CN105350740B - Utilize hook and the instrument laying marmorean method of metope - Google Patents

Utilize hook and the instrument laying marmorean method of metope Download PDF

Info

Publication number
CN105350740B
CN105350740B CN201510644309.9A CN201510644309A CN105350740B CN 105350740 B CN105350740 B CN 105350740B CN 201510644309 A CN201510644309 A CN 201510644309A CN 105350740 B CN105350740 B CN 105350740B
Authority
CN
China
Prior art keywords
hook
marble
cement mortar
bistrique
dovetail groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510644309.9A
Other languages
Chinese (zh)
Other versions
CN105350740A (en
Inventor
张丽华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pinghu Qian Feng Machinery Co., Ltd.
Original Assignee
张丽华
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 张丽华 filed Critical 张丽华
Priority to CN201510644309.9A priority Critical patent/CN105350740B/en
Publication of CN105350740A publication Critical patent/CN105350740A/en
Application granted granted Critical
Publication of CN105350740B publication Critical patent/CN105350740B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/18Implements for finishing work on buildings for setting wall or ceiling slabs or plates
    • E04F21/1838Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements
    • E04F21/1844Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements by applying them one by one

Abstract

It is disclosed by the invention to be used to lay the marmorean hook of metope and its instrument and laying method, aim to provide that a kind of marble is connected with cement mortar more firmly, can be outputed on marble slab place hook after dovetail groove be used to lay the marmorean hook of metope and its instrument and laying method.Including hook, the hook is Ω types, and the cross section of hook is rectangle, also include bistrique and mill handle, bistrique is up-small and down-big cone, and mill handle is provided with positioning inner sleeve, its lower end is provided with bearing, and bearing is externally provided with eight shape angles, and the bottom of angle is embedded with positioning roller.After handle will be ground on power tool, after controlling bistrique to enter the certain depth of marble using positioning roller, can be outputed on marble slab can be put into the local dovetail groove of hook, so that the cement mortar of hook both ends and marble applying surfaces and embedded dovetail groove is combined together, so that marble is not easy to drop, and it is easy to construct.

Description

Utilize hook and the instrument laying marmorean method of metope
Technical field
The present invention relates to when being applied to paste marble material in architectural engineering for increasing the part of bonding strength And its to place the part grinding tool slotted on finishing material and the method constructed using the instrument, more specifically Say, be to utilize hook and the instrument laying marmorean method of metope.
Background technology
At present, it is necessary on the metope of enterprise's foreground background metope or height no more than 2.5 meters in construction and decoration industry When laying the bigger marble slabs of area, can often use cladding method to construct, but cladding method not only efficiency it is low, into This height, occupied ground are larger, and marble is hanging hanging, and overall impact resistance is poor, and when being laid with cement mortar, Because cement mortar is different from marble coefficient of thermal expansion and contraction, the time has grown marble and easily dropped, not safe enough.
The present invention specifically addresses there is the metope upper berth for being not more than 2.5 meters in height with cement mortar in the prior art If during the bigger marble slabs of area, because cement mortar is different from marble coefficient of thermal expansion and contraction, the time has grown marble Easily drop or loosen, it is not safe enough and firm the defects of.
It is an object of the invention to provide one kind using hook and the instrument laying marmorean method of metope, the hook can be with Effectively marble is connected with cement mortar more firm so that marble is not easy to drop from metope.
It is described it is a further object to provide one kind using hook and the instrument laying marmorean method of metope Instrument includes bistrique and mill handle, and can be outputed on marble slab can be put into the local dovetail groove of hook so that hook both ends and big Cement mortar in reason stone applying surfaces position and embedded dovetail groove is combined together, and it is easy to construct.
Another object of the present invention will provide the present invention using hook and the instrument laying marmorean method of metope.
The content of the invention
In order to solve above-mentioned technical problem, the present invention lays the marmorean method of metope using hook and instrument Hook uses following technical proposals:The hook is Ω types, and the cross section of the hook is rectangle, the width of the hook cross-section Spend for 20 millimeters to 40 millimeters, it is described hook for spring steel make, rectangle cause hook in groove will not side fall, the both ends of hook All the time what can be connected with cement mortar is very firm.
The present invention uses following technical proposals using hook and the instrument laying marmorean method of metope:Described kit Bistrique and mill handle are included, the bistrique is up-small and down-big cone, and the upper end of the cone is provided with mill bar, and the mill handle is arranged on mill The upper end of bar, the cylindrical of mill handle are provided with positioning inner sleeve, and the cylindrical of the positioning inner sleeve is provided with lock-screw, described fixed The lower end of position inner sleeve is provided with bearing, and the cylindrical of the bearing is provided with eight shape angles, and the bottom of the angle is longitudinally embedding There is positioning roller, the centre of the positioning roller is fitted with the alignment pin fixed with angle, the bottom of the bistrique and cone It is coaxial with mill bar and mill handle that place and the outside of mill bar, which are plated with 100 mesh to the emery grit of 300 mesh, the bistrique,.Will mill After handle is arranged on power tool, bistrique is controlled into transverse shifting after the certain depth of marble using positioning roller, can Easily to grind dovetail groove in marmorean paved surface, can cause in cement mortar insertion dovetail groove and with being arranged on groove Interior hook combines, and is not easy to drop from the metope being laid, and it is easy to construct.
The present invention is using the technical scheme of hook and the instrument laying marmorean method of metope through the following steps that completing 's:
A, metope basic unit to be laid is cleared up, from cement mortar by the floating rear plucking superficial layer of design requirement;It is so that big Bonding intensity during reason stone paving is higher, and construction is more prone to.
B, maintenance to cement mortar solidifies, hardened;So that subsequent handling is easily carried out.
C, the requirement sticked according to marmorean size and design carries out cellular snap line;Can be with very convenient during such paving Constructed according to design requirement on ground.
The distance of the end face of bistrique and positioning roller is arranged to the half of marble thickness using lock-screw d, It is clamped in 2/3rds, then by mill handle on electric drill or other power tools;According to design requirement bistrique can be controlled to enter Marmorean depth.
E, the position on the inside of each angle of marble paved surface is ground to downwards after locating wheel encounters marmorean paved surface, With hand steered firmly angle, then transverse shifting marble dovetail groove is ground at the parallel position in two sides;Gear can certainly be set Bar is defined to angle so that cement mortar can enter in dovetail groove, can also be when marble size is larger The centre of side directly grinds dovetail groove to centre, to increase bonding strength.
F, after hook is tightened up with hand or pliers, several are equably placed in every dovetail groove;
G, afterwards, cement mortar is spread in the paved surface provided with dovetail groove, while causes cement mortar insertion dovetail groove It is interior;By being integrally formed into the cement mortar in the cement mortar and paved surface in dovetail groove and hook, it is of course also possible to make With other paving materials.
H, gently tapped with rubber hammer after the marble for being covered with cement mortar is laid on plucking superficial layer smooth;Make Whole plane can become smooth attractive in appearance according to design requirement.
I, after maintenance is hardened to cement mortar, clean surface.
Due to laying the marmorean method of metope using above-mentioned technical proposal, utilization hook and instrument provided by the invention Beneficial effect is:1. marble is connected more firm with cement mortar;2. dovetail groove can be outputed on marble slab;3. apply Work is easy.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the present invention;
Fig. 2 is Fig. 1 of the present invention overlooking the structure diagram;
Fig. 3 is marble slotting position structural representation of the present invention;
Fig. 4 is Fig. 3 of the present invention A-A cross section structure diagrams;
Fig. 5 is structural representation of the present invention under laying state.
Embodiment
The present invention will be described in detail with embodiment below in conjunction with the accompanying drawings.
Embodiment
Such as(Accompanying drawing 6, accompanying drawing 7)Shown, of the invention utilizes hook and the instrument laying marmorean method of metope, the extension Hook 9 is Ω types, and the cross section of the hook 9 is rectangle, and the width of 9 cross sections of the hook is 30 millimeters, and the hook 9 is bullet Spring steel makes.
Such as(Accompanying drawing 1, accompanying drawing 2)Shown, of the invention includes mill using hook and the marmorean method of instrument laying metope Head and mill handle, the bistrique 1 are up-small and down-big cone, and the upper end of the cone is provided with mill bar 1.1, and the mill handle 2 is arranged on The upper end of mill bar 1.1, mill the cylindrical of handle 2 are provided with positioning inner sleeve 3, and the cylindrical of the positioning inner sleeve 3 is provided with locking screw Nail 3.1, the lower end of the positioning inner sleeve 3 are provided with bearing 4, and the cylindrical of the bearing 4 is provided with eight shape angles 5, described fixed The bottom of position pin 5 is longitudinally embedded with positioning roller 5.1, and the centre of the positioning roller 5.1 is fitted with the positioning fixed with angle 5 Pin 5.2.At the bottom of the bistrique 1 and cone and outside of mill bar 1.1 is plated with the emery grits of 200 mesh.The bistrique 1 It is coaxial with mill bar 1.1 and mill handle 2.
Such as(Accompanying drawing 3, accompanying drawing 4, accompanying drawing 5)Shown, of the invention utilizes hook and the instrument laying marmorean method of metope Complete according to the following steps:
A, metope basic unit to be laid is cleared up, from cement mortar by the floating rear plucking superficial layer 10 of design requirement;
B, maintenance to cement mortar solidifies, hardened;
C, the requirement sticked according to marmorean size and design carries out cellular snap line;
D, the distance of the end face of bistrique 1 and positioning roller 5.1 is arranged to the five of marble thickness using lock-screw 3.1 / tri-, then mill handle 2 is clamped on electric drill;
E, the position on the inside of each angle of marble paved surface is ground to downwards the laying that locating wheel 5.1 encounters marble 6 Behind face, dovetail groove 7 is ground at the parallel position in two sides with hand steered firmly angle 5, then transverse shifting marble 6;
F, with hand will link up with 9 tighten up after, equably placed in every dovetail groove 5 hook 9;
G, afterwards, cement mortar 10 is spread in the paved surface provided with dovetail groove 7, while causes cement mortar 10 to be embedded in swallow In stern notch;
H, gently tapped with rubber hammer after the marble 6 for being covered with cement mortar 10 is laid on plucking superficial layer 11 flat It is whole;
I, after maintenance is hardened to cement mortar 10, clean surface.

Claims (1)

1. one kind utilizes hook and the instrument laying marmorean method of metope, the hook(9)For Ω types, the hook(9)'s Cross section is rectangle, the hook(9)The width of cross section is 20 millimeters to 40 millimeters, the hook(9)Made for spring steel, Described instrument includes bistrique and mill handle, the bistrique(1)For up-small and down-big cone, the upper end of the cone is provided with mill bar (1.1), the mill handle(2)It is arranged on mill bar(1.1)Upper end, the mill handle(2)Cylindrical be provided with positioning inner sleeve(3), institute State positioning inner sleeve(3)Cylindrical be provided with lock-screw(3.1), the positioning inner sleeve(3)Lower end be provided with bearing(4), it is described Bearing(4)Cylindrical be provided with eight shape angles(5), the angle(5)Bottom longitudinally be embedded with positioning roller(5.1), The positioning roller(5.1)Centre be fitted with and angle(5)Fixed alignment pin(5.2), the bistrique(1)Bottom and At cone and mill bar(1.1)Outside be plated with 100 mesh to the emery grit of 300 mesh, the bistrique(1)With mill bar(1.1) With grinding handle(2)To be coaxial,
Its laying method is to comprise the following steps:
A, metope basic unit to be laid is cleared up, from cement mortar by the floating rear plucking superficial layer of design requirement(10);
B, maintenance to cement mortar solidifies, hardened;
C, the requirement sticked according to marmorean size and design carries out cellular snap line;
D, lock-screw is utilized(3.1)By bistrique(1)End face and positioning roller(5.1)Distance be arranged to marble thickness Half is to 2/3rds, then will grind handle(2)It is clamped on electric drill or other power tools;
E, the position on the inside of each angle of marble paved surface is ground to downwards locating wheel(5.1)Encounter marble(6)Laying Behind face, with hand steered firmly angle(5), then transverse shifting marble(6)Dovetail groove is ground at the parallel position in two sides(7);
F, will be linked up with hand or pliers(9)After tightening up, several hooks are equably placed in every dovetail groove(9);
G, afterwards, provided with dovetail groove(7)Paved surface on spread cement mortar(10), while cause cement mortar(9)It is embedded In dovetail groove, and covered hook(9)Both ends;
H, cement mortar will be covered with(10)Marble(6)It is laid on plucking superficial layer(11)Gently tapped with rubber hammer after upper It is smooth;
I, conserve to cement mortar(10)After hardening, clean surface.
CN201510644309.9A 2015-10-06 2015-10-06 Utilize hook and the instrument laying marmorean method of metope Active CN105350740B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510644309.9A CN105350740B (en) 2015-10-06 2015-10-06 Utilize hook and the instrument laying marmorean method of metope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510644309.9A CN105350740B (en) 2015-10-06 2015-10-06 Utilize hook and the instrument laying marmorean method of metope

Publications (2)

Publication Number Publication Date
CN105350740A CN105350740A (en) 2016-02-24
CN105350740B true CN105350740B (en) 2017-11-17

Family

ID=55326789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510644309.9A Active CN105350740B (en) 2015-10-06 2015-10-06 Utilize hook and the instrument laying marmorean method of metope

Country Status (1)

Country Link
CN (1) CN105350740B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908949B (en) * 2016-04-28 2018-05-15 苏州金螳螂建筑装饰股份有限公司 A kind of facing back grooving method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003064839A (en) * 2001-08-30 2003-03-05 Yuuchii Ka Wall face finishing construction method, pebble dash wall face material used for it, and construction apparatus used for it
CN2761359Y (en) * 2004-12-31 2006-03-01 刘宇 Grinding head for plate material
CN201106277Y (en) * 2007-10-18 2008-08-27 王金芳 Machine for grooving wall
CN102561642A (en) * 2012-02-06 2012-07-11 周述文 Mounting device with elastic hook and construction method for hanging and combining building stone or ceramic tiles with mastic
CN202412019U (en) * 2012-01-14 2012-09-05 兰波 Rust removal grinding machine for building construction
CN204196010U (en) * 2014-10-15 2015-03-11 长葛市华泰建筑机械厂 A kind of fluting cutting machine
CN204571184U (en) * 2015-04-28 2015-08-19 哈尔滨欧源科技开发有限公司 A kind of barb-type jump ring be embedded in ceramic tile or stone material groove
CN204960223U (en) * 2015-10-06 2016-01-13 杭州沈大侠装饰设计工程有限公司 A couple for laying wall marble and instrument thereof

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003064839A (en) * 2001-08-30 2003-03-05 Yuuchii Ka Wall face finishing construction method, pebble dash wall face material used for it, and construction apparatus used for it
CN2761359Y (en) * 2004-12-31 2006-03-01 刘宇 Grinding head for plate material
CN201106277Y (en) * 2007-10-18 2008-08-27 王金芳 Machine for grooving wall
CN202412019U (en) * 2012-01-14 2012-09-05 兰波 Rust removal grinding machine for building construction
CN102561642A (en) * 2012-02-06 2012-07-11 周述文 Mounting device with elastic hook and construction method for hanging and combining building stone or ceramic tiles with mastic
CN204196010U (en) * 2014-10-15 2015-03-11 长葛市华泰建筑机械厂 A kind of fluting cutting machine
CN204571184U (en) * 2015-04-28 2015-08-19 哈尔滨欧源科技开发有限公司 A kind of barb-type jump ring be embedded in ceramic tile or stone material groove
CN204960223U (en) * 2015-10-06 2016-01-13 杭州沈大侠装饰设计工程有限公司 A couple for laying wall marble and instrument thereof

Also Published As

Publication number Publication date
CN105350740A (en) 2016-02-24

Similar Documents

Publication Publication Date Title
US20210254335A1 (en) Decorative concrete with uniform surface and method of forming the same
WO2009154814A3 (en) Concrete finishing apparatus
MXPA05012851A (en) Cutting segment, method of manufacturing cutting segment, and cutting tool.
CN110230380B (en) Construction method of pouring and tamping integrated grindstone terrace
CN105113754B (en) Marmorean method is laid using hook and instrument
CN102767275A (en) Stone floor
CN105350740B (en) Utilize hook and the instrument laying marmorean method of metope
US8070558B2 (en) Porcelain epoxy flooring and method for producing the same
CN105155826B (en) Marble lays instrument and laying method
CN105113772B (en) Metope marble lays instrument and laying method
CN204960223U (en) A couple for laying wall marble and instrument thereof
PT1977867E (en) Jet tool and tool holding head for surface working of slabs and blocks of stone, cementitious or the like materials
CN201614727U (en) Stone paving leveling device
JP5951302B2 (en) Rough surface finishing tool and pavement surface finishing method using the same
CN205021404U (en) Instrument is laid to marble
CN205935571U (en) Brush that draws for building
CN109760217B (en) Stone cutting device
KR20100035204A (en) Constructive method of dry grinding bottom close material of building
CN203045546U (en) Seamless joint abrasion traceless diamond wheel
CN204298708U (en) Arrangement of reinforcement compound outdoor ground brick
KR20190113694A (en) Multifunctional Hera for Surface Repair
CN211473221U (en) Novel terrazzo
CN108908652B (en) Concrete pavement texturing test piece manufacturing method, machining mold and texture cutter
CH709589A2 (en) Tool for machining surfaces.
CN209682111U (en) A kind of ground pavement is hammered into shape with general-purpose glue

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhang Lihua

Inventor before: Shen Jian

Inventor before: Wu Pei

TA01 Transfer of patent application right

Effective date of registration: 20171019

Address after: 362400, Quanzhou, Fujian province Anxi County Peach boat Township South pit village center point 17

Applicant after: Zhang Lihua

Address before: Hangzhou City, Zhejiang province 310000 Moganshan Road No. 1418-66 2 Building 5 Room 502 (Shangcheng District Science and technology industrial base)

Applicant before: Shen, Hangzhou swordsman Decoration Design Engineering Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191014

Address after: Room 604, 2 stairs, building 41, Zhongxin garden, No.147, Third Ring Road, Luocheng garden, Hui'an County, Fujian Province, 362100

Patentee after: Lin Shao Zhong

Address before: No. 17, Nankeng Village Center, Taozhou Township, Anxi County, Quanzhou City, Fujian Province

Patentee before: Zhang Li Hua

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191231

Address after: 314200 No.8 Chuangye Road, dushangang Town, Pinghu City, Jiaxing City, Zhejiang Province

Patentee after: Pinghu Qian Feng Machinery Co., Ltd.

Address before: Room 604, 2 stairs, building 41, Zhongxin garden, No.147, Third Ring Road, Luocheng garden, Hui'an County, Fujian Province, 362100

Patentee before: Lin Shaozhong

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Method of laying wall marble with hooks and tools

Effective date of registration: 20211216

Granted publication date: 20171117

Pledgee: Zhejiang Pinghu Rural Commercial Bank Co.,Ltd. Huanggu sub branch

Pledgor: PINGHU QIANFENG MACHINERY Co.,Ltd.

Registration number: Y2021330002534