CN204475533U - Built-in fitting high-accuracy mounting device in a kind of concrete - Google Patents
Built-in fitting high-accuracy mounting device in a kind of concrete Download PDFInfo
- Publication number
- CN204475533U CN204475533U CN201520134603.0U CN201520134603U CN204475533U CN 204475533 U CN204475533 U CN 204475533U CN 201520134603 U CN201520134603 U CN 201520134603U CN 204475533 U CN204475533 U CN 204475533U
- Authority
- CN
- China
- Prior art keywords
- steel plate
- bolt
- iron parts
- concrete
- embedded iron
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 33
- 239000010959 steel Substances 0.000 claims abstract description 33
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical group [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 30
- 238000010276 construction Methods 0.000 abstract description 10
- 208000015181 infectious disease Diseases 0.000 abstract description 3
- 238000005259 measurement Methods 0.000 abstract description 3
- 238000009434 installation Methods 0.000 description 6
- 230000003014 reinforcing effect Effects 0.000 description 4
- 238000009439 industrial construction Methods 0.000 description 3
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000000717 retained effect Effects 0.000 description 1
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model relates to built-in fitting high-accuracy mounting device in concrete, effectively can solve the problem that post facility that the pre-buried low precision of prior art causes cannot be installed, its technical scheme solved is, one end of flower basket bolt is connected with fixture, the other end of flower basket bolt is connected with benchmark steel plate, in the heart bolt is housed in benchmark steel plate, the first nut bolt on benchmark steel plate is equipped with, stretch out on the bolt below benchmark steel plate and the second nut is housed, between benchmark steel plate and the second nut, embedded iron parts is housed, embedded iron parts is placed in concrete, fixture is fixed on bracing members scaffold through cruciform fastening for falsework, the utility model successfully solves embedded iron parts in concrete on construction site and is subject to postorder construction infection embedded iron parts precision, improve certainty of measurement and efficiency, it is the innovation on embedded iron parts erecting device.
Description
Technical field
The utility model relates to building field, particularly built-in fitting high-accuracy mounting device in a kind of concrete.
Background technology
Along with the develop rapidly of national economy situation, various energy industry is advanced by leaps and bounds.Industrial construction form of diverse, in industrial construction civil engineering construction, the pre-buried accuracy relation of ironware is to subsequent installation quality.The features such as in industrial construction, embedded iron parts has required precision high, and distribution area is wide, density is large, and ironware quantity is many, and the duration is tight, task weight, and operating personnel is few.It is to have reinforced and reinforcing bar is helped to have pricked at formwork erection that traditional embedded iron parts is installed, install before concreting, fixedly the needing of embedded iron parts uses steel bar end to be fixedly welded on the reinforcing cage helping to have pricked, or install in the template of reinforcing, but vibrate in process at postorder concreting, vibrating spear, the pre-buried precision of embedded iron parts can be affected, even cause the difficulty that post facility cannot be installed.Therefore, the improvement of embedded iron parts erecting device is the problem needing solution at present badly.
Summary of the invention
For above-mentioned situation, be solve the defect of prior art, the object of the utility model is just to provide built-in fitting high-accuracy mounting device in a kind of concrete, effectively can solve the problem that post facility that the pre-buried low precision of prior art causes cannot be installed.
The technical scheme that the utility model solves is, comprise fixture, flower basket bolt and benchmark steel plate, one end of flower basket bolt is connected with fixture, the other end of flower basket bolt is connected with benchmark steel plate, in the heart bolt is housed in benchmark steel plate, the first nut bolt on benchmark steel plate is equipped with, stretch out on the bolt below benchmark steel plate and the second nut is housed, between benchmark steel plate and the second nut, embedded iron parts is housed, embedded iron parts is placed in concrete, and fixture is fixed on bracing members scaffold through cruciform fastening for falsework.
The utility model successfully solves embedded iron parts in concrete on construction site and is subject to postorder construction infection embedded iron parts precision, and the installation accuracy of embedded iron parts can be improved in postorder has constructed rear certain hour, decrease unnecessary input, improve certainty of measurement and efficiency, is the innovation on embedded iron parts erecting device.
Accompanying drawing explanation
Fig. 1 is structural front view of the present utility model.
Fig. 2 is using state figure of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described in further detail.
Provided by Fig. 1-2, the utility model comprises fixture, flower basket bolt and benchmark steel plate, one end of flower basket bolt 2 is connected with fixture 1, the other end of flower basket bolt 2 is connected with benchmark steel plate 3, in benchmark steel plate 3, bolt 4 is housed in the heart, the first nut 5 bolt 4 on benchmark steel plate 3 is equipped with, stretch out on the bolt 4 below benchmark steel plate 3 and second nut 6 is housed, between benchmark steel plate 3 and the second nut 6, embedded iron parts 7 is housed, embedded iron parts 7 is placed in concrete eight, and fixture 1 is fixed on bracing members scaffold 10 through cruciform fastening for falsework 9.
In order to ensure result of use, described flower basket bolt 2 has 3, and 3 flower basket bolts 2 are in positive triangular pyramid.
Described fixture 1 is the steel pipe of diameter 48mm, long 400mm.
Described benchmark steel plate 3 is the circular steel plate of thick 10mm, and center is provided with circular hole.
Described bolt 4 length is at least 120mm.
There is through hole at described embedded iron parts 7 center, and through-hole diameter is greater than bolt 4 diameter 2mm.
Service condition of the present utility model is, first weld 3 flower basket bolts 2 by fixture 1, flower basket bolt 2 welds benchmark steel plate 3, make flower basket bolt 2 in positive triangular pyramid, erection bolt 4 on benchmark steel plate 3, first nut 5, second nut 6, embedded iron parts 7 bolt 4 is equipped with, second nut 6 is concordant with bolt 4, before concrete eight construction, the embedded iron parts 7 of device is located in the concrete eight that will build, and according to position, fixture 1 is fixed on bracing members scaffold 10 by cruciform fastening for falsework 9, after concrete eight construction, level gauge and spirit level is relied on to regulate flower basket bolt 2 before initial set, carry out position and precision check, make the installation accuracy requirement of embedded iron parts 7 degree of being up to the standard and the discrepancy in elevation.After concrete eight intensity reaches 50% of design strength, looser a bolt 4, remove the utility model device, bolt 6 is retained in concrete eight.
The utility model utilizes shaped steel for component, the ironware erecting device made, be fixed on the bracing members scaffold of job site, ironware is not connected with reinforcing cage and template, concreting, after vibrating, concrete initial set advance line position and precision are checked, improve embedded iron parts installation accuracy, and then improve post facility installation quality, solve construction difficult problem, quick detachable, can have enough to meet the need, utilization rate is high, successfully solve embedded iron parts in concrete on construction site and be subject to postorder construction infection embedded iron parts precision, and the installation accuracy of embedded iron parts can be improved in postorder has constructed rear certain hour, decrease unnecessary input, improve certainty of measurement and efficiency, it is the innovation on embedded iron parts erecting device, there is good economic and social benefit.
Claims (6)
1. built-in fitting high-accuracy mounting device in a concrete, comprise fixture, flower basket bolt and benchmark steel plate, it is characterized in that, one end of flower basket bolt (2) is connected with fixture (1), the other end of flower basket bolt (2) is connected with benchmark steel plate (3), bolt (4) is housed in benchmark steel plate (3) in the heart, bolt (4) on benchmark steel plate (3) is equipped with the first nut (5), stretch out on the bolt (4) below benchmark steel plate (3) and the second nut (6) is housed, embedded iron parts (7) is housed between benchmark steel plate (3) and the second nut (6), embedded iron parts (7) is placed in concrete (8), fixture (1) is fixed on bracing members scaffold (10) through cruciform fastening for falsework (9).
2. built-in fitting high-accuracy mounting device in concrete according to claim 1, is characterized in that, described flower basket bolt (2) has 3, and 3 flower basket bolts (2) are in positive triangular pyramid.
3. built-in fitting high-accuracy mounting device in concrete according to claim 1, is characterized in that, described fixture (1) is diameter 48mm, the steel pipe of long 400mm.
4. built-in fitting high-accuracy mounting device in concrete according to claim 1, is characterized in that, the circular steel plate that described benchmark steel plate (3) is thick 10mm, center is provided with circular hole.
5. built-in fitting high-accuracy mounting device in concrete according to claim 1, is characterized in that, described bolt (4) length is at least 120mm.
6. built-in fitting high-accuracy mounting device in concrete according to claim 1, is characterized in that, there is through hole at described embedded iron parts (7) center, and through-hole diameter is greater than bolt (4) diameter 2mm.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520134603.0U CN204475533U (en) | 2015-03-10 | 2015-03-10 | Built-in fitting high-accuracy mounting device in a kind of concrete |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520134603.0U CN204475533U (en) | 2015-03-10 | 2015-03-10 | Built-in fitting high-accuracy mounting device in a kind of concrete |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204475533U true CN204475533U (en) | 2015-07-15 |
Family
ID=53631335
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520134603.0U Expired - Fee Related CN204475533U (en) | 2015-03-10 | 2015-03-10 | Built-in fitting high-accuracy mounting device in a kind of concrete |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204475533U (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106545174A (en) * | 2016-11-24 | 2017-03-29 | 中国三冶集团有限公司 | A kind of coaxial installation of embedded parts positioner and method |
| CN108609549A (en) * | 2018-05-29 | 2018-10-02 | 五冶集团上海有限公司 | A kind of hanging scaffold platform removed for steel stack |
| CN109914820A (en) * | 2019-03-25 | 2019-06-21 | 中国核工业华兴建设有限公司 | Portable high-accuracy absolute altitude installation of embedded parts tool |
| CN110777650A (en) * | 2019-11-29 | 2020-02-11 | 中建三局第二建设工程有限责任公司 | Embedded assembly type expansion joint overlength installation suspension leveling positioning system and construction method |
| CN110847429A (en) * | 2019-12-24 | 2020-02-28 | 平煤神马建工集团有限公司 | CL building system outer wall CL heated board reinforcing apparatus |
| CN114033087A (en) * | 2021-11-02 | 2022-02-11 | 郑州祥和集团有限公司 | Construction method of substation embedded parts |
-
2015
- 2015-03-10 CN CN201520134603.0U patent/CN204475533U/en not_active Expired - Fee Related
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106545174A (en) * | 2016-11-24 | 2017-03-29 | 中国三冶集团有限公司 | A kind of coaxial installation of embedded parts positioner and method |
| CN106545174B (en) * | 2016-11-24 | 2018-09-14 | 中国三冶集团有限公司 | A kind of coaxial installation of embedded parts positioning device and method |
| CN108609549A (en) * | 2018-05-29 | 2018-10-02 | 五冶集团上海有限公司 | A kind of hanging scaffold platform removed for steel stack |
| CN109914820A (en) * | 2019-03-25 | 2019-06-21 | 中国核工业华兴建设有限公司 | Portable high-accuracy absolute altitude installation of embedded parts tool |
| CN110777650A (en) * | 2019-11-29 | 2020-02-11 | 中建三局第二建设工程有限责任公司 | Embedded assembly type expansion joint overlength installation suspension leveling positioning system and construction method |
| CN110847429A (en) * | 2019-12-24 | 2020-02-28 | 平煤神马建工集团有限公司 | CL building system outer wall CL heated board reinforcing apparatus |
| CN114033087A (en) * | 2021-11-02 | 2022-02-11 | 郑州祥和集团有限公司 | Construction method of substation embedded parts |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204475533U (en) | Built-in fitting high-accuracy mounting device in a kind of concrete | |
| CN203808484U (en) | Integrated cantilevered and attached external scaffolding | |
| CN103334499A (en) | Beam column node connection device | |
| CN202913420U (en) | Reusable positioning device for installing foundation bolts | |
| CN203475806U (en) | Tool type anchoring bolt assembly used for fixing shape steel cantilever beam in construction sites | |
| CN202937005U (en) | Cast-in-situ concrete beam lateral template reinforcement device | |
| CN202787926U (en) | Overhanging scaffold simple and convenient to disassemble and assemble | |
| CN203222738U (en) | Steel pipe latticed column temporary buttress supporting device | |
| CN204728707U (en) | A kind of sliding beam pull bar of length adjustable | |
| CN203412292U (en) | Detachable discharging platform | |
| CN204199667U (en) | Detachable builder's jack corner tripod | |
| CN204386608U (en) | A kind of tunnel invert construction tool | |
| CN203654710U (en) | Instrumental connecting tube for external wall scaffold shearing wall portion | |
| CN104074275A (en) | Prefabricated concrete column connecting joint structure | |
| CN102661035A (en) | Tool type wall connecting piece for exterior wall scaffold | |
| CN202745353U (en) | Tool-type overhanging scaffold | |
| CN202209046U (en) | Wall connecting rod for external scaffold | |
| CN204139622U (en) | Adjustable segmented column steel bar positioning fixture | |
| CN203097263U (en) | Standardized revolving scaffolding connecting tube | |
| CN204081468U (en) | A kind of shear-wall strengthening formwork structure | |
| CN204530489U (en) | A kind of high pier creeping formwork hydraulic lifting apparatus | |
| CN211286558U (en) | Pull rod type external scaffold external corner shaping tool structure | |
| CN203569693U (en) | Pre-buried iron part with steel ties arranged on concrete structure | |
| CN105625711A (en) | Construction-purpose roof template | |
| CN203755642U (en) | Cantilever scaffold profile steel anchoring device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150715 Termination date: 20190310 |