CN105347527B - A kind of waterworks purifier - Google Patents

A kind of waterworks purifier Download PDF

Info

Publication number
CN105347527B
CN105347527B CN201510849231.4A CN201510849231A CN105347527B CN 105347527 B CN105347527 B CN 105347527B CN 201510849231 A CN201510849231 A CN 201510849231A CN 105347527 B CN105347527 B CN 105347527B
Authority
CN
China
Prior art keywords
tower
pipe
water
filter
filter chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510849231.4A
Other languages
Chinese (zh)
Other versions
CN105347527A (en
Inventor
罗学东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Mibu Environmental Protection Technology Co ltd
Original Assignee
Chongqing Hehuang Technology Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Hehuang Technology Consulting Co Ltd filed Critical Chongqing Hehuang Technology Consulting Co Ltd
Priority to CN201510849231.4A priority Critical patent/CN105347527B/en
Publication of CN105347527A publication Critical patent/CN105347527A/en
Application granted granted Critical
Publication of CN105347527B publication Critical patent/CN105347527B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filtering Materials (AREA)
  • Filtration Of Liquid (AREA)

Abstract

The present invention discloses a kind of waterworks purifier,Including the water intaking filter being sequentially connected,Primary settling tower,Tube settling room and filter chamber,Water intaking filter includes filter chamber and connected reservoir chamber,The front end of filter chamber is provided with water inlet,Inside is provided with filter screen,Reservoir chamber bottom is provided with fixed support,Reservoir chamber is connected by water inlet pipe with primary settling tower,Primary settling tower includes the interior tower that outer tower connects water inlet pipe with bottom,Nei Tanei is relatively arranged in a crossed manner inclined deflection plate upward,Inclined-pipe settler is provided with tube settling room,Its underpart is connected by water pipe and interior top of tower,Filter chamber top is provided with the water distributor connected with tube settling ceiling portion,Filter chamber bottom is connected with outlet pipe,The present invention is provided with water intaking filter at water intaking end,And shorten the distance of impurity sedimentation using deflection plate,Accelerate the sinking speed of impurity,Raw water is through tube settling room,It can reach drinking water standard substantially after filter chamber's precipitation filtering.

Description

A kind of waterworks purifier
Technical field
The present invention relates to water-suppling treatment equipment field, and in particular to a kind of waterworks purifier.
Background technology
The activity of the mankind can be such that substantial amounts of industry, agricultural and domestic refuse is discharged into water, be contaminated water body, at present The sewage that the whole world there are about billion cubic meter more than 4200 every year is discharged into rivers,lakes and seas, pollutes the fresh water of 5.5 tcms, this phase When in more than the 14% of global runoff volume, the water pollution aggravated increasingly, forming significant threat to the living safety of the mankind, into For the major obstacles of human health, economy and social sustainable development, investigated according to authoritative institution of the world, in developing country, respectively Class disease has 80% to be propagated because antihygienic water has been drunk, every year the global 200d 0 caused by drinking unhygienic water at least Ten thousand people are dead, therefore water pollution is referred to as " world's number one killer ", at present, in terms of river and the dirty water decontamination handles, form Various water treatment facilities just play an important role, but in general purifier requires that influent turbidity is not high, for some The higher water of turbidity is often still extremely difficult to drinking water standard after in general is handled.
The content of the invention
To solve above technical problem, the present invention provides a kind of can effectively intercept water float thing and larger at water intaking end A kind of waterworks purifier of impurity.
Technical scheme is as follows:
A kind of waterworks purifier, its key are:Including water intaking filter, the primary settling being sequentially connected Tower, tube settling room and the first filter chamber;
The water intaking filter includes the second filter chamber, reservoir chamber and fixed support, the front end of second filter chamber Provided with water inlet, filter screen is provided with the second filter chamber, transition water pipe is connected between second filter chamber and reservoir chamber, it is described Reservoir chamber bottom is provided with the fixed support, and the reservoir chamber is connected by water inlet pipe with primary settling tower;
The primary settling tower includes Wai Ta and Nei Ta, forms mud discharging passage, the bottom of the interior tower therebetween Water inlet pipe is connected with, is intersected from top to bottom provided with least two deflection plates in the Nei Tanei, the deflection plate is inclined upwardly 5- 10 °, the deflection plate lower side is fixedly connected with the tower wall of the interior tower, and the deflection plate upper side edge is respectively equipped with baffle plate, often The individual deflection plate is respectively equipped with mud discharging mouth with the Nei Ta junctions, the lower edge of the mud discharging mouth and the deflection plate Lower side is concordant;
It is provided with inclined-pipe settler in the tube settling room, the tube settling room below the inclined-pipe settler leads to The top of piping and the interior tower is connected, and the water inlet pipe and pipeline are located at the Nei Ta both sides respectively;
First filter chamber top is provided with water distributor, and the water distributor water inlet end connects with the tube settling ceiling portion Logical, first filter chamber bottom is connected with outlet pipe, and filter layer is provided with the middle part of first filter chamber.
Beneficial effect using the technical program is due to that water intaking filter, Neng Gouyou are provided with the water intaking end at water source The floating object gone in water removal to effect, and have preliminary filtration result, raw water to impurity such as other organic pollutions, inorganic pollutions When passing through the deflection plate of primary settling tower, other larger impurity meeting preliminary sedimentations on deflection plate and are discharged into Wai Tazhong, this Shi Yuanshui turbidity has substantially reduced, impurity meeting secondary precipitation when raw water flows through tube settling room in water, after secondary precipitation Raw water can reach drinking water standard substantially after filter chamber filters again.
As preferred:The bottom of towe of above-mentioned outer tower is provided with the first mud discharging pipe, and the first mud discharging pipe is provided with the One mud discharging regulating valve.The sludge that outer tower bottom of towe is deposited on using the beneficial effect of this scheme can be by mud discharging Guan Ding Phase discharges.
Above-mentioned deflection plate is 20-30, is evenly distributed between bottom of towe and the tower top of the interior tower.Using having for this scheme Beneficial effect is that deflection plate density sets the distance for rationally, shortening impurity sedimentation, is advantageous to accelerate the sedimentation of impurity.
Above-mentioned tube settling room bottom is provided with sludge collection bucket, and the bottom of the sludge collection bucket is provided with the second mud discharging Pipe, the second mud discharging pipe are provided with the second mud discharging regulating valve.Beneficial effect using this scheme is can be according to need Periodical blowdown is wanted, avoids sludge accumulation is excessive from influenceing tube settling effect.
Above-mentioned first mud discharging regulating valve and the second described mud discharging regulation valve opening time are small at intervals of 20-24 When.Beneficial effect using this scheme is periodically to exclude the sludge of deposition, avoids sludge accumulation excessive, influences sedimentation effect.
Sludge-tank is provided with below above-mentioned primary settling tower and the tube settling room.Beneficial effect using this scheme is heavy Long-pending sludge is concentrated and is emitted in sludge-tank, facilitates worker to concentrate cleaning.
Observation window, the inclined tube are equipped with the top of above-mentioned primary settling tower, tube settling room and first filter chamber Automatic exhaust steam valve is provided with the top of mud chamber.Purifier inner case can fast be checked by observation window using this scheme.
Above-mentioned filter layer includes manganese layer of sand and the anthracite coal measure being laid on the manganese layer of sand.Using the beneficial effect of this scheme It is that can further remove the impurity such as iron in water, manganese.
Beneficial effect:
Using the beneficial effects of the invention are as follows due to the water intaking end at water source be provided with water intaking filter, can be effectively The floating object gone in water removal, and has preliminary filtration result to impurity such as other organic pollutions, inorganic pollutions, now raw water When passing through primary settling tower, other larger impurity can settle layer by layer on deflection plate, and it is reasonable that deflection plate density is set, and shortens The distance of impurity sedimentation, be advantageous to accelerate the sedimentation of impurity, the turbidity of raw water reduced, when raw water flows through tube settling room in water Impurity can secondary precipitation, the raw water after secondary precipitation can reach drinking water standard substantially after filter chamber filters again.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the enlarged drawing in a portions in Fig. 1;
Fig. 3 is the structural representation of water intaking filter.
Embodiment
With reference to embodiment and accompanying drawing, the invention will be further described.
As Figure 1-3, a kind of waterworks purifier, including it is sequentially connected water intaking filter, primary settling tower 1st, the filter chamber 3 of tube settling room 2 and first, the primary settling tower 1 and the lower section of the tube settling room 2 are provided with sludge-tank 13, The top of the primary settling tower 1, tube settling room 2 and the first filter chamber of the mistake 3 is equipped with observation window 12, the tube settling The top of room 2 is provided with automatic exhaust steam valve 14.
The water intaking filter is immersed in raw water, and the water intaking filter includes the second filter chamber 19, reservoir chamber 15 and fixed support 17, the front end of second filter chamber 19 is provided with water inlet 18, and filter screen 20, institute are provided with the second filter chamber 19 State and transition water pipe 16 is connected between the second filter chamber 19 and reservoir chamber 15, the bottom of reservoir chamber 15 is provided with the fixed support 17, the reservoir chamber 15 is connected by water inlet pipe 4 with primary settling tower.
The primary settling tower 1 includes outer tower 104 and Nei Ta 103, forms mud discharging passage 106 therebetween, described The bottom of interior tower 103 is connected with water inlet pipe 4, intersects from top to bottom in the interior tower 103 and is provided with least two deflection plates 102, The deflection plate 102 is 20-30, is evenly distributed between bottom of towe and the tower top of the interior tower 103, the deflection plate 102 is upward 5-10 ° is tilted, the lower side of deflection plate 102 is fixedly connected with the tower wall of the interior tower 103, the upper side edge of deflection plate 102 Baffle plate 101 is respectively equipped with, each deflection plate 102 is respectively equipped with mud discharging mouth 105 with the interior junction of tower 103, should The lower edge of mud discharging mouth 105 is concordant with the lower side of deflection plate 102, and the sludge being thus deposited on deflection plate 102 can lead to Cross the mud discharging mouth 105 to be discharged into mud discharging passage 106, and be gradually deposited at the bottom of towe of outer tower 104, the outer tower 104 bottom of towe is provided with the first mud discharging pipe 5, and the first mud discharging pipe 5 is provided with the first mud discharging regulating valve 6.
Inclined-pipe settler 202 is provided with the tube settling room 2, the inclined tube of the lower section of inclined-pipe settler 202 Mud chamber 2 is connected by the top of pipeline 7 and the interior tower 103, and the water inlet pipe 4 and pipeline 7 are located at the interior tower 103 respectively Both sides, the bottom of tube settling room 2 are provided with sludge collection bucket 201, and the bottom of the sludge collection bucket 201 is arranged provided with the second sludge Pipe 8 is put, the second mud discharging pipe 8 is provided with the second mud discharging regulating valve 9, the He of the first mud discharging regulating valve 6 The described opening time of the second mud discharging regulating valve 9 is at intervals of 20-24 hours.
The top of second filter chamber 3 is provided with water distributor 10, and the water inlet end of water distributor 10 pushes up with the tube settling room 2 Portion is connected by pipeline, and the bottom of the second filter chamber 3 is connected with outlet pipe 11, and the middle part of filter chamber 3 is provided with filter layer, institute Stating filter layer includes manganese layer of sand and the anthracite coal measure being laid on the manganese layer of sand.

Claims (6)

  1. A kind of 1. waterworks purifier, it is characterised in that:Including water intaking filter, the primary settling tower being sequentially connected (1), tube settling room (2) and the first filter chamber (3);
    The water intaking filter includes the second filter chamber (19), reservoir chamber (15) and fixed support (17), second filtering The front end of room (19) is provided with water inlet (18), is provided with filter screen (20) in the second filter chamber (19), second filter chamber (19) and Transition water pipe (16) is connected between reservoir chamber (15), reservoir chamber (15) bottom is provided with the fixed support (17), described Reservoir chamber (15) is connected by water inlet pipe (4) with primary settling tower;
    The primary settling tower (1) includes outer tower (104) and interior tower (103), forms mud discharging passage (106) therebetween, The bottom of the interior tower (103) is connected with water inlet pipe (4), intersects from top to bottom in the interior tower (103) and is provided with deflection plate (102), the deflection plate (102) is inclined upwardly 5-10 °, and the deflection plate (102) is 20-30, is evenly distributed on the interior tower (103) between bottom of towe and tower top, deflection plate (102) lower side is fixedly connected with the tower wall of the interior tower (103), described Deflection plate (102) upper side edge is respectively equipped with baffle plate (101), and each deflection plate (102) is connected punishment with the interior tower (103) Not She You mud discharging mouth (105), the lower edge of the mud discharging mouth (105) is concordant with deflection plate (102) lower side;
    Be provided with inclined-pipe settler (202) in the tube settling room (2), it is described oblique below the inclined-pipe settler (202) Pipe mud chamber (2) is connected by the top of pipeline (7) and the interior tower (103);
    Water distributor (10), water distributor (10) water inlet end and the tube settling room are provided with the top of first filter chamber (3) (2) top is connected, and the first filter chamber (3) bottom is connected with outlet pipe (11), is provided with the middle part of first filter chamber (3) Filtering layer, the filter layer include manganese layer of sand and the anthracite coal measure being laid on the manganese layer of sand.
  2. A kind of 2. waterworks purifier according to claim 1, it is characterised in that:The bottom of towe of the outer tower (104) Provided with the first mud discharging pipe (5), the first mud discharging pipe (5) is provided with the first mud discharging regulating valve (6).
  3. A kind of 3. waterworks purifier according to claim 2, it is characterised in that:Tube settling room (2) bottom Portion is provided with sludge collection bucket (201), and the bottom of the sludge collection bucket (201) is provided with the second mud discharging pipe (8), and described second is dirty Mud delivery pipe (8) is provided with the second mud discharging regulating valve (9).
  4. A kind of 4. waterworks purifier according to claim 3, it is characterised in that:The first mud discharging regulation Valve (6) and the second described mud discharging regulating valve (9) opening time are at intervals of 20-24 hours.
  5. A kind of 5. waterworks purifier according to claim any one of 1-4, it is characterised in that:The primary settling Sludge-tank (13) is provided with below tower (1) and the tube settling room (2).
  6. A kind of 6. waterworks purifier according to claim 5, it is characterised in that:The primary settling tower (1), tiltedly Observation window (12) is equipped with the top of pipe mud chamber (2) and first filter chamber (3), is set at the top of the tube settling room (2) There is automatic exhaust steam valve (14).
CN201510849231.4A 2015-11-28 2015-11-28 A kind of waterworks purifier Expired - Fee Related CN105347527B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510849231.4A CN105347527B (en) 2015-11-28 2015-11-28 A kind of waterworks purifier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510849231.4A CN105347527B (en) 2015-11-28 2015-11-28 A kind of waterworks purifier

Publications (2)

Publication Number Publication Date
CN105347527A CN105347527A (en) 2016-02-24
CN105347527B true CN105347527B (en) 2018-02-16

Family

ID=55323623

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510849231.4A Expired - Fee Related CN105347527B (en) 2015-11-28 2015-11-28 A kind of waterworks purifier

Country Status (1)

Country Link
CN (1) CN105347527B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090095690A1 (en) * 2007-10-14 2009-04-16 Mccabe Derald L Solids removal system and method
CN201240953Y (en) * 2008-07-08 2009-05-20 甘臻 Integral water purifying apparatus
CN201770557U (en) * 2010-09-01 2011-03-23 浙江沃特水处理设备有限公司 Integrated water purifying device
US9056266B2 (en) * 2012-07-21 2015-06-16 Don M. Buckner Method and system to separate solids from liquids
CN205328720U (en) * 2015-11-28 2016-06-22 綦江县狮子桥供水有限公司 Water works purifier

Also Published As

Publication number Publication date
CN105347527A (en) 2016-02-24

Similar Documents

Publication Publication Date Title
CN105502729B (en) A kind of water treatment facilities
CN205367916U (en) Integrated water treatment equipment
CN208980453U (en) A kind of water treatment facilities of silt separation
CN205412459U (en) Water purification unit with water intaking filter equipment
CN205627336U (en) Area water intaking filter equipment's primary settling of water factory tower
CN105417776B (en) Purified water treatment device with water intaking filter
CN105347562B (en) Waterworks water treatment facilities with water intaking filter
CN105498352B (en) A kind of waterworks sedimentation device
CN205323362U (en) Device is subsided in water treatment with water intaking filter equipment
CN105347527B (en) A kind of waterworks purifier
CN205367948U (en) Integration water purification system
CN105498354B (en) Waterworks sedimentation device with water intaking filter
CN105498306B (en) waterworks sedimentation device
CN205313237U (en) Area water intaking filter equipment's integrated water purification system
CN105347528B (en) A kind of purified water treatment device
CN105413255B (en) Water factory's primary settling tower
CN105498353B (en) A kind of waterworks primary settling tower
CN205328720U (en) Water works purifier
CN205419945U (en) Device is subsided in water treatment with submergence formula water intaking filter equipment
CN205360814U (en) Water purification apparatus
CN205907144U (en) Industrial sewage treatment system
CN105347531B (en) A kind of integrated water treatment equipment of band water intaking filter
CN206143020U (en) Glass fiber reinforced plastic oil separation tank
CN105502713A (en) Waterwork water purification treatment equipment
CN105502714A (en) Waterwork water purification treatment equipment with water taking and filtering device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180112

Address after: 400023 Chongqing Jiangbei District Wujiang Road No. 18 1-1 (room 1-6)

Applicant after: CHONGQING HEHUANG TECHNOLOGY CONSULTING Co.,Ltd.

Address before: Jianshan village Chongqing city Qijiang County Gunan town 401421 three agency

Applicant before: QIJIANG SHIZIQIAO WATER SUPPLY CO.,LTD.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200512

Address after: 400800 first floor, Kechuang building, Wansheng Economic Development Zone, Qijiang District, Chongqing

Patentee after: Chongqing Mibu Environmental Protection Technology Co.,Ltd.

Address before: 400023 Chongqing Jiangbei District Wujiang Road No. 18 1-1 (room 1-6)

Patentee before: CHONGQING HEHUANG TECHNOLOGY CONSULTING Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180216

Termination date: 20211128