CN105314537B - Lifting alignment in-place method for boiler water storing tank - Google Patents

Lifting alignment in-place method for boiler water storing tank Download PDF

Info

Publication number
CN105314537B
CN105314537B CN201510512296.XA CN201510512296A CN105314537B CN 105314537 B CN105314537 B CN 105314537B CN 201510512296 A CN201510512296 A CN 201510512296A CN 105314537 B CN105314537 B CN 105314537B
Authority
CN
China
Prior art keywords
place
lifting
storage tank
water storage
raising
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510512296.XA
Other languages
Chinese (zh)
Other versions
CN105314537A (en
Inventor
李义
许世猛
吕慧军
戴海涛
朱春宝
程铭
吴强强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Tianjin Electric Power Construction Co ltd
Original Assignee
China Energy Engineering Group Tianjin Electric Power Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Tianjin Electric Power Construction Co ltd filed Critical China Energy Engineering Group Tianjin Electric Power Construction Co ltd
Priority to CN201510512296.XA priority Critical patent/CN105314537B/en
Publication of CN105314537A publication Critical patent/CN105314537A/en
Application granted granted Critical
Publication of CN105314537B publication Critical patent/CN105314537B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a lifting alignment in-place method for a boiler water storing tank. The method includes the following steps that actual in-place installation elevation and horizontal and longitudinal locating positions of the water storing tank are determined; the situation that a pre-storing bearing steel frame cross beam meets the requirement of pre-storing load of the water storing tank is determined, and temporary reinforcing measures are prepared well; measure beams are pre-stored and the arranging positions of measure beams on steel frame beams are determined, a pair of polytetrafluoroethylene plates are put as pads at each corner of the four contact points, and temporary reinforcement is carried out; during lifting and pre-storing, front, back, left and right parts of a lifted object are accurately adjusted, the elevation and locating errors are controlled to be within +/-2 mm, and the elevation is at most 50 mm and lower than the actual height; after a suspension pipe of the water storing tank is installed in place, alignment of the water storing tank starts, front-back and right-left adjustment is conducted by means of the polytetrafluoroethylene plates pressed by the four bearing points, and lifting and alignment are prepared after data are checked and free of errors; 50-ton jacks at the four corners slowly lift, and shim plates are added along with lifting; and the positions under the four corners are compacted through wedged pad iron after lifting to be in place, and locating pins of the jacks are locked. According to the lifting alignment in-place method for the boiler water storing tank, usage is convenient, and a large quantity of manpower and material resources can be saved.

Description

Boiler water storage tank raising counterpart method in place
Technical field
The present invention relates to boiler water storage tank installing area, more particularly, to boiler water storage tank raising counterpart method in place.
Background technology
1050mw boiler water storage tank equipment in boiler factory weighs about (70-100) ton, and does not design the hanging system of equipment itself System, the connecting pipe erecting by overhang burden installed mainly by the later stage, and this overweight equipment early stage prestores to adopt (650-1000) more Ton crawler crane lifting prestores, and with the progress of engineering, after board roof hoisting finishes, large caterpillar is under normal circumstances also therewith Withdraw, leave lower physical notches to subsequent installation counterpart, most scenes need to return assembly pulley with hoist engine and carry out secondary lifting.
This programme by interim for equipment deposit position finely positioning by drawing, and by conventional pre- location mode shoulder pole girder Bottom arranges four 50 tons of hydraulic jack in advance, and the height that prestores slightly below designs height in place (20-50) mm, very heavy when prestoring Top do not exert oneself, after top connecting pipe and erecting by overhang install, with jack jacking in place and implement weld.
Content of the invention
After the purpose of the present invention avoids board roof hoisting to finish, the physical notches problem that exists, and boiler water storage tank is provided Raising counterpart method in place.
The present invention for achieving the above object, provides boiler water storage tank raising counterpart method in place, comprises the steps:
Confirm the actual installed height mark in place of water storage tank and horizontal, longitudinal register position;
The load-bearing steelframe crossbeam that confirms to prestore meets water storage tank and prestores loading, and carries out temperature pier measure, such as discontented full Border is hung thing and is prestored loading, using interim measure material bracing reinforcement;
Prestore measure beam determine measure beam in truss-steel beam putting position, first pads at the every angle of four contact points and puts a pair poly- four PVF plate, then carry out temperature pier;
Lifting will be hung thing when prestoring and all around be adjusted correctly, and absolute altitude and position error scope control, within ± 2mm, are marked Height is not more than 50mm in actual height;
Water storage tank column pipe install in place after, water storage tank counterpart starts, using the polytetrafluoroethylene (PTFE) that press against under 4 points of load-bearing Plate all around adjusts, and prepares raising counterpart after verification data is errorless;
The slow raising of 50 tons of corner jack, places parallels with raising;
Raising is padded with inclined sizing block below corner after putting in place, and jack locks alignment pin;
Complete counterpart and implement welding, inspection weld bond is qualified and determines interim measure off-the-line after the erecting by overhang stress of top.
Described measure beam is shoulder pole girder.
The invention has the beneficial effects as follows: boiler water storage tank raising counterpart of the present invention method in place, easy to use, permissible Save substantial amounts of manpower and materials, such as, save the large-scale crane cost renting or even hundreds of thousands tens of thousands of no less than machine-team and Large-scale crane need to use place;The scene of saving prepares two, two sets, more than 10 tons hoist engines of large pulley group, 10 single-sheaved blocks 14 Platform;Save extraordinary suspender lockset.
Specific embodiment
It is described in detail referring to the drawings below with reference to embodiments of the invention.
Boiler water storage tank raising counterpart method in place, comprises the steps:
Confirm the actual installed height mark in place of water storage tank and horizontal, longitudinal register position;
The load-bearing steelframe crossbeam that confirms to prestore meets water storage tank and prestores loading, and carries out temperature pier measure, such as discontented full Border is hung thing and is prestored loading, using interim measure material bracing reinforcement;
Prestore measure beam determine measure beam in truss-steel beam putting position, first pads at the every angle of four contact points and puts a pair poly- four PVF plate, then carry out temperature pier;
Lifting will be hung thing when prestoring and all around be adjusted correctly, and absolute altitude and position error scope control, within ± 2mm, are marked Height is not more than 50mm in actual height;
Water storage tank column pipe install in place after, water storage tank counterpart starts, using the polytetrafluoroethylene (PTFE) that press against under 4 points of load-bearing Plate all around adjusts, and prepares raising counterpart after verification data is errorless;
The slow raising of 50 tons of corner jack, places parallels with raising;
Raising is padded with inclined sizing block below corner after putting in place, and jack locks alignment pin;
Complete counterpart and implement welding, inspection weld bond is qualified and determines interim measure off-the-line after the erecting by overhang stress of top.
Described measure beam is shoulder pole girder.
The above is only the preferred embodiment of the present invention it is noted that ordinary skill people for the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (2)

1. boiler water storage tank raising counterpart method in place is it is characterised in that comprise the steps:
Confirm the actual installed height mark in place of water storage tank and horizontal, longitudinal register position;
The load-bearing steelframe crossbeam that confirms to prestore meets water storage tank and prestores loading, and carries out temperature pier measure, is such as unsatisfactory for actual hanging Thing prestores loading, using interim measure material bracing reinforcement;
Prestore measure beam determine measure beam in truss-steel beam putting position, first pads at the every angle of four contact points and puts a pair of polytetrafluoroethyl-ne Alkene plate, then carry out temperature pier;
Lifting will be hung thing when prestoring and all around be adjusted correctly, and, within ± 2mm, absolute altitude is low for absolute altitude and position error scope control It is not more than 50mm in actual height;
Water storage tank column pipe install in place after, water storage tank counterpart starts, before the polyfluortetraethylene plate that press against under 4 points of load-bearing Left and right adjustment afterwards, prepares raising counterpart after verification data is errorless;
The slow raising of 50 tons of corner jack, places parallels with raising;
Raising is padded with inclined sizing block below corner after putting in place, and jack locks alignment pin;
Complete counterpart and implement welding, inspection weld bond is qualified and determines interim measure off-the-line after the erecting by overhang stress of top.
2. boiler water storage tank raising counterpart according to claim 1 method in place is it is characterised in that described measure beam is flat Spreader beam.
CN201510512296.XA 2015-08-19 2015-08-19 Lifting alignment in-place method for boiler water storing tank Active CN105314537B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510512296.XA CN105314537B (en) 2015-08-19 2015-08-19 Lifting alignment in-place method for boiler water storing tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510512296.XA CN105314537B (en) 2015-08-19 2015-08-19 Lifting alignment in-place method for boiler water storing tank

Publications (2)

Publication Number Publication Date
CN105314537A CN105314537A (en) 2016-02-10
CN105314537B true CN105314537B (en) 2017-01-25

Family

ID=55242986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510512296.XA Active CN105314537B (en) 2015-08-19 2015-08-19 Lifting alignment in-place method for boiler water storing tank

Country Status (1)

Country Link
CN (1) CN105314537B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3926411A (en) * 1975-04-02 1975-12-16 Tegtmeier & Sons Lifting jack
DE2840528A1 (en) * 1978-09-18 1980-03-27 Kraftwerk Union Ag Horizontal cylindrical boiler support - has cradle with surface bearing against boiler periphery but not secured to it
CN102295227A (en) * 2010-06-23 2011-12-28 中国中轻国际工程有限公司 Hoisting method and mobile loading platform for economizer of alkali recovery furnace
CN203474218U (en) * 2013-08-30 2014-03-12 中国能源建设集团山西省电力建设四公司 Lifting rod fastening device on water-cooling wall of boiler in thermal power plant
CN103939875A (en) * 2014-05-23 2014-07-23 山东电力建设第三工程公司 Vertical type waste heat boiler module hanging construction method
CN104003312A (en) * 2014-06-04 2014-08-27 山东电力建设第一工程公司 Module type steam pocket lifting device
ES2529475A1 (en) * 2014-11-27 2015-02-20 Automatización, Telegestión Y Ahorro Energético, S.L. Water vapor boiler purge energy recovery equipment (Machine-translation by Google Translate, not legally binding)

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3926411A (en) * 1975-04-02 1975-12-16 Tegtmeier & Sons Lifting jack
DE2840528A1 (en) * 1978-09-18 1980-03-27 Kraftwerk Union Ag Horizontal cylindrical boiler support - has cradle with surface bearing against boiler periphery but not secured to it
CN102295227A (en) * 2010-06-23 2011-12-28 中国中轻国际工程有限公司 Hoisting method and mobile loading platform for economizer of alkali recovery furnace
CN203474218U (en) * 2013-08-30 2014-03-12 中国能源建设集团山西省电力建设四公司 Lifting rod fastening device on water-cooling wall of boiler in thermal power plant
CN103939875A (en) * 2014-05-23 2014-07-23 山东电力建设第三工程公司 Vertical type waste heat boiler module hanging construction method
CN104003312A (en) * 2014-06-04 2014-08-27 山东电力建设第一工程公司 Module type steam pocket lifting device
ES2529475A1 (en) * 2014-11-27 2015-02-20 Automatización, Telegestión Y Ahorro Energético, S.L. Water vapor boiler purge energy recovery equipment (Machine-translation by Google Translate, not legally binding)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
贮水箱双机抬吊、过程临抛吊装方案;王东;《今日机械工程》;20100605(第06期);第144-145页 *

Also Published As

Publication number Publication date
CN105314537A (en) 2016-02-10

Similar Documents

Publication Publication Date Title
CN104141383B (en) A kind of Bailey beam pendent form support system and construction thereof
CN203947771U (en) A kind of Bailey beam pendent form support system
CN103410094B (en) Installation construction method for bridge rigid hinge
CN106930541A (en) A kind of construction method of suspension type steel vestibule
CN105625581A (en) Bearer for gliding reticulated shell
CN103666494A (en) Coke oven column installation method
CN207294093U (en) A kind of large span steel truss integral lifting apparatus
CN106192776A (en) A kind of big Span Continuous Flexible arch bridge with steel truss beam free cantilever erection construction technology
CN106522101A (en) Construction method of superlong cable beam-free sections of cable-stayed bridge
CN104674665A (en) Installation method for corridor bridge of large space steel structure
CN104828758A (en) Thermal power generating unit draught fan structure support overall transfer device and transfer method
CN110499702A (en) A kind of cable saddle positioning reinforcing device of Cable-stayed Bridge Pylon
CN112554250A (en) Pile foundation building micro composite steel pipe pile underpinning inclination correcting structure and construction method thereof
CN111472353A (en) Reverse construction method steel pipe upright pile construction casing device and construction method thereof
CN102777044B (en) Hoisting method of steel-structured spraying layer of urea prilling tower
CN104775363B (en) The spelling method of upper king-post strut reinforcing bar sections
CN105314537B (en) Lifting alignment in-place method for boiler water storing tank
CN206205480U (en) A kind of interim steel pipe support prestressed reinforcement structure
CN104961058B (en) A kind of double Z shaped support steel beam and crane supporting member and preparation method containing it
CN107587770A (en) Disjunctor storehouse synchronization slding form operation method
CN101831916B (en) Method for mounting large-size sleeve bolt framework in combined type
CN206376275U (en) A kind of construction elevator base apparatus on basement roof
CN103754791A (en) Method for lifting water-tower 1000m<3> water tank by utilizing prestressed strands
CN111005324B (en) Support-free suspension and locking construction method for assembled type segmental box girder
CN105970988B (en) The construction method of elevator sidewall reinforcing bar is installed in raft foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant