CN105350550B - A kind of stiffening device and method of the pavement structure stability of soil and rock construction - Google Patents
A kind of stiffening device and method of the pavement structure stability of soil and rock construction Download PDFInfo
- Publication number
- CN105350550B CN105350550B CN201510704989.9A CN201510704989A CN105350550B CN 105350550 B CN105350550 B CN 105350550B CN 201510704989 A CN201510704989 A CN 201510704989A CN 105350550 B CN105350550 B CN 105350550B
- Authority
- CN
- China
- Prior art keywords
- cofferdam
- described device
- soil
- weir
- anchor head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/02—Restraining of open water
- E02D19/04—Restraining of open water by coffer-dams, e.g. made of sheet piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Road Paving Structures (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
The invention discloses the stiffening device and method of a kind of pavement structure stability of soil and rock construction, device is made up of pervious bed, collection branch pipe, main drainpipe, anchor head and discharge outlet;Some collection branch pipes are provided with regard to equidistant vertical at a certain distance on main drainpipe, radial anchor head is constituted, the outside one end of collection branch pipe is sealed by the pervious bed;The sealing of main drainpipe one end, the other end are provided with the discharge outlet.Infiltration after the present invention can make seepage prevention of cofferdam curtain is discharged by drainage pipeline, reduces cofferdam panel seepage water pressure;Anchor head in batardeau concrete panel junction pours anchoring together with panel, reinforces cofferdam mask;Device has anchored native stone weir body and panel in earth rock cofferdam filling body simultaneously, constitutes space web frame, enhances cofferdam globality.The present invention can greatly strengthen the pavement structure stability of soil and rock construction.
Description
Technical field
The invention belongs to Hydraulic and Hydro-Power Engineering technical field, more particularly to a kind of pavement structure of soil and rock construction is stably
The stiffening device and method of property, is applied to the design and construction of soil and rock construction.
Background technology
Hydraulic and Hydro-Power Engineering soil and rock construction construction condition has:Dry season is unstable with flood period;One dry season encloses
Weir cannot be built and complete;Foundation ditch desilting is drawn water and is easier to, and water can be crossed when dam body is relatively low in construction, it is impossible to can be reached when crossing water again
Estimated dash elevation.Overflow cofferdam is not less relatively for soil and rock construction weir body volume, but mask is subject to current in the period of passing the flood period
Wash away, stability needs to meet water requirement.Weir body filling material stability, curtain anti-seepage effect, downstream drainage effect of easing stress
And panel anchoring effect etc. all affect soil and rock construction mask it is stable.
To keep mask stable in existing soil and rock construction design and construction, seepage proof curtain is often taken, and in downstream weir body
Laying the larger rockfill of volume and boulder drainage blanket passage is used for draining.Meanwhile, pour thicker concrete slab and protect
Face.These processing mode effects are not obvious, and cofferdam construction is higher to material requirements, fill transport and get the raw materials ready and fill out with subregion
The complex process such as build, engineering cost is higher.
The soil and rock construction weir body amount of filling is larger, builds area place and mostly is native stone mixing material.Based on construction site material
Material characteristic, by building effective draining anchor structure, strengthens weir body and mask stability, met water requirement, can be greatly
Reduce engineering construction complexity and construction cost.
Before this method design is completed, do not find steady using related drain anchor structure reinforcement soil and rock construction mask
Qualitatively study and cofferdam construction project example.
The content of the invention
In order to solve above-mentioned technical problem, the present invention proposes one kind and is based on construction site soil stone mixing material characteristic, leads to
The pavement structure for cross and build effective draining anchor structure, strengthening the stable soil and rock construction of soil and rock construction mask is stable
Property stiffening device and method.
The technical scheme that adopted of device of the present invention is:A kind of reinforcement of the pavement structure stability of soil and rock construction
Device, it is characterised in that:Described device is made up of pervious bed, collection branch pipe, main drainpipe, anchor head and discharge outlet;The main row
Some collection branch pipes are provided with regard to equidistant vertical at a certain distance on water pipe, radial anchor head is constituted, collection branch pipe to
Sealed by the pervious bed outer one end;Main drainpipe one end sealing, the other end are provided with the discharge outlet.
Preferably, the pervious bed is made up of non-woven fabrics.
Preferably, the main body tubing of described device can be made up of PE tubing or steel tubing.
The technical scheme adopted by the method for the present invention is:A kind of reinforcement of the pavement structure stability of soil and rock construction
Method, it is characterised in that comprise the following steps:
Step 1:Size and material behavior of the soil and rock construction according to cofferdam, determine the arrangement form and model of described device
Enclose;
Step 2:When earth rock cofferdam is filled, placement in layers from bottom to up simultaneously buries described device, and native stone filling material is built
Weir body;The discharge outlet arranges outside, it is ensured that pouring for concrete slab do not affect draining;By the anchor head same concrete slab
Structure is fixed together, and forms overall skeleton;
Step 3:Described device builds and finishes, and completes cofferdam and fills and mask pouring construction, and weir body is with mask by described
Device forms space web frame, enhanced stability.
Preferably, placement in layers from bottom to up embedded described device, institute when the earth rock cofferdam described in step 2 is filled
State device to arrange in plum blossom-shaped in the body of weir, described device 1.0 ~ 1.5m of arrangement pitch between in level, vertically the cloth between
Put 1.0 ~ 1.5m of spacing.
Preferably, during mask pouring construction described in step 3, the outermost one of described device constitutes radial anchor head
Pour together with concrete slab.
The main advantage of the present invention is:
1st, when in method, soil and rock construction downstream is filled, the reinforcement anchoring effect of draining anchor structure enhances native stone
The structural stability of weir body;
2nd, in method, native stone filling body infiltration can be discharged by discharge structure, reduced downstream penetration hydraulic pressure by force, strengthened shield
Face stability;
3rd, in method, draining anchor structure anchor head is anchored at the stability for strengthening discharge structure together with panel, while right
Panel reinforcement is anchored.Weir body and panel are also combined together by the anchoring process, are formed space web frame, are enhanced weir body
Stability in the large;
4th, the mask stability of the soil and rock construction of the invention strengthens method, enhances the drainage effect behind cofferdam and weir
Body structural strength, reduces the requirement to weir body filling material, without arranging the complicated discharge structure such as excessive heap stone-laying body, will
Cofferdam weir body filling construction simplifies, and saves material investment and operating expenses.
Description of the drawings
Fig. 1:It is the apparatus structure sketch of the embodiment of the present invention;
Fig. 2:It is drainage principle figure of the device of the embodiment of the present invention in the body of soil and rock construction downstream weir;
Fig. 3:It is the device application schematic diagram of the embodiment of the present invention;
Fig. 4:It is the device space arrangement form schematic diagram of the embodiment of the present invention.
Specific embodiment
Understand for the ease of those of ordinary skill in the art and implement the present invention, below in conjunction with the accompanying drawings and embodiment is to this
It is bright to be described in further detail, it will be appreciated that enforcement example described herein is merely to illustrate and explains the present invention, not
For limiting the present invention.
Ask for an interview Fig. 1, a kind of stiffening device of the pavement structure stability of soil and rock construction that the present invention is provided, device 7
It is made up of pervious bed 1, collection branch pipe 2, main drainpipe 3, anchor head 4 and discharge outlet 5;On main drainpipe 3 at a certain distance just etc.
Away from some collection branch pipes 2 are vertically installed with, radial anchor head 4 is constituted;Pervious bed 1 is made up of non-woven fabrics, and collection branch pipe 2 is outside
Sealed by pervious bed 1 one end;The sealing of 3 one end of main drainpipe, the other end are provided with discharge outlet 5.
Ask for an interview Fig. 2, Fig. 3 and Fig. 4, a kind of reinforcement side of the pavement structure stability of soil and rock construction that the present invention is provided
Method, comprises the following steps:
Step 1:Size and material behavior of the soil and rock construction according to cofferdam, the arrangement form and scope of determining device 7;
As shown in figure 3, the soil and rock construction downstream weir body gradient is divided into two sections, first paragraph is highly H1, on toeH1
Arrangement apparatus 7 in the weir body of height;Second segment is highly H from Riverbed 9 to cofferdam by-level section2, then in its slope section
MiddleH2Arrangement apparatus 7 in the body of weir.
Device 7 in the body of weir in plum blossom-shaped arrange, as shown in Figure 4.Level to 1.0 ~ 1.5m of arrangement pitch between device 7,
Vertically to 1.0 ~ 1.5m of arrangement pitch between device 7.
Step 2:When earth rock cofferdam is filled, placement in layers from bottom to up embedded device 7 roll native stone filling material 8 close
Real weir body;Discharge outlet 5 is outwards arranged, it is ensured that pouring for concrete slab 6 do not affect draining;Will be anchor head 4 hardened with concrete surface
Structure is fixed together, and forms overall skeleton.
Step 3:Device 7 builds and finishes, and completes cofferdam and fills and mask pouring construction(One composition spoke of outermost of device 7
Penetrate shape anchor head 4 to pour together with concrete slab 6), with mask by the formation space web frame of device 7, enhancing is steady for weir body
It is qualitative.
How the device of the present embodiment is arranged according to cofferdam design and construction conditional decision.Apparatus main body tubing can be managed by PE
Material or steel tubing etc. are constituted.The quantity of radial anchor head 4 is with spacing by the cofferdam size and filling material after seepage prevention of cofferdam curtain
Characteristic is determined;Device horizontal interval is determined by cofferdam height and material character etc. to the laying number of plies with vertical;Collection branch pipe structure
Size is determined using material, filling construction requirement etc. with pile tube by cofferdam size;With panel be cast in anchor head size together by
Concrete surface plate thickness etc. is determined.
Although this specification more used mixed territory panel 6, device 7, native stone filling material 8, Riverbed 9,
The terms such as pervious bed 1, collection branch pipe 2, main drainpipe 3, anchor head 4 and discharge outlet 5, but it is not precluded from the possibility using other terms
Property.Using these terms just for the sake of more easily describing the essence of the present invention, it is construed as what any one was added
Restriction is all contrary with spirit of the invention.
It should be appreciated that the part that this specification is not elaborated belongs to prior art.
It should be appreciated that the above-mentioned description for preferred embodiment is more detailed, therefore can not be considered to this
The restriction of invention patent protection scope, one of ordinary skill in the art are being weighed without departing from the present invention under the enlightenment of the present invention
Under the protected ambit of profit requirement, replacement can also be made or deformed, be each fallen within protection scope of the present invention, this
It is bright scope is claimed to be defined by claims.
Claims (5)
1. a kind of reinforcement method of the pavement structure stability of soil and rock construction, is the pavement structure using soil and rock construction
The stiffening device of stability is strengthened;Described device(7)By pervious bed(1), collection branch pipe(2), main drainpipe(3), anchor head
(4)And discharge outlet(5)Composition;The main drainpipe(3)On some described catchment is provided with regard to equidistant vertical at a certain distance
Arm(2), constitute radial anchor head(4), collection branch pipe(2)Outside one end is by the pervious bed(1)Sealing;The main draining
Pipe(3)One end sealing, the other end are provided with the discharge outlet(5);
Characterized in that, the method comprising the steps of:
Step 1:Soil and rock construction determines described device according to the size and material behavior in cofferdam(7)Arrangement form and model
Enclose;
Step 2:When earth rock cofferdam is filled, placement in layers from bottom to up simultaneously buries described device(7), native stone filling material(8)Repair
Build weir body;The discharge outlet(5)Arrange outside, it is ensured that concrete slab(6)Pour;By the anchor head(4)
It is fixed together with concrete slab structure, forms overall skeleton;
Described device(7)In the weir of the two-stage up and down slope in cofferdam, installation position is different, described device on the slope of higher level weir(7)It is laid in
In 1/2 region of Yan Po bottoms, described device on the slope of subordinate weir(7)It is laid in the middle of the slope of weir in 1/2 region;
Step 3:Described device(7)Structure is finished, and is completed cofferdam and is filled and mask pouring construction, and weir body passes through the dress with mask
Put(7)Form space web frame, enhanced stability.
2. method according to claim 1, it is characterised in that:The pervious bed(1)It is made up of non-woven fabrics.
3. method according to claim 1, it is characterised in that:Described device(7)Main body tubing can be by PE tubing or steel
Tubing is constituted.
4. method according to claim 1, it is characterised in that:When earth rock cofferdam described in step 2 is filled from bottom to up
Placement in layers embedded described device(7), device(7)Arrange in plum blossom-shaped in the body of weir, described device(7)In level between
1.0 ~ 1.5m of arrangement pitch, vertically 1.0 ~ 1.5m of arrangement pitch between.
5. method according to claim 1, it is characterised in that:During mask pouring construction described in step 3, described device
(7)One radial anchor head of outermost(4)Same concrete slab(6)Pour together.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510704989.9A CN105350550B (en) | 2015-10-27 | 2015-10-27 | A kind of stiffening device and method of the pavement structure stability of soil and rock construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510704989.9A CN105350550B (en) | 2015-10-27 | 2015-10-27 | A kind of stiffening device and method of the pavement structure stability of soil and rock construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105350550A CN105350550A (en) | 2016-02-24 |
CN105350550B true CN105350550B (en) | 2017-03-29 |
Family
ID=55326602
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510704989.9A Expired - Fee Related CN105350550B (en) | 2015-10-27 | 2015-10-27 | A kind of stiffening device and method of the pavement structure stability of soil and rock construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105350550B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111733841A (en) * | 2020-06-16 | 2020-10-02 | 中建三局基础设施建设投资有限公司 | Lake bottom karst treatment method for deep-buried shield tunnel |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201554028U (en) * | 2009-10-19 | 2010-08-18 | 毛泽立 | Root-type deep-hole drainage pile |
CN202745066U (en) * | 2012-08-27 | 2013-02-20 | 中国建筑第六工程局有限公司 | Drainage structure for reducing underground water level and water content of slope soil |
CN103669399B (en) * | 2013-12-30 | 2016-03-23 | 青岛旭域土工材料股份有限公司 | Concrete slab reinforced soil retaining wall and construction method thereof |
JP3196277U (en) * | 2014-12-18 | 2015-02-26 | 村橋 義雄 | Drainage device for earth and sand |
-
2015
- 2015-10-27 CN CN201510704989.9A patent/CN105350550B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN105350550A (en) | 2016-02-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104131575B (en) | A kind of karst height grows the leak stopping water discharge method of the stratum dam foundation | |
CN105297685B (en) | Base concrete panel rock-fill dam and construction method thereof | |
CN102296572B (en) | Earth and rockfill dam body seepage monitoring structure provided with abandoned dreg site behind dam and construction method thereof | |
CN106049379B (en) | Temporary power generation method during construction lag of downstream of spillway and rockfill self-breaking dam | |
CN101429759A (en) | Inverse drainage processing method in high concrete panel rock-fill dam construction period | |
CN108385627A (en) | Power station diversion tunnel plugging construction method based on karst landform | |
CN105179011A (en) | Tunnel plugging facility and tunnel plugging method | |
CN104594297B (en) | A kind of double face slab rock-fill dams and construction method thereof | |
CN105756100B (en) | Basement post-pouring zone system and preparation method thereof | |
CN103266633A (en) | Seepage-proof sewage discharging and floodwater draining method for tailing reservoir in wet metallurgy | |
CN106758890A (en) | Campshed box culvert structure and its construction method | |
CN105970882B (en) | Solve the structure and its building method of face dam construction time dam body reverse osmosis water problems | |
CN106567365B (en) | Earth and rockfill dam longitudinal reinforcement construction method | |
CN205875096U (en) | Rockfill self-breaking dam | |
CN105507348B (en) | The waterproof construction method and structure of basement detached column and Vierendeel girder in junction | |
CN203007961U (en) | Gabion cofferdam structure | |
CN105350550B (en) | A kind of stiffening device and method of the pavement structure stability of soil and rock construction | |
CN205907658U (en) | Be used for anti - structure that seeps water of concrete -faced rockfill dam construction time dam body | |
CN106522170A (en) | Novel dam type adopting concrete anti-seepage wall as dam body anti-seepage body | |
CN206189430U (en) | A escape canal for deep overburden ground | |
CN206204970U (en) | A kind of high fill foundation weeper drain | |
CN206298869U (en) | Free drainage concrete retaining wall structure | |
CN108867225A (en) | The processing method of sinkhole within the scope of karst landform road foundation | |
CN211312563U (en) | Anti-seepage and anti-impact overflow cofferdam structure | |
CN108316260A (en) | Plugging structure for diversion tunnel based on karst landform and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170329 Termination date: 20201027 |