CN105382391A - 一种钢轨焊接方法 - Google Patents

一种钢轨焊接方法 Download PDF

Info

Publication number
CN105382391A
CN105382391A CN201510926129.XA CN201510926129A CN105382391A CN 105382391 A CN105382391 A CN 105382391A CN 201510926129 A CN201510926129 A CN 201510926129A CN 105382391 A CN105382391 A CN 105382391A
Authority
CN
China
Prior art keywords
rail
welding
heating time
welding procedure
u76crre
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510926129.XA
Other languages
English (en)
Other versions
CN105382391B (zh
Inventor
高文会
田甜
代韬
胡玉堂
倪峥嵘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tieke Jinhua Testing Center Co ltd
China Academy of Railway Sciences Corp Ltd CARS
Railway Engineering Research Institute of CARS
Beijing Teletron Telecom Engineering Co Ltd
Original Assignee
China Academy of Railway Sciences Corp Ltd CARS
Metals and Chemistry Research Institute of CARS
Beijing CARS Advanced Material Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Railway Sciences Corp Ltd CARS, Metals and Chemistry Research Institute of CARS, Beijing CARS Advanced Material Technology Co Ltd filed Critical China Academy of Railway Sciences Corp Ltd CARS
Priority to CN201510926129.XA priority Critical patent/CN105382391B/zh
Publication of CN105382391A publication Critical patent/CN105382391A/zh
Application granted granted Critical
Publication of CN105382391B publication Critical patent/CN105382391B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K11/00Resistance welding; Severing by resistance heating
    • B23K11/04Flash butt welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2101/00Articles made by soldering, welding or cutting
    • B23K2101/26Railway- or like rails
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2103/00Materials to be soldered, welded or cut
    • B23K2103/02Iron or ferrous alloys
    • B23K2103/04Steel or steel alloys

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

本发明公开了一种钢轨焊接方法,其特征在于,所述方法采用对牌号为U71Mn、U75V、U76CrRe的钢轨进行混焊和不同交货状态下的牌号为U75V的钢轨进行混焊,能实现在线路上不同地段铺设相应强度等级钢轨的目标。本发明通过利用固定式闪光焊接的方式将不同钢种或不同交货状态的钢轨焊接在一起,然后根据铁路线路的情况对长钢轨进行装车和铺设。既实现了在线路不同地段铺设相应强度等级的钢轨,而焊接接头又是高强度的闪光焊接头,通过提高钢轨的使用水平,提高铁路无缝线路的整体水平。

Description

一种钢轨焊接方法
技术领域
本发明涉及铁路铺设领域,特别是一种钢轨焊接方法。
背景技术
目前国内各铁路局钢轨的使用水平普遍不高。主要表现是直线、曲线、坡道地段均铺设相同的钢轨。带来的弊端是直线地段磨耗较小,而曲线或坡道地段则磨耗或伤损较大,没有实现钢轨的等寿命匹配。一些路局虽然在曲线地段铺设了耐磨钢轨,但是在曲线与直线交界的地方采用铝热焊接的方法,当使用铝热焊焊接不同钢种或不同交货状态的钢轨时,其断轨率和重伤率高于同种钢轨的铝热焊接。
近年来我国铁路钢轨的基地焊接技术取得了长足进步,在焊轨基地焊接相同钢种的钢轨,焊接质量非常稳定,断轨率在以下;但在焊轨基地目前还没有实现不同钢种钢轨之间的焊接。
发明内容
一种钢轨焊接方法,所述方法采用对牌号为U71Mn、U75V、U76CrRe的钢轨进行混焊和不同交货状态下的牌号为U75V的钢轨进行混焊,能实现在线路上不同地段铺设相应强度等级的钢轨的目标。
所述对钢轨牌号为U71Mn、U75V、U76CrRe钢轨的混焊参数为:
(1)U71MnG-U71MnG焊接工艺曲线焊接加热时间82s~84s,顶锻量9.8mm-12mm。
(2)U75V-U75V焊接工艺曲线焊接加热时间82s~84s,顶锻量7.8mm-8.7mm。
(3)U76CrRE-U76CrRE焊接工艺曲线焊接加热时间82s~84s,顶锻量8.0m-8.6mm。
(4)U71MnG-U75V焊接工艺曲线焊接加热时间84s~86s,顶锻量8.9mm-10.5mm。
(5)U75V-U76CrRE焊接工艺曲线焊接加热时间83s~85s,顶锻量7mm-8.8mm。
(6)U71MnG-U76CrRE焊接工艺曲线焊接加热时间84s~85s,顶锻量8.2mm-10.1mm。
所述不同交货状态的U75V钢轨的混焊参数为:
(1)U75V热轧钢轨-U75V热轧钢轨焊接工艺曲线焊接加热时间110s,其平均顶锻量17.2mm。
(2)U75V热轧钢轨-U75V热处理钢轨焊接工艺曲线焊接加热时间110s,其平均顶锻量17.7mm。
(3)U75V热处理钢轨-U75V热处理钢轨焊接工艺曲线焊接加热时间110s,其平均顶锻量17.2mm。
本发明通过利用固定式闪光焊接的方式将不同钢种或不同交货状态的钢轨焊接在一起,然后根据铁路线路的情况对长钢轨进行装车和铺设。既实现了在线路不同地段铺设相应强度等级的钢轨,而焊接接头又是高强度的闪光焊接头,通过提高钢轨的使用水平,提高铁路无缝线路的整体水平。
附图说明
图1为U71MnG-U71MnG焊接工艺曲线。
图2为U75V-U75V焊接工艺曲线。
图3为U76CrRE-U76CrRE焊接工艺曲线。
图4为U71MnG-U75V焊接工艺曲线。
图5为U75V-U76CrRE焊接工艺曲线。
图6为U71MnG-U76CrRE焊接工艺曲线。
图7为U75V热轧钢轨-U75V热轧钢轨焊接工艺曲线。
图8为U75V热轧钢轨-U75V热处理钢轨焊接工艺曲线。
图9为U75V热处理钢轨-U75V热处理钢轨焊接工艺曲线。
图10为将不同钢种或不同交货状态的钢轨进行混焊的焊接参数工艺曲线示例。
具体实施方式
下面结合附图和具体实施例对本发明提供的一种钢轨焊接方法进行详细描述。
表1所示,根据本发明的一种焊接方法,所述方法为利用同一组参数实现对不同钢种的钢轨的焊接。
表1
不同钢种钢轨因成分不同,其力学性能、理化常数也不同。将两种不同的钢轨焊接在一起,对电压、电流、加热时间和顶锻量的变比更为敏感。本发明通过通用焊接工艺参数实现了对U71Mn、U75V、U76CrRe三种不同钢种钢轨的混焊和对不同交货状态的U75V钢轨的混焊。
根据本发明的该种焊接方法进一步包括以下几个方面:
1.用同一组参数实现对U71Mn、U75V、U76CrRe三种不同钢种钢轨的混焊,具体焊接参数如下(下述焊接工艺均采用包钢60kg/mU71MnG、U75V、U76CrRE钢轨,焊接设备采用GAAS80/580型焊机,控制系统为SWEP06。)
图1示出,U71MnG-U71MnG焊接工艺曲线
焊接加热时间82s~84s。
平均顶锻量11mm,最小9.8mm,最大12mm。
U71MnG-U71MnG焊接工艺曲线
图2示出,U75V-U75V焊接工艺曲线
焊接加热时间82s~84s。
平均顶锻量8.3mm,最小7.8mm,最大8.7mm。
图3示出,U76CrRE-U76CrRE焊接工艺曲线
焊接加热时间82s~84s。
平均顶锻量8.2mm,最小8.0mm,最大8.6mm。
图4示出,U71MnG-U75V焊接工艺曲线
焊接加热时间84s~86s。
平均顶锻量9.5mm,最小8.9mm,最大10.5mm。
图5示出,U75V-U76CrRE焊接工艺曲线
焊接加热时间83s~85s。
平均顶锻量8mm,最小7mm,最大8.8mm。
图6示出,U71MnG-U76CrRE焊接工艺曲线
焊接加热时间84s~85s。
平均顶锻量9.1mm,最小8.2mm,最大10.1mm。
2.用同一组参数实现对不同交货状态的U75V钢轨的混焊,具体焊接参数如下(下述焊接工艺均采用攀钢60kg/mU75V热轧钢轨和热处理钢钢轨,焊接设备采用GAAS80/580型焊机,控制系统为SWEP06。)
图7示出,U75V热轧钢轨-U75V热轧钢轨焊接工艺曲线
焊接加热时间110s。
平均顶锻量17.2mm。
图8示出,U75V热轧钢轨-U75V热处理钢轨焊接工艺曲线
焊接加热时间110s。
平均顶锻量17.7mm。
图9示出,U75V热处理钢轨-U75V热处理钢轨焊接工艺曲线
焊接加热时间110s。
平均顶锻量17.2mm。
图10为将不同钢种或不同交货状态的钢轨进行混焊的焊接参数工艺曲线示例
在进行钢轨混焊作业时,需要直线普通钢轨和曲线耐磨钢轨交替进料,若频繁地调整焊接参数将引起质量不稳定。使用通用的焊接参数可以避免因更换参数所引起的焊接缺陷。
由于直线地段磨耗较小,而曲线或坡道地段则磨耗或伤损较大,此方法实现了在铁路线路直线、曲线不同地段根据需要铺设不同钢种、不同强度级别或不同交货状态的钢轨。在焊轨基地焊接在一起的不同钢种长轨根据铁路线路的情况,按照配轨表进行长钢轨装车和铺设,实现直线、曲线钢轨的等寿命匹配,进一步提高钢轨使用水平。
最后应说明的是,以上实施例仅用以描述本发明的技术方案而不是对本技术方法进行限制,本发明在应用上可以延伸为其他的修改、变化、应用和实施例,并且因此认为所有这样的修改、变化、应用、实施例都在本发明的精神和教导范围内。

Claims (4)

1.一种钢轨焊接方法,其特征在于,所述方法采用对牌号为U71Mn、U75V、U76CrRe的钢轨进行混焊和不同交货状态下的钢轨牌号为U75V的钢轨进行混焊,能实现在线路上不同地段铺设相应强度等级的钢轨的目标。
2.根据权利要求1所述的焊接方法,其特征在于,所述对钢轨牌号为U71Mn、U75V、U76CrRe三种钢轨的混焊参数为:
(1)U71MnG-U71MnG焊接工艺曲线焊接加热时间82s~84s,顶锻量9.8mm-12mm;
(2)U75V-U75V焊接工艺曲线焊接加热时间82s~84s,顶锻量7.8mm-8.7mm;
(3)U76CrRE-U76CrRE焊接工艺曲线焊接加热时间82s~84s,顶锻量8.0m-8.6mm;
(4)U71MnG-U75V焊接工艺曲线焊接加热时间84s~86s,顶锻量8.9mm-10.5mm;
(5)U75V-U76CrRE焊接工艺曲线焊接加热时间83s~85s,顶锻量7mm-8.8mm;
(6)U71MnG-U76CrRE焊接工艺曲线焊接加热时间84s~85s,顶锻量为8.2mm-10.1mm。
3.根据权利要求1所述的焊接方法,其特征在于,所述不同交货状态的U75V钢轨的混焊参数为:
(1)U75V热轧钢轨-U75V热轧钢轨焊接工艺曲线焊接加热时间110s,其平均顶锻量17.2mm;
(2)U75V热轧钢轨-U75V热处理钢轨焊接工艺曲线焊接加热时间110s,其平均顶锻量17.7mm;
(3)U75V热处理钢轨-U75V热处理钢轨焊接工艺曲线焊接加热时间110s,其平均顶锻量17.2mm。
4.根据权利要求1所述的焊接方法,其特征在于,所述焊接方法适用于60kg/m不同钢种、不同强度级别或不同交货状态的钢轨。
CN201510926129.XA 2015-12-14 2015-12-14 一种钢轨焊接方法 Active CN105382391B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510926129.XA CN105382391B (zh) 2015-12-14 2015-12-14 一种钢轨焊接方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510926129.XA CN105382391B (zh) 2015-12-14 2015-12-14 一种钢轨焊接方法

Publications (2)

Publication Number Publication Date
CN105382391A true CN105382391A (zh) 2016-03-09
CN105382391B CN105382391B (zh) 2018-03-06

Family

ID=55415519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510926129.XA Active CN105382391B (zh) 2015-12-14 2015-12-14 一种钢轨焊接方法

Country Status (1)

Country Link
CN (1) CN105382391B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106334863A (zh) * 2016-10-19 2017-01-18 攀钢集团攀枝花钢铁研究院有限公司 一种对75kg/m过共析钢轨与珠光体钢轨进行移动闪光焊接的方法和钢轨
CN106695098A (zh) * 2017-03-01 2017-05-24 上海带轨道焊接科技有限公司 一种不同轨种钢轨的焊接方法
CN107520529A (zh) * 2017-08-31 2017-12-29 攀钢集团研究院有限公司 136re+ss热处理钢轨移动闪光焊接的方法
CN107552936A (zh) * 2017-09-07 2018-01-09 攀钢集团研究院有限公司 60kg/mU75V+U75VG钢轨移动闪光焊接及热处理工艺
CN109986189A (zh) * 2019-05-08 2019-07-09 西南交通大学 一种细化钢轨闪光焊焊缝晶粒的工艺
CN113439001A (zh) * 2019-02-19 2021-09-24 杰富意钢铁株式会社 钢轨的制造方法和钢轨
CN114012227A (zh) * 2021-11-24 2022-02-08 攀钢集团攀枝花钢铁研究院有限公司 一种钢轨的焊接方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4929816A (en) * 1988-02-01 1990-05-29 Franz Plasser Bahnbaumaschinen-Industriegesellschaft Gmbh Electric flash-butt welding machine and method of providing a welded joint between adjacent ends of rail sections
CN1370652A (zh) * 2000-03-18 2002-09-25 中铁宝桥股份有限公司 高锰钢辙叉或锰钢轨与普通钢轨的直接闪光对焊连接方法
CN101337303A (zh) * 2008-04-03 2009-01-07 燕山大学 一种贝氏体钢辙叉与碳钢钢轨焊接方法
CN101474713A (zh) * 2009-01-22 2009-07-08 中铁宝桥股份有限公司 高锰钢辙叉与钢轨闪光对接焊接方法
WO2011052562A1 (ja) * 2009-10-30 2011-05-05 新日本製鐵株式会社 レール鋼のフラッシュバット溶接方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4929816A (en) * 1988-02-01 1990-05-29 Franz Plasser Bahnbaumaschinen-Industriegesellschaft Gmbh Electric flash-butt welding machine and method of providing a welded joint between adjacent ends of rail sections
CN1370652A (zh) * 2000-03-18 2002-09-25 中铁宝桥股份有限公司 高锰钢辙叉或锰钢轨与普通钢轨的直接闪光对焊连接方法
CN101337303A (zh) * 2008-04-03 2009-01-07 燕山大学 一种贝氏体钢辙叉与碳钢钢轨焊接方法
CN101474713A (zh) * 2009-01-22 2009-07-08 中铁宝桥股份有限公司 高锰钢辙叉与钢轨闪光对接焊接方法
WO2011052562A1 (ja) * 2009-10-30 2011-05-05 新日本製鐵株式会社 レール鋼のフラッシュバット溶接方法

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106334863A (zh) * 2016-10-19 2017-01-18 攀钢集团攀枝花钢铁研究院有限公司 一种对75kg/m过共析钢轨与珠光体钢轨进行移动闪光焊接的方法和钢轨
CN106334863B (zh) * 2016-10-19 2018-09-04 成都先进金属材料产业技术研究院有限公司 一种对75kg/m过共析钢轨与珠光体钢轨进行移动闪光焊接的方法和钢轨
CN106695098A (zh) * 2017-03-01 2017-05-24 上海带轨道焊接科技有限公司 一种不同轨种钢轨的焊接方法
CN107520529A (zh) * 2017-08-31 2017-12-29 攀钢集团研究院有限公司 136re+ss热处理钢轨移动闪光焊接的方法
CN107520529B (zh) * 2017-08-31 2019-10-11 攀钢集团研究院有限公司 136re+ss热处理钢轨移动闪光焊接的方法
CN107552936A (zh) * 2017-09-07 2018-01-09 攀钢集团研究院有限公司 60kg/mU75V+U75VG钢轨移动闪光焊接及热处理工艺
CN107552936B (zh) * 2017-09-07 2019-09-17 攀钢集团研究院有限公司 60kg/m U75V+U75VG钢轨移动闪光焊接工艺
CN113439001A (zh) * 2019-02-19 2021-09-24 杰富意钢铁株式会社 钢轨的制造方法和钢轨
CN109986189A (zh) * 2019-05-08 2019-07-09 西南交通大学 一种细化钢轨闪光焊焊缝晶粒的工艺
CN114012227A (zh) * 2021-11-24 2022-02-08 攀钢集团攀枝花钢铁研究院有限公司 一种钢轨的焊接方法

Also Published As

Publication number Publication date
CN105382391B (zh) 2018-03-06

Similar Documents

Publication Publication Date Title
CN105382391A (zh) 一种钢轨焊接方法
Saita et al. Trends in rail welding technologies and our future approach
CN203765298U (zh) 电梯门加工流水线
CN108179415B (zh) 一种废旧矿山机械设备零件液压立柱的修复方法
CN105290572A (zh) 一种超高强度钢的焊接方法
CN102861973A (zh) 轨道客车车顶钢结构制造工艺
Kuchuk-Yatsenko et al. Flash-butt welding of high-strength rails
JP6822612B1 (ja) レールの製造方法
CN203781658U (zh) 焊接式轨道
CN101474713B (zh) 高锰钢辙叉与钢轨闪光对接焊接方法
CN103028813B (zh) G42CrMo4N冷轧轴套局部破损的焊接修复方法
CN107116292A (zh) 一种轨道平板车固定式闪光焊机设备
CN102864701A (zh) 合金钢加强辙叉
CN206232015U (zh) 大型变压器移位组合钢轨滑道
Kuzmenko et al. New technology of electric arc bath welding of rails on tram and crane tracks
CN101813419B (zh) 烧结带冷台车及其修复方法
CN103192174A (zh) 钢筋骨架滚焊机焊接电极装置
CN205203842U (zh) 一种防止堆料的受煤坑煤仓
CN203364601U (zh) 一种步进梁式加热炉
CN206795009U (zh) 带有导电机构的龙门式h型钢焊接机
CN206794379U (zh) 一种锻轧钢球输送球道
CN102407400B (zh) 丝管蒸发器滚焊工艺
CN202416102U (zh) 一种轨底夹持移动式钢轨焊接接头竖向矫直机
CN104480807A (zh) 一种道岔转辙器
CN103817452A (zh) 一种多层多道焊的随焊锤击方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No. 2, No. two, No. 2, Da Liu Shu Road, Beijing, Beijing

Patentee after: METALS & CHEMISTRY RESEARCH INSTITUTE OF CHINA ACADEMY OF RAILWAY SCIENCES Corp.,Ltd.

Patentee after: BEIJING RAILWELD NEW MATERIAL TECHNOLOGY Co.,Ltd.

Patentee after: CHINA ACADEMY OF RAILWAY SCIENCES Corp.,Ltd.

Address before: 100081 Beijing city Haidian District Daliushu Road No. 2

Patentee before: METALS & CHEMISTRY Research Institute CHINA ACADEMY OF RAILWAY SCIENCES

Patentee before: BEIJING RAILWELD NEW MATERIAL TECHNOLOGY Co.,Ltd.

Patentee before: CHINA ACADEMY OF RAILWAY SCIENCES

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230703

Address after: 100081 Building 9, Zone 1, No. 2, Daliushu Road, Haidian District, Beijing

Patentee after: Tieke Jinhua Testing Center Co.,Ltd.

Patentee after: METALS & CHEMISTRY RESEARCH INSTITUTE OF CHINA ACADEMY OF RAILWAY SCIENCES Corp.,Ltd.

Patentee after: BEIJING RAILWELD NEW MATERIAL TECHNOLOGY Co.,Ltd.

Patentee after: CHINA ACADEMY OF RAILWAY SCIENCES Corp.,Ltd.

Address before: No. 2, No. two, No. 2, Da Liu Shu Road, Beijing, Beijing

Patentee before: METALS & CHEMISTRY RESEARCH INSTITUTE OF CHINA ACADEMY OF RAILWAY SCIENCES Corp.,Ltd.

Patentee before: BEIJING RAILWELD NEW MATERIAL TECHNOLOGY Co.,Ltd.

Patentee before: CHINA ACADEMY OF RAILWAY SCIENCES Corp.,Ltd.