing device for beam column form

Similar Documents

Publication Publication Date Title
CN107503473A (en) A kind of tool-type rectangular column steel bar positioning fixture
CN203475806U (en) Tool type anchoring bolt assembly used for fixing shape steel cantilever beam in construction sites
CN208733666U (en) A kind of fixing bolt preformed hole template tool
CN204475533U (en) Built-in fitting high-accuracy mounting device in a kind of concrete
CN203361603U (en) Detachable anchoring part of building-type steel beam overhanging scaffold
CN201401010Y (en) Fixing device for preset nut type steel reinforced concrete combined column template
CN203487639U (en) Device for precisely pre-burying and fixing steelwork column anchor bolts
CN105386596A (en) Template mounting and reinforcing device
CN102926554A (en) Steel hanging seat template supports and construction method thereof
CN211258625U (en) Tunnel secondary lining platform truck end template
CN104278668B (en) The syndeton of a kind of embedded iron parts and dowel
CN204266572U (en) Scaffold wall connecting piece
CN204152198U (en) A kind of vault building construction steel arch tire and braced structures
CN202611223U (en) Recyclable bolt type scaffold wall connection piece
CN206541411U (en) A kind of detection prior-warning device of cantilever pouring construction bridges Hanging Basket anchor system
CN202689558U (en) T-shaped adjustable split screw bolt
CN104880139A (en) Reinforcing steel bar inner arc radius measuring scale
CN102995890A (en) Scaffold hard tying device capable of realizing efficient recycling
CN204342302U (en) For the tower machine attachment changed course bracing or strutting arrangement be arranged in parallel
CN204139334U (en) Girder steel and steel column weld temporary connecting structure entirely
CN111236626A (en) Side wall unilateral template support system combining composite fiber template and steel truss
CN202488064U (en) Detachable through-wall pipeline protecting device
CN206830188U (en) Just prop up two lining contact measurement apparatus in tunnel
CN212535053U (en) Side wall unilateral template support system combining composite fiber template and steel truss
CN204456449U (en) A kind of simple and easy callable pre-buried wall-connecting piece

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160309

RJ01 Rejection of invention patent application after publication