CN105319456A - Electric iron tester and hard water manufacture method thereof - Google Patents
Electric iron tester and hard water manufacture method thereof Download PDFInfo
- Publication number
- CN105319456A CN105319456A CN201410379341.4A CN201410379341A CN105319456A CN 105319456 A CN105319456 A CN 105319456A CN 201410379341 A CN201410379341 A CN 201410379341A CN 105319456 A CN105319456 A CN 105319456A
- Authority
- CN
- China
- Prior art keywords
- solution
- electric iron
- water
- test
- machine according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)
Abstract
The present invention discloses an electric iron tester and a hard water manufacture method thereof. The electric iron tester comprises a PLC control cabinet, a body, a water supply support, a test assembly, a support panel, a link mechanism, a lifting gear, a guide rail device and a water tank. The water tank is configured to supply soft water and hard water. The hard water manufacture method of an electric iron tester comprises: pouring calcium chloride into an empty container, and adding purified water with stirring until dissolving the calcium chloride to generate the solution A; pouring magnesium sulfate into an empty container, and adding purified water with stirring until dissolving the magnesium sulfate to generate the solution B; uniformly mixing the solution A and the solution B to generate the solution AB; pouring sodium bicarbonate into an empty container, and adding purified water with stirring until dissolving the sodium bicarbonate to generate the solution C; pouring the solution C into the solution AB to generate the solution ABC; and adding purified water in the solution ABC to perform dilution, and generating required hard water. According to the electric iron tester provided by the invention, the performances of an electric iron may be comprehensively, automatically and accurately tested, and the electric iron tester has good economic benefits.
Description
Technical field
The present invention relates to electric equipment products checkout equipment field, be specifically related to a kind of electric iron test machine.
Background technology
Along with the fast development of electron trade, electric equipment products emerge in an endless stream, wherein just comprise electric iron, and people are when buying electric iron, more can pay close attention to its overall performance and serviceable life, so more demand is then proposed to the performance testing apparatus of electric iron, but electric iron testing tool is in the market confined to the single test of individual event action mostly, or just carry out performance test for certain concrete parts, and monoblock type test can not be given to the performance of electric iron various aspects, like this then an electric iron needs multiple testing apparatus each performance to its correspondence to test, cause the increase on cost.
Summary of the invention
In order to overcome the technical matters of above-mentioned existence, the invention provides a kind of can the electric iron test machine of full test electric iron performance, provide a kind of further and test required hard water method for making.
The technical solution adopted for the present invention to solve the technical problems is: provide a kind of electric iron test machine, it comprises PLC control cabinet, body, be arranged on water supply support, test suite and the support panel on this body, the linkage assembly be connected with this support panel, control the jacking gear of this linkage assembly vertical movement, draw the track-type facilities of this linkage assembly tangential movement, and be positioned at the water tank on this water supply support; Described test suite comprises the flatiron fixture be connected with linkage assembly, the passway for water be connected with described water tank, be positioned at the iron board below flatiron fixture, be arranged on the terminal inductor on support panel and supply socket, described flatiron clamp mouth connects the electric iron of required test.
Further, described linkage assembly comprises connecting rod and installs the connecting rod base of this connecting rod.
Further, the peristaltic pump that described passway for water comprises graduated cylinder and is connected with graduated cylinder, this peristaltic pump is connected with described water tank by the first solenoid valve, and this graduated cylinder is connected with the electric iron of required test by the second solenoid valve.
Further, described jacking gear is cylinder.
Further, described track-type facilities comprises the guide rod seat of guide rod and location guide, and this guide rod is connected with described connecting rod base.
Further, described body is provided with multiple test suite along connecting rod direction.
Further, symmetrical two groups of multiple test suites on described body.
Further, symmetrical two groups of multiple test suites on described body, and often group is 6 test suites.
Further, described water tank supply soft water and hard water.
A kind of method for making preparing above-mentioned required hard water is provided, comprises the following steps:
Step one: poured into by lime chloride in an electrical condenser, then adds pure water and carries out stirring until lime chloride all dissolves generation solution A;
Step 2: poured into by magnesium sulfate in an electrical condenser, then adds pure water and carries out stirring until magnesium sulfate all dissolves generation solution B;
Step 3: solution A and B solution are mixed, generates solution A B;
Step 4: poured into by sodium bicarbonate in an electrical condenser, then adds pure water and carries out stirring until sodium bicarbonate all dissolves generation solution C;
Step 5: solution C poured in solution A B and mix, generates solution A BC;
Step 6: add pure water in solution A BC and dilute, namely generate the hard water needed for test.
Beneficial effect of the present invention is: adopt electric iron test machine of the present invention, test process is controlled by PLC control system, comprehensive automation can be carried out to electric iron accurately to test, avoid the limitation that the test of individual event performance individual equipment or equipment only test some parts, there is good economic benefit.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the present invention is described in further details.
Fig. 1 is electric iron test machine perspective view of the present invention;
Fig. 2 is electric iron test machine passway for water structural representation of the present invention;
Fig. 3 is electric iron test machine front view of the present invention;
Fig. 4 is electric iron test machine vertical view of the present invention;
Fig. 5 is electric iron test machine right view of the present invention;
Fig. 6 is electric iron test machine flatiron fixture partial enlarged drawing of the present invention;
The partial enlarged drawing that Fig. 7 is electric iron test machine jacking gear of the present invention when being air cylinder structure;
Embodiment
Please refer to Fig. 1-7, first with reference to figure 1, this electric iron test machine comprises PLC control cabinet 1, body 2, be arranged on two groups of multiple test suites symmetrical on this body 2, and often group is six test suites 4, water supply support 3 and support panel 5, the linkage assembly 6 be connected with this support panel 5, the cylinder 7(controlling this linkage assembly 6 vertical movement is shown in Fig. 7), draw the track-type facilities 8 of this linkage assembly 6 tangential movement, and be positioned at the water tank 9 on this water supply support 3; Wherein test suite 4 comprises the flatiron fixture 41(be connected with linkage assembly 6 and sees Fig. 6), the passway for water 45(be connected with water tank 9 is shown in Fig. 2), be positioned at the iron board 42 below flatiron fixture 41, be arranged on the terminal inductor 43 on support panel 5 and supply socket 44, flatiron fixture 41 clamps the electric iron 10 that mouth connects required test.
Wherein, bar linkage structure 6 comprises connecting rod 61 and installs the connecting rod base 62 of this connecting rod; Track-type facilities 8 comprises the guide rod seat 82 of guide rod 81 and location guide 81, and this guide rod 81 is connected with connecting rod base 62.
As shown in Figure 2, wherein, the peristaltic pump 452 that passway for water 45 comprises graduated cylinder 451 and is connected with graduated cylinder 451, this peristaltic pump 452 is connected with described water tank 9 by the first solenoid valve 453, this graduated cylinder 451 is connected with the electric iron 10 of required test by the second solenoid valve 454, the performance of electric iron can be tested by supply soft water or hard water in water tank 9, whether open or close the first solenoid valve 453 water controlled in water tank 9 is fed in peristaltic pump 452, open or close the second electric valve 454 water controlled in graduated cylinder 451 whether to be fed in the electric iron 10 of required test.
When electric iron 10 is tested, first test procedure is set in PLC control cabinet 1: comprise the socket power on/off time, motor speed, peristaltic pump adds water time and cylinder lifts or lowering time etc., iron board 42 surface is down to by electric iron 10 by cylinder 7 drivening rod 61, second solenoid valve 454 is opened, the water in graduated cylinder 451 is made to enter into electric iron 10, PLC controls electric iron 10 and repeatedly moves before and after guide rod 81 is in iron board 42, and PLC control cabinet can to the water inlet of the electric iron repeatedly moved, drainage performance, the heat time of steam work, evaporation time, evaporation rate, water leak rate, very brief burst of steam quality, iron plate temperature, thermosistor, temperature detect switch (TDS), the comprehensive life etc. of the components and parts such as temperature control protection gives monitoring and the judge of system.
In water tank 9, soft water can be injected the water inlet of electric iron 10, drainage performance are tested, also can inject hard water and higher water inlet, drainage performance test are carried out to electric iron 10.There is provided a kind of for this reason and prepare the method for making that 60L tests hard water, comprise the following steps:
Step one: the lime chloride of 19.5 grams is poured in an electrical condenser, the pure water then adding 1 liter carries out stirring until lime chloride all dissolves generation solution A;
Step 2: the magnesium sulfate of 11.5 grams is poured in an electrical condenser, the pure water then adding 1 liter carries out stirring until magnesium sulfate all dissolves generation solution B;
Step 3: solution A and B solution are mixed, generates solution A B;
Step 4: the sodium bicarbonate of 20 grams is poured in an electrical condenser, the pure water then adding 1 liter carries out stirring until sodium bicarbonate all dissolves generation solution C;
Step 5: solution C poured in solution A B and mix, generates the solution A BC of 3L;
Step 6: add 57 liters of pure water in solution A BC and dilute, namely generate the hard water needed for test.
Above content is in conjunction with concrete preferred implementation further description made for the present invention; can not assert that specific embodiment of the invention is confined to these explanations; for those skilled in the art; without departing from the inventive concept of the premise; some simple deduction or replace can also be made, all should be considered as belonging to protection scope of the present invention.
Claims (10)
1. an electric iron test machine, it is characterized in that: comprise PLC control cabinet, body, be arranged on water supply support, test suite and the support panel on this body, the linkage assembly be connected with this support panel, control the jacking gear of this linkage assembly vertical movement, draw the track-type facilities of this linkage assembly tangential movement, and be positioned at the water tank on this water supply support; Described test suite comprises the flatiron fixture be connected with linkage assembly, the passway for water be connected with described water tank, be positioned at the iron board below flatiron fixture, be arranged on the terminal inductor on support panel and supply socket, described flatiron clamp mouth connects the electric iron of required test.
2. electric iron test machine according to claim 1, is characterized in that: described linkage assembly comprises connecting rod and installs the connecting rod base of this connecting rod.
3. electric iron test machine according to claim 2, it is characterized in that: the peristaltic pump that described passway for water comprises graduated cylinder and is connected with graduated cylinder, this peristaltic pump is connected with described water tank by the first solenoid valve, and this graduated cylinder is connected with the electric iron of required test by the second solenoid valve.
4. electric iron test machine according to claim 3, is characterized in that: described jacking gear is cylinder.
5. electric iron test machine according to claim 4, it is characterized in that: described track-type facilities comprises the guide rod seat of guide rod and location guide, this guide rod is connected with described connecting rod base.
6. electric iron test machine according to claim 5, is characterized in that: described body is provided with multiple test suite along connecting rod direction.
7. electric iron test machine according to claim 6, is characterized in that: symmetrical two groups of multiple test suites on described body.
8. electric iron test machine according to claim 7, is characterized in that: symmetrical two groups of multiple test suites on described body, and often group is 6 test suites.
9. the electric iron test machine according to any one of claim 1-8, is characterized in that: described water tank supply soft water and hard water.
10. prepare a method for making for hard water needed for claim 9, it is characterized in that: comprise the following steps:
Step one: poured into by lime chloride in an electrical condenser, then adds pure water and carries out stirring until lime chloride all dissolves generation solution A;
Step 2: poured into by magnesium sulfate in an electrical condenser, then adds pure water and carries out stirring until magnesium sulfate all dissolves generation solution B;
Step 3: solution A and B solution are mixed, generates solution A B;
Step 4: poured into by sodium bicarbonate in an electrical condenser, then adds pure water and carries out stirring until sodium bicarbonate all dissolves generation solution C;
Step 5: solution C poured in solution A B and mix, generates solution A BC;
Step 6: add pure water in solution A BC and dilute, namely generate the hard water needed for test.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410379341.4A CN105319456A (en) | 2014-08-04 | 2014-08-04 | Electric iron tester and hard water manufacture method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410379341.4A CN105319456A (en) | 2014-08-04 | 2014-08-04 | Electric iron tester and hard water manufacture method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105319456A true CN105319456A (en) | 2016-02-10 |
Family
ID=55247285
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410379341.4A Pending CN105319456A (en) | 2014-08-04 | 2014-08-04 | Electric iron tester and hard water manufacture method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105319456A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107840434A (en) * | 2017-11-10 | 2018-03-27 | 岳京松 | The soft or hard water automatic preparation method in laboratory and device |
CN108205095A (en) * | 2016-12-16 | 2018-06-26 | 阿特斯阳光电力集团有限公司 | Connector testing device |
CN112415308A (en) * | 2020-11-03 | 2021-02-26 | 蒋玮 | Electric iron clamp structure and electric iron testing device |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101096817A (en) * | 2006-03-16 | 2008-01-02 | 多梅纳公司 | Ironing device |
CN202204876U (en) * | 2011-07-15 | 2012-04-25 | 上海天祥质量技术服务有限公司 | Endurance testing device for electric iron |
CN102654545A (en) * | 2011-03-01 | 2012-09-05 | 东莞市时唛特电器有限公司 | Equipment for testing service life of electric kettle |
CN202720290U (en) * | 2012-08-07 | 2013-02-06 | 慈溪市金泰日用品有限公司 | Test system of electric iron |
CN102998195A (en) * | 2012-11-29 | 2013-03-27 | 无锡众望四维科技有限公司 | Electric iron base plate coating abrasion tester |
CN102998135A (en) * | 2012-11-21 | 2013-03-27 | 陈伟 | Cordless electric iron plugging testing machine |
-
2014
- 2014-08-04 CN CN201410379341.4A patent/CN105319456A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101096817A (en) * | 2006-03-16 | 2008-01-02 | 多梅纳公司 | Ironing device |
CN102654545A (en) * | 2011-03-01 | 2012-09-05 | 东莞市时唛特电器有限公司 | Equipment for testing service life of electric kettle |
CN202204876U (en) * | 2011-07-15 | 2012-04-25 | 上海天祥质量技术服务有限公司 | Endurance testing device for electric iron |
CN202720290U (en) * | 2012-08-07 | 2013-02-06 | 慈溪市金泰日用品有限公司 | Test system of electric iron |
CN102998135A (en) * | 2012-11-21 | 2013-03-27 | 陈伟 | Cordless electric iron plugging testing machine |
CN102998195A (en) * | 2012-11-29 | 2013-03-27 | 无锡众望四维科技有限公司 | Electric iron base plate coating abrasion tester |
Non-Patent Citations (2)
Title |
---|
SGG158630: "硬水制作配方", 《百度文库:HTTP://WK.BAIDU.COM/VIEW/22D97E1659EEF8C75FBFB3C0》 * |
杨颐: "《当代农机实用新技术》", 31 December 1987 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108205095A (en) * | 2016-12-16 | 2018-06-26 | 阿特斯阳光电力集团有限公司 | Connector testing device |
CN107840434A (en) * | 2017-11-10 | 2018-03-27 | 岳京松 | The soft or hard water automatic preparation method in laboratory and device |
CN107840434B (en) * | 2017-11-10 | 2023-07-28 | 岳京松 | Automatic preparation method and device for soft and hard water in laboratory |
CN112415308A (en) * | 2020-11-03 | 2021-02-26 | 蒋玮 | Electric iron clamp structure and electric iron testing device |
CN112415308B (en) * | 2020-11-03 | 2024-06-11 | 蒋玮 | Electric iron clamp structure and electric iron testing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105319456A (en) | Electric iron tester and hard water manufacture method thereof | |
CN203349990U (en) | Hydraulic-pressure seal testing machine | |
CN204044256U (en) | Testing device for electric kettle connector | |
CN103758350A (en) | Air and electricity linkage device of full-automatic high-speed concrete spraying machine | |
CN103136994A (en) | Open programmable logic controller (PLC) electrical engineering practice device based on safety voltage | |
CN205635698U (en) | Axostylus axostyle quenches quick -wittedly | |
CN213749532U (en) | Testing device of industrial robot in power battery IPX9 | |
CN103048208A (en) | Diaphragm life-test rack | |
CN205427133U (en) | A stretcher for subway signal modules simulation tests | |
CN201688949U (en) | Automobile rubber pipe quick pressure measuring device | |
CN203178148U (en) | Membrane life-test rack | |
CN203080586U (en) | Automatic water replenishing device | |
CN215354913U (en) | Joint debugging detection system for centralized liquid supply system | |
CN202272004U (en) | Debugging terminal of passenger train toilet system | |
CN202011977U (en) | Weaving water washing liquid pH value adjusting device | |
CN201837901U (en) | Fully automatic water level controller | |
CN205049356U (en) | Train hood switching device wind energy test equipment | |
CN205085061U (en) | Production is with automatic dust removal, edulcoration device | |
CN206296625U (en) | A kind of robot automatic welding flexible welding clamp system | |
CN202471564U (en) | Ageing simulation device of cooling water pipe | |
CN210376525U (en) | Strapping machine running condition testing device | |
CN103817429A (en) | Intelligent direct current inverter type steel bar electroslag pressure welder | |
CN206772496U (en) | A kind of compound steelplastic pipe part air tightness detection machine of self-action curved straight pipe | |
CN206993528U (en) | A kind of multimode simple assembly and disassembling formula leak-testing instrument apparatus | |
CN201852599U (en) | Cleaning machine testing system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160210 |