CN105350740A - Hooks for laying wall marble, tool for mounting hooks, and method for laying wall marble - Google Patents

Hooks for laying wall marble, tool for mounting hooks, and method for laying wall marble Download PDF

Info

Publication number
CN105350740A
CN105350740A CN201510644309.9A CN201510644309A CN105350740A CN 105350740 A CN105350740 A CN 105350740A CN 201510644309 A CN201510644309 A CN 201510644309A CN 105350740 A CN105350740 A CN 105350740A
Authority
CN
China
Prior art keywords
marble
hook
cement mortar
laying
hooks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510644309.9A
Other languages
Chinese (zh)
Other versions
CN105350740B (en
Inventor
沈鉴
吴佩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pinghu Qian Feng Machinery Co., Ltd.
Original Assignee
Shen Hangzhou Swordsman Decoration Design Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shen Hangzhou Swordsman Decoration Design Engineering Co Ltd filed Critical Shen Hangzhou Swordsman Decoration Design Engineering Co Ltd
Priority to CN201510644309.9A priority Critical patent/CN105350740B/en
Publication of CN105350740A publication Critical patent/CN105350740A/en
Application granted granted Critical
Publication of CN105350740B publication Critical patent/CN105350740B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/18Implements for finishing work on buildings for setting wall or ceiling slabs or plates
    • E04F21/1838Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements
    • E04F21/1844Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements by applying them one by one

Abstract

The invention discloses hooks for laying wall marble, a tool for mounting the hooks, and a method for laying the wall marble, the marble and the cement mortar can be connected more firmly through the hooks, and dovetail grooves can be made in marble slabs by the tool so as to hold the hooks. Each hook is omega-shaped and has a rectangular cross section. The tool comprises a grinding head and a grinding handle; the grinding head is a cone having a small upper part and a large lower part; the grinding handle is provided with a positioning inner sleeve; a bearing is arranged at the lower end of the positioning inner sleeve; a splayed positioning pin is arranged outside the bearing; and positioning rollers are embedded at the bottoms of the positioning pin. The grinding handle is mounted on a power tool, then the depth of the part, entering the marble, of the grinding head is controlled through the positioning rollers, and dovetail grooves capable of holding parts of the hooks can be made in the marble slabs, so that the two ends of the hooks can bond with the marble laying surface and cement mortar embedded in the dovetail grooves, thus the marble is not liable to fall off, and the construction is easy.

Description

For laying the marmorean hook of metope and instrument thereof and laying method
Technical field
The present invention relates in construction work when being applicable to paste marble material for increasing the part of bonding strength and for placing this part grinding tool of slotting on finish material and utilizing this instrument to carry out the method for constructing, more particularly, be for laying the marmorean hook of metope and instrument thereof and laying method.
Background technology
At present in building finishing industry; need enterprise's foreground background metope or be highly not more than 2.5 meters metope on lay area bigger marble slabs time; often can adopt cladding method construction; but not only efficiency is low, cost is high for cladding method, occupied ground is comparatively large, and marble is unsettled hanging, and overall impact resistance is poor; and when laying by cement mortar; because cement mortar is different from marble coefficient of thermal expansion and contraction, the time has been grown marble and has easily dropped, safe not.
The present invention is devoted to solve in prior art and also exists when laying the bigger marble slabs of area by cement mortar on the metope being highly not more than 2.5 meters, because cement mortar is different from marble coefficient of thermal expansion and contraction, time has been grown marble and has easily dropped or loosen, safety and firmly defect not.
The object of this invention is to provide a kind of for laying the marmorean hook of metope, what can be effectively connected with cement mortar by marble is more firm, and marble is not easily dropped from metope.
Another object of the present invention is to provide a kind of instrument for laying metope marble hook, the dovetail groove putting into hook local can be outputed on marble slab, make to link up with two ends and marble applying surfaces position and the cement mortar embedded in dovetail groove to combine, and construction easily.
Of the present invention also have an object will provide the present invention for laying the laying method of the marmorean hook of metope and instrument.
Summary of the invention
In order to solve the technical problem of above-mentioned existence, the present invention adopts following technical proposals for laying the marmorean hook of metope: comprise hook, described hook is Ω type, the cross section of described hook is rectangle, the width of described hook cross-section is 20 millimeters to 40 millimeters, described hook is that spring steel makes, and rectangle makes hook can not fall side in groove, and it is very firm that the two ends of hook can be connected with cement mortar all the time.
The present invention adopts following technical proposals for the instrument laying metope marble hook: comprise bistrique and mill handle, described bistrique is up-small and down-big cone, the upper end of described cone is provided with mill bar, described mill handle is arranged on the upper end of mill bar, the cylindrical of described mill handle is provided with positioning inner sleeve, the cylindrical of described positioning inner sleeve is provided with lock-screw, the lower end of described positioning inner sleeve is provided with bearing, the cylindrical of described bearing is provided with Eight characters shape angle, the bottom of described angle is longitudinally embedded with positioning roller, the middle adaptation of described positioning roller has the alignment pin fixing with angle, the outside of the bottom of described bistrique and cone place and mill bar is all electroplate with 100 order to 300 object emery grits, described bistrique is coaxial with grinding bar and grinding handle.Mill handle is arranged on after on power tool, utilize positioning roller to transverse shifting after controlling bistrique and entering the certain degree of depth of marble, dovetail groove can be ground like a cork in marmorean paved surface, cement mortar can be made to embed in dovetail groove and be arranged on the hook in groove and be combined, not easily drop from the metope be laid, and construction easily.
The present invention is completed by following steps for the technical scheme of laying the marmorean hook of metope and instrument and laying method:
A, clear up metope basic unit to be laid, select cement mortar by the floating rear plucking surface course of designing requirement; Make bonding intensity during marble paving higher, construction is more prone to.
B, maintenance to cement mortar are solidified, are hardened; Subsequent handling is easily carried out.
Cellular snap line is carried out in c, the requirement sticked according to marmorean size and design; Can construct according to designing requirement easily during such paving.
D, utilize lock-screw that the end face of bistrique and the distance of positioning roller are set to 2/1 to three/2nds of marble thickness, then mill spindle clamp is held on electric drill or other power tool; Bistrique can be controlled according to designing requirement and enter the marmorean degree of depth.
E, position inside each angle of marble paved surface are ground to after locating wheel encounters marmorean paved surface downwards, with hand steered live angle, then transverse shifting marble grinds dovetail groove at two parallel positions of side; Blend stop can certainly be arranged limit angle, cement mortar can be entered in dovetail groove, when marble size is larger, also directly can grind dovetail groove in the centre of side to centre, in order to increase bonding strength.
F, with hand or pliers, hook is tightened up after, in every bar dovetail groove, place several equably;
G, afterwards, the paved surface being provided with dovetail groove spreads cement mortar, make cement mortar embed in dovetail groove simultaneously; Be integrated by entering cement mortar in dovetail groove and the cement mortar in paved surface and linking up with into, certainly, also can use other paving materials.
H, the marble being covered with cement mortar is laid on after on plucking surface course and knocks smooth gently with rubber hammer; Make whole plane can become smooth attractive in appearance according to designing requirement.
After i, maintenance to cement mortar sclerosis, clean surface.
Owing to adopting technique scheme, provided by the invention for laying the marmorean hook of metope and instrument with the beneficial effect of laying method is: 1. marble be connected with cement mortar more firm; 2. can output dovetail groove on marble slab; 3. construction easily.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation of the present invention;
Fig. 2 is the plan structure schematic diagram of Fig. 1 of the present invention;
Fig. 3 is marble slotting position structural representation of the present invention;
Fig. 4 is the A-A sectional structure schematic diagram of Fig. 3 of the present invention;
Fig. 5 is the structural representation of the present invention under laying state;
Fig. 6 is the structural representation of invention hook;
Fig. 7 is the plan structure schematic diagram of Fig. 6 of the present invention.
Detailed description of the invention
Describe the present invention below in conjunction with accompanying drawing and detailed description of the invention.
Embodiment
As shown in (accompanying drawing 6, accompanying drawing 7), of the present inventionly comprise hook for laying the marmorean hook of metope, described hook 9 is Ω type, and the cross section of described hook 9 is rectangle, and the width of described hook 9 cross section is 30 millimeters, and described hook 9 is that spring steel makes.
As (accompanying drawing 1, accompanying drawing 2) shown in, instrument for laying metope marble hook of the present invention comprises bistrique and mill handle, described bistrique 1 is up-small and down-big cone, the upper end of described cone is provided with mill bar 1.1, described mill handle 2 is arranged on the upper end of mill bar 1.1, the cylindrical of described mill handle 2 is provided with positioning inner sleeve 3, the cylindrical of described positioning inner sleeve 3 is provided with lock-screw 3.1, the lower end of described positioning inner sleeve 3 is provided with bearing 4, the cylindrical of described bearing 4 is provided with Eight characters shape angle 5, the bottom of described angle 5 is longitudinally embedded with positioning roller 5.1, the middle adaptation of described positioning roller 5.1 has the alignment pin 5.2 fixing with angle 5.The outside of the bottom of described bistrique 1 and cone place and mill bar 1.1 is all electroplate with 200 object emery grits.Described bistrique 1 is coaxial with grinding bar 1.1 and grinding handle 2.
As shown in (accompanying drawing 3, accompanying drawing 4, accompanying drawing 5), of the present inventionly to complete according to the following steps for laying the marmorean hook of metope and instrument and laying method thereof:
A, clear up metope basic unit to be laid, select cement mortar by the floating rear plucking surface course 10 of designing requirement;
B, maintenance to cement mortar are solidified, are hardened;
Cellular snap line is carried out in c, the requirement sticked according to marmorean size and design;
D, utilize lock-screw 3.1 that the distance of the end face of bistrique 1 and positioning roller 5.1 is set to 3/5ths of marble thickness, then mill handle 2 is clamped on electric drill;
E, position inside each angle of marble paved surface are ground to after locating wheel 5.1 encounters the paved surface of marble 6 downwards, with hand steered live angle 5, then transverse shifting marble 6 grinds dovetail groove 7 at two parallel positions of side;
F, with hand, hook 9 is tightened up after, place equably in every bar dovetail groove 5 hook 9;
G, afterwards, the paved surface being provided with dovetail groove 7 is spread cement mortar 10, make cement mortar 10 embed in dovetail groove simultaneously;
H, the marble 6 being covered with cement mortar 10 is laid on after on plucking surface course 11 and knocks smooth gently with rubber hammer;
After i, maintenance to cement mortar 10 are hardened, clean surface.

Claims (3)

1. one kind for laying the marmorean hook of metope, comprise hook, it is characterized in that: described hook (9) is Ω type, the cross section of described hook (9) is rectangle, the width of described hook (9) cross section is 20 millimeters to 40 millimeters, and described hook (9) is spring steel making.
2. one kind for laying the instrument of metope marble hook, comprise bistrique and mill handle, it is characterized in that: described bistrique (1) is up-small and down-big cone, the upper end of described cone is provided with mill bar (1.1), described mill handle (2) is arranged on the upper end of mill bar (1.1), the cylindrical of described mill handle (2) is provided with positioning inner sleeve (3), the cylindrical of described positioning inner sleeve (3) is provided with lock-screw (3.1), the lower end of described positioning inner sleeve (3) is provided with bearing (4), the cylindrical of described bearing (4) is provided with Eight characters shape angle (5), the bottom of described angle (5) is longitudinally embedded with positioning roller (5.1), the middle adaptation of described positioning roller (5.1) has the alignment pin (5.2) fixing with angle (5), the outside of the bottom of described bistrique (1) and cone place and mill bar (1.1) is all electroplate with 100 order to 300 object emery grits, described bistrique (1) is coaxial with mill bar (1.1) and mill handle (2).
3., for laying the marmorean hook of metope and instrument thereof and a laying method, it is characterized in that comprising the following steps:
A, clear up metope basic unit to be laid, select cement mortar by the floating rear plucking surface course (10) of designing requirement;
B, maintenance to cement mortar are solidified, are hardened;
Cellular snap line is carried out in c, the requirement sticked according to marmorean size and design;
D, utilize lock-screw (3.1) that the distance of the end face of bistrique (1) and positioning roller (5.1) is set to 2/1 to three/2nds of marble thickness, then handle (2) will be ground be clamped on electric drill or other power tool;
E, position inside each angle of marble paved surface are ground to after locating wheel (5.1) encounters the paved surface of marble (6) downwards, with hand steered live angle (5), then transverse shifting marble (6) grinds dovetail groove (7) at two parallel positions of side;
F, will to link up with hand or pliers after (9) tighten up, in every bar dovetail groove, place several hooks (9) equably;
G, afterwards, the paved surface being provided with dovetail groove (7) is spread cement mortar (10), make cement mortar (9) embed in dovetail groove simultaneously, and covered the two ends of hook (9);
H, the marble (6) being covered with cement mortar (10) is laid on plucking surface course (11) upper after knock smooth gently with rubber hammer;
After i, maintenance to cement mortar (10) sclerosis, clean surface.
CN201510644309.9A 2015-10-06 2015-10-06 Utilize hook and the instrument laying marmorean method of metope Active CN105350740B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510644309.9A CN105350740B (en) 2015-10-06 2015-10-06 Utilize hook and the instrument laying marmorean method of metope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510644309.9A CN105350740B (en) 2015-10-06 2015-10-06 Utilize hook and the instrument laying marmorean method of metope

Publications (2)

Publication Number Publication Date
CN105350740A true CN105350740A (en) 2016-02-24
CN105350740B CN105350740B (en) 2017-11-17

Family

ID=55326789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510644309.9A Active CN105350740B (en) 2015-10-06 2015-10-06 Utilize hook and the instrument laying marmorean method of metope

Country Status (1)

Country Link
CN (1) CN105350740B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908949A (en) * 2016-04-28 2016-08-31 苏州金螳螂建筑装饰股份有限公司 Veneer back face grooving method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003064839A (en) * 2001-08-30 2003-03-05 Yuuchii Ka Wall face finishing construction method, pebble dash wall face material used for it, and construction apparatus used for it
CN2761359Y (en) * 2004-12-31 2006-03-01 刘宇 Grinding head for plate material
CN201106277Y (en) * 2007-10-18 2008-08-27 王金芳 Machine for grooving wall
CN102561642A (en) * 2012-02-06 2012-07-11 周述文 Mounting device with elastic hook and construction method for hanging and combining building stone or ceramic tiles with mastic
CN202412019U (en) * 2012-01-14 2012-09-05 兰波 Rust removal grinding machine for building construction
CN204196010U (en) * 2014-10-15 2015-03-11 长葛市华泰建筑机械厂 A kind of fluting cutting machine
CN204571184U (en) * 2015-04-28 2015-08-19 哈尔滨欧源科技开发有限公司 A kind of barb-type jump ring be embedded in ceramic tile or stone material groove
CN204960223U (en) * 2015-10-06 2016-01-13 杭州沈大侠装饰设计工程有限公司 A couple for laying wall marble and instrument thereof

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003064839A (en) * 2001-08-30 2003-03-05 Yuuchii Ka Wall face finishing construction method, pebble dash wall face material used for it, and construction apparatus used for it
CN2761359Y (en) * 2004-12-31 2006-03-01 刘宇 Grinding head for plate material
CN201106277Y (en) * 2007-10-18 2008-08-27 王金芳 Machine for grooving wall
CN202412019U (en) * 2012-01-14 2012-09-05 兰波 Rust removal grinding machine for building construction
CN102561642A (en) * 2012-02-06 2012-07-11 周述文 Mounting device with elastic hook and construction method for hanging and combining building stone or ceramic tiles with mastic
CN204196010U (en) * 2014-10-15 2015-03-11 长葛市华泰建筑机械厂 A kind of fluting cutting machine
CN204571184U (en) * 2015-04-28 2015-08-19 哈尔滨欧源科技开发有限公司 A kind of barb-type jump ring be embedded in ceramic tile or stone material groove
CN204960223U (en) * 2015-10-06 2016-01-13 杭州沈大侠装饰设计工程有限公司 A couple for laying wall marble and instrument thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908949A (en) * 2016-04-28 2016-08-31 苏州金螳螂建筑装饰股份有限公司 Veneer back face grooving method
CN105908949B (en) * 2016-04-28 2018-05-15 苏州金螳螂建筑装饰股份有限公司 A kind of facing back grooving method

Also Published As

Publication number Publication date
CN105350740B (en) 2017-11-17

Similar Documents

Publication Publication Date Title
CN106965313B (en) Reverse-beating forming device and method for concrete external wall panel
CN105113754A (en) Hooks for laying marble and tool thereof and laying and pasting method
CN105350740A (en) Hooks for laying wall marble, tool for mounting hooks, and method for laying wall marble
CN204960223U (en) A couple for laying wall marble and instrument thereof
CN104131694A (en) Efficient and low-consumption combined formwork system and construction method thereof
CN203347196U (en) Auxiliary jig for tile laying
CN105113772B (en) Metope marble lays instrument and laying method
CN105155826B (en) Marble lays instrument and laying method
CN204960261U (en) A couple for laying marble and instrument thereof
CN204370762U (en) A kind of anti-skidding marble tile of easy processing
CN106760297A (en) Exterior wall surface decorative device
CN103628650A (en) Metal floor and formation method
CN205021404U (en) Instrument is laid to marble
CN103122695A (en) Tool for controlling pouring thickness of concrete floor
CN205021362U (en) Instrument is laid to wall marble
KR20190113694A (en) Multifunctional Hera for Surface Repair
CN209722636U (en) A kind of paving slab in construction place
CN105507568A (en) Tile paving device and tile paving method
CN204298708U (en) Arrangement of reinforcement compound outdoor ground brick
CN205115962U (en) A simple and easy equipment of paving for thin layer construction
CN209682111U (en) A kind of ground pavement is hammered into shape with general-purpose glue
CN204571235U (en) Grey device put down by tile work
CN212885961U (en) Multifunctional railing fixing device
CN211473221U (en) Novel terrazzo
CN205012197U (en) Imitative brick with high water permeability ability

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhang Lihua

Inventor before: Shen Jian

Inventor before: Wu Pei

CB03 Change of inventor or designer information
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20171019

Address after: 362400, Quanzhou, Fujian province Anxi County Peach boat Township South pit village center point 17

Applicant after: Zhang Lihua

Address before: Hangzhou City, Zhejiang province 310000 Moganshan Road No. 1418-66 2 Building 5 Room 502 (Shangcheng District Science and technology industrial base)

Applicant before: Shen, Hangzhou swordsman Decoration Design Engineering Co., Ltd.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191014

Address after: Room 604, 2 stairs, building 41, Zhongxin garden, No.147, Third Ring Road, Luocheng garden, Hui'an County, Fujian Province, 362100

Patentee after: Lin Shao Zhong

Address before: No. 17, Nankeng Village Center, Taozhou Township, Anxi County, Quanzhou City, Fujian Province

Patentee before: Zhang Li Hua

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191231

Address after: 314200 No.8 Chuangye Road, dushangang Town, Pinghu City, Jiaxing City, Zhejiang Province

Patentee after: Pinghu Qian Feng Machinery Co., Ltd.

Address before: Room 604, 2 stairs, building 41, Zhongxin garden, No.147, Third Ring Road, Luocheng garden, Hui'an County, Fujian Province, 362100

Patentee before: Lin Shaozhong

TR01 Transfer of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Method of laying wall marble with hooks and tools

Effective date of registration: 20211216

Granted publication date: 20171117

Pledgee: Zhejiang Pinghu Rural Commercial Bank Co.,Ltd. Huanggu sub branch

Pledgor: PINGHU QIANFENG MACHINERY Co.,Ltd.

Registration number: Y2021330002534

PE01 Entry into force of the registration of the contract for pledge of patent right