CN105457388A - Water-plant primary settling tower provided with water taking and filtering device - Google Patents

Water-plant primary settling tower provided with water taking and filtering device Download PDF

Info

Publication number
CN105457388A
CN105457388A CN201510915355.8A CN201510915355A CN105457388A CN 105457388 A CN105457388 A CN 105457388A CN 201510915355 A CN201510915355 A CN 201510915355A CN 105457388 A CN105457388 A CN 105457388A
Authority
CN
China
Prior art keywords
water
tower
primary settling
mud discharging
water taking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510915355.8A
Other languages
Chinese (zh)
Inventor
罗学东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qijiang County Shiziqiao Water Supply Co Ltd
Original Assignee
Qijiang County Shiziqiao Water Supply Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qijiang County Shiziqiao Water Supply Co Ltd filed Critical Qijiang County Shiziqiao Water Supply Co Ltd
Priority to CN201510915355.8A priority Critical patent/CN105457388A/en
Publication of CN105457388A publication Critical patent/CN105457388A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D36/00Filter circuits or combinations of filters with other separating devices
    • B01D36/04Combinations of filters with settling tanks

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Filtration Of Liquid (AREA)

Abstract

The invention discloses a water-plant primary settling tower provided with a water taking and filtering device. The water-plant primary settling tower comprises a primary settling tower and the water taking and filtering device connected with the primary settling tower, wherein the water taking and filtering device comprises a water taking tank and a fixed bracket, the water taking tank is fixed on the fixed bracket, the bottom surface of the water taking tank is open, gratings are arranged on the bottom surface of the water taking tank, and a filter material layer is arranged in the water taking tank; the primary settling tower comprises an outer tower, an inner tower and a sludge discharge channel between the outer tower and the inner tower, the bottom of the inner tower is connected with a water inlet pipe which is connected with the upper part of the water taking tank, the top of the inner tower is connected with a water outlet pipe, at least two upwards inclined baffle plates are arranged in the inner tower from top to bottom in a crossed manner, and the lower side edge of each baffle plate is fixedly connected with the wall of the inner tower. Due to the fact that the water taking and filtering device is arranged at the water taking end of a water source, impurities at the water taking end can be primarily filtered and removed, other large-particle impurities in water are further precipitated on the baffle plates when raw water flows through the primary settling tower again, and at the moment, the raw water can almost meet the water quality requirement of feedwater of a water plant.

Description

Water factory's primary settling tower of band water intaking filter
Technical field
The present invention relates to water-suppling treatment equipment field, be specifically related to a kind of water factory's primary settling tower with water intaking filter.
Background technology
The activity of the mankind can make a large amount of industry, agricultural and domestic refuse enter in water, water body is polluted, the current whole world about has the sewage of billion cubic meter more than 4200 to enter rivers,lakes and seas every year, pollute the fresh water of 5.5 tcms, this is equivalent to more than 14% of global runoff volume, increasingly the water pollutions aggravated, significant threat is formed to the living safety of the mankind, become human health, the major obstacles of economy and social sustainable development, investigate according to authoritative institution of the world, in developing country, various diseases has 80% to propagate because having drunk antihygienic water, at least cause global 200d 00,000 people dead because drinking unhygienic water every year, therefore water pollutions is referred to as " world's number one killer ", at present, in river and the dirty water decontamination handles, various informative water treatment facilities just play an important role, but general purifier requires that influent turbidity is not high, the water higher for some turbidity often is still difficult to reach drinking water standard after general process.
Summary of the invention
For solving above technical problem, the invention provides a kind of water factory's primary settling tower effectively tackling the band water intaking filter of water float thing and larger impurity at water intaking end.
Technical scheme is as follows:
With water factory's primary settling tower of water intaking filter, its key is: the water intaking filter comprising primary settling tower and be connected with this primary settling tower;
Described water intaking filter comprises fetching tank for water and fixed support, and described fetching tank for water is fixed on described fixed support, and described fetching tank for water bottom surface opening is also provided with grid, is provided with filter material layer in described fetching tank for water;
Described primary settling tower comprises Wai Ta and Nei Ta, therebetween mud discharging passage is formed, the bottom of described interior tower is connected with water inlet pipe, this water inlet pipe is connected with the top of described fetching tank for water, the top of described interior tower is connected with outlet pipe, intersect from top to bottom at described Nei Tanei and be provided with at least two deflection plates, this deflection plate is inclined upwardly 5-10 °, the lower side of described deflection plate is fixedly connected with the tower wall of described interior tower, the upper side edge of described deflection plate is respectively equipped with baffle plate, each described deflection plate and described Nei Ta junction are respectively equipped with mud discharging mouth, the lower limb of this mud discharging mouth is concordant with this deflection plate lower side.
The beneficial effect adopting the technical program is because the water intaking end at water source is provided with water intaking filter, effectively can remove the floating thing in water, and have preliminary filtration result to other the impurity such as organic pollution, inorganic pollution, when now former water flows through primary settling tower again, in water, other large granular impurity to be deposited in further on deflection plate and to enter in mud discharging passage, now the turbidity of former water reduces greatly, substantially can reach the water quality requirement of water factory's water inlet.
As preferably: be provided with mud discharging pipe at the bottom of the tower of above-mentioned outer tower, described mud discharging pipe is provided with mud discharging control valve.The beneficial effect of this scheme is adopted to be that the mud be deposited at the bottom of outer tower tower is regularly discharged by mud discharging pipe.
Above-mentioned deflection plate is 20-30, is evenly distributed at the bottom of the tower of described interior tower and between tower top.Adopt the beneficial effect of this scheme to be that deflection plate density is arranged rationally, shorten the distance of impurity sedimentation, be conducive to the sedimentation accelerating impurity.
The above-mentioned mud discharging control valve opening time is spaced apart 20-24 hour.Adopt the beneficial effect of this scheme to be regularly got rid of by the mud of deposition, avoid mud overheap, affect sedimentation effect.
Sludge-tank is provided with below above-mentioned outer tower.Adopt the beneficial effect of this scheme be deposition mud concentrate be emitted in sludge-tank, facilitate workman concentrate cleaning.
Above-mentioned interior top of tower is provided with observation window.The beneficial effect of this scheme is adopted to be fast check purifier inner case by observation window.
Filtrate in above-mentioned filter material layer is granules of polystyrene, is provided with filtrate catch net above described filter material layer.Adopt the beneficial effect of this scheme to be the weight that filtrate proportion gentlier effectively can alleviate whole intake equipment, facilitate M R, the filtrate catch net above filtrate can effectively stop filtrate to float, and guarantees that filter material layer position is fixed and has certain density.
Beneficial effect:
Adopting the invention has the beneficial effects as follows because the water intaking end at water source is provided with water intaking filter, effectively can remove the floating thing in water, and the organic pollution to other, the impurity such as inorganic pollution have preliminary filtration result, when now former water flows through primary settling tower again, in water, other large granular impurity to be deposited in further on deflection plate and to enter in mud discharging passage, now the turbidity of former water reduces greatly, substantially, the water quality requirement of water factory's water inlet can be reached, through the primary filter of this equipment, the dosage of water factory processed medicament and chlorine can be reduced, reduce aluminium salt and DBPs content in the rear water of filter, whole device security is reliable, filtration result is good.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the enlarged drawing a of Fig. 1;
Fig. 3 is the structural representation of water intaking filter.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing, the invention will be further described.
As Figure 1-3, a kind of water factory's primary settling tower with water intaking filter, the water intaking filter comprising primary settling tower and be connected with this primary settling tower.
Described water intaking filter is immersed in water source, described water intaking filter comprises fetching tank for water 13 and fixed support 14, described fetching tank for water 13 is fixed on described fixed support 14, described fetching tank for water 13 bottom surface opening is also provided with grid 15, filter material layer 16 is provided with in described fetching tank for water 13, filtrate in described filter material layer 16 is granules of polystyrene, is provided with filtrate catch net 17 above described filter material layer 16.
Described primary settling tower comprises outer tower 1 and Nei Ta 2, therebetween mud discharging passage 3 is formed, the bottom of described interior tower 2 is connected with water inlet pipe 6, this water inlet pipe 6 is connected with the top of described fetching tank for water 13, the top of described interior tower 2 is connected with outlet pipe 11, intersect from top to bottom in described interior tower 2 and be provided with at least two deflection plates 4, described deflection plate 4 is 20-30, be evenly distributed at the bottom of the tower of described interior tower 2 and between tower top, this deflection plate 4 is inclined upwardly 5-10 °, the lower side of described deflection plate 4 is fixedly connected with the tower wall of described interior tower 2, the upper side edge of described deflection plate 4 is respectively equipped with baffle plate 5, each described deflection plate 4 is respectively equipped with mud discharging mouth 12 with described interior tower 2 junction, the lower limb of this mud discharging mouth 12 is concordant with this deflection plate 4 lower side, the mud be deposited on thus on deflection plate 4 enters in mud discharging passage 3 by described mud discharging mouth 12, and be deposited at the bottom of the tower of outer tower 1 gradually, mud discharging pipe 7 is provided with at the bottom of the tower of described outer tower 1, described mud discharging pipe 7 is provided with mud discharging control valve 8, described mud discharging control valve 8 opening time is spaced apart 20-24 hour, sludge-tank 9 is provided with below described outer tower 1, described interior tower 2 top is provided with observation window 10.

Claims (7)

1. the water factory's primary settling tower with water intaking filter, is characterized in that: the water intaking filter comprising primary settling tower and be connected with this primary settling tower;
Described water intaking filter comprises fetching tank for water (13) and fixed support (14), described fetching tank for water (13) is fixed on described fixed support (14), described fetching tank for water (13) bottom surface opening is also provided with grid (15), is provided with filter material layer (16) in described fetching tank for water (13);
Described primary settling tower comprises outer tower (1) and interior tower (2), therebetween mud discharging passage (3) is formed, the bottom of described interior tower (2) is connected with water inlet pipe (6), this water inlet pipe (6) is connected with the top of described fetching tank for water (13), the top of described interior tower (2) is connected with outlet pipe (11), intersect from top to bottom in described interior tower (2) and be provided with at least two deflection plates (4), this deflection plate (4) is inclined upwardly 5-10 °, the lower side of described deflection plate (4) is fixedly connected with the tower wall of described interior tower (2), the upper side edge of described deflection plate (4) is respectively equipped with baffle plate (5), each described deflection plate (4) and described interior tower (2) junction are respectively equipped with mud discharging mouth (12), the lower limb of this mud discharging mouth (12) is concordant with this deflection plate (4) lower side.
2. water factory's primary settling tower of band water intaking filter according to claim 1, it is characterized in that: be provided with mud discharging pipe (7) at the bottom of the tower of described outer tower (1), described mud discharging pipe (7) is provided with mud discharging control valve (8).
3. water factory's primary settling tower of band water intaking filter according to claim 1 and 2, is characterized in that: described deflection plate (4) is 20-30, is evenly distributed at the bottom of the tower of described interior tower (2) and between tower top.
4. water factory's primary settling tower of band water intaking filter according to claim 2, is characterized in that: described mud discharging control valve (8) opening time is spaced apart 20-24 hour.
5. water factory's primary settling tower of band water intaking filter according to claim 3, is characterized in that: described outer tower (1) below is provided with sludge-tank (9).
6. water factory's primary settling tower of the band water intaking filter according to claim 4 or 5, is characterized in that: described interior tower (2) top is provided with observation window (10).
7. water factory's primary settling tower of band water intaking filter according to claim 3, it is characterized in that: the filtrate in described filter material layer (16) is granules of polystyrene, described filter material layer (16) top is provided with filtrate catch net (17).
CN201510915355.8A 2015-12-10 2015-12-10 Water-plant primary settling tower provided with water taking and filtering device Pending CN105457388A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510915355.8A CN105457388A (en) 2015-12-10 2015-12-10 Water-plant primary settling tower provided with water taking and filtering device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510915355.8A CN105457388A (en) 2015-12-10 2015-12-10 Water-plant primary settling tower provided with water taking and filtering device

Publications (1)

Publication Number Publication Date
CN105457388A true CN105457388A (en) 2016-04-06

Family

ID=55595813

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510915355.8A Pending CN105457388A (en) 2015-12-10 2015-12-10 Water-plant primary settling tower provided with water taking and filtering device

Country Status (1)

Country Link
CN (1) CN105457388A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109482127A (en) * 2017-09-13 2019-03-19 天津市亨必达化学合成物有限公司 A kind of multifunctional reaction still

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120097585A1 (en) * 2009-04-10 2012-04-26 Advanced Energy Saving Systems Water Purification System with Entrained Filtration Elements
CN105417776A (en) * 2015-11-28 2016-03-23 綦江县狮子桥供水有限公司 Clean water treatment device with taken water filtering device
CN105502714A (en) * 2015-11-30 2016-04-20 綦江县狮子桥供水有限公司 Waterwork water purification treatment equipment with water taking and filtering device
CN105498354A (en) * 2015-11-28 2016-04-20 綦江县狮子桥供水有限公司 Settling apparatus with intake water filtering unit for waterworks
CN205323362U (en) * 2015-11-28 2016-06-22 綦江县狮子桥供水有限公司 Device is subsided in water treatment with water intaking filter equipment
CN205367916U (en) * 2015-11-30 2016-07-06 綦江县狮子桥供水有限公司 Integrated water treatment equipment
CN205412459U (en) * 2015-11-28 2016-08-03 綦江县狮子桥供水有限公司 Water purification unit with water intaking filter equipment
CN205627336U (en) * 2015-11-28 2016-10-12 綦江县狮子桥供水有限公司 Area water intaking filter equipment's primary settling of water factory tower

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120097585A1 (en) * 2009-04-10 2012-04-26 Advanced Energy Saving Systems Water Purification System with Entrained Filtration Elements
CN105417776A (en) * 2015-11-28 2016-03-23 綦江县狮子桥供水有限公司 Clean water treatment device with taken water filtering device
CN105498354A (en) * 2015-11-28 2016-04-20 綦江县狮子桥供水有限公司 Settling apparatus with intake water filtering unit for waterworks
CN205323362U (en) * 2015-11-28 2016-06-22 綦江县狮子桥供水有限公司 Device is subsided in water treatment with water intaking filter equipment
CN205412459U (en) * 2015-11-28 2016-08-03 綦江县狮子桥供水有限公司 Water purification unit with water intaking filter equipment
CN205627336U (en) * 2015-11-28 2016-10-12 綦江县狮子桥供水有限公司 Area water intaking filter equipment's primary settling of water factory tower
CN105502714A (en) * 2015-11-30 2016-04-20 綦江县狮子桥供水有限公司 Waterwork water purification treatment equipment with water taking and filtering device
CN205367916U (en) * 2015-11-30 2016-07-06 綦江县狮子桥供水有限公司 Integrated water treatment equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109482127A (en) * 2017-09-13 2019-03-19 天津市亨必达化学合成物有限公司 A kind of multifunctional reaction still

Similar Documents

Publication Publication Date Title
CN205367916U (en) Integrated water treatment equipment
CN105502729B (en) A kind of water treatment facilities
CN205627336U (en) Area water intaking filter equipment's primary settling of water factory tower
CN205412459U (en) Water purification unit with water intaking filter equipment
CN205323362U (en) Device is subsided in water treatment with water intaking filter equipment
CN205435187U (en) Primary settling tower with submergence formula water intake device
CN105457388A (en) Water-plant primary settling tower provided with water taking and filtering device
CN205367948U (en) Integration water purification system
CN205328720U (en) Water works purifier
CN205313237U (en) Area water intaking filter equipment's integrated water purification system
CN205328722U (en) Water works water treatment facilities
CN205360814U (en) Water purification apparatus
CN105498353B (en) A kind of waterworks primary settling tower
CN205412342U (en) Water purification unit primary settling tower
CN205419945U (en) Device is subsided in water treatment with submergence formula water intaking filter equipment
CN105347562B (en) Waterworks water treatment facilities with water intaking filter
CN105417776B (en) Purified water treatment device with water intaking filter
CN205313236U (en) Area water intaking filter equipment's integration water purification system of water factory
CN105498354A (en) Settling apparatus with intake water filtering unit for waterworks
CN105498352A (en) Waterworks sedimentation device
CN105413255B (en) Water factory's primary settling tower
CN205367917U (en) Integration is filtered and is adsorbed water purification system
CN105502714A (en) Waterwork water purification treatment equipment with water taking and filtering device
CN205222866U (en) Urban water supply water purification integration equipment
CN105498306A (en) Waterworks sedimentation device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160406