CN204475533U - Built-in fitting high-accuracy mounting device in a kind of concrete - Google Patents

Built-in fitting high-accuracy mounting device in a kind of concrete Download PDF

Info

Publication number
CN204475533U
CN204475533U CN201520134603.0U CN201520134603U CN204475533U CN 204475533 U CN204475533 U CN 204475533U CN 201520134603 U CN201520134603 U CN 201520134603U CN 204475533 U CN204475533 U CN 204475533U
Authority
CN
China
Prior art keywords
steel plate
bolt
iron parts
concrete
embedded iron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520134603.0U
Other languages
Chinese (zh)
Inventor
刘学辉
马军尧
白朝阳
李晓光
薛煜光
王芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PINGMEI SHENMA CONSTRUCTION ENGINEERING GROUP Co Ltd CIVIL WORK SECTION
Original Assignee
PINGMEI SHENMA CONSTRUCTION ENGINEERING GROUP Co Ltd CIVIL WORK SECTION
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PINGMEI SHENMA CONSTRUCTION ENGINEERING GROUP Co Ltd CIVIL WORK SECTION filed Critical PINGMEI SHENMA CONSTRUCTION ENGINEERING GROUP Co Ltd CIVIL WORK SECTION
Priority to CN201520134603.0U priority Critical patent/CN204475533U/en
Application granted granted Critical
Publication of CN204475533U publication Critical patent/CN204475533U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to built-in fitting high-accuracy mounting device in concrete, effectively can solve the problem that post facility that the pre-buried low precision of prior art causes cannot be installed, its technical scheme solved is, one end of flower basket bolt is connected with fixture, the other end of flower basket bolt is connected with benchmark steel plate, in the heart bolt is housed in benchmark steel plate, the first nut bolt on benchmark steel plate is equipped with, stretch out on the bolt below benchmark steel plate and the second nut is housed, between benchmark steel plate and the second nut, embedded iron parts is housed, embedded iron parts is placed in concrete, fixture is fixed on bracing members scaffold through cruciform fastening for falsework, the utility model successfully solves embedded iron parts in concrete on construction site and is subject to postorder construction infection embedded iron parts precision, improve certainty of measurement and efficiency, it is the innovation on embedded iron parts erecting device.

Description

Built-in fitting high-accuracy mounting device in a kind of concrete
Technical field
The utility model relates to building field, particularly built-in fitting high-accuracy mounting device in a kind of concrete.
Background technology
Along with the develop rapidly of national economy situation, various energy industry is advanced by leaps and bounds.Industrial construction form of diverse, in industrial construction civil engineering construction, the pre-buried accuracy relation of ironware is to subsequent installation quality.The features such as in industrial construction, embedded iron parts has required precision high, and distribution area is wide, density is large, and ironware quantity is many, and the duration is tight, task weight, and operating personnel is few.It is to have reinforced and reinforcing bar is helped to have pricked at formwork erection that traditional embedded iron parts is installed, install before concreting, fixedly the needing of embedded iron parts uses steel bar end to be fixedly welded on the reinforcing cage helping to have pricked, or install in the template of reinforcing, but vibrate in process at postorder concreting, vibrating spear, the pre-buried precision of embedded iron parts can be affected, even cause the difficulty that post facility cannot be installed.Therefore, the improvement of embedded iron parts erecting device is the problem needing solution at present badly.
Summary of the invention
For above-mentioned situation, be solve the defect of prior art, the object of the utility model is just to provide built-in fitting high-accuracy mounting device in a kind of concrete, effectively can solve the problem that post facility that the pre-buried low precision of prior art causes cannot be installed.
The technical scheme that the utility model solves is, comprise fixture, flower basket bolt and benchmark steel plate, one end of flower basket bolt is connected with fixture, the other end of flower basket bolt is connected with benchmark steel plate, in the heart bolt is housed in benchmark steel plate, the first nut bolt on benchmark steel plate is equipped with, stretch out on the bolt below benchmark steel plate and the second nut is housed, between benchmark steel plate and the second nut, embedded iron parts is housed, embedded iron parts is placed in concrete, and fixture is fixed on bracing members scaffold through cruciform fastening for falsework.
The utility model successfully solves embedded iron parts in concrete on construction site and is subject to postorder construction infection embedded iron parts precision, and the installation accuracy of embedded iron parts can be improved in postorder has constructed rear certain hour, decrease unnecessary input, improve certainty of measurement and efficiency, is the innovation on embedded iron parts erecting device.
Accompanying drawing explanation
Fig. 1 is structural front view of the present utility model.
Fig. 2 is using state figure of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described in further detail.
Provided by Fig. 1-2, the utility model comprises fixture, flower basket bolt and benchmark steel plate, one end of flower basket bolt 2 is connected with fixture 1, the other end of flower basket bolt 2 is connected with benchmark steel plate 3, in benchmark steel plate 3, bolt 4 is housed in the heart, the first nut 5 bolt 4 on benchmark steel plate 3 is equipped with, stretch out on the bolt 4 below benchmark steel plate 3 and second nut 6 is housed, between benchmark steel plate 3 and the second nut 6, embedded iron parts 7 is housed, embedded iron parts 7 is placed in concrete eight, and fixture 1 is fixed on bracing members scaffold 10 through cruciform fastening for falsework 9.
In order to ensure result of use, described flower basket bolt 2 has 3, and 3 flower basket bolts 2 are in positive triangular pyramid.
Described fixture 1 is the steel pipe of diameter 48mm, long 400mm.
Described benchmark steel plate 3 is the circular steel plate of thick 10mm, and center is provided with circular hole.
Described bolt 4 length is at least 120mm.
There is through hole at described embedded iron parts 7 center, and through-hole diameter is greater than bolt 4 diameter 2mm.
Service condition of the present utility model is, first weld 3 flower basket bolts 2 by fixture 1, flower basket bolt 2 welds benchmark steel plate 3, make flower basket bolt 2 in positive triangular pyramid, erection bolt 4 on benchmark steel plate 3, first nut 5, second nut 6, embedded iron parts 7 bolt 4 is equipped with, second nut 6 is concordant with bolt 4, before concrete eight construction, the embedded iron parts 7 of device is located in the concrete eight that will build, and according to position, fixture 1 is fixed on bracing members scaffold 10 by cruciform fastening for falsework 9, after concrete eight construction, level gauge and spirit level is relied on to regulate flower basket bolt 2 before initial set, carry out position and precision check, make the installation accuracy requirement of embedded iron parts 7 degree of being up to the standard and the discrepancy in elevation.After concrete eight intensity reaches 50% of design strength, looser a bolt 4, remove the utility model device, bolt 6 is retained in concrete eight.
The utility model utilizes shaped steel for component, the ironware erecting device made, be fixed on the bracing members scaffold of job site, ironware is not connected with reinforcing cage and template, concreting, after vibrating, concrete initial set advance line position and precision are checked, improve embedded iron parts installation accuracy, and then improve post facility installation quality, solve construction difficult problem, quick detachable, can have enough to meet the need, utilization rate is high, successfully solve embedded iron parts in concrete on construction site and be subject to postorder construction infection embedded iron parts precision, and the installation accuracy of embedded iron parts can be improved in postorder has constructed rear certain hour, decrease unnecessary input, improve certainty of measurement and efficiency, it is the innovation on embedded iron parts erecting device, there is good economic and social benefit.

Claims (6)

1. built-in fitting high-accuracy mounting device in a concrete, comprise fixture, flower basket bolt and benchmark steel plate, it is characterized in that, one end of flower basket bolt (2) is connected with fixture (1), the other end of flower basket bolt (2) is connected with benchmark steel plate (3), bolt (4) is housed in benchmark steel plate (3) in the heart, bolt (4) on benchmark steel plate (3) is equipped with the first nut (5), stretch out on the bolt (4) below benchmark steel plate (3) and the second nut (6) is housed, embedded iron parts (7) is housed between benchmark steel plate (3) and the second nut (6), embedded iron parts (7) is placed in concrete (8), fixture (1) is fixed on bracing members scaffold (10) through cruciform fastening for falsework (9).
2. built-in fitting high-accuracy mounting device in concrete according to claim 1, is characterized in that, described flower basket bolt (2) has 3, and 3 flower basket bolts (2) are in positive triangular pyramid.
3. built-in fitting high-accuracy mounting device in concrete according to claim 1, is characterized in that, described fixture (1) is diameter 48mm, the steel pipe of long 400mm.
4. built-in fitting high-accuracy mounting device in concrete according to claim 1, is characterized in that, the circular steel plate that described benchmark steel plate (3) is thick 10mm, center is provided with circular hole.
5. built-in fitting high-accuracy mounting device in concrete according to claim 1, is characterized in that, described bolt (4) length is at least 120mm.
6. built-in fitting high-accuracy mounting device in concrete according to claim 1, is characterized in that, there is through hole at described embedded iron parts (7) center, and through-hole diameter is greater than bolt (4) diameter 2mm.
CN201520134603.0U 2015-03-10 2015-03-10 Built-in fitting high-accuracy mounting device in a kind of concrete Expired - Fee Related CN204475533U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520134603.0U CN204475533U (en) 2015-03-10 2015-03-10 Built-in fitting high-accuracy mounting device in a kind of concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520134603.0U CN204475533U (en) 2015-03-10 2015-03-10 Built-in fitting high-accuracy mounting device in a kind of concrete

Publications (1)

Publication Number Publication Date
CN204475533U true CN204475533U (en) 2015-07-15

Family

ID=53631335

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520134603.0U Expired - Fee Related CN204475533U (en) 2015-03-10 2015-03-10 Built-in fitting high-accuracy mounting device in a kind of concrete

Country Status (1)

Country Link
CN (1) CN204475533U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106545174A (en) * 2016-11-24 2017-03-29 中国三冶集团有限公司 A kind of coaxial installation of embedded parts positioner and method
CN108609549A (en) * 2018-05-29 2018-10-02 五冶集团上海有限公司 A kind of hanging scaffold platform removed for steel stack
CN109914820A (en) * 2019-03-25 2019-06-21 中国核工业华兴建设有限公司 Portable high-accuracy absolute altitude installation of embedded parts tool
CN114033087A (en) * 2021-11-02 2022-02-11 郑州祥和集团有限公司 Construction method of embedded part of transformer substation

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106545174A (en) * 2016-11-24 2017-03-29 中国三冶集团有限公司 A kind of coaxial installation of embedded parts positioner and method
CN106545174B (en) * 2016-11-24 2018-09-14 中国三冶集团有限公司 A kind of coaxial installation of embedded parts positioning device and method
CN108609549A (en) * 2018-05-29 2018-10-02 五冶集团上海有限公司 A kind of hanging scaffold platform removed for steel stack
CN109914820A (en) * 2019-03-25 2019-06-21 中国核工业华兴建设有限公司 Portable high-accuracy absolute altitude installation of embedded parts tool
CN114033087A (en) * 2021-11-02 2022-02-11 郑州祥和集团有限公司 Construction method of embedded part of transformer substation

Similar Documents

Publication Publication Date Title
CN204475533U (en) Built-in fitting high-accuracy mounting device in a kind of concrete
CN202139833U (en) Cantilever scaffold for building construction
CN202913420U (en) Reusable positioning device for installing foundation bolts
CN202937005U (en) Cast-in-situ concrete beam lateral template reinforcement device
CN202787926U (en) Overhanging scaffold simple and convenient to disassemble and assemble
CN203475806U (en) Tool type anchoring bolt assembly used for fixing shape steel cantilever beam in construction sites
CN203412292U (en) Detachable discharging platform
CN204199667U (en) Detachable builder's jack corner tripod
CN203022222U (en) Wholly-cast ring beam of brick-concrete building support
CN203654710U (en) Instrumental connecting tube for external wall scaffold shearing wall portion
CN102661035A (en) Tool type wall connecting piece for exterior wall scaffold
CN202209046U (en) Wall connecting rod for external scaffold
CN204139622U (en) Adjustable segmented column steel bar positioning fixture
CN202706526U (en) Concrete structure construction template fixing and reinforcing device
CN202745353U (en) Tool-type overhanging scaffold
CN203097263U (en) Standardized revolving scaffolding connecting tube
CN204343647U (en) A kind of the shaped steel suspension scaffolding bracing frame
CN204983719U (en) Assembly type structure faces flat protection of edge water and chooses net
CN204081468U (en) A kind of shear-wall strengthening formwork structure
CN204342302U (en) For the tower machine attachment changed course bracing or strutting arrangement be arranged in parallel
CN203569693U (en) Pre-buried iron part with steel ties arranged on concrete structure
CN206028597U (en) Processingequipment and system of processing of steel reinforcement cage
CN105625711A (en) Construction-purpose roof template
CN203755642U (en) Cantilever scaffold profile steel anchoring device
CN204405060U (en) A kind of spirit-leveling instrument on bracing members framing scaffold installs device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150715

Termination date: 20190310