CN105386521B - The beam and post module for building frame can be assembled - Google Patents
The beam and post module for building frame can be assembled Download PDFInfo
- Publication number
- CN105386521B CN105386521B CN201510859639.XA CN201510859639A CN105386521B CN 105386521 B CN105386521 B CN 105386521B CN 201510859639 A CN201510859639 A CN 201510859639A CN 105386521 B CN105386521 B CN 105386521B
- Authority
- CN
- China
- Prior art keywords
- pullover
- steel plate
- screw
- post
- assembled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 147
- 239000010959 steel Substances 0.000 claims abstract description 147
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 3
- 239000004567 concrete Substances 0.000 description 13
- 239000000919 ceramic Substances 0.000 description 6
- 239000011449 brick Substances 0.000 description 5
- 238000007789 sealing Methods 0.000 description 5
- 238000010276 construction Methods 0.000 description 4
- 238000007493 shaping process Methods 0.000 description 3
- 238000005266 casting Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000000429 assembly Methods 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000000747 cardiac effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
- E04B1/21—Connections specially adapted therefor
- E04B1/215—Connections specially adapted therefor comprising metallic plates or parts
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The present invention relates to a kind of house frame technical field, more specifically to a kind of beam and post module that can be assembled as building frame.Including beam and column, it is characterised in that:The two ends of described beam and column are provided with pullover, and described pullover and middle reinforced concrete body are poured as an entirety, and described beam two ends are provided with joist steel sleeve-board head, and described post two ends are provided with upper prop steel plate pullover and lower prop steel plate pullover;Installing/dismounting of the present invention is efficient and convenient, firmly.
Description
Technical field:
The present invention relates to a kind of house frame technical field, more specifically to a kind of beam that can be assembled as building frame
With post module.
Background technology:
Now, it is armored concrete that the framework of building is all mostly in the world, is all poured when building a building, building
Framework is poured as an entirety, relatively more time-consuming, and can not be pulled down and be re-assemblied.It not can be assembled at all now
For the beam and post module of building frame.
The content of the invention:
The technical problems to be solved by the invention are that overcoming existing technological deficiency to provide one kind can be assembled as building frame
The beam of frame and post module.
The technical problems to be solved by the invention are realized using following technical scheme:
The beam and post module for building frame, including beam and column can be assembled, it is characterised in that:The two ends of described beam and column
Provided with pullover, described pullover and middle reinforced concrete body are poured as an entirety, as beam, as post.Also, pass through
Several accessories, allow the head of this beam and column to distinguish close-coupled together, are formed as the framework of building.This beam and column assembling
Into building frame and armored concrete pour the overall building frame that builds up, have identical rugged performance, and can pull down, weight
New assembling, building can be pulled down, is transported to other places, re-assemblies.Thus allow building frame can be with prefabricated
Module assembled.
Described beam two ends are provided with joist steel sleeve-board head, and described post two ends are provided with upper prop steel plate pullover and lower prop steel plate set
Head;
Described joist steel sleeve-board head inner hollow, sideways provided with opening, described joist steel sleeve-board head bottom is convex provided with connecting
Rise, described joist steel sleeve-board head top is provided with connecting groove;
Described upper prop steel plate pullover is in cross, and center is provided with central recess, and described central recess is surrounded by company
Groove is connect, described central recess surrounding is additionally provided with screw;
Described lower prop steel plate pullover is in cross, and center is provided with central recess, and described central recess is surrounded by company
Connect projection.
Further, four directions bucket connector is additionally provided with, described four directions bucket connector inner hollow, top is provided with opening,
Bottom centre is provided with through hole, and through hole is surrounded by screw, and these screws can be bolted to connection with upper prop steel plate pullover,
Screw, central recess of the screw, through hole of described four directions bucket connector respectively with upper prop steel plate pullover are corresponding, and described four
Side's bucket connection body sidewall is provided with screw, can be joined with bolts by this screw with joist steel sleeve-board head.
Further, in addition to connection accessory, described connection accessory is cylinder or cuboid, described connection accessory
Bottom and bottom are provided with central protuberance, described central protuberance and the central recess phase of upper prop steel plate pullover, lower prop steel plate pullover
Correspondence, allows between lower prop and is connected.
Further, in addition to L-shaped connector, described L-shaped connector two sides is provided with screw, described L-shaped connector
Two sides is connected with joist steel sleeve-board rostral face, post steel plate pullover side respectively.
Further, described joist steel sleeve-board crown end is provided with several screws, and the screw on described top struggles against with four directions
Connector is connected, with being provided with several screws separately below above described joist steel sleeve-board head, connects respectively with L-shaped connector
Connect fixation;
Described upper prop steel plate pullover and lower prop steel plate pullover side are provided with screw, are connected respectively with L-shaped connector.
Further, described connecting groove side is transversely provided with a screw, and described connection bump side is laterally set
There is a screw, when raised and groove coincide, bolt can be interted and fixed.
The present invention is than pouring overall building frame speed soon, short time limit.Moreover, beam used, post, four directions bucket connector,
Connection accessory, L-shaped connector and corresponding bolt and bolt between upper lower prop, can precast and, also just can be with shape
The social model of building is produced into enterprise, the construction for solving national building is difficult.Moreover, the Liang Yuzhu for building frame can be assembled
Module, coordinates assembling antidetonation wall brick, can be assembled into the floor of ceiling shaping, it is possible to assembled building.
The present invention facilitates building construction, in addition, it is desirable to when removing, can directly disassemble building, be transported to appropriate place
It is then assembled into as building.Moreover, in the past in desert, on mountain top, on the raft in water, due to being inconvenient to build, it is difficult to
Build building.And because desert foundation easily sink in desert, easily allow building run-off the straight, pour entirety so building
Building frame danger close.But, use this assembled building, it is possible to avoid a series of problems completely.So, in desert
In, on mountain top, on the raft in water, can assembled building, it is for human habitation.When needing to remove, can directly it disassemble
Building, is transported to appropriate place and is then assembled into as building.The present invention benefits the nation and the people, and installing/dismounting is efficient and convenient, firmly.
Brief description of the drawings:
Fig. 1 is schematic structural view of the invention;
Fig. 2 is upper prop steel plate pullover front view;
Fig. 3 is upper prop steel plate pullover upward view;
Fig. 4 is lower prop steel plate pullover front view;
Fig. 5 is lower prop steel plate pullover top view;
Fig. 6 is joist steel sleeve-board head front view;
Fig. 7 is joist steel sleeve-board head sectional view;
Fig. 8 is joist steel sleeve-board rostral view;
Fig. 9 is four directions bucket connector front view;
Figure 10 is four directions bucket connector top view;
Figure 11 is connection accessory sectional view;
Figure 12 is the structural representation of beam;
Figure 13 is the structural representation of post.
Wherein:1- beam 2- post 3- upper prop steel plate pullover 31- central recess 32- connecting groove 4- lower prop steel plate pullovers
41- central protuberance 42- connection bump 5- joist steel sleeve-board heads 6- four directions bucket connector 61- through holes 7- connection accessory 8-L shapes
Connector
Embodiment:
In order that the technical means, the inventive features, the objects and the advantages of the present invention are easy to understand, tie below
Conjunction is specifically illustrating, and the present invention is expanded on further.
Can be assembled includes beam and column for the beam of building frame with post module, and there is the steel that steel plate is fabricated at two of beam and column
Sleeve-board head, the steel plate pullover at two and middle armored concrete cylinder are poured as an entirety, as beam, as post.Also,
By several accessories, allow the head of this beam and column to be closely joined together respectively, be formed as the framework of building.This beam and column
The building frame being assembled into pours the overall building frame built up with armored concrete, has identical rugged performance, and can tear open
Under, re-assembly, building can be pulled down, be transported to other places, re-assembly.Thus allow building can be with prefabricated
Module assembled.
The construction of beam:
There is joist steel sleeve-board head at beam two, is fabricated to sheet metal as joist steel sleeve-board is first, two of a beam is required for steel
Sleeve-board head a, beam is needed with two steel plate pullovers.The steel plate pullover at two is poured as one with middle armored concrete cylinder
Individual entirety, as a beam.Two steel plate pullover of this beam, is just the increase in the intensity at two position of this beam and ensure that beam
Service life.Moreover, the head of beam is must to be connected with the head of post, so, steel plate pullover is used, also can just be made
As suitable shape, projection or groove with steel body on steel plate pullover, and bolt hole are allowed, to be connected with the head of post
It is fixed.
Beam just refers to horizontal in building frame, and post just refers to what is be vertically arranged in building frame.The head of beam is necessary
It is connected with the head of post, building frame could be formed.Because beam and column is connected, simply it is head, steel plate pullover
Exactly at two of beam, so key is exactly the structural style of steel plate pullover.The steel plate pullover at two of beam is the same structure
Pattern.Joist steel sleeve-board head inner hollow, sideways provided with opening, this steel plate pullover is a steel hat-shaped, is square or rectangular
The shape of body, it is no steel plate to have one side, forms a square bar hat-shaped.
In order to allow the head of steel plate pullover and post to be connected, there are several screws the side of steel plate pullover, in this screw
There is nuts inside steel plate pullover, nuts is an internal sealing, can be cast in the concrete inside steel plate pullover.
This several screw, is, in order to allow the head of beam to be fixed by bolt and four directions bucket connector, and to allow the head of beam and the head of post
What portion was connected.
With there are several screws separately below above the steel plate pullover of beam, there is nuts in this screw in steel plate pullover
Portion, nuts is an internal sealing, can be cast in the concrete inside steel plate pullover, bolt can be screwed in from the outside.
This several screw, be in order to allow the head of beam to be fixed by bolt and L-shaped connector, and allow beam head and post head connect
Connect fixed.
Beam just refer to it is horizontal in building frame, the steel plate pullover of beam be at two of beam, so, the steel plate pullover of beam
It is to have above and below.There is a connecting groove above the steel plate pullover of beam, connecting groove is transversely provided with a through hole, this leads to
Laterally intert steel plate pullover from the inner surface of steel plate of steel plate pullover in hole.This connecting groove is for one with upper prop steel plate pullover
What individual connection bump was connected.There is a connection bump below the steel plate pullover of beam, connection bump is transversely provided with one and led to
Hole.This projection is connected for a connecting groove of lower prop steel plate pullover.
Got up two steel plate pullovers with bar connecting, two of reinforcing bar is respectively welded at table in two steel plate pullovers
Face, then, is fixed in mould, casting concrete, it is possible to which making forms beam.If moreover, when this beam has also been poured, being exactly
Ceramic tile surface structure.Moreover, there is raised line, it can assemble " assembling antidetonation wall brick ".
It is obvious that there is the steel plate pullover that steel plate makes at the module of this beam, two, it can be connected with post.This beam
Module, be also to have ceramic tile surface, all can be the shaping of disposable ceramic tile surface with metope.The module of this beam, is also to have convex
There are some through holes on bar, raised line, " the assembling antidetonation wall brick " that can be invented with me is connected, and is assembled into an entirety.This
The module of beam is planted, also having there are some through holes on side raised line, raised line, can connected with " floor for caning be assembled into ceiling shaping "
Fixation is connect, an entirety is assembled into.
The construction of post:
Post just refers to what is be vertically arranged in building frame.There is steel plate pullover at described post, two, and steel plate pullover typically uses thin steel
Plate is fabricated to.Two of one post is required for steel plate pullover, and a post is needed with two steel plate pullovers.
The steel plate pullover at two and middle armored concrete cylinder are poured as an entirety, as a post.This post
Two steel plate pullover, is just the increase in the intensity at two position of this post, and ensure that the service life of post.Moreover, post
Head be must and the head of beam be connected, so, use steel plate pullover, also just can make turns into suitable shape, allow steel plate
Projection or groove with steel body on pullover, and bolt hole, are connected with the head with beam.
Post just refers to what is be vertically arranged in building frame.The head of post is to must be able to be connected with the head of beam, could group
Dress forms building frame.Because post and beam are connected, simply it is head, steel plate pullover is exactly at two of post, so closing
Key is exactly the structural style of steel plate pullover.This steel plate pullover is a steel hat-shaped.It is criss-cross shape, certainly, there is one side
It is no steel plate, forms a square bar hat-shaped.The steel plate pullover at two of beam is the same structural style, still,
The steel plate pullover at two of post is not the same structural style, and post two ends are provided with upper prop steel plate pullover and lower prop steel plate pullover.
Upper prop steel plate covers head structure:
In order to allow the head of steel plate pullover and beam to be connected, upper prop steel plate pullover is in cross, to allow the head of beam to take
On the head of post.Cruciform central is provided with central recess, and described central recess is surrounded by connecting groove, central recess surrounding
Screw is additionally provided with, has cap nut in this screw inside steel plate pullover, cap nut is an internal sealing, can be cast in steel plate
, from the outside can be with DRIVE SCREWS in concrete inside pullover.This several screw, be in order to allow post head by screw and
Four directions bucket connector fix, moreover, thus allow what the head of beam and the head of post were connected.
There are several connecting grooves above upper prop steel plate pullover, connecting groove side is transversely provided with a screw, and this leads to
Laterally intert steel plate pullover from the inner surface of steel plate of steel plate pullover in hole.These connecting grooves are for the head with the beam on top
Connection bump be connected.There is a connection bump below the steel plate pullover of beam, connection bump side is laterally set
There is a screw.This connection bump of beam is precisely in order to be connected with a connecting groove of upper prop steel plate pullover.Cause
Need to push up the head of one or two or three or four beams for the top of a, post, so, upper prop steel plate pullover
There are several connecting grooves above, with the head for several beams that are connected respectively.Certainly, the top of a post need top one or
During the head of person two or three or four or multiple beams, because the number of beam is different, upper prop steel plate pullover can have
It is corresponding to change.
The centre of upper prop steel plate pullover, which also has, a through hole in the middle of a central recess, groove, this through hole is from steel plate set
The inner surface of steel plate of head laterally interts steel plate pullover.This central recess is in order to being connected accessory fixation.Between upper lower prop
Connection accessory be directly connected again with post above, so, up and down two posts also with regard to connection secure.
There are several screws the side of upper prop steel plate pullover, has cap nut in this screw inside steel plate pullover, cap nut
It is an internal sealing, can be cast in the concrete inside steel plate pullover, from the outside can be with DRIVE SCREWS.This several spiral shell
Hole, is, in order to allow the head of post to be fixed by screw and L-shaped connector, and to allow what the head of beam and the head of post were connected.
Lower prop steel plate covers head structure:
In order to allow the head of beam of lower prop steel plate pullover and head portion to be connected, the top surface of lower prop steel plate pullover is also in ten
Font, to allow the head of post to ride over the head of beam.There are several connection bumps, connection bump side above lower prop steel plate pullover
It is transversely provided with a screw.These connection bumps are in order to which the connecting groove of the joist steel sleeve-board head with bottom is connected.
This connecting groove of beam is precisely in order to be connected with a connection bump of lower prop steel plate pullover.Because, post
The head of following necessarily one or two or three or four beams, so, have some above lower prop steel plate pullover
Individual connecting groove, is connected with the head respectively with several beams.
Central recess is provided with the middle of lower prop steel plate pullover, this groove is in order to which the post with bottom is connected.This
The connection accessory of groove and a cylinder or rectangular shape is directly connected to fix, the connection accessory between upper lower prop directly with
Following post is connected again, so, two posts are also secured with regard to connection up and down.
There are several screws the side of lower prop steel plate pullover, has cap nut in this screw inside steel plate pullover, cap nut
It is an internal sealing, can be cast in the concrete inside steel plate pullover, from the outside can be with DRIVE SCREWS.This several spiral shell
Hole, is, in order to allow the head of post to be fixed by screw and L-shaped connector, and to allow what the head of beam and the head of post were connected.
Two steel plate pullovers up and down are got up with bar connecting, two of reinforcing bar is respectively welded at table in two steel plate pullovers
Face, then, is fixed in mould, casting concrete, it is possible to which making forms post.If moreover, when this post has also been poured, being exactly
Ceramic tile surface structure.Moreover, there is raised line side, it can assemble " assembling antidetonation wall brick ".
It is obvious that there is the steel plate pullover that steel plate makes at the module of this post, two, it can be connected with beam.This post
Module, be also to have ceramic tile surface, all can be that disposable ceramic tile surface shapes simultaneously with metope.The module of this post, be also
Having has some through holes on raised line, raised line, can be connected with " assembling antidetonation wall brick ", be assembled into an entirety.
The construction of four directions bucket connector:
Four directions bucket connector, the accessory for exactly allowing Liang Yuzhu to be connected, four directions bucket connector inner hollow, top is provided with
Opening, bottom centre is provided with through hole, and through hole is surrounded by screw, screw, through hole and the upper prop steel plate pullover of four directions bucket connector
Screw, central recess it is corresponding, four directions bucket connection body sidewall is provided with screw, can connect solid by the head of bolt and beam
It is fixed.Four directions bucket connector, can make, the relatively large through-hole of bottom allows the groove of column top to expose of steel plate.If bottom also has
Dry small through hole, can be fixed by the top attachment of bolt and post.That is four directions bucket connector, i.e., be connected solid with beam
It is fixed, also it is connected with post.Liang Yuzhu is also just connected and fixed.Four directions bucket connector is an auxiliary assembling building frame
Accessory.
Connection accessory between upper lower prop:
Connection accessory between upper lower prop, can be a cylinder or rectangular shape, during connection accessory bottom is provided with
Cardiac prominence is risen, and top is provided with the connection accessory between central protuberance, upper lower prop, and the directly intermediate groove with upper prop steel plate pullover is connected
Fixed, also the intermediate groove directly with lower prop steel plate pullover is connected, and also just allows lower prop to be connected.Between upper lower prop
Connection accessory, be also an accessory for auxiliary assembling building frame.
L-shaped connector:
L-shaped connector two sides is provided with screw, is also the accessory for allowing Liang Yuzhu to be connected, and is to allow Liang Yuzhu to be connected from side
Fixed accessory.The side of namely L-shaped steel plate connector and beam is joined with bolts, the side of L-shaped connector also with post
It is joined with bolts, thus allows Liang Yuzhu to be connected from side, so add the intensity that Liang Yuzhu is connected.
The general principle and principal character and advantages of the present invention of the present invention has been shown and described above.The technology of the industry
Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the simply explanation described in above-described embodiment and specification is originally
The principle of invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these changes
Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its
Equivalent thereof.
Claims (6)
1. the beam and post module for building frame can be assembled, including beam and column, it is characterised in that:The two ends of described beam and column are set
There is a pullover, described pullover and middle reinforced concrete body are poured as an entirety, and described beam two ends are provided with joist steel sleeve-board
Head, described post two ends are provided with upper prop steel plate pullover and lower prop steel plate pullover;
Described joist steel sleeve-board head inner hollow, sideways provided with opening, described joist steel sleeve-board head bottom is provided with connection bump, institute
The joist steel sleeve-board head top stated is provided with connecting groove;
Described upper prop steel plate pullover is in cross, and center is provided with central recess, and it is recessed that described central recess is surrounded by connection
Groove, described central recess surrounding is additionally provided with screw;
Described lower prop steel plate pullover is in cross, and center is provided with central recess, and it is convex that described central recess is surrounded by connection
Rise.
2. the beam and post module according to claim 1 that can be assembled as building frame, it is characterised in that:It is additionally provided with cubic bucket
Connector, described four directions bucket connector inner hollow, top is provided with opening, and bottom centre is provided with through hole, and through hole is surrounded by
Screw, screw, the central recess of the screw, through hole of described four directions bucket connector respectively with upper prop steel plate pullover is corresponding, institute
The four directions bucket connection body sidewall stated is provided with screw.
3. the beam and post module according to claim 1 or 2 that can be assembled as building frame, it is characterised in that:Also include connecting
Accessory is connect, described connection accessory is cylinder or cuboid, and described connection accessory bottom and bottom are provided with central protuberance, institute
The central protuberance stated is corresponding with the central recess of upper prop steel plate pullover, lower prop steel plate pullover.
4. the beam and post module according to claim 1 or 2 that can be assembled as building frame, it is characterised in that:Also include L-shaped
Connector, described L-shaped connector two sides is provided with screw, described L-shaped connector two sides respectively with joist steel sleeve-board rostral face, post
Steel plate pullover side is connected.
5. the beam and post module according to claim 4 that can be assembled as building frame, it is characterised in that:Described joist steel plate
Pullover top is provided with several screws, and the screw on described top is connected with four directions bucket connector, described joist steel sleeve-board
Head with being provided with several screws separately below, is connected with L-shaped connector respectively above;
Described upper prop steel plate pullover and lower prop steel plate pullover side are provided with screw, are connected respectively with L-shaped connector.
6. the beam and post module according to claim 4 that can be assembled as building frame, it is characterised in that:Described connection is recessed
Groove side is transversely provided with a screw, and described connection bump side is transversely provided with a screw.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510859639.XA CN105386521B (en) | 2015-11-26 | 2015-11-26 | The beam and post module for building frame can be assembled |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510859639.XA CN105386521B (en) | 2015-11-26 | 2015-11-26 | The beam and post module for building frame can be assembled |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105386521A CN105386521A (en) | 2016-03-09 |
CN105386521B true CN105386521B (en) | 2017-09-22 |
Family
ID=55419251
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510859639.XA Expired - Fee Related CN105386521B (en) | 2015-11-26 | 2015-11-26 | The beam and post module for building frame can be assembled |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105386521B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060081A (en) * | 2017-04-21 | 2017-08-18 | 福州市川普建筑产业化有限公司 | Precast prestressed concrete column system and its application method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102561530A (en) * | 2012-03-19 | 2012-07-11 | 天津大学 | Rectangular steel tube concrete column and steel beam all-bolt connecting joint |
CN104234212A (en) * | 2014-09-19 | 2014-12-24 | 东南大学 | Socket and spigot type light steel frame connecting joint and construction method thereof |
CN104358320A (en) * | 2014-11-28 | 2015-02-18 | 西安建筑科技大学 | Fully prefabricated assembling type beam column joint |
CN204435542U (en) * | 2015-01-26 | 2015-07-01 | 济南轨道交通集团有限公司 | Integration bean column node formwork structure |
CN205224269U (en) * | 2015-11-26 | 2016-05-11 | 孙本新 | Can assemble roof beam and post module into building frame |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2675960B1 (en) * | 2011-02-14 | 2016-06-29 | Constantine Shuhaibar | Split gusset connection |
-
2015
- 2015-11-26 CN CN201510859639.XA patent/CN105386521B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102561530A (en) * | 2012-03-19 | 2012-07-11 | 天津大学 | Rectangular steel tube concrete column and steel beam all-bolt connecting joint |
CN104234212A (en) * | 2014-09-19 | 2014-12-24 | 东南大学 | Socket and spigot type light steel frame connecting joint and construction method thereof |
CN104358320A (en) * | 2014-11-28 | 2015-02-18 | 西安建筑科技大学 | Fully prefabricated assembling type beam column joint |
CN204435542U (en) * | 2015-01-26 | 2015-07-01 | 济南轨道交通集团有限公司 | Integration bean column node formwork structure |
CN205224269U (en) * | 2015-11-26 | 2016-05-11 | 孙本新 | Can assemble roof beam and post module into building frame |
Also Published As
Publication number | Publication date |
---|---|
CN105386521A (en) | 2016-03-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106522372B (en) | A kind of hybrid integrated house and construction method | |
CN207749908U (en) | A kind of enclosure wall of full assembly lightweight steel construction | |
CN107905385A (en) | The assembled arthitecutral structure and method of construction that steel construction is combined with concrete structure | |
CN107190847A (en) | Prefabricated assembled light steel wallboard, building construction and its method of construction | |
CN105386521B (en) | The beam and post module for building frame can be assembled | |
CN205475854U (en) | Roof beam wall composite external wall component | |
CN209533737U (en) | A kind of superimposed sheet prefabricated mould | |
CN206953254U (en) | Shaped steel combination floor makes mould | |
CN107574923A (en) | A kind of prefabricated assembled concrete framework connected using steel joint | |
CN203939238U (en) | For a flask board of epirelief concrete member formwork device | |
CN205224269U (en) | Can assemble roof beam and post module into building frame | |
CN208280381U (en) | A kind of connecting structure structure of the two-sided vertical node of folded type steel shear wall | |
CN104295146B (en) | 110kV line project improvement corner tower composition structure | |
CN206385568U (en) | A kind of city integrated piping lane hoisting ring device | |
CN207295406U (en) | Diaphragm plate Cast-in-Situ Segment template system for Precast T-Beam connection | |
CN208899648U (en) | A kind of strong outline border super-high building structure with diagonal brace | |
CN209443573U (en) | Assembled high-ductility round steel concrete column-concrete beam connecting joint | |
CN207847078U (en) | Core Walls Structure shear wall converts boom device without wall without creeping formwork seat in the plane at beam | |
CN208430635U (en) | A kind of dismountable assembled architecture combined member | |
CN206987373U (en) | Core column concrete pours mouth mold tool | |
CN208251460U (en) | A kind of assembly concrete column | |
CN207245155U (en) | A kind of composite shuttering of aluminium frame bamboo slab rubber | |
CN205616260U (en) | Landing stage frame bracket and whole structure of watering of support girder | |
CN206971834U (en) | Pin-connected panel electronic box protection canopy | |
CN205967303U (en) | Be used for wind power hub high strength combination economizer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170922 |