CN105376119A - Intelligent transformer substation system grade time characteristic testing device - Google Patents

Intelligent transformer substation system grade time characteristic testing device Download PDF

Info

Publication number
CN105376119A
CN105376119A CN201510953691.1A CN201510953691A CN105376119A CN 105376119 A CN105376119 A CN 105376119A CN 201510953691 A CN201510953691 A CN 201510953691A CN 105376119 A CN105376119 A CN 105376119A
Authority
CN
China
Prior art keywords
data
module
analysis system
standard
message
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510953691.1A
Other languages
Chinese (zh)
Inventor
石光
韩伟
吴春红
刘磊
孔圣立
赵文沛
周东顶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU LINGCHUANG ELECTRIC AUTOMATION CO Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Henan Electric Power Co Ltd
Original Assignee
JIANGSU LINGCHUANG ELECTRIC AUTOMATION CO Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU LINGCHUANG ELECTRIC AUTOMATION CO Ltd, State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Henan Electric Power Co Ltd filed Critical JIANGSU LINGCHUANG ELECTRIC AUTOMATION CO Ltd
Priority to CN201510953691.1A priority Critical patent/CN105376119A/en
Publication of CN105376119A publication Critical patent/CN105376119A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/08Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
    • H04L43/0852Delays
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/50Testing arrangements

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Environmental & Geological Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses an intelligent transformer substation system grade time characteristic testing device, comprising a data transmission system and a data analysis system. The data transmission system comprises a standard signal collection module, a data processing forwarding module and a synchronization signal output module; the standard signal collection module and the data processing forwarding module are connected to a data analysis system; and the output terminal of the synchronization signal output module is connected to the input terminals of the standard signal collection module and the data processing forwarding module. The invention can realize the time characteristic test on a merging unit to be tested, a protection measurement control device and an intelligent switch device, greatly improves the conditioning speed of the intelligent transformer substation, provides good technical guarantee to the development of the intelligent transformer station, and lays solid foundation to safety stable operation of the intelligent transformer station.

Description

Intelligent Substation System level time response testing apparatus
Technical field
The present invention relates to the detection check equipment technical field of intelligent substation of electric power system and digital transformer substation, particularly relate to a kind of Intelligent Substation System level time response testing apparatus.
Background technology
Intelligent substation is important component part indispensable during intelligent grid is built.Compared with traditional transformer station, sampling between intelligent substation electrical equipment, control signal are changed in order to optical fiber and digital transmission means by traditional cable analog quantity transmission means more and more, also bring the instability problem of data information transfer thus, wherein the unsteadiness of time performance is particularly evident.EC61850(DL/T860) uniformity test of standard has carried out relevant regulations and explanation for system performance testing, and wherein uniformity test document proposes the requirement of two aspects to performance test, is respectively time accuracy and communication delay test.The domestic main employing synchronization accuracy of time accuracy and time keep time precision as test index, and communication delay mainly adopts dispersion and absolute delay as test index.
At present, the development of intelligent substation and digital transformer substation has entered into the large area engineer applied stage, for ensureing that intelligent substation safely and steadily runs, not only need before putting into operation to test various equipment self performance and function, more need to increase the weight of the system level testing to transformer station, to reach comprehensive assessment to intelligent substation overall performance and function and detection.From current situation, on market, existing dependence test instrument and instrument can only be combined the different intelligent electronic equipments such as unit, intelligent terminal and protection observing and controlling respectively and test, intelligent substation globality, systematic test request are departed from, reduce testing efficiency, and test mode produces test signal by testing equipment self, can not embody its true ruuning situation completely; Standard clock source and precision thereof is relied in test process, and the ability of signal when requiring testing equipment to have access and to export pair, reduce test compatible, add complexity and the difficulty in on-the-spot test loop.
Summary of the invention
The object of the present invention is to provide a kind of Intelligent Substation System level time response testing apparatus; time response test can be carried out to the tested merge cells of intelligent substation, protection supervisory equipment and Intellectualized Switchgear simultaneously, meet the system-level time response testing requirement of power system customer to intelligent substation.
For achieving the above object, the technical solution used in the present invention is:
Intelligent Substation System level time response testing apparatus, comprise data transmission system to unify data analysis system, data transmission system comprises standard signal acquisition module, data processing forwarding module and synchronizing signal output module, described standard signal acquisition module and data processing forwarding module connection data analytical system, the input of output connection standard signal acquisition module of synchronizing signal output module and the input of data processing forwarding module; The standard sample data obtained for obtaining the analog signal of an intelligent substation electricity, and based on the timeticks of synchronizing signal output module to analog signal sampling, are committed to data analysis system by standard signal acquisition module; The FT3 sample values that data processing forwarding module sends for receiving the tested merge cells of intelligent substation, and mark due in information and carry out format conversion, will with time target FT3 sample values be committed to data analysis system by Ethernet; Data processing forwarding module also for receiving SV message that the tested merge cells of intelligent substation sends and marking due in information, will with time target tested merge cells SV message be committed to data analysis system; Data processing forwarding module also for receiving Goose message that intelligent substation protection supervisory equipment sends and the Goose message that Intellectualized Switchgear sends and marking due in information respectively, will with time target protection supervisory equipment Goose message and Intellectualized Switchgear Goose message be committed to data analysis system; Data processing forwarding module also for Real-time Collection Intellectualized Switchgear on-off model and be committed to data analysis system; Synchronizing signal output module is for exporting pulse per second (PPS) synchronizing signal; Data analysis system, for extracting and the fundamental phase of the FT3 sample values of the standard sample data of contrast standard signal acquisition module output and the output of data processing forwarding module, realizes the time response test of the tested merge cells of intelligent substation; Data analysis system, also for the tested merge cells SV message of correction data processing forward module output and the time scale information of protection supervisory equipment Goose message, realizes the time response test of protection supervisory equipment; Data analysis system, also for the time scale information of Intellectualized Switchgear Goose message and the displacement information of on-off model of the output of correction data processing forward module, realizes the time response test of Intellectualized Switchgear.
Described data processing forwarding module comprises data receipt unit and data forwarding unit, data receipt unit is connected with data forwarding unit by shared dual-ported memory, the SV message that data receipt unit sends for receiving the tested merge cells of intelligent substation, meet the FT3 sample values of IEC60044-8 standard or national grid standard, the Goose message that protection supervisory equipment sends and the Goose message that Intellectualized Switchgear sends, and record tested merge cells SV message respectively, FT3 sample values, the due in information of protection supervisory equipment Goose message and Intellectualized Switchgear Goose message, data receipt unit is also for the on-off model of Real-time Collection Intellectualized Switchgear, data forwarding unit is used for respectively to tested merge cells SV message, protection supervisory equipment Goose message and Intellectualized Switchgear Goose packet labeling due in information, formed with time target tested merge cells SV message, data analysis system is sent to after protection supervisory equipment Goose message and Intellectualized Switchgear Goose message, data forwarding unit is also for marking due in information to FT3 sample values, and will with time target FT3 sample values convert IEC61850-9-1 protocol form to after send data analysis system to by Ethernet, data forwarding unit is also for sending the on-off model of Intellectualized Switchgear to data analysis system.
Described standard signal acquisition module comprises normal voltage collecting unit, normalized current collecting unit and Multi-path synchronous collection plate, normal voltage collecting unit comprises standard potential transformer and voltage signal transducer, the output of standard potential transformer connects the input of voltage signal transducer, normalized current collecting unit comprises standard current transformer and current signal transducer, the output of standard current transformer connects the input of current signal transducer, the output of voltage signal transducer is connected the input of Multi-path synchronous collection plate respectively with the output of current signal transducer, Multi-path synchronous collection plate connection data analytical system, the input of Multi-path synchronous collection plate also connects the output of synchronizing signal output module.
Described synchronizing signal output module comprises 1PPS pulse per second (PPS) synchronizing signal output unit and IRIG-B code to optical pulse signal output unit.
Described data receipt unit adopts FPGA, and described data forwarding unit adopts microprocessor.
Described data analysis system adopts PC host computer.
The present invention demarcates markers by standard signal acquisition module to the analog signal sampling of an intelligent substation electricity, and the time response test for merge cells is provided for the standard source contrasted; The present invention realizes reception, the synchronous process to the sampled data of intelligent substation various ways by data processing forwarding module and forwards, data analysis system is utilized to realize the time response test of each layer equipment of intelligent substation, substantially increase the debugging speed of intelligent substation, and providing good technique guarantee for the fast development construction of intelligent substation, the safe and stable operation for intelligent substation has laid solid foundation.
Accompanying drawing explanation
Fig. 1 is theory diagram of the present invention.
Embodiment
As shown in Figure 1, Intelligent Substation System level time response testing apparatus of the present invention, comprise data transmission system to unify data analysis system, data transmission system comprises standard signal acquisition module, data processing forwarding module and synchronizing signal output module, standard signal acquisition module and data processing forwarding module connection data analytical system, the input of output connection standard signal acquisition module of synchronizing signal output module and the input of data processing forwarding module.
Standard signal acquisition module comprises normal voltage collecting unit, normalized current collecting unit and Multi-path synchronous collection plate, normal voltage collecting unit comprises standard potential transformer and voltage signal transducer, the output of standard potential transformer connects the input of voltage signal transducer, and the output of voltage signal transducer connects the input of Multi-path synchronous collection plate; Normalized current collecting unit comprises standard current transformer and current signal transducer, the output of standard current transformer connects the input of current signal transducer, the output of current signal transducer connects the input of Multi-path synchronous collection plate, Multi-path synchronous collection plate connection data analytical system, the input of Multi-path synchronous collection plate also connects the output of synchronizing signal output module.Standard signal acquisition module is for obtaining the analog signal of an intelligent substation electricity, and based on the timeticks of synchronizing signal output module to analog signal sampling, the standard sample data obtained are committed to data analysis system, as the contrast signal of merge cells time response test.Specifically, the primary voltage of intelligent substation is converted to secondary voltage by standard potential transformer, after overvoltage signal transducer, secondary voltage becomes the small voltage signal can changed for A/D, in like manner, the primary current of intelligent substation is converted to secondary current by standard current transformer, after overcurrent signal transducer, secondary current becomes the small area analysis signal can changed for A/D, Multi-path synchronous collection plate carries out high precision collecting to small voltage signal and small area analysis signal respectively based on the timeticks of synchronizing signal output module, and will with time target standard sample data be transferred to data analysis system, as the contrast standard source of merge cells time response test.
Data processing forwarding module comprises data receipt unit and data forwarding unit, and the data receipt unit in the present embodiment adopts FPGA to realize, and data forwarding unit adopts microprocessor to realize.Data receipt unit is connected with data forwarding unit by shared dual-ported memory and dual port RAM, can realize the exchanges data of every 1ms.Wherein, the peripheral circuit of data receipt unit comprises pulse per second (PPS) synchronous Signal Receiver Unit, Ethernet data receiving element and FT3 sample values receiving element, FT3 sample values receiving element adopts two groups of HFBR-2416 light receiving elements, adaptive reception can meet the FT3 sample values of IEC60044-8 standard or national grid standard; Ethernet data receiving element adopts two groups of AFBR-5803 ethernet transceiver parts; directly controlled by FPGA; the reception of two groups of SV messages or Goose message can be realized; wherein SV message is the sample values meeting IEC61850-9-1 or IEC61850-9-2 agreement that tested merge cells exports, and Goose message is the transformer substation case towards general object that protection supervisory equipment and Intellectualized Switchgear send.Data receipt unit by monitoring 1PPS pulse per second (PPS) synchronizing signal or IRIG-B code to optical pulse signal, the SV message that the tested merge cells of real-time reception intelligent substation sends, meet the FT3 sample values of IEC60044-8 standard or national grid standard, the Goose message that protection supervisory equipment sends and the Goose message that Intellectualized Switchgear sends, and record tested merge cells SV message respectively, FT3 sample values, the due in information of protection supervisory equipment Goose message and Intellectualized Switchgear Goose message, data receipt unit is also for the on-off model of Real-time Collection Intellectualized Switchgear.Data forwarding unit is used for respectively to tested merge cells SV message, protection supervisory equipment Goose message and Intellectualized Switchgear Goose packet labeling due in information, formed with time target tested merge cells SV message, protection supervisory equipment Goose message and Intellectualized Switchgear Goose message after send data analysis system to.Because data analysis system directly can not receive the sample values of FT3 form, data forwarding unit is also for marking due in information to FT3 sample values, and will with time target FT3 sample values convert IEC61850-9-1 protocol form to after send data analysis system to by Ethernet, data forwarding unit is also for sending the on-off model of Intellectualized Switchgear to data analysis system.
Synchronizing signal output module comprises 1PPS pulse per second (PPS) synchronizing signal output unit and IRIG-B code to optical pulse signal output unit, 1PPS pulse per second (PPS) synchronizing signal or IRIG-B code can be exported respectively to optical pulse signal, for the Multi-path synchronous collection plate of standard signal acquisition module and the data receipt unit of data processing forwarding module provide pulse per second (PPS) synchronizing signal.
Data analysis system in the present embodiment adopts PC host computer, data analysis system, for extracting and the fundamental phase of the FT3 sample values of the standard sample data of contrast standard signal acquisition module output and the output of data processing forwarding module, realizes the time response test of the tested merge cells of intelligent substation; Data analysis system, also for the tested merge cells SV message of correction data processing forward module output and the time scale information of protection supervisory equipment Goose message, realizes the time response test of protection supervisory equipment; Data analysis system, also for the time scale information of Intellectualized Switchgear Goose message and the displacement information of on-off model of the output of correction data processing forward module, realizes the time response test of Intellectualized Switchgear.
Operation principle of the present invention is: standard signal acquisition module based on the timeticks of synchronizing signal output module to the analog signal sampling of an intelligent substation electricity, and will with time target standard sample data be committed to data analysis system; Utilize data processing forwarding module to obtain tested merge cells by the FT3 sample values exported after the analog signal sampling of an intelligent substation electricity and record its due in information, will with time target FT3 sample values convert IEC61850-9-1 protocol form to after send data analysis system to by Ethernet; Data analysis system to time target FT3 sample values carry out interpolation processing and obtain synchronously sampled data, by extracting and contrasting the phase information of the fundamental signal of synchronously sampled data and standard sample data, complete electric current and voltage ratio of precision to check and absolute delay time measurement, Phase synchronization, realize the time response test of merge cells.
Data processing forwarding module of the present invention can receive Goose message that intelligent substation protection supervisory equipment sends and the SV message that tested merge cells sends, and based on the pulse per second (PPS) synchronizing signal difference record protection measure and control device Goose message of synchronizing signal output module output and the due in information of tested merge cells SV message, formed with time target protection supervisory equipment Goose message and tested merge cells SV message after be committed to data analysis system, data analysis system is according to the time scale information of tested merge cells SV message and protection supervisory equipment Goose message, calculate the operation time limit of relaying protection when breaking down, complete the time response test of protection supervisory equipment.
The Goose message that the present invention is sent by data processing forwarding module acquisition Intellectualized Switchgear, and record the due in information of Intellectualized Switchgear Goose message, formed with time target Intellectualized Switchgear Goose message after send data analysis system to, simultaneously Real-time Collection Intellectualized Switchgear on-off model and be committed to data analysis system, data analysis system divides/closes the displacement information of state according to the time scale information of Intellectualized Switchgear Goose message and switch, computational intelligence switchgear receive Goose message and the time of delay of process and Intellectualized Switchgear switch divide/conjunction state conjugates and sends the time of delay of Goose message, complete the time response test of Intellectualized Switchgear.
The present invention can realize the time response test of the tested merge cells of intelligent substation, protection supervisory equipment and Intellectualized Switchgear; substantially increase the debugging speed of intelligent substation; and providing good technique guarantee for the fast development construction of intelligent substation, the safe and stable operation for intelligent substation has laid solid foundation.

Claims (6)

1. Intelligent Substation System level time response testing apparatus, it is characterized in that: comprise data transmission system and to unify data analysis system, data transmission system comprises standard signal acquisition module, data processing forwarding module and synchronizing signal output module, described standard signal acquisition module and data processing forwarding module connection data analytical system, the input of output connection standard signal acquisition module of synchronizing signal output module and the input of data processing forwarding module; The standard sample data obtained for obtaining the analog signal of an intelligent substation electricity, and based on the timeticks of synchronizing signal output module to analog signal sampling, are committed to data analysis system by standard signal acquisition module; The FT3 sample values that data processing forwarding module sends for receiving the tested merge cells of intelligent substation, and mark due in information and carry out format conversion, will with time target FT3 sample values be committed to data analysis system by Ethernet; Data processing forwarding module also for receiving SV message that the tested merge cells of intelligent substation sends and marking due in information, will with time target tested merge cells SV message be committed to data analysis system; Data processing forwarding module also for receiving Goose message that intelligent substation protection supervisory equipment sends and the Goose message that Intellectualized Switchgear sends and marking due in information respectively, will with time target protection supervisory equipment Goose message and Intellectualized Switchgear Goose message be committed to data analysis system; Data processing forwarding module also for Real-time Collection Intellectualized Switchgear on-off model and be committed to data analysis system; Synchronizing signal output module is for exporting pulse per second (PPS) synchronizing signal; Data analysis system, for extracting and the fundamental phase of the FT3 sample values of the standard sample data of contrast standard signal acquisition module output and the output of data processing forwarding module, realizes the time response test of the tested merge cells of intelligent substation; Data analysis system, also for the tested merge cells SV message of correction data processing forward module output and the time scale information of protection supervisory equipment Goose message, realizes the time response test of protection supervisory equipment; Data analysis system, also for the time scale information of Intellectualized Switchgear Goose message and the displacement information of on-off model of the output of correction data processing forward module, realizes the time response test of Intellectualized Switchgear.
2. Intelligent Substation System level time response testing apparatus as claimed in claim 1, it is characterized in that: described data processing forwarding module comprises data receipt unit and data forwarding unit, data receipt unit is connected with data forwarding unit by shared dual-ported memory, the SV message that data receipt unit sends for receiving the tested merge cells of intelligent substation, meet the FT3 sample values of IEC60044-8 standard or national grid standard, the Goose message that protection supervisory equipment sends and the Goose message that Intellectualized Switchgear sends, and record tested merge cells SV message respectively, FT3 sample values, the due in information of protection supervisory equipment Goose message and Intellectualized Switchgear Goose message, data receipt unit is also for the on-off model of Real-time Collection Intellectualized Switchgear, data forwarding unit is used for respectively to tested merge cells SV message, protection supervisory equipment Goose message and Intellectualized Switchgear Goose packet labeling due in information, formed with time target tested merge cells SV message, data analysis system is sent to after protection supervisory equipment Goose message and Intellectualized Switchgear Goose message, data forwarding unit is also for marking due in information to FT3 sample values, and will with time target FT3 sample values convert IEC61850-9-1 protocol form to after send data analysis system to by Ethernet, data forwarding unit is also for sending the on-off model of Intellectualized Switchgear to data analysis system.
3. Intelligent Substation System level time response testing apparatus as claimed in claim 1 or 2, it is characterized in that: described standard signal acquisition module comprises normal voltage collecting unit, normalized current collecting unit and Multi-path synchronous collection plate, normal voltage collecting unit comprises standard potential transformer and voltage signal transducer, the output of standard potential transformer connects the input of voltage signal transducer, normalized current collecting unit comprises standard current transformer and current signal transducer, the output of standard current transformer connects the input of current signal transducer, the output of voltage signal transducer is connected the input of Multi-path synchronous collection plate respectively with the output of current signal transducer, Multi-path synchronous collection plate connection data analytical system, the input of Multi-path synchronous collection plate also connects the output of synchronizing signal output module.
4. Intelligent Substation System level time response testing apparatus as claimed in claim 3, is characterized in that: described synchronizing signal output module comprises 1PPS pulse per second (PPS) synchronizing signal output unit and IRIG-B code to optical pulse signal output unit.
5. Intelligent Substation System level time response testing apparatus as claimed in claim 4, it is characterized in that: described data receipt unit adopts FPGA, described data forwarding unit adopts microprocessor.
6. Intelligent Substation System level time response testing apparatus as claimed in claim 5, is characterized in that: described data analysis system adopts PC host computer.
CN201510953691.1A 2015-12-18 2015-12-18 Intelligent transformer substation system grade time characteristic testing device Pending CN105376119A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510953691.1A CN105376119A (en) 2015-12-18 2015-12-18 Intelligent transformer substation system grade time characteristic testing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510953691.1A CN105376119A (en) 2015-12-18 2015-12-18 Intelligent transformer substation system grade time characteristic testing device

Publications (1)

Publication Number Publication Date
CN105376119A true CN105376119A (en) 2016-03-02

Family

ID=55377946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510953691.1A Pending CN105376119A (en) 2015-12-18 2015-12-18 Intelligent transformer substation system grade time characteristic testing device

Country Status (1)

Country Link
CN (1) CN105376119A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107942280A (en) * 2018-01-03 2018-04-20 中国电力科学研究院有限公司 A kind of method and system for being calibrated to the absolute delay time
CN115694701A (en) * 2022-08-30 2023-02-03 中国航发四川燃气涡轮研究院 Time synchronization circuit and synchronization method for rotor parameter data telemetering transmission

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8145467B1 (en) * 2008-02-25 2012-03-27 Xilinx, Inc. Method and apparatus for profiling a hardware/software embedded system
CN102608450A (en) * 2012-02-24 2012-07-25 江苏凌创电气自动化股份有限公司 Testing and verifying system appropriate for intelligent transformer substation and verifying method
CN102901874A (en) * 2012-11-08 2013-01-30 江苏凌创电气自动化股份有限公司 Phase- and time mark measurement-based electronic transformer absolute delay detection method
CN202903926U (en) * 2012-11-15 2013-04-24 江苏凌创电气自动化股份有限公司 Portable electronic transformer time characteristic tester
CN103439679A (en) * 2013-08-28 2013-12-11 国家电网公司 Absolute time delay detection device and method of intelligent substation mutual inductor data collection system
CN103869182A (en) * 2013-12-20 2014-06-18 国家电网公司 Merging unit transient state test system based on accurate discrete time control

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8145467B1 (en) * 2008-02-25 2012-03-27 Xilinx, Inc. Method and apparatus for profiling a hardware/software embedded system
CN102608450A (en) * 2012-02-24 2012-07-25 江苏凌创电气自动化股份有限公司 Testing and verifying system appropriate for intelligent transformer substation and verifying method
CN102901874A (en) * 2012-11-08 2013-01-30 江苏凌创电气自动化股份有限公司 Phase- and time mark measurement-based electronic transformer absolute delay detection method
CN202903926U (en) * 2012-11-15 2013-04-24 江苏凌创电气自动化股份有限公司 Portable electronic transformer time characteristic tester
CN103439679A (en) * 2013-08-28 2013-12-11 国家电网公司 Absolute time delay detection device and method of intelligent substation mutual inductor data collection system
CN103869182A (en) * 2013-12-20 2014-06-18 国家电网公司 Merging unit transient state test system based on accurate discrete time control

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107942280A (en) * 2018-01-03 2018-04-20 中国电力科学研究院有限公司 A kind of method and system for being calibrated to the absolute delay time
CN115694701A (en) * 2022-08-30 2023-02-03 中国航发四川燃气涡轮研究院 Time synchronization circuit and synchronization method for rotor parameter data telemetering transmission
CN115694701B (en) * 2022-08-30 2024-04-02 中国航发四川燃气涡轮研究院 Time synchronization circuit and synchronization method for telemetering transmission of rotor parameter data

Similar Documents

Publication Publication Date Title
US20200309829A1 (en) On-line monitoring system for the performance of the measurement equipment in the entire power grid based on wide-area synchronous measurement
RU2577245C2 (en) Merging unit and method of operating merging unit
CN102520288B (en) Primary-rising based current differential protection synchronization performance testing system and testing method
CN110337626A (en) System and method for detecting the injection of the wrong data in substation
CN103091602B (en) Power line carrier wave online fault detection device
CN105572516B (en) Multi-functional FPGA acquisition unit with time reference output
CN102495322B (en) Synchronous performance test method for digital relay protection device based on IEC61850 (International Electrotechnical Commission 61850)
CN102694373B (en) Intelligent electronic device using transient fault information and relay protection method
CN102914758A (en) Electronic type transformer verifying unit based on IEEE1588 clock calibration mode
CN207798999U (en) A kind of distribution automation system detection device
CN107727910B (en) Synchronous collection system of transformer substation's electric current based on passive electronic transformer
CN105449840A (en) An intelligent sensor using wireless charging technology and an application system thereof
CN201402287Y (en) Voltage drop detecting device of secondary circuit of voltage transformer
CN103235217B (en) Dual protection act consistance monitoring device and monitoring method
CN106603338B (en) Intelligent terminal response time testing method, device and system
CN105376119A (en) Intelligent transformer substation system grade time characteristic testing device
CN102879734B (en) Method for testing time delay of on-off action of intelligent transformer substation
CN204789801U (en) Computer type relay protection synthesizes testing arrangement
CN204244203U (en) A kind of system of testing relay-protection tester Time delay
CN201984117U (en) Capacitor group switching testing device
CN101452638A (en) Electrical energy meter or power load administrative terminal verifying device
CN203084183U (en) Electronic mutual inductor calibration test device based on IEEE1588 time setting mode
CN201887543U (en) Sampling value time calibration device
CN101609980B (en) Method for realizing circuit optical fiber longitudinal differential protection by matching electronic mutual inductor and electromagnetic mutual inductor
CN204679601U (en) A kind of power angle measuring device for power generator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160302

RJ01 Rejection of invention patent application after publication