CN206205480U - A kind of interim steel pipe support prestressed reinforcement structure - Google Patents

A kind of interim steel pipe support prestressed reinforcement structure Download PDF

Info

Publication number
CN206205480U
CN206205480U CN201621132247.XU CN201621132247U CN206205480U CN 206205480 U CN206205480 U CN 206205480U CN 201621132247 U CN201621132247 U CN 201621132247U CN 206205480 U CN206205480 U CN 206205480U
Authority
CN
China
Prior art keywords
steel
steel pipe
plate
pair
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621132247.XU
Other languages
Chinese (zh)
Inventor
吕文龙
马奎
黄志涛
彭发英
刘恋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Jianke Construction Engineering Technology Development Co ltd
Original Assignee
GUANGDONG JIANKE CONSTRUCTION ENGINEERING TECHNOLOGY DEVELOPMENT Co Ltd
Guangdong Provincial Academy of Building Research Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG JIANKE CONSTRUCTION ENGINEERING TECHNOLOGY DEVELOPMENT Co Ltd, Guangdong Provincial Academy of Building Research Group Co Ltd filed Critical GUANGDONG JIANKE CONSTRUCTION ENGINEERING TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201621132247.XU priority Critical patent/CN206205480U/en
Application granted granted Critical
Publication of CN206205480U publication Critical patent/CN206205480U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of interim steel pipe support prestressed reinforcement structure, including the first supporting construction, first supporting construction is mainly made up of two sections of steel pipes and a pair of steel plates, two sections of steel pipes are vertically arranged and dock, steel pipe above is epimere steel pipe, epimere steel pipe is applied with the prestressing force produced by jacking, underlying steel pipe is hypomere steel pipe, one of steel plate is used to be connected with the structural elements of floor top surface, referred to as upper steel plate, the upper steel plate is fixed on the upper end of epimere steel pipe, another block of steel plate is used to be connected with the structural elements of floor bottom surface, referred to as lower steel plate, the lower steel plate is fixed on the lower end of hypomere steel pipe.The utility model can solve existing steel pipe support stress lag issues, flexible arrangement, expand the scope of application, production equipment is not interfered with construction period normally to run, in work progress, the set location of steel ox pin can be according to actual conditions flexible arrangement, convenient construction while realizing rationally utilizing construction space.

Description

A kind of interim steel pipe support prestressed reinforcement structure
Technical field
The utility model is related to Structures Reinforced Technique, more particularly to a kind of interim steel pipe support for being capable of flexible arrangement Prestressed reinforcement structure.
Background technology
Building structure strengthening, as the term suggests it is exactly the stability for strengthening building structure.Passed through during building structure strengthening The hypodynamic problem of post load bearing beam can often be run into, it is necessary to by setting up interim steel pipe support to being unsatisfactory for the framework of requirement for bearing capacity Post beam carries out part and the consolidation process such as underpins.
The construction of traditional interim steel pipe support is usually directly to need Support Position to set up interim steel pipe support.But, There is following defect in this mode for directly setting up interim steel pipe support:
(1) steel pipe support stress is delayed, and support stress it is delayed can cause structural elements produce slight deformation, cause unfavorable Influence.
(2) the bottom of steel pipe support supports on the ground, therefore, in the case of ground space deficiency, it is impossible to directly arrange Steel pipe support, so that the applicable situation of steel pipe support is very limited, construction is inconvenient, it is impossible to construction quality is effectively ensured.
(3), if in interim steel pipe Construction of Supporting is carried out in factory building, production equipment is inevitably located at steel pipe support Side, construction when, production equipment need stop production, larger economic loss can be brought to enterprise.
Utility model content
The purpose of this utility model is to provide a kind of simple structure, low cost of manufacture, easy construction, ensure that engineering The interim steel pipe support prestressed reinforcement structure of quality.
Above-mentioned purpose of the present utility model is realized by following technical measures:A kind of interim steel pipe support prestressing force adds Fixing structure, it is characterised in that:It includes the first supporting construction, and first supporting construction is main by two sections of steel pipes and a pair of steel plates Composition, two sections of steel pipes are vertically arranged and dock, and steel pipe above is epimere steel pipe, and the epimere steel pipe is applied with logical The prestressing force of jacking generation is crossed, underlying steel pipe is hypomere steel pipe, and one of steel plate is used for the structure with floor top surface Component is connected, referred to as upper steel plate, and the upper steel plate is fixed on the upper end of epimere steel pipe, and another block of steel plate is used for and floor bottom surface Structural elements connection, referred to as lower steel plate, the lower steel plate is fixed on the lower end of hypomere steel pipe.
Epimere steel pipe of the present utility model is applied with the prestressing force formed by jacking, can well solve existing steel pipe The delayed problem of support stress, and, the utility model flexible arrangement greatly expands the suitable of pre-stressed steel pipe temporary support Use scope.In addition, set location of the present utility model can avoid the location of production equipment according to on-site actual situations, applying The normal operation of production equipment is not interfered between the duration, so as to avoid bringing larger economic loss to enterprise;In work progress In, the set location of steel ox pin can be being realized rationally using construction space while side according to actual conditions flexible arrangement Just construct.The utility model simple structure, low cost of manufacture, easy construction, ensure that construction quality.
Used as a kind of implementation method of the present utility model, two sections of steel pipes are docked by a pair of curved plates, this pair of arc The inner surface of shape steel plate is adapted with the outside wall surface of two sections of steel pipes, and this pair of curved plate is symmetrically welded at two sections of steel pipe docking sites Outside wall surface on.
Used as a kind of implementation method of the present utility model, the length of the curved plate is more than or equal to 200mm, this pair of arc The distance between edges of boards of shape steel plate are 30~50mm.
As a kind of improvement of the present utility model, the second support knot is had additional between the lower steel plate and hypomere steel pipe Structure, second supporting construction is mainly made up of a pair of steel pipes, ribbed stiffener and H profile steels, and the lower steel plate is a pair, this pair of lower steel Plate is separately fixed on the lower end of the steel pipe of second supporting construction, and the ribbed stiffener is located at the steel pipe of the second supporting construction On the outer wall circumference of the lower end of upper end and hypomere steel pipe, the lower end of the hypomere steel pipe and ribbed stiffener thereon are fixed on institute jointly State on the top flange of H profile steel, and the upper end of the steel pipe of second supporting construction and ribbed stiffener thereon are fixed on the H jointly On the lower flange of shaped steel.
As a kind of preferred embodiment of the present utility model, the lower end of the epimere steel pipe and the upper end of hypomere steel pipe it Between distance be 0~5mm.
Used as a kind of implementation method of the present utility model, the length of the steel pipe of second supporting construction is identical, described to be somebody's turn to do Thickness to lower steel plate is identical so that H profile steel is horizontally disposed.
Compared with prior art, the utility model has following significant effect:
(1) the utility model applies prestressing force by jack jacking to epimere steel pipe, and existing steel pipe branch is solved well The delayed problem of support stress.
(2) the utility model has numerous embodiments, therefore, set location of the present utility model can be according to live actual Situation avoids the location of production equipment, the normal operation of production equipment is not interfered with construction period, so as to avoid to enterprise Industry brings larger economic loss.
(3) steel ox pin of the present utility model applies prestressed intermediary as to epimere steel pipe, and its position for setting can be with root According to actual conditions flexible arrangement, can realize rationally using construction space while convenient construction.
(4) the utility model flexible arrangement, greatly expands the scope of application of pre-stressed steel pipe temporary support.
The utility model simple structure, low cost of manufacture, easy construction, ensure that construction quality.
Brief description of the drawings
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Fig. 1 is the structural representation (being not drawn into curved plate) of the utility model embodiment 1;
Fig. 2 is that the structure perspective of curved plate connection epimere steel pipe and hypomere steel pipe in the utility model embodiment 1 is illustrated Figure;
Fig. 3 is the structural representation (being not drawn into curved plate) in the work progress of the utility model embodiment 1;
Fig. 4 is the structural representation (being not drawn into curved plate) of the utility model embodiment 2;
Fig. 5 is one of the structural representation in the work progress of the utility model embodiment 2 (being not drawn into curved plate);
Fig. 6 is two (being not drawn into curved plate) of the structural representation in the work progress of the utility model embodiment 2.
Specific embodiment
Embodiment 1
As illustrated in fig. 1 and 2, it is a kind of interim steel pipe support prestressed reinforcement structure of the utility model, it includes first Support structure, the first supporting construction is mainly made up of two sections of steel pipes and a pair of square plates, and the size of square plate should be according to reality Needs and related current specifications, code etc. determine that steel pipe uses seamless steel pipe, and two sections of steel pipes are vertically arranged and dock, positioned at upper The steel pipe of side is epimere steel pipe 1, and epimere steel pipe 1 is applied with the prestressing force produced by jacking, and underlying steel pipe is hypomere Steel pipe 2, one of steel plate is used to be connected with the structural elements 16 of floor top surface, referred to as upper steel plate 3, structural elements 16 be beam or Plate etc., upper steel plate 3 is connected by chemical anchor bolts 18 with beam or plate, and the size and number of chemical anchor bolts should according to actual needs and phase Current specifications, code etc. is closed to determine.The upper steel plate 3 is fixed on the upper end of epimere steel pipe 1, and another block of steel plate is used for and floor The structural elements 17 of bottom surface is connected, referred to as lower steel plate 4, and structural elements 17 is beam or plate etc., lower steel plate 4 by chemical anchor bolts 18 with Beam or plate are connected, and the lower steel plate 4 is fixed on the lower end of hypomere steel pipe 2.
The distance between the lower end of epimere steel pipe 1 and the upper end of hypomere steel pipe 2 are 0~5mm.In the present embodiment, epimere Steel pipe 1 and hypomere steel pipe 2 are docked by a pair of curved plates 5, and the length of curved plate 5 is more than or equal to 200mm.This pair of arc The inner surface of steel plate 5 is adapted with the outside wall surface of epimere steel pipe 1 and hypomere steel pipe 2, and this pair of curved plate 5 is symmetrically welded at epimere In the outside wall surface of steel pipe 1 and the docking site of hypomere steel pipe 2, the distance between this pair of edges of boards of curved plate 5 are 30~50mm.
As shown in figure 3, the construction method of above-mentioned interim steel pipe support prestressed reinforcement structure, comprises the following steps:
(1) upper steel plate 3 and lower steel plate 4 are separately fixed on the structural elements of floor top surface and bottom surface;
(2) the upper end of epimere steel pipe 1 is fixed on upper steel plate 3, and the lower end of hypomere steel pipe 2 is fixed on lower steel plate 4, And epimere steel pipe 1 is located at the surface of hypomere steel pipe 2;
(3) a pair of steel ox pin 6 and two blocks of vertical steel plates 7 are used, and a wherein side of two blocks of vertical steel plates 7 is respectively welded at On the outer wall of epimere steel pipe 1, to be arranged symmetrically, every piece of another side of vertical steel plate 7 passes through high-strength bolt to two blocks of vertical steel plates 7 19 one steel ox pin 6 of connection;Should be according to actual needs with the number and size of the high-strength bolt 19 of steel plate for connecting steel ox pin And related current specifications, code etc. determine.
(4) the supporting steel plate 8 for fixing on the ground is set in the underface of each steel ox pin 6, is set on supporting steel plate 8 One jack 9, prestressing force is applied by the jacking steel ox pin 6 of jack 9 to epimere steel pipe 1;The prestressing force that jack applies answers root According to being actually needed and related current specifications, code etc. determine.
(5) after having applied prestressing force, the upper end of the lower end of epimere steel pipe 1 and hypomere steel pipe 2 is docked;Specifically use one Curved plate 5 is symmetrically welded in the outside wall surface of epimere steel pipe 1 and the docking site of hypomere steel pipe 2, as shown in Figure 2.
(6) jack 9, steel ox pin 6 and vertical steel plate 7 are removed, interim steel pipe support prestressed reinforcement structure is obtained.
Embodiment 2
As shown in figure 4, the present embodiment is with the difference of embodiment 1:Increase between lower steel plate 4 and hypomere steel pipe 2 The second supporting construction is provided with, the second supporting construction is mainly made up of a pair of steel pipes 12, ribbed stiffener 10 and H profile steels 11, steel pipe is used Seamless steel pipe, lower steel plate 4 is a pair, and this pair of lower steel plate 4 is separately fixed on the lower end of steel pipe 12 of the second supporting construction, steel pipe 12 length is identical, and the thickness of this pair of lower steel plate 4 is identical so that H profile steel 11 is horizontally disposed, and ribbed stiffener 10 is located at the second support On the outer wall circumference of the upper end of the steel pipe 12 of structure and the lower end of hypomere steel pipe 2, the lower end of hypomere steel pipe 2 and ribbed stiffener thereon 10 are fixed on the top flange of H profile steel 11 jointly, and the upper end of the steel pipe 12 of the second supporting construction and ribbed stiffener 10 thereon are common It is same to be fixed on the lower flange of H profile steel 11.
As shown in figure 5, the construction method of above-mentioned interim steel pipe support prestressed reinforcement structure, comprises the following steps:
(1) this pair of lower steel plate 4 is fixed on the structural elements of floor bottom surface, then by a pair of steel pipes of the second supporting construction 12 lower end is separately fixed on lower steel plate 4;
The second supporting construction this pair of steel pipe 12 upper end outer wall circumference soldering ribbed stiffener 10, then by this pair of steel pipe 12 Upper end and ribbed stiffener 10 thereon be welded on jointly on the lower flange of H profile steel 11;
(3) in the lower end outer wall circumference soldering ribbed stiffener 10 of hypomere steel pipe 2, then by the lower end of hypomere steel pipe 2 and thereon plus Strength rib 10 is welded on the top flange of H profile steel 11 jointly;
(4) be arranged above upper steel plate 3 in hypomere steel pipe 2, will upper steel plate 3 be fixed on the structural elements of floor top surface On, then the upper end of epimere steel pipe 2 is fixed on upper steel plate 3;
(5) a pair of steel ox pin 6 and two blocks of vertical steel plates 7 are used, a wherein side of two blocks of vertical steel plates 7 is welded on On the outer wall of Duan Gangguan 1, to be arranged symmetrically, another side of each vertical steel plate 7 passes through high-strength bolt 19 to two blocks of vertical steel plates 7 One steel ox pin 6 of connection;
(6) the supporting steel plate 8 being fixed on loading end is set in the underface of each steel ox pin 6, in the present embodiment, is held Section is the upper surface of the top flange of H profile steel 11, and a jack 9 is set on supporting steel plate 8, by the jacking steel ox of jack 9 Pin 6 applies prestressing force to epimere steel pipe 1;
(7) after having applied prestressing force, the upper end of the lower end of epimere steel pipe 1 and hypomere steel pipe 2 is docked;Specifically use one Curved plate 5 is symmetrically welded in the outside wall surface of epimere steel pipe 1 and the docking site of hypomere steel pipe 2;
(8) jack 9, steel ox pin 6 and vertical steel plate 7 are removed, interim steel pipe support prestressed reinforcement structure is obtained.
Embodiment 3
As shown in fig. 6, the present embodiment is with the difference of embodiment 2:Step (5) in, also using another pair steel Ox pin 13 and other two blocks of vertical steel plates 14, the outer of hypomere steel pipe 2 is welded on by a wherein side of this two blocks vertical steel plates 14 On wall, to be arranged symmetrically, another side of each vertical steel plate 14 connects one to two blocks of vertical steel plates 14 by high-strength bolt 19 Steel ox pin 13, the steel ox pin 13 on hypomere steel pipe 2 and the steel ox pin on epimere steel pipe 1 are relative about 6;In step (6) In, supporting steel plate 15 is fixed on the upper surface of each the steel ox pin 13 on hypomere steel pipe 2, set on supporting steel plate 15 One jack 9, the steel ox pin 6 being located at by the jacking of jack 9 on epimere steel pipe 1 applies prestressing force to epimere steel pipe 1, that is, carry Face is the upper surface of the steel ox pin 13 being located on hypomere steel pipe 2.
Seamless steel pipe diameter and thickness should be according to actual needs and related current specifications, code etc. determine existing according to construction Field situation seamless steel pipe can be divided into four sections of steel pipes of the two sections of steel pipes or embodiment 2 using embodiment 1:When needing arrangement prestress When steel pipe support locational space is enough, using two sections of seamless steel pipes;There is equipment when arrangement prestress steel pipe support position is needed Or because other reasonses cause insufficient space, when steel pipe can not directly fall in underface, using four sections of seamless steel pipes.
When seamless steel pipe uses two sections of seamless steel pipes, the length of two ends seamless steel pipe can be actually needed according to scene to be adjusted It is whole, but after the completion of steel pipe arrangement, the spacing of epimere steel pipe and hypomere steel pipe should be between 0~5mm.
When seamless steel pipe uses four sections of seamless steel pipes, epimere, hypomere, the length of a pair of seamless steel pipes of the second supporting construction Can be actually needed according to scene and be adjusted, but the length of a pair of seamless steel pipes of the second supporting construction should be identical, with this pair of nothing The thickness for stitching the steel plate of fastener for connection should be identical, and after the completion of steel pipe arrangement, epimere should be in 0~5mm with the spacing of hypomere steel pipe Between.
The structural elements, its bearing capacity such as beam that floor top surface and bottom surface are connected with square plate by chemical anchor bolts or plate And construction should meet the regulation of interim pre-stressed steel pipe support arrangement and the requirement that uses and related current specifications, code etc., no The position of satisfaction requirement should be again chosen when meeting or takes corresponding strengthening measure to meet dependency structure component and required, Ran Houzai Arrange interim pre-stressed steel pipe supporting construction.
The size of ribbed stiffener should according to actual needs and related current specifications, code etc. determine.For bottom steel pipe top And the weld size and related request of middle part steel pipe lower section and ribbed stiffener, for the weld seam that steel pipe and ribbed stiffener are connected with H profile steel Size and related request, all should according to actual needs and related current specifications, code etc. determine.
The size of steel ox pin should according to actual needs and related current specifications, code etc. determine, according to job site situation Steel ox pin can use two or four:When nearby space is enough for arrangement prestress steel pipe support position, using two steel ox pin, Each steel ox pin is attached with one block of steel plate by high-strength bolt respectively;Exist near arrangement prestress steel pipe support position Equipment or because other reasonses cause the insufficient space, jack can not to directly fall in when on floor ground or H profile steel beam, using four Individual steel ox pin, each steel ox pin is attached with one block of steel plate by high-strength bolt respectively.
The vertical steel plate being connected with steel ox pin:During using two steel ox pin, the vertical steel plate being connected with steel ox pin should pass through Welding manner is connected with top seamless steel pipe, and two pieces of vertical steel plate replies claim arrangement, and arrangement height is according to needed for jack arrangement Height and below steel plate thickness determine;During using four steel ox pin, wherein two blocks of vertical steel plates should be distinguished by welding manner Be connected with top seamless steel pipe, in addition two blocks of vertical steel plates should by welding manner respectively with top seamless steel pipe immediately below nothing Seam fastener for connection, four blocks of vertical steel plates should arrange symmetrical and consistency from top to bottom that arrangement spacing is high according to needed for jack arrangement two-by-two Degree and below steel plate determine.
The size of the vertical steel plate connected to steel ox pin should according to actual needs and the determination such as related current specifications, code.
The vertical steel plate being connected with steel ox pin is attached with seamless steel pipe using welding manner, the size and correlation of weld seam It is required that should according to actual needs and related current specifications, code etc. determine.
Jack is two, and supporting steel plate is placed in jack lower section, and jack should be after steel ox pin be installed, difference frame It is located at immediately below the steel ox pin of upper end two, prestressing force is applied as needed.The size of the supporting steel plate that jack lower section is placed should According to actual needs and related current specifications, code etc. determine.
Jack supported underneath steel plate is placed under floor when on the structural elements such as square beam or plate, and these structural elements hold Loading capability and construction should meet interim jack arrangement and apply the rule of prestressed requirement and related current specifications, code etc. It is fixed, should again choose to meet desired position or take corresponding strengthening measure to meet dependency structure component when being unsatisfactory for and require, Then supporting steel plate and its top jack are arranged again.
Two pieces of curved plate sizes for being fixedly connected top seamless steel pipe extremely underface seamless steel pipe answer complete phase Together, curved plate height according to actual needs and related current specifications, code etc. determine, but should be not less than 200mm, internal diameter and nothing Seam outer diameter of steel pipes is identical, many 2mm of wall ratio wall thickness of seamless steel tube.Two pieces of curved plates should be symmetrically welded, the arc length of curved plate Should meet the following requirements:For convenience of constructing, two pieces of curved plates are fixed on when on seamless steel pipe by welding manner, curved plate The distance between edges of boards should be between 30~50mm.
Curved plate should be according to reality with the weld size and related request of top seamless steel pipe and its underface seamless steel pipe Border needs and related current specifications, code etc. determine.
Implementation method not limited to this of the present utility model, according to the above of the present utility model, according to the general of this area Logical technological know-how and customary means, under the premise of the above-mentioned basic fundamental thought of the utility model is not departed from, the utility model may be used also To make the modification of other diversified forms, replace or change, all fall within the utility model rights protection scope.

Claims (6)

1. a kind of interim steel pipe support prestressed reinforcement structure, it is characterised in that:It includes the first supporting construction, described first Support structure is mainly made up of two sections of steel pipes and a pair of steel plates, and two sections of steel pipes are vertically arranged and dock, steel pipe above It is epimere steel pipe, the epimere steel pipe is applied with the prestressing force produced by jacking, underlying steel pipe is hypomere steel pipe, its In one block of steel plate be used to be connected with the structural elements of floor top surface, referred to as upper steel plate, the upper steel plate is fixed on the upper of epimere steel pipe On end, and another block of steel plate is used to be connected with the structural elements of floor bottom surface, referred to as lower steel plate, and the lower steel plate is fixed on hypomere steel On the lower end of pipe.
2. interim steel pipe support prestressed reinforcement structure according to claim 1, it is characterised in that:Two sections of steel pipes lead to A pair of curved plate docking are crossed, this pair of inner surface of curved plate is adapted with the outside wall surface of two sections of steel pipes, this pair of curved plate It is symmetrically welded in two sections of outside wall surfaces of steel pipe docking site.
3. interim steel pipe support prestressed reinforcement structure according to claim 2, it is characterised in that:The curved plate It is 30~50mm that length is more than or equal to the distance between 200mm, this pair of edges of boards of curved plate.
4. interim steel pipe support prestressed reinforcement structure according to claim 3, it is characterised in that:The lower steel plate with The second supporting construction is had additional between hypomere steel pipe, second supporting construction is main by a pair of steel pipes, ribbed stiffener and H profile steel groups Into the lower steel plate is a pair, and this pair of lower steel plate is separately fixed on the lower end of the steel pipe of second supporting construction, described to add Strength rib is located on the outer wall circumference of the lower end of the upper end and hypomere steel pipe of the steel pipe of the second supporting construction, under the hypomere steel pipe End and ribbed stiffener thereon are fixed on the top flange of the H profile steel jointly, and the upper end of the steel pipe of second supporting construction And ribbed stiffener thereon is fixed on the lower flange of the H profile steel jointly.
5. interim steel pipe support prestressed reinforcement structure according to claim 4, it is characterised in that:The epimere steel pipe The distance between upper end of lower end and hypomere steel pipe is 0~5mm.
6. interim steel pipe support prestressed reinforcement structure according to claim 5, it is characterised in that:The second support knot The length of the steel pipe of structure is identical, and the thickness of this pair of lower steel plate is identical so that H profile steel is horizontally disposed.
CN201621132247.XU 2016-10-18 2016-10-18 A kind of interim steel pipe support prestressed reinforcement structure Withdrawn - After Issue CN206205480U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621132247.XU CN206205480U (en) 2016-10-18 2016-10-18 A kind of interim steel pipe support prestressed reinforcement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621132247.XU CN206205480U (en) 2016-10-18 2016-10-18 A kind of interim steel pipe support prestressed reinforcement structure

Publications (1)

Publication Number Publication Date
CN206205480U true CN206205480U (en) 2017-05-31

Family

ID=58758544

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621132247.XU Withdrawn - After Issue CN206205480U (en) 2016-10-18 2016-10-18 A kind of interim steel pipe support prestressed reinforcement structure

Country Status (1)

Country Link
CN (1) CN206205480U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351462A (en) * 2016-10-18 2017-01-25 广东省建筑科学研究院集团股份有限公司 Temporary steel pipe supported prestressed reinforcement structure and construction method thereof
CN108843008A (en) * 2018-06-05 2018-11-20 广东省建筑科学研究院集团股份有限公司 A kind of postposition H profile steel builder's jack and its construction method
CN109629847A (en) * 2019-01-20 2019-04-16 南京工业大学 A kind of ruggedized construction and method of rectangular section axial compression reinforced column

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351462A (en) * 2016-10-18 2017-01-25 广东省建筑科学研究院集团股份有限公司 Temporary steel pipe supported prestressed reinforcement structure and construction method thereof
CN106351462B (en) * 2016-10-18 2023-01-13 广东省建筑科学研究院集团股份有限公司 Temporary steel pipe support prestress reinforcing structure and construction method thereof
CN108843008A (en) * 2018-06-05 2018-11-20 广东省建筑科学研究院集团股份有限公司 A kind of postposition H profile steel builder's jack and its construction method
CN109629847A (en) * 2019-01-20 2019-04-16 南京工业大学 A kind of ruggedized construction and method of rectangular section axial compression reinforced column

Similar Documents

Publication Publication Date Title
CN106351462A (en) Temporary steel pipe supported prestressed reinforcement structure and construction method thereof
WO2022062294A1 (en) Suspension connection node for large-span cantilever steel truss and construction method therefor
CN106836498B (en) Hoisting construction method for steel truss of grand stand roof of super-large span stadium
CN102642247B (en) Prefabricated steel reinforced concrete (psrc) column using angle steels and method of constructing prefabricated steel reinforced concrete (psrc) column using angle steels
CN104141383A (en) Bailey beam suspension formwork supporting system and construction method thereof
CN206205480U (en) A kind of interim steel pipe support prestressed reinforcement structure
CN105625581A (en) Bearer for gliding reticulated shell
CN203947771U (en) A kind of Bailey beam pendent form support system
CN102296858A (en) Roof steel structure for cement production line clinker warehouse and construction method thereof
CN109763835A (en) A kind of shield machine reception steel platform
CN104674665A (en) Installation method for corridor bridge of large space steel structure
CN107336346A (en) A kind of beam making bench
CN107489163B (en) method for mounting ring bolt of metallurgical industrial furnace body
CN110409624B (en) Reverse calculation and construction method for large equipment installation and main body structure
CN105317052A (en) Tower crane foundation bolt fixing method
CN213953189U (en) Supporting device for ensuring smooth surface of lower cone shell of prefabricated water tank
CN107267165B (en) A kind of dry coke quenching furnace body is circular layout pre-embedded bolt fixed structure and installation method
CN106703073B (en) Super High building hoist exempts from return back to top steel beam foundation and its construction method
CN206512931U (en) A kind of working iron railing stool of building floor
CN104961058B (en) A kind of double Z shaped support steel beam and crane supporting member and preparation method containing it
CN107587770A (en) Disjunctor storehouse synchronization slding form operation method
CN215441984U (en) Steel pipe truss roof section steel conducting column temporary supporting foundation device
CN210482635U (en) Concrete pillar reinforcing structure at lower part of shock insulation support
CN113668773A (en) Y-shaped cast steel column and mounting process thereof
CN206982971U (en) A kind of beam making bench

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200113

Address after: 510500 No. 121 martyrs East Road, Guangzhou, Guangdong, Tianhe District

Patentee after: GUANGDONG JIANKE CONSTRUCTION ENGINEERING TECHNOLOGY DEVELOPMENT Co.,Ltd.

Address before: 510500 No. 121 martyrs East Road, Guangzhou, Guangdong, Tianhe District

Co-patentee before: GUANGDONG JIANKE CONSTRUCTION ENGINEERING TECHNOLOGY DEVELOPMENT Co.,Ltd.

Patentee before: GUANGDONG PROVINCIAL ACADEMY OF BUILDING RESEARCH GROUP Co.,Ltd.

TR01 Transfer of patent right
AV01 Patent right actively abandoned

Granted publication date: 20170531

Effective date of abandoning: 20230113

AV01 Patent right actively abandoned

Granted publication date: 20170531

Effective date of abandoning: 20230113

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned