CN105351674A CN201510757727.9A CN201510757727A CN105351674A CN 105351674 A CN105351674 A CN 105351674A CN 201510757727 A CN201510757727 A CN 201510757727A CN 105351674 A CN105351674 A CN 105351674A
Authority
CN
China
Prior art keywords
valve
pipe fitting
coated
blocking method
irregular deformation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510757727.9A
Other languages
Chinese (zh)
Other versions
CN105351674B (en
Inventor
戴斌
蔡晓春
马志明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Energy Construction Group Co.,Ltd.
Original Assignee
Shanghai Gas No2 Pipeline Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Gas No2 Pipeline Engineering Co Ltd filed Critical Shanghai Gas No2 Pipeline Engineering Co Ltd
Priority to CN201510757727.9A priority Critical patent/CN105351674B/en
Publication of CN105351674A publication Critical patent/CN105351674A/en
Application granted granted Critical
Publication of CN105351674B publication Critical patent/CN105351674B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/168Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe
    • F16L55/17Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe by means of rings, bands or sleeves pressed against the outside surface of the pipe or hose
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/168Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe
    • F16L55/175Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe by using materials which fill a space around the pipe before hardening

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Protection Of Pipes Against Damage, Friction, And Corrosion (AREA)

Abstract

The invention discloses a method for stopping leakage of a valve or a pipe irregularly deformed due to rusting. The method includes the steps that a leakage point is pretreated; a rust layer is brushed through a Black Knight product twice; a brushed region is coated with a plastic film; two parts of a Bexane adhesive are mixed, the deformed valve or the deformed pipe are coated with the Bexane adhesive, and it is guaranteed that the leakage point is exposed outside without being plugged; after 24 hours of air drying, a quick cure is kneaded and activated and is tightly attached to the surface of the leakage point, and the leakage point can be plugged; after the surface of the quick cure is coated with a plastic film, the portion coated with the quick cure is rapidly sleeved with a clamp so as to be fastened; after the quick cure is completely cured, the portion is coated with a layer of the Bexane adhesive again, and the whole clamp is completely coated; soap liquid is used for testing the leakage point; and Mega stretch and seal is wound around the surface of the leakage point till the clamp is completely coated, and an insulation material is used for covering the surface of the repaired leakage point. By the adoption of the method, leakage stoppage operation can be directly implemented on a high-pressure gate station pipeline without a gas halt, and leakage stoppage of the valve or the pipe can be achieved within a short time; and no potential safety hazard exists in the construction process and no large threat is caused to a natural gas gate station.

Description

A kind ofly cause the valve of irregular deformation or the blocking method of pipe fitting due to corrosion
Technical field
The present invention relates to pipeline construction technological method, particularly relate to and a kind ofly cause the valve of irregular deformation or the blocking method of pipe fitting due to corrosion.
Background technique
Quickening along with popularization construction speed has driven the expansion of the supporting pipeline network construction work of rock gas, and installation and the retrofit work of Urban Underground gas distributing system are also more and more frequent.Consider the feature of urban population dense, all kinds of enterprises and institutions distribution Relatively centralized, make gas distributing system retrofit work of getting angry in city there is certain risk.Therefore, the retrofit work in order to ensure city gas distributing system carries out smoothly, avoids affecting industrial production gas and Domestic Gas, and on-line production rebuilding construction technology is used more widely in increasing occasion.
The natural gas line in general city is longer, several kilometers at least, dozens of kilometres at most, and caliber is comparatively large, at present for the valve or pipe fitting that cause the valve of irregular deformation or pipe fitting leak stopping mainly to stop the supple of gas or steam more to renew due to corrosion.If adopting gets angry change construction, first by rock gas in inert gas replacement pipe, not only length consuming time must be done like this, and waste.Cannot realize for the high-pressure door station that can not stop the supple of gas or steam, gas leakage can only be let alone, there is larger risk; Irregular valve or the pipe fitting blocking construction cycle longer, need to coordinate and to prepare material many, inside door station, construction risk is higher.
Therefore, it is a kind of when on-line production that those skilled in the art is devoted to exploitation, because corrosion causes the valve of irregular deformation or the construction technique of pipe fitting leak stopping, ensures construction effect and be reduced to minimum by construction on the impact of user.
Summary of the invention
Because the above-mentioned defect of prior art, technical problem to be solved by this invention is how at on-line production, carries out leak stopping operation when not getting angry to the valve or pipe fitting that cause irregular deformation due to corrosion.
For achieving the above object, the invention provides and a kind ofly cause the valve of irregular deformation or the blocking method of pipe fitting due to corrosion, comprise the following steps:
S1, use brush class instrument carry out pretreatment to leak source, make the Surface Rust of leak source exposed, smooth;
S2, use rust-proofing become brushing rusty scale twice;
S3, the use coated printed regions of plastic pellicle, lost efficacy to avoid meeting water;
S4, tear plastic pellicle off, two component blending can be connect hundred, be coated on deformation valves or pipe fitting, and guarantee that leak source is exposed, not do shutoff;
S5, after air-dry 24 hours, kneading activate admittedly can connect, adhere well to leak source surface, implement leak stopping;
S6, after admittedly can connecing Surface coating plastic pellicle, apply mechanically clamp rapidly;
S7, after admittedly can connecing solidification completely, then be coated with one deck hundred and can connect, whole fixture is filled completely;
S8, use foam liquid leak test;
S9, use MAG close winding leak source are surperficial completely coated to fixture;
S10, use insulating material cover the surface after leak source repairing.
Further, described brush class instrument is hairbrush or copper brush or steel brush.
Further, in step S2, after brushing air-dry 20 minutes for the first time, carry out second time brushing again; Second time brushing after air-dry 24 hours.
Further, in step S10, described insulating material is insulation rubber cushion or insulating paint.
Further, also comprise: S11, dismounting fixture.
Further, described fixture adopts stainless steel to customize according to the profile of deformation valves or pipe fitting.
Further, described foam liquid is the water-soluble dilution of soap or the water-soluble dilution of detergent or the water-soluble dilution of high foam detergent powder or the water-soluble dilution of high foam laundry liquid.
Further, the thickness of described plastic pellicle is between 0.05mm ~ 0.15mm.
Further, described rust-proofing becomes model to be BK-104.
Further, described hundred ratios that can connect two component blending are 1:1.
One of the present invention, at on-line production, when not getting angry, because corrosion causes the construction technique of the valve of irregular deformation or the leak stopping of pipe fitting, has following technique effect:
1, the present invention directly can implement plugging operations by chemical product at the valve of not stopping the supple of gas or steam on the pipeline of high-pressure door station or pipe fitting;
2, the present invention can realize irregular deformation valve or pipe fitting plugging operation within a short period of time;
3, material used herein is more single, and personnel depaly compares simplifies;
4, there is not potential risk in the present invention in work progress, can not cause larger threat to natural valve station.
Embodiment
Below embodiment of the present invention is further elaborated:
1. get out material required for operation, include brush, rust-proofing becomes, plastic pellicle (thickness is 0.12mm), and hundred can connect, admittedly can connect, soap solution, MAG is close, insulation rubber cushion, paint etc.;
2. find leak source, utilize the instrument such as hairbrush or copper brush to carry out pretreatment, make leak source Surface Rust exposed, smooth;
3. use rust-proofing to become BK-104 brushing rusty scale twice, brush air-dry rear (about 20min) first and carry out secondary operation again, brush complete, wait to do.With the coated printed regions of plastic pellicle, avoid meeting water and lost efficacy;
4. brush after complete 24 hours, tear plastic pellicle off, product blending of can practicing midwifery hundred is even, gets lodged on valve because corrosion causes irregular deformation or pipe fitting, guarantees that leak source leaks and do not do shutoff outside;
After 5.24 hours, kneading activates and admittedly can connect, and adhere well to leak source surface, implements leak stopping
6., after admittedly can connecing Surface coating plastic pellicle (prevent from admittedly can connecing be stained with fixture glutinous), apply mechanically clamp rapidly;
7. after admittedly can connecing solidification completely (summer is about 15-30min, and winter is about 30-45min), then be coated with one deck hundred and can connect, whole fixture is filled completely, increase aesthetic;
8. use soap solution leak test;
9. after shutoff success, use MAG's close winding leak source surface completely coated to fixture, use insulation rubber cushion or spray paint to cover and repair surface.
More than describe preferred embodiment of the present invention in detail.Should be appreciated that the ordinary skill of related domain just design according to the present invention can make many modifications and variations without the need to creative work.Therefore, all technician in the art, all should by the determined protection domain of claims under this invention's idea on the basis of existing technology by the available technological scheme of logical analysis, reasoning, or a limited experiment.

Claims (10)

1., because corrosion causes the valve of irregular deformation or a blocking method for pipe fitting, it is characterized in that, comprise the following steps:
S1, use brush class instrument carry out pretreatment to leak source, make the Surface Rust of leak source exposed, smooth;
S2, use rust-proofing become brushing rusty scale twice;
S3, the use coated printed regions of plastic pellicle, lost efficacy to avoid meeting water;
S4, tear plastic pellicle off, two component blending can be connect hundred, be coated on deformation valves or pipe fitting, and guarantee that leak source is exposed, not do shutoff;
S5, after air-dry 24 hours, kneading activate admittedly can connect, adhere well to leak source surface, implement leak stopping;
S6, after admittedly can connecing Surface coating plastic pellicle, apply mechanically clamp rapidly;
S7, after admittedly can connecing solidification completely, then be coated with one deck hundred and can connect, whole fixture is filled completely;
S8, use foam liquid leak test;
S9, use MAG close winding leak source are surperficial completely coated to fixture;
S10, use insulating material cover the surface after leak source repairing.
2. as claimed in claim 1 because corrosion causes the valve of irregular deformation or the blocking method of pipe fitting, it is characterized in that, described brush class instrument is hairbrush or copper brush or steel brush.
3. as claimed in claim 1 because corrosion causes the valve of irregular deformation or the blocking method of pipe fitting, it is characterized in that, in step S2, after brushing air-dry 20 minutes for the first time, carry out second time brushing again; Second time brushing after air-dry 24 hours.
4. as claimed in claim 1 because corrosion causes the valve of irregular deformation or the blocking method of pipe fitting, it is characterized in that, in step S10, described insulating material is insulation rubber cushion or insulating paint.
5., as claimed in claim 1 because corrosion causes the valve of irregular deformation or the blocking method of pipe fitting, it is characterized in that, also comprise:
S11, dismounting fixture.
6. as claimed in claim 1 because corrosion causes the valve of irregular deformation or the blocking method of pipe fitting, it is characterized in that, described fixture adopts stainless steel to customize according to the profile of deformation valves or pipe fitting.
7. as claimed in claim 1 because corrosion causes the valve of irregular deformation or the blocking method of pipe fitting, it is characterized in that, described foam liquid is the water-soluble dilution of soap or the water-soluble dilution of detergent or the water-soluble dilution of high foam detergent powder or the water-soluble dilution of high foam laundry liquid.
8., as claimed in claim 1 because corrosion causes the valve of irregular deformation or the blocking method of pipe fitting, it is characterized in that, the thickness of described plastic pellicle is between 0.05mm ~ 0.15mm.
9., as claimed in claim 1 because corrosion causes the valve of irregular deformation or the blocking method of pipe fitting, it is characterized in that, described rust-proofing becomes model to be BK-104.
10., as claimed in claim 1 because corrosion causes the valve of irregular deformation or the blocking method of pipe fitting, it is characterized in that, described hundred ratios that can connect two component blending are 1:1.
CN201510757727.9A 2015-11-10 2015-11-10 A kind of blocking method for the valve or pipe fitting for causing irregular deformation due to corrosion Active CN105351674B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510757727.9A CN105351674B (en) 2015-11-10 2015-11-10 A kind of blocking method for the valve or pipe fitting for causing irregular deformation due to corrosion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510757727.9A CN105351674B (en) 2015-11-10 2015-11-10 A kind of blocking method for the valve or pipe fitting for causing irregular deformation due to corrosion

Publications (2)

Publication Number Publication Date
CN105351674A true CN105351674A (en) 2016-02-24
CN105351674B CN105351674B (en) 2017-12-19

Family

ID=55327702

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510757727.9A Active CN105351674B (en) 2015-11-10 2015-11-10 A kind of blocking method for the valve or pipe fitting for causing irregular deformation due to corrosion

Country Status (1)

Country Link
CN (1) CN105351674B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106122675A (en) * 2016-06-27 2016-11-16 长沙新奥燃气有限公司 The quick-speed first-aid repair method of city mesolow fuel gas transmission steel pipe
CN109237200A (en) * 2018-10-17 2019-01-18 陈培高 A kind of interim leak stopping protective device of outdoor gas pipeline

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1378051A (en) * 2002-01-29 2002-11-06 陈悦 Live leaking-stopping technology
CN101144557A (en) * 2007-09-28 2008-03-19 重庆燃气(集团)有限责任公司 Gas pipe under-pressure leakage-plugging method
CN201072003Y (en) * 2007-09-21 2008-06-11 重庆燃气(集团)有限责任公司 Gas pipe mend block mending with pressure
CN101344207A (en) * 2007-07-11 2009-01-14 周毅 Maintenance construction method for anti-corrosion metal pipeline
CN104251363A (en) * 2013-06-26 2014-12-31 上海梅山钢铁股份有限公司 Gas pipeline bellows plugging method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1378051A (en) * 2002-01-29 2002-11-06 陈悦 Live leaking-stopping technology
CN101344207A (en) * 2007-07-11 2009-01-14 周毅 Maintenance construction method for anti-corrosion metal pipeline
CN201072003Y (en) * 2007-09-21 2008-06-11 重庆燃气(集团)有限责任公司 Gas pipe mend block mending with pressure
CN101144557A (en) * 2007-09-28 2008-03-19 重庆燃气(集团)有限责任公司 Gas pipe under-pressure leakage-plugging method
CN104251363A (en) * 2013-06-26 2014-12-31 上海梅山钢铁股份有限公司 Gas pipeline bellows plugging method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106122675A (en) * 2016-06-27 2016-11-16 长沙新奥燃气有限公司 The quick-speed first-aid repair method of city mesolow fuel gas transmission steel pipe
CN109237200A (en) * 2018-10-17 2019-01-18 陈培高 A kind of interim leak stopping protective device of outdoor gas pipeline

Also Published As

Publication number Publication date
CN105351674B (en) 2017-12-19

Similar Documents

Publication Publication Date Title
CN103925455B (en) A kind of water body joint coating on pipeline guard method and structure
CN105351674A (en) Method for stopping leakage of valve or pipe irregularly deformed due to rusting
KR102054235B1 (en) Method for repairing leak of pipe using patch
CN109057819A (en) A kind of construction method of the compound two linings form of shield method effluent tunnel
AU2015237222A1 (en) Methods for detection, marking and sealing leaks in pipes or ducts
CN105065852B (en) Construction method for laying pressure steel pipe in water passing tunnel of hydropower station
CN205504337U (en) Gas piping leak source online processing device
JP5828172B2 (en) Gas leak repair method for gas piping and gas leak repair member for gas piping
Mühlberg Corrosion protection of offshore wind turbines-A challenge for the steel builder and paint applicator
CN104299762B (en) A kind of transformer lead seals structure, transformer and sealing technology
CN201706136U (en) Underground-to-overground section fuel gas inlet pipe with anticorrosion reinforced layer
CN106521608B (en) A kind of preparation method of the zinc-plated electrophoretic paint steel pipe of combustion gas
CN105238206A (en) Metal corrosion resistant agent and metal anticorrosion treatment method
CN104532882B (en) Harbour steel-pipe pile scene method for anticorrosion treatment
CN108501355A (en) A kind of method for anticorrosion treatment of elastic anti-corrosion coating site operation
CN204629095U (en) A kind of pipeline dimension damage repair technology pilot system
JP6611213B1 (en) Water tank paint repair method
KR20080052401A (en) Method for pipe lining
CN204176248U (en) A kind of steel pipe fitting with polyurea anti-corrosion coating
Wilson et al. Implementation of polyurea applications for wastewater system corrosion-mitigation projects: Final report on project F15-AR04
CN103537421B (en) The long-acting coating process in oil & gas equipment metal surface
CN106833102A (en) A kind of natural gas line paint stripper and its construction method
CN102990319A (en) Corrosion control method of welding bead and melting loss portion
CN108006370A (en) A kind of pipelines and petrochemical pipelines anticorrosion insulating layer implementation
CN207145869U (en) Lining plastic main pipeline in pointer irrigation sprinkler fertilizer apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No.162 Weifang Road, China (Shanghai) pilot Free Trade Zone, Pudong New Area, Shanghai, 200122

Patentee after: Shanghai Energy Construction Group Co.,Ltd.

Address before: 200122 No. 162, Weifang Road, Shanghai, Pudong New Area

Patentee before: SHANGHAI MUNICIPAL GAS NO.2 PIPELINES ENGINEERING Co.,Ltd.