CN105335846A - Diesel engine overall test process management system - Google Patents
Diesel engine overall test process management system Download PDFInfo
- Publication number
- CN105335846A CN105335846A CN201510926123.2A CN201510926123A CN105335846A CN 105335846 A CN105335846 A CN 105335846A CN 201510926123 A CN201510926123 A CN 201510926123A CN 105335846 A CN105335846 A CN 105335846A
- Authority
- CN
- China
- Prior art keywords
- module
- diesel engine
- data
- complete machine
- engine complete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Engineering & Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Economics (AREA)
- Marketing (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Testing Of Engines (AREA)
Abstract
The invention discloses a diesel engine overall test process management system, which uses a browser/server (B/S) structure, and comprises a front desk function menu module dynamically configured, a rear desk function menu module, a rear desk server module and a system management module, wherein the front desk function menu module can access through a browser, the rear desk function menu module is arranged on a server, and the rear desk server module and the system management module are operated after various roles of personnel register according to authority given by authority managers. A diesel engine overall test process management platform builds a management process of diesel engine overall test projects preliminarily, achieves standardized management of a diesel engine overall test project process, achieves whole data management of the diesel engine overall test project process, is used to look up history data of test projects, and supplies help for development of diesel engine overall test works.
Description
Technical field
The invention belongs to technical field of network information, especially relate to a kind of Diesel Engine Complete Machine experiment process management system.
Background technology
At present, information system management range of application in each enterprise is very extensive, and along with the development of informationization technology, the requirement of enterprise to information system management is also more and more higher.Diesel Engine Complete Machine process of the test is very complicated, the data class produced is many, quantity large, therefore, needs to design a kind of Diesel Engine Complete Machine experiment process management system, to strengthen, to the standardization testing overall process, information system management, realizing the effective management to process of the test data.
Summary of the invention
In view of this, the present invention is intended to propose a kind of Diesel Engine Complete Machine experiment process management system, to realize the effective management to process of the test data, and the object of the process of the test dates back that guarantees data integrity, reaches.
For achieving the above object, technical scheme of the present invention is achieved in that
A kind of Diesel Engine Complete Machine experiment process management system, adopts B/S browser and server structure, comprises foreground function menu module, background service module and system management module;
Described foreground function menu module comprise help user enter into rapidly pilot project historical data check interface data display module, perform and check the workflow management module of pilot project flow process for user;
Described background service module comprises Diesel Engine Complete Machine experiment process administration module and Diesel Engine Complete Machine pilot project data module, be respectively used to the management of Diesel Engine Complete Machine trial flow process and Diesel Engine Complete Machine pilot project data, importing module fast for the Diesel Engine Complete Machine test figure data of test-bed being imported to fast Diesel Engine Complete Machine experiment process management system in addition, testing the Diesel Engine Complete Machine test figure express-analysis module of necessary external characteristic curve, load characteristic curve and universal characteristic curve for generating Diesel Engine Complete Machine fast;
Described system management module comprises user management module, authority management module, log management module, systematic parameter configuration module, and wherein, user management module is the accounts information for management system user; Authority management module is that different users is set to different roles, and the division finally by role controls the access rights of each user to database; Systematic parameter configuration module is the parameters for managing this system.
Further, described Diesel Engine Complete Machine experiment process administration module in the process of implementation, understand the data model of automatic data flow process generated according to designed data form by data stored in database, this data model comprises following list: pilot project table, pilot project planning and work distribution chart, test program approval form, test mission table, test report approval form, emission result tables of data, vibration rating result tables of data, acoustical power result data table, cold starting test figure table, discharge raw data table, acoustical power raw data table, highland test tables of data, conventional test tables of data, vibration grading raw data table, support shaft coupling and prepare planning table, backup system prepares planning table, testing apparatus prepares planning table and measurement of power controls to prepare planning table, these lists form a complete relational data model together, can retrieve mutually between data.
Further, import fast in module in test figure, the EXCEL template of a data importing program and a Diesel Engine Complete Machine test figure importing be set up, data are imported by data importing program fast according to EXCEL template.
Relative to prior art, the present invention has following advantage:
Diesel Engine Complete Machine experiment process management platform of the present invention achieves the standardization to whole process of the test, informationalized management, achieves the effective management to Diesel Engine Complete Machine test overall process data.
Accompanying drawing explanation
The accompanying drawing forming a part of the present invention is used to provide a further understanding of the present invention, and schematic description and description of the present invention, for explaining the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the schematic diagram of Diesel Engine Complete Machine experiment process management system described in the embodiment of the present invention;
The data model figure that Fig. 2 is data form described in the embodiment of the present invention;
Fig. 3 imports schematic diagram fast for test figure described in the embodiment of the present invention;
Fig. 4 is the curve standard form schematic diagram of test figure express-analysis CMOS macro cell described in the embodiment of the present invention.
Embodiment
It should be noted that, when not conflicting, the embodiment in the present invention and the feature in embodiment can combine mutually.
Below with reference to the accompanying drawings and describe the present invention in detail in conjunction with the embodiments.
A kind of Diesel Engine Complete Machine experiment process management system, as shown in Figure 1, adopt B/S browser and server structure, comprise foreground function menu module, background service module and system management module, by B/S browser conduct interviews dynamic-configuration foreground function menu module, be arranged on background service module on described server and system management module, background service module and system management module log in laggard line operate by operating personnel according to authority;
Described foreground function menu module mainly comprises data display module, workflow management module, and test figure imports module and test figure express-analysis module fast, and wherein, data display module helps user to enter into rapidly pilot project historical data; Workflow management module is the interface that user performed and checked pilot project flow process; Test figure imports module fast and helps user to enter into test figure and import module fast; The interface that test figure express-analysis module helps user to enter into test figure express-analysis and curve to generate fast.
Described background service module comprises Diesel Engine Complete Machine experiment process administration module, Diesel Engine Complete Machine pilot project data module; Be respectively used to the management of Diesel Engine Complete Machine trial flow process and Diesel Engine Complete Machine pilot project data;
Described Diesel Engine Complete Machine experiment process administration module, comprise pilot project to create, project examination, project planning, testing apparatus prepares planning, backup system prepares planning, measurement of power controls to prepare planning, support shaft coupling and prepare planning, three grades of outline examination & approval sub-processes, Pyatyi outline examination & approval sub-process, seven grades of outline examination & approval sub-processes, test preparation data is paid, backup system prepares data and pays, measurement of power controls preparation data and pays, support shaft coupling and prepare data payment, data are examined, three grades of report examination & approval sub-processes, Pyatyi report examination & approval sub-process and seven grades of report examination & approval sub-processes totally 18 management processes.
When flow process is initiated, " pilot project establishment " process is performed by specific people, the information etc. of the essential information of pilot project, basic demand, examination & approval rank, charter and contract is filled in " pilot project table ", deliver to relevant leader, perform " project examination " process, after leader's approval, deliver to project leader, perform " project planning " process by project leader, project leader will determine the operational staff of all processes after flow process, and whether implementation and supervision process completes.At subsequent process, as long as process of the test information is filled in complete by relevant operational staff on time.
Outline is consistent with the examination & approval rank of report, at pilot project establishing stage, one just must be selected from " three grades of examination & approval ", " Pyatyi examination & approval " and " seven grades of examination & approval " to examine rank, follow-up flow process according to the selection of user, can enter into the outline of mutually corresponding examination & approval rank and the examination & approval sub-process of report automatically.
Three grades of examination & approval sub-processes of outline and report comprise " establishment ", " check ", " approval " three implementations;
The Pyatyi examination & approval sub-process figure of outline and report comprises " establishment ", " check ", " standard examination ", " authorization ", " approval " five implementations;
Seven grades of examination & approval sub-processes of outline and report comprise " establishment ", " check ", " countersign ", " examination ", " standard examination ", " authorization ", " approval " seven implementations.
After each process is finished, in the data form that the data stuffing that this implementation generates is specified by flow process automatically in figure, data form is as follows: pilot project table, pilot project planning and work distribution chart, test program approval form, test mission table, test report approval form, emission result tables of data, vibration rating result tables of data, acoustical power result data table, cold starting test figure table, discharge raw data table, acoustical power raw data table, highland test tables of data, conventional test tables of data, vibration grading raw data table, support shaft coupling and prepare planning table, backup system prepares planning table, testing apparatus prepares planning table and measurement of power controls to prepare planning table.
Described Diesel Engine Complete Machine experiment process administration module in the process of implementation, understand the data model of automatic data flow process generated according to designed data form by data stored in database, data model comprises some data forms, all data form component relationship databases, can retrieve between data mutually.
As shown in Figure 3, import fast in module in test figure, the EXCEL template of a data importing program and a Diesel Engine Complete Machine test figure importing be set up.In template, all Diesel Engine Complete Machine test figures to be classified as 5 SHEET pages, be respectively: routine data, emission result data, vibration rating result data, acoustical power result data, cold starting test figure, during importing, the data in each SHEET page are entered into different databases by the requirement shown in figure by importing program respectively.Wherein, in routine data SHEET page, according to the difference of institute's number completion certificate, then enter into different databases, e.g., if number exists emissions data in holding, then program is automatically imported in discharge raw data table, as, if there is vibration data in data, then program is automatically imported in vibration grading raw data table, as, only there are the data of conventional class in data, then program is automatically imported in conventional test tables of data, by that analogy.
In test figure express-analysis module, be exactly generate external characteristics fast, part throttle characteristics and the property data such as universal, as long as user chooses data in a database, just the above-mentioned three kinds of test patterns of the generation of washability, as shown in (a) (b) (c) in Fig. 4, for the needs of experiment work.
Described system management module comprises user management module, authority management module, systematic parameter configuration module, and wherein, user management module is the accounts information for management system user; Authority management module is that different users is set to different roles, and the division finally by role controls the access rights of each user to database; Systematic parameter configuration module is the parameters for managing this system.
The course of work of this example: after user logs in the account of oneself, just enters into this system foreground function/menu interface.
One, user is in the function/menu interface of foreground, can select to enter data display module and workflow management module.Wherein, data display module helps user to enter into rapidly pilot project historical data and checks interface, and here user can view all pilot project data in Back Administration Module, and the information searched comes from system background service.After user selects to enter workflow management module, can select to initiate trial flow process, or perform existing trial flow process, also can check trial flow performing account of the history, and all procedure informations come from system background service equally;
Two, Back Administration Module is for storing Diesel Engine Complete Machine trial flow process and Diesel Engine Complete Machine pilot project data, for user provides flow process and data, services.
Three, described system management module mainly comprises: user management module, authority management module and systematic parameter configuration module.Only have system manager to have permission to be configured these modules.User management module is used for management system user account information; Authority management module is that different users is set to different roles, and the division finally by role controls the access rights of each user to database; Systematic parameter configuration module is for managing the basic parameter of this system.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.
Claims (3)
1. a Diesel Engine Complete Machine experiment process management system, is characterized in that: adopt B/S browser and server structure, comprise foreground function menu module, background service module and system management module; Described foreground function menu module comprise help user enter into rapidly pilot project historical data check interface data display module, perform and check the workflow management module of pilot project flow process for user;
Described background service module comprises Diesel Engine Complete Machine experiment process administration module and Diesel Engine Complete Machine pilot project data module, be respectively used to the management of Diesel Engine Complete Machine trial flow process and Diesel Engine Complete Machine pilot project data, importing module fast for the Diesel Engine Complete Machine test figure data of test-bed being imported to fast Diesel Engine Complete Machine experiment process management system in addition, testing the Diesel Engine Complete Machine test figure express-analysis module of necessary external characteristic curve, load characteristic curve and universal characteristic curve for generating Diesel Engine Complete Machine fast;
Described system management module comprises user management module, authority management module, log management module, systematic parameter configuration module, and wherein, user management module is the accounts information for management system user; Authority management module is that different users is set to different roles, and the division finally by role controls the access rights of each user to database; Systematic parameter configuration module is the parameters for managing this system.
2. Diesel Engine Complete Machine experiment process management system according to claim 1, it is characterized in that: described Diesel Engine Complete Machine experiment process administration module in the process of implementation, understand the data model of automatic data flow process generated according to designed data form by data stored in database, this data model comprises some lists, all lists form a complete relational data model together, can retrieve mutually between data.
3. Diesel Engine Complete Machine experiment process management system according to claim 1, it is characterized in that: import fast in module in test figure, set up the EXCEL template of a data importing program and a Diesel Engine Complete Machine test figure importing, data are imported by data importing program fast according to EXCEL template.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510926123.2A CN105335846A (en) | 2015-12-11 | 2015-12-11 | Diesel engine overall test process management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510926123.2A CN105335846A (en) | 2015-12-11 | 2015-12-11 | Diesel engine overall test process management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105335846A true CN105335846A (en) | 2016-02-17 |
Family
ID=55286361
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510926123.2A Pending CN105335846A (en) | 2015-12-11 | 2015-12-11 | Diesel engine overall test process management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105335846A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106651290A (en) * | 2016-10-08 | 2017-05-10 | 江门市江海区六米软件有限公司 | Flow management software system and the authority management method thereof |
CN107655645A (en) * | 2017-09-15 | 2018-02-02 | 苏州大成有方数据科技有限公司 | A kind of testing stand data management system and its method of work |
CN113869883A (en) * | 2021-10-30 | 2021-12-31 | 哈尔滨工业大学 | Experimental project operation management method based on template instance strategy |
CN117571305A (en) * | 2024-01-17 | 2024-02-20 | 长沙润伟机电科技有限责任公司 | Control system for driving running-in test bed |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1629850A (en) * | 2003-12-16 | 2005-06-22 | 上海电器科学研究所(集团)有限公司 | A control method for laboratory test process management system |
CN101620698A (en) * | 2009-07-27 | 2010-01-06 | 石庆生 | Integrated system of test detection, management and monitoring and method |
CN102722769A (en) * | 2011-03-29 | 2012-10-10 | 上海凡默谷信息技术有限公司 | Experimental data processing system and method |
CN104091229A (en) * | 2014-06-22 | 2014-10-08 | 中国北方发动机研究所(天津) | Whole diesel engine test data management platform |
CN104866945A (en) * | 2015-03-27 | 2015-08-26 | 中国北方发动机研究所(天津) | Data service system of complete-machine assembling of diesel engine |
-
2015
- 2015-12-11 CN CN201510926123.2A patent/CN105335846A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1629850A (en) * | 2003-12-16 | 2005-06-22 | 上海电器科学研究所(集团)有限公司 | A control method for laboratory test process management system |
CN101620698A (en) * | 2009-07-27 | 2010-01-06 | 石庆生 | Integrated system of test detection, management and monitoring and method |
CN102722769A (en) * | 2011-03-29 | 2012-10-10 | 上海凡默谷信息技术有限公司 | Experimental data processing system and method |
CN104091229A (en) * | 2014-06-22 | 2014-10-08 | 中国北方发动机研究所(天津) | Whole diesel engine test data management platform |
CN104866945A (en) * | 2015-03-27 | 2015-08-26 | 中国北方发动机研究所(天津) | Data service system of complete-machine assembling of diesel engine |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106651290A (en) * | 2016-10-08 | 2017-05-10 | 江门市江海区六米软件有限公司 | Flow management software system and the authority management method thereof |
CN107655645A (en) * | 2017-09-15 | 2018-02-02 | 苏州大成有方数据科技有限公司 | A kind of testing stand data management system and its method of work |
CN113869883A (en) * | 2021-10-30 | 2021-12-31 | 哈尔滨工业大学 | Experimental project operation management method based on template instance strategy |
CN117571305A (en) * | 2024-01-17 | 2024-02-20 | 长沙润伟机电科技有限责任公司 | Control system for driving running-in test bed |
CN117571305B (en) * | 2024-01-17 | 2024-04-16 | 长沙润伟机电科技有限责任公司 | Control system for driving running-in test bed |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Aureli et al. | Nonfinancial reporting regulation and challenges in sustainability disclosure and corporate governance practices | |
Cater-Steel et al. | Challenge of adopting multiple process improvement frameworks | |
US20130117060A1 (en) | System for Collaboration and Meeting Management | |
CN102208064A (en) | Administrative collaborative approval system and approval method | |
CN107833009A (en) | Personalized checking method, device, storage medium and the terminal of Claims Resolution order | |
CN105447627A (en) | Design review process management and control mode research method | |
CN105335846A (en) | Diesel engine overall test process management system | |
CN1578961A (en) | Method and software for identifying and creating connections and accountability in a business organization | |
CN109242332A (en) | A kind of monitoring analysis system of tax collection and administration data, method and device | |
CN102208065A (en) | Intelligent navigation system and method for administrative approval | |
CN117474461A (en) | Work bill management method and system of intelligent digital platform | |
CN109670728B (en) | Ship design quality information management system based on database | |
CN115600972A (en) | Method, device, equipment and storage medium for verifying and selling of bad assets | |
Hanafi et al. | Identification of IT Governance and Management Objectives and Target Process Capability Level in Government Institution | |
CN109345363A (en) | A kind of land value-added tax settlement auditing system and method | |
CN114996296A (en) | College data resource directory integration system and method | |
CN113706101A (en) | Power grid project management intelligent system architecture and method | |
RU105492U1 (en) | AUTOMATED SYSTEM FOR REALIZATION OF REQUESTS OF THE MANAGEMENT BODY TO SUBSIDIARY STRUCTURE ELEMENTS ON THE BASIS OF MODIFIED EXCEL TABLES | |
KR20110096355A (en) | Decision making system for city regeneration | |
Petit et al. | Enterprise Architecture Enhanced with Responsibility to Manage Access Rights-Case Study in an EU Institution | |
US20050102153A1 (en) | System and method for management of data requests in a regulatory proceeding | |
KR20150121648A (en) | Device requesting repair and method of the same | |
Wridiani et al. | Integrated Monitoring System to Improve the Procurement Process through Provider with an End-User Development Approach (Case Study: XXX Institute) | |
Fu | Design and implementation of the intellectual property right management system based on MVC pattern | |
Consalvi et al. | Meeting of the Group of Experts on Business Registers Organised jointly by UNECE, Eurostat and OECD 30 September–2 October 2019 Geneva, Switzerland |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160217 |