CN205627336U - Area water intaking filter equipment's primary settling of water factory tower - Google Patents
Area water intaking filter equipment's primary settling of water factory tower Download PDFInfo
- Publication number
- CN205627336U CN205627336U CN201620421336.XU CN201620421336U CN205627336U CN 205627336 U CN205627336 U CN 205627336U CN 201620421336 U CN201620421336 U CN 201620421336U CN 205627336 U CN205627336 U CN 205627336U
- Authority
- CN
- China
- Prior art keywords
- water
- tower
- primary settling
- water intaking
- factory
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses an area water intaking filter equipment's primary settling of water factory tower, include primary settling tower and the water intaking filter equipment who is connected with this primary settling tower, water intaking filter equipment is including water intaking jar and fixed bolster, the water intaking jar is fixed on the fixed bolster, water intaking tank bottoms face opening is equipped with the grid, be equipped with the filter material layer in the water intaking jar, the primary settling tower includes outer tower, interior tower and the mud discharge -channel between the two, the inlet tube is connected to the bottom of interior tower, this inlet tube is connected with jar upper portion of fetching water, the outlet pipe is connected at the top of interior tower, to the baffling board that alternately is equipped with two at least tilt up down on the nei tanei follow, the lower side and the interior tata wall rigid coupling of baffling board, the utility model discloses because water intake end at the water source has set up water intaking filter equipment, can carry out preliminary filtering to water intake end's impurity, when the primary settling tower was flowed through again to the raw water this moment, other large granule impurity of aquatic can further deposit on the baffling board, and the raw water can reach the quality of water requirement that the water factory intake basically this moment.
Description
Technical field
This utility model relates to water-suppling treatment equipment field, is specifically related to the water factory of a kind of band water intaking defecator
Primary settling tower.
Background technology
The activity of the mankind can make substantial amounts of industry, agricultural and domestic refuse enter in water, makes water body be subject to dirt
Dye, the current whole world there are about the sewage of billion cubic meter more than 4200 every year and enters rivers,lakes and seas, pollutes 5.5 ten thousand
The fresh water of billion cubic meter, this is equivalent to more than the 14% of whole world runoff volume, and the water that increasingly aggravates pollutes,
The living safety of the mankind is constituted significant threat, becomes the weight of human health, economy and social sustainable development
Big obstacle, investigates according to authoritative institution of the world, and in developing country, various diseases has 80% to be because drinking
Antihygienic water and propagate, annual at least cause global 200d 00,000 people death, therefore because drinking unhygienic water
Water pollutes and is referred to as " world's number one killer ", at present, in terms of river and the dirty water decontamination handles, various informative
Water treatment facilities just play an important role, but general purifier requires that influent turbidity is the highest, right
The water higher in some turbidity is the most still extremely difficult to drinking water standard after general process.
Utility model content
For solving above technical problem, this utility model provides a kind of can effectively intercept water float at water intaking end
Water factory's primary settling tower of the band water intaking defecator of thing and bigger impurity.
Technical scheme is as follows:
A kind of water factory primary settling tower of band water intaking defecator, it it is critical only that: include primary settling tower and
The water intaking defecator being connected with this primary settling tower;
Described water intaking defecator includes that fetching tank for water and fixed support, described fetching tank for water are fixed on described fixing
On frame, described fetching tank for water bottom surface opening is also provided with grid, is provided with filter material layer in described fetching tank for water;
Described primary settling tower includes Wai Ta and Nei Ta, forms therebetween mud discharging passage, described interior tower
Bottom connect and have water inlet pipe, this water inlet pipe is connected with the top of described fetching tank for water, the top of described interior tower company
Being connected to outlet pipe, intersect from top to bottom at described Nei Tanei and be provided with at least two deflection plate, this deflection plate is upwards
Tilting 5-10 °, the lower side of described deflection plate is fixing with the tower wall of described interior tower to be connected, described deflection plate
Upper side edge is respectively equipped with baffle plate, and each described deflection plate and described Nei Ta junction are respectively equipped with mud discharging mouth,
The lower limb of this mud discharging mouth is concordant with this deflection plate lower side.
The technical program is used to provide the benefit that owing to the water intaking end at water source is provided with water intaking defecator,
Can effectively remove the floating thing in water, and the impurity such as other organic pollution, inorganic pollution are had
Preliminary filtration result, when the most former water passes through primary settling tower, in water, other large granular impurity can enter one
Step is deposited on deflection plate and enters in mud discharging passage, and the turbidity of the most former water is substantially reduced, base
Instinct reaches the water quality requirement of water factory's water inlet.
As preferably: be provided with mud discharging pipe at the bottom of the tower of above-mentioned outer tower, described mud discharging pipe is provided with mud
Emissions adjustment valve.The mud that the beneficial effect using this scheme is deposited at the bottom of outer tower tower can pass through mud discharging
Pipe is periodically discharged.
Above-mentioned deflection plate is 20-30, is evenly distributed at the bottom of the tower of described interior tower and between tower top.Use this side
Case provides the benefit that deflection plate density is arranged rationally, shortens the distance of impurity sedimentation, is conducive to accelerating miscellaneous
The sedimentation of matter.
Above-mentioned mud discharging regulation valve opening time is spaced apart 20-24 hour.This scheme is used to provide the benefit that
Periodically the mud of deposition is got rid of, it is to avoid mud is piled up too much, affects sedimentation effect.
It is provided with sludge-tank below above-mentioned outer tower.The mud of deposition concentrates discharge to use this scheme to provide the benefit that
In sludge-tank, workman is facilitated to concentrate cleaning.
Above-mentioned interior top of tower is provided with observation window.Use this scheme to provide the benefit that fast to be looked into by observation window
See purifier inner case.
Filtrate in above-mentioned filter material layer is granules of polystyrene, and described filter material layer is arranged over filtrate and intercepts net.
Filtrate proportion gentlier can effectively alleviate the weight of whole intake equipment to use this scheme to provide the benefit that, convenient
M R, the filtrate above filtrate intercepts net and can effectively stop filtrate to float, it is ensured that filter material layer position is solid
Determine and there is certain density.
Beneficial effect:
Using the beneficial effects of the utility model is owing to the water intaking end at water source is provided with water intaking defecator,
Can effectively remove the floating thing in water, and the impurity such as other organic pollution, inorganic pollution are had
Preliminary filtration result, when the most former water passes through primary settling tower, in water, other large granular impurity can enter one
Step is deposited on deflection plate and enters in mud discharging passage, and the turbidity of the most former water is substantially reduced, base
Instinct reaches the water quality requirement of water factory's water inlet, through the primary filter of this equipment, it is possible to reduce controlling the water circulation factory medicament
With the dosage of chlorine, reducing after filter aluminium salt and disinfection byproduct (DBP) content in water, whole equipment is safe and reliable, filter
Except effective.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the enlarged drawing in a portion in Fig. 1;
Fig. 3 is the structural representation of water intaking defecator.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing, the utility model is described in further detail.
As Figure 1-3, water factory's primary settling tower of a kind of band water intaking defecator, including primary settling tower and
The water intaking defecator being connected with this primary settling tower.
Described water intaking defecator is immersed in water source, and described water intaking defecator includes fetching tank for water 13 and fixes
Support 14, described fetching tank for water 13 is fixed on described fixed support 14, and described fetching tank for water 13 bottom surface opening is also
Being provided with grid 15, be provided with filter material layer 16 in described fetching tank for water 13, the filtrate in described filter material layer 16 is polyphenyl
Ethylene granule, described filter material layer 16 is arranged over filtrate and intercepts net 17.
Described primary settling tower includes outer tower 1 and Nei Ta 2, forms therebetween mud discharging passage 3, described
The bottom of interior tower 2 connects water inlet pipe 6, and this water inlet pipe 6 is connected with the top of described fetching tank for water 13, described
The top of interior tower 2 connects outlet pipe 11, intersects from top to bottom and be provided with at least two folding in described interior tower 2
Stream plate 4, described deflection plate 4 is 20-30, is evenly distributed at the bottom of the tower of described interior tower 2 and between tower top,
This deflection plate 4 is inclined upwardly 5-10 °, and the tower wall of the lower side of described deflection plate 4 and described interior tower 2 is fixed
Connecting, the upper side edge of described deflection plate 4 is respectively equipped with baffle plate 5, each described deflection plate 4 and described interior tower 2
Junction is respectively equipped with mud discharging mouth 12, the lower limb of this mud discharging mouth 12 and this deflection plate 4 lower side
Concordant, be thus deposited on the mud on deflection plate 4 can by described mud discharging mouth 12 enter mud discharging lead to
In road 3, and it is gradually deposited at the bottom of the tower of outer tower 1, at the bottom of the tower of described outer tower 1, is provided with mud discharging pipe 7, institute
State mud discharging pipe 7 and be provided with mud discharging regulation valve 8, described mud discharging regulation valve 8 opening time interval
For 20-24 hour, being provided with sludge-tank 9 below described outer tower 1, described interior tower 2 top is provided with observation window 10.
Claims (7)
1. water factory's primary settling tower of a band water intaking defecator, it is characterised in that: include primary settling tower
And the water intaking defecator being connected with this primary settling tower;
Described water intaking defecator includes fetching tank for water (13) and fixed support (14), described fetching tank for water (13)
Being fixed on described fixed support (14), described fetching tank for water (13) bottom surface opening is also provided with grid (15),
Filter material layer (16) it is provided with in described fetching tank for water (13);
Described primary settling tower includes outer tower (1) and interior tower (2), forms therebetween mud discharging passage (3),
The bottom of described interior tower (2) connects water inlet pipe (6), this water inlet pipe (6) and described fetching tank for water (13)
Top connect, the top of described interior tower (2) connects outlet pipe (11), in described interior tower (2) from
Up to descending intersection to be provided with at least two deflection plate (4), this deflection plate (4) is inclined upwardly 5-10 °, described folding
The lower side of stream plate (4) is fixing with the tower wall of described interior tower (2) to be connected, the upside of described deflection plate (4)
While be respectively equipped with baffle plate (5), each described deflection plate (4) is respectively equipped with described interior tower (2) junction
Mud discharging mouth (12), the lower limb of this mud discharging mouth (12) is concordant with this deflection plate (4) lower side.
Water factory's primary settling tower of band the most according to claim 1 water intaking defecator, it is characterised in that:
Being provided with mud discharging pipe (7) at the bottom of the tower of described outer tower (1), described mud discharging pipe (7) is provided with mud
Emissions adjustment valve (8).
Water factory's primary settling tower of band the most according to claim 1 and 2 water intaking defecator, its feature
Be: described deflection plate (4) is 20-30, be evenly distributed at the bottom of the tower of described interior tower (2) and tower top it
Between.
Water factory's primary settling tower of band the most according to claim 2 water intaking defecator, it is characterised in that:
Described mud discharging regulation valve (8) opening time is spaced apart 20-24 hour.
Water factory's primary settling tower of band the most according to claim 3 water intaking defecator, it is characterised in that:
Described outer tower (1) lower section is provided with sludge-tank (9).
6. according to water factory's primary settling tower of the band water intaking defecator described in claim 4 or 5, its feature
It is: described interior tower (2) top is provided with observation window (10).
Water factory's primary settling tower of band the most according to claim 3 water intaking defecator, it is characterised in that:
Filtrate in described filter material layer (16) is granules of polystyrene, and described filter material layer (16) is arranged over filtrate
Intercept net (17).
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510856706 | 2015-11-28 | ||
CN2015108567062 | 2015-11-28 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205627336U true CN205627336U (en) | 2016-10-12 |
Family
ID=57057885
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620421336.XU Expired - Fee Related CN205627336U (en) | 2015-11-28 | 2016-05-11 | Area water intaking filter equipment's primary settling of water factory tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205627336U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105457388A (en) * | 2015-12-10 | 2016-04-06 | 綦江县狮子桥供水有限公司 | Water-plant primary settling tower provided with water taking and filtering device |
CN107569874A (en) * | 2017-10-13 | 2018-01-12 | 乐绪春 | A kind of sewage disposal settler |
CN110498524A (en) * | 2019-09-06 | 2019-11-26 | 陆鑫 | Domestic sewage treatment device and its processing method based on solid-liquid separation technique |
-
2016
- 2016-05-11 CN CN201620421336.XU patent/CN205627336U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105457388A (en) * | 2015-12-10 | 2016-04-06 | 綦江县狮子桥供水有限公司 | Water-plant primary settling tower provided with water taking and filtering device |
CN107569874A (en) * | 2017-10-13 | 2018-01-12 | 乐绪春 | A kind of sewage disposal settler |
CN110498524A (en) * | 2019-09-06 | 2019-11-26 | 陆鑫 | Domestic sewage treatment device and its processing method based on solid-liquid separation technique |
CN110498524B (en) * | 2019-09-06 | 2022-01-04 | 宁夏优智环保科技有限公司 | Domestic sewage treatment equipment based on solid-liquid separation technology and treatment method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205367916U (en) | Integrated water treatment equipment | |
CN205627336U (en) | Area water intaking filter equipment's primary settling of water factory tower | |
CN105502729B (en) | A kind of water treatment facilities | |
CN205412459U (en) | Water purification unit with water intaking filter equipment | |
CN205435187U (en) | Primary settling tower with submergence formula water intake device | |
CN205323362U (en) | Device is subsided in water treatment with water intaking filter equipment | |
CN205623913U (en) | Aquaculture pond | |
CN205367948U (en) | Integration water purification system | |
CN208234726U (en) | A kind of stone frog cultivation water circulation system | |
CN208218580U (en) | A kind of cultivation factory sewage-treatment plant | |
CN205412342U (en) | Water purification unit primary settling tower | |
CN205419945U (en) | Device is subsided in water treatment with submergence formula water intaking filter equipment | |
CN105413255B (en) | Water factory's primary settling tower | |
CN205328722U (en) | Water works water treatment facilities | |
CN205360814U (en) | Water purification apparatus | |
CN205313237U (en) | Area water intaking filter equipment's integrated water purification system | |
CN105347562B (en) | Waterworks water treatment facilities with water intaking filter | |
CN205328720U (en) | Water works purifier | |
CN205313236U (en) | Area water intaking filter equipment's integration water purification system of water factory | |
CN105498353B (en) | A kind of waterworks primary settling tower | |
CN205556395U (en) | Modified domestic sewage treatment equipment | |
CN105457388A (en) | Water-plant primary settling tower provided with water taking and filtering device | |
CN205367917U (en) | Integration is filtered and is adsorbed water purification system | |
CN211703351U (en) | Water purification system for industrial three-dimensional circulating water crab healthy breeding | |
CN105417776B (en) | Purified water treatment device with water intaking filter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161012 Termination date: 20170511 |
|
CF01 | Termination of patent right due to non-payment of annual fee |