CN105350948B - Shale gas horizontal well fracturing method and shale gas horizontal well completion method - Google Patents

Shale gas horizontal well fracturing method and shale gas horizontal well completion method Download PDF

Info

Publication number
CN105350948B
CN105350948B CN201410419145.5A CN201410419145A CN105350948B CN 105350948 B CN105350948 B CN 105350948B CN 201410419145 A CN201410419145 A CN 201410419145A CN 105350948 B CN105350948 B CN 105350948B
Authority
CN
China
Prior art keywords
payzone
pitching
horizontal well
shale gas
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410419145.5A
Other languages
Chinese (zh)
Other versions
CN105350948A (en
Inventor
蒋廷学
苏瑗
贾长贵
卫然
王海涛
李双明
卞晓冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Research Institute of Petroleum Engineering
Original Assignee
China Petroleum and Chemical Corp
Sinopec Research Institute of Petroleum Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Research Institute of Petroleum Engineering filed Critical China Petroleum and Chemical Corp
Priority to CN201410419145.5A priority Critical patent/CN105350948B/en
Publication of CN105350948A publication Critical patent/CN105350948A/en
Application granted granted Critical
Publication of CN105350948B publication Critical patent/CN105350948B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of shale gas horizontal well fracturing methods and shale gas horizontal well completion method.The fracturing process, including step 1: to Jing Nei lower layer payzone perforation and pressure break is carried out;Step 2: lower layer's payzone is set;Step 3: to payzone perforation in upper layer in well and pressure break is carried out;Step 4: upper layer payzone is set;Step 3 and step 4 are repeated, until completing fractured horizontal well construction.This fracturing process can effectively be transformed shale gas reservoir, form the network fracture with effective flow conductivity.

Description

Shale gas horizontal well fracturing method and shale gas horizontal well completion method
Technical field
The present invention relates to oil/gas well fields, more particularly to a kind of shale gas horizontal well fracturing method.The present invention is also Be related to include this shale gas horizontal well fracturing method shale gas horizontal well completion method.
Background technique
Shale gas is the unconventional gas resource having a high potential in recent years, and has become the heat of world's oil-gas exploration and development Door field.Shale gas reservoir is rich in organic matter, is typical self-generation, self-reservoir type gas reservoir.Compared with other natural gas pools, shale gas Natural gas in hiding based on free gas and adsorbed gas and preservation, saturation in situ are enriched in the micro/nano level of shale reservoir system Hole-seam, mineral particle surface.Shale gas reservoir has without obvious gas-water interface, large area continuously at the spies such as hiding, low hole, hypotonic Sign, generally without natural production capacity, it is necessary to industrial capacity could be formed by fracturing engineering, and initial production is higher, successively decreases Fastly, but later period stable production period is long.
Feature based on shale gas reservoir, in order to ensure the economic validity of its exploitation, it is necessary to it is transformed, tool is formed The network fracture of effective flow conductivity just can be effectively carried out extraction.
Summary of the invention
In view of the above-mentioned problems, the invention proposes a kind of shale gas horizontal well fracturing methods.This fracturing process energy It is enough that effectively shale gas reservoir is transformed, form the network fracture with effective flow conductivity.
According to the first aspect of the invention, a kind of shale gas horizontal well fracturing method is proposed, including,
Step 1: to Jing Nei lower layer payzone perforation and pressure break is carried out;
Step 2: lower layer's payzone is set;
Step 3: to payzone perforation in upper layer in well and pressure break is carried out;
Step 4: upper layer payzone is set;
Step 3 and step 4 are repeated, until completing fractured horizontal well construction.
Shale gas reservoir can be effectively transformed according to the method for the present invention, form the net with effective flow conductivity Network crack.Further, since to lower layer's payzone pressure break, and after setting, then pressure break is carried out to upper layer payzone, avoids lower layer's production Influence of the layer output object to upper layer payzone pressing crack construction, facilitates constructing operation.
In one embodiment, it is set in step multiple, partially sets step and set using pitching, partially set step It is set using bridge plug.When shale gas horizontal well is set, the time that bridge plug is set is longer, and bridge plug is possible to occur in underground The problem of damaging and being hampered, the time that pitching is set is shorter and there is no the problems that is hampered, and this method is set using pitching and mentioned It has arrived part bridge plug to set, can not only greatly reduce and set the time used in step, improved construction efficiency, but also can be with It reduces underground and sets and bore the probability that plug is hampered.
In one embodiment, it is set in step in pitching, the preforation tunnel of input ball sealer blocking institute's pressure break;? Bridge plug is set in step, and bridge plug separates adjacent payzone.Bridge plug, which is set, can separate adjacent payzone, so as to complete to press The well section split is not influenced by the fracturing operation of subsequent payzone.In a preferred embodiment, it is set in step multiple, alternately Formula is set using pitching and is set with bridge plug.The step that sets of odd number payzone is set using pitching, and the step that sets of even number payzone makes It is set with bridge plug.In fracturing process, the well section for completing pressure break is not influenced by the fracturing operation of subsequent payzone, this is greatly convenient Construction.In addition, may also reach up according to this method: bridge plug dosage section about half, construction time save 1/3 or more.
In one embodiment, it is set in step in pitching, the quantity of input ball sealer is the perforation of corresponding payzone 1 times to 3 times of eyelet number.Preferably, it is set in step in pitching, the quantity of input ball sealer is the perforation of corresponding payzone 1.5 times of eyelet number.In another embodiment, it is set in step in pitching, the diameter of input ball sealer is accordingly to produce 1 times to 3 times of the preforation tunnel diameter of layer.Preferably, it is set in step in pitching, input ball sealer is corresponding payzone 1.5 times of preforation tunnel diameter.It can guarantee penetrating for completely plugged corresponding payzone using the ball sealer of this size and number Hole eyelet facilitates entire pressing crack construction process.
According to the second aspect of the invention, it is also proposed that a kind of shale gas horizontal well completion method comprising according to above The shale gas horizontal well fracturing method.
Compared with the prior art, the advantages of the present invention are as follows: (1) of the invention method to lower layer payzone pressure break, and After setting, then pressure break is carried out to upper layer payzone, avoids influence of lower layer's payzone output object to upper layer payzone pressing crack construction, it is convenient Constructing operation.(2) in the method for the invention, it partially sets step to set using pitching, partially sets step and use bridge plug It sets.This, which can not only greatly reduce, sets the time used in step, improves construction efficiency, but also can reduce underground seat The probability that envelope and brill plug are hampered.In addition, method and process of the invention it is simple, it is low in cost, convenient for operating, ensure in shale gas The success of pressing crack construction, reduces construction risk in horizontal well.
Detailed description of the invention
The invention will be described in more detail below based on embodiments and refering to the accompanying drawings.Wherein:
Fig. 1 is the schematic diagram set to Jing Nei lower layer payzone progress pressure break and pitching;
Fig. 2 is the schematic diagram after fractured horizontal well construction terminates.
In the accompanying drawings, identical component uses identical appended drawing reference.Attached drawing is not according to actual ratio.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings.
It is carried out usually after well cementation according to the method for the present invention.Fig. 1 is schematically showed according to the present invention in well The process that lower layer's payzone carries out pressure break and pitching is set.
Firstly, into pit shaft 10 tripping in perforating gun (not shown) to predetermined payzone 11 (or first layer 11) to carry out perforation, And preforation tunnel 16 is formed on casing 15.In general, first layer 11 is the payzone of the bottom.Ability when perforating gun and perforating application Known to the technical staff in domain, which is not described herein again.After perforation terminates, it is filled with high-pressure fluid into well and carries out pressure break, Payzone crack 12 is formed in first layer 11.The quantity in payzone crack 12 is usually multiple.Payzone exudate or product pass through payzone Crack 12 and preforation tunnel 16 enter in pit shaft 10, and can produce on ground.
Next, putting into ball sealer 13 into pit shaft 10 to block preforation tunnel 16, prevent payzone exudate from flowing into It is clear in order to show into pit shaft 10, it is not shown in Fig. 1 and all blocks all preforation tunnels.In order to guarantee ball sealer 13 All preforation tunnels 16 can be blocked, the diameter of used ball sealer 13 is 1 times of the opening diameter of preforation tunnel 16 To 3 times, preferably 1.5 times.In this way, ball sealer 13 will not enter in payzone crack 12, but at preforation tunnel 16, this Also it facilitates and removes the brill of ball sealer 13 before extraction.In another embodiment, the quantity of input ball sealer 13 is to penetrate 1 times to 3 times of the quantity of hole eyelet 16, preferably 1.5 times.The quantity of ball sealer 13 be greater than preforation tunnel 16 quantity, be by It is in pit shaft 10 in part ball sealer 13, rather than blocks preforation tunnel 16, do not have the effect of blocking preforation tunnel 16.
End and then the secondary tripping in perforating gun (not shown) into pit shaft 10 are set to the second layer 21 in first layer 11.The Two layer of 21 top that is adjacent with first layer 11 and being in first layer 11, that is to say, that pressing crack construction process is from payzone depths court It is carried out to earth's surface.After carrying out perforation, pressure break to the second layer 21, set using bridge plug.The perforation and pressure break of the second layer 21 are applied Work is identical as the perforation of first layer 11 and pressing crack construction, and which is not described herein again.
After pressing crack construction, bridge plug 23 is put into pit shaft 10 by the second layer 21 and in the production of 21 or more the second layer Layer separates.So that first layer 11 and the second layer 21 not will receive the construction infection of the layer in 21 or more the second layer.
After this, odd number payzone is set using pitching, and dual numbers payzone is set using bridge plug, that is to say, that it hands over It is set for being set using pitching with bridge plug.After completing fractured horizontal well construction and terminating, situation such as Fig. 2 is set in pit shaft 10 It is shown.It is set since method of the invention is set using some pitchings instead of bridge plug, the usage amount of bridge plug can reduce a half left side The right side, therefore also just solve the problems, such as that bridge plug is set and take a long time and entire pressing crack construction is caused to take a long time, improve construction Efficiency.It is possible to be damaged and the probability that is hampered in underground in addition, also reducing bridge plug.Pitching, which is set, does not block pit shaft 10, makes Obtaining still can carry out backwash to the environment in pit shaft 10, facilitate other operations in fracturing process.And bridge plug sets and can incite somebody to action Adjacent payzone separates, so that the intact well section of environment is not influenced by subsequent fracturing operation in well, this also facilitates pressure break and applies Work.
Although illustrating in the present embodiment, setting for first layer 11 has used pitching setting, and the second layer 21 sets use Bridge plug is set, but actually setting for first layer 11 can also be used bridge plug setting, and the second layer 21 is set using pitching It sets.Even, continuous multiple payzones can set using pitching, or continuous multiple payzones are set using bridge plug.These set Mode is within the protection scope of the present invention.
Although by reference to preferred embodiment, invention has been described, the case where not departing from the scope of the present invention Under, various improvement can be carried out to it and can replace component therein with equivalent.Especially, as long as there is no structures to rush Prominent, items technical characteristic mentioned in the various embodiments can be combined in any way.The invention is not limited to texts Disclosed in specific embodiment, but include all technical solutions falling within the scope of the claims.

Claims (7)

1. a kind of shale gas horizontal well fracturing method, including,
Step 1: to Jing Nei lower layer payzone perforation and pressure break is carried out;
Step 2: lower layer's payzone is set;
Step 3: to payzone perforation in upper layer in well and pressure break is carried out;
Step 4: the upper layer payzone is set;
Step 3 and step 4 are repeated, until completing fractured horizontal well construction;
Wherein, it being set in step multiple, alternative expression is set using pitching and is set with bridge plug, it is set in step in the pitching, Input ball sealer blocks preforation tunnel.
2. the method according to claim 1, wherein the step that sets of odd number payzone is set using pitching, even number The step that sets of payzone is set using bridge plug.
3. the method according to claim 1, wherein set in step in the bridge plug, bridge plug is by adjacent production Layer separates.
4. the method according to claim 1, wherein being set in step in the pitching, input ball sealer Quantity be 1 times to 3 times of preforation tunnel number of corresponding payzone.
5. according to the method described in claim 4, it is characterized in that, being set in step in the pitching, input ball sealer Quantity be 1.5 times of preforation tunnel number of corresponding payzone.
6. according to claim 1 to method described in any one of 5, which is characterized in that set in step, thrown in the pitching The diameter of the ball sealer entered is 1 times to 3 times of the preforation tunnel diameter of corresponding payzone.
7. according to the method described in claim 6, it is characterized in that, being set in step in the pitching, input ball sealer Diameter be 1.5 times of preforation tunnel diameter of corresponding payzone.
CN201410419145.5A 2014-08-22 2014-08-22 Shale gas horizontal well fracturing method and shale gas horizontal well completion method Active CN105350948B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410419145.5A CN105350948B (en) 2014-08-22 2014-08-22 Shale gas horizontal well fracturing method and shale gas horizontal well completion method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410419145.5A CN105350948B (en) 2014-08-22 2014-08-22 Shale gas horizontal well fracturing method and shale gas horizontal well completion method

Publications (2)

Publication Number Publication Date
CN105350948A CN105350948A (en) 2016-02-24
CN105350948B true CN105350948B (en) 2019-01-01

Family

ID=55326994

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410419145.5A Active CN105350948B (en) 2014-08-22 2014-08-22 Shale gas horizontal well fracturing method and shale gas horizontal well completion method

Country Status (1)

Country Link
CN (1) CN105350948B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107725009B (en) * 2016-08-12 2020-07-31 中国石油化工股份有限公司 Well completion method for horizontal well
CN108240209B (en) * 2016-12-26 2020-07-10 中国石油天然气股份有限公司 Method for secondary fracturing of coal-bed gas well
CN107605449B (en) * 2017-08-03 2020-04-10 中国石油天然气股份有限公司 Ball-throwing temporary plugging layered fracturing method for heterogeneous reservoir
CN108561082B (en) * 2018-01-05 2019-12-31 中煤科工集团西安研究院有限公司 Method for modifying limestone aquifer by mutually-embedded jet grouting
CN111305803B (en) * 2019-12-03 2022-08-30 中石化石油工程技术服务有限公司 Shale gas horizontal well cutting type fracturing method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1064912A (en) * 1992-04-21 1992-09-30 辽河石油勘探局曙光采油厂 Selective pluggind technology for gas well using polymer compound material ball
CN1416499A (en) * 2000-02-15 2003-05-07 埃克森美孚上游研究公司 Method and appts. for stimulation of multiple formation intervals
CN101146888A (en) * 2005-01-21 2008-03-19 费尔蒙特矿物有限公司 Soluble deverting agents
CN101351523A (en) * 2005-12-05 2009-01-21 普拉德研究及开发股份有限公司 Degradable material assisted diversion or isolation
CN101457640A (en) * 2007-12-14 2009-06-17 中国石油大学(北京) Abradant jet downhole perforation, kerf multiple fracturing method and device
CN101553552A (en) * 2006-10-24 2009-10-07 普拉德研究及开发股份有限公司 Degradable material assisted diversion
CN102777155A (en) * 2011-05-13 2012-11-14 中国石油化工股份有限公司 Shale gas bridge plug subsection completion method
EP2631422A2 (en) * 2012-02-24 2013-08-28 Wojskowa Akademia Techniczna Method of conjugated hydrocarbon gas extraction and storage CO2 in horizontal wellbores

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1064912A (en) * 1992-04-21 1992-09-30 辽河石油勘探局曙光采油厂 Selective pluggind technology for gas well using polymer compound material ball
CN1416499A (en) * 2000-02-15 2003-05-07 埃克森美孚上游研究公司 Method and appts. for stimulation of multiple formation intervals
CN101146888A (en) * 2005-01-21 2008-03-19 费尔蒙特矿物有限公司 Soluble deverting agents
CN101351523A (en) * 2005-12-05 2009-01-21 普拉德研究及开发股份有限公司 Degradable material assisted diversion or isolation
CN101553552A (en) * 2006-10-24 2009-10-07 普拉德研究及开发股份有限公司 Degradable material assisted diversion
CN101457640A (en) * 2007-12-14 2009-06-17 中国石油大学(北京) Abradant jet downhole perforation, kerf multiple fracturing method and device
CN102777155A (en) * 2011-05-13 2012-11-14 中国石油化工股份有限公司 Shale gas bridge plug subsection completion method
EP2631422A2 (en) * 2012-02-24 2013-08-28 Wojskowa Akademia Techniczna Method of conjugated hydrocarbon gas extraction and storage CO2 in horizontal wellbores

Also Published As

Publication number Publication date
CN105350948A (en) 2016-02-24

Similar Documents

Publication Publication Date Title
CN105350948B (en) Shale gas horizontal well fracturing method and shale gas horizontal well completion method
US10018025B2 (en) Hydraulic fracturing system and method
CN103967472B (en) A kind of coal bed gas staged fracturing horizontal well enhanced gas extraction method
CN102678092B (en) A kind ofly abovegroundly combine construction coal and the coal bed gas method of adopting altogether down
Dehua et al. Large-scale multi-stage hydraulic fracturing technology for shale gas horizontal Well JY1HF
Li et al. Research and application of water jet technology in well completion and stimulation in China
MX2008010963A (en) Well planning system and method.
CN105545307A (en) Method for over-pit and under-pit cooperative control of roofs of far and near fields of extra-large stoping space
WO2010092352A3 (en) Method and apparatus for multi-zone stimulation
CN105370259A (en) Staged fracturing method of horizontal well
CN104963671B (en) A kind of fracturing reform method of High angle from formula well reservoir
US20150075784A1 (en) Phased stimulation methods
CN107939368A (en) The real-time control method of hydraulic fracture complexity in a kind of same fracturing section of well of improving the standard
CN106593389A (en) Method for fracturing high-angle naturally-fractured oil reservoir by using permanent plugging agent
Zanganeh et al. The role of hydraulic fracture geometry and conductivity profile, unpropped zone conductivity and fracturing fluid flowback on production performance of shale oil wells
CN107387049B (en) Repeated fracturing method and system
Anderson* et al. Maximizing productive stimulated reservoir volume in the eagle ford-an infill case study
CN104594869A (en) Reservoir reforming method
US9784090B2 (en) Method for selecting the location of a stimulating geothermal well
WO2014138301A3 (en) Through tubing perpendicular boring
CN108397171A (en) A kind of nitrogen auxiliary carbon dioxide is handled up the method for the fine and close oil of exploitation
CN107100666A (en) Quick-fried crowded extinction and dust-removing method under a kind of Coal Seam Prone To Outburst coal roadway tunneling
RU2379492C2 (en) Development method at wells re-entry and oil field in general
CN105804742A (en) Shale gas reservoir three-dimensional fracturing method
CN202325277U (en) Sectional uniform acidifying tubular column in sand control tubular column of oil-water well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant