CN105305629B - Method of work for the Automatic safety control system for island detection of distributed energy - Google Patents

Method of work for the Automatic safety control system for island detection of distributed energy Download PDF

Info

Publication number
CN105305629B
CN105305629B CN201510719147.0A CN201510719147A CN105305629B CN 105305629 B CN105305629 B CN 105305629B CN 201510719147 A CN201510719147 A CN 201510719147A CN 105305629 B CN105305629 B CN 105305629B
Authority
CN
China
Prior art keywords
electrical source
distributed
frequency
distributed electrical
net side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510719147.0A
Other languages
Chinese (zh)
Other versions
CN105305629A (en
Inventor
曹良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Changzhou Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Changzhou Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Changzhou Power Supply Co of Jiangsu Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN201510719147.0A priority Critical patent/CN105305629B/en
Publication of CN105305629A publication Critical patent/CN105305629A/en
Application granted granted Critical
Publication of CN105305629B publication Critical patent/CN105305629B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/40Synchronising a generator for connection to a network or to another generator
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/388Islanding, i.e. disconnection of local power supply from the network
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/20Systems supporting electrical power generation, transmission or distribution using protection elements, arrangements or systems

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention relates to a kind of method of work of the Automatic safety control system for island detection for distributed energy:It is installed in the control terminal-pair of the distributed electrical source distributed power source and synchronizes measurement frequency, and stamp markers, synchro measure frequency data is sent to public power net side by 3G network;The control terminal-pair utility network for being installed in public power net side synchronizes measurement frequency, and stamps markers, while receives the synchro measure frequency data sent on distributed electrical source;The control terminal of public power net side is installed according to markers, public power net side and the frequency difference of distributed electrical source are calculated, if the frequency difference sends trip signal after 150 millisecond time-delay more than a set action value to distributed electrical source;If the frequency difference not less than the set action value, then calculates frequency difference energy product score value K beyond a setting initiation valuedf;If KdfMore than a frequency difference energy integral setting value, then trip signal is sent to distributed electrical source.

Description

Method of work for the Automatic safety control system for island detection of distributed energy
The application is Application No.:201210515888.3 invention and created name is《Isolated island for distributed energy is examined The automated security control system of survey》, the applying date is:The divisional application of the application for a patent for invention on December 5th, 2012.
Technical field
The present invention relates to technical field of electric power, more particularly to a kind of isolated island for distributed energy based on 3G network is examined The automated security control system of survey.
Background technology
So-called island phenomenon, refers in distributed generation system, when power network power supply is jumped because of failure accident or power failure maintenance After lock, the distributed grid-connected electricity generation system of each user terminal fails to detect power down mode in time so as to which itself is cut off into utility grid Network, ultimately form the isolated island generating system for a self-energizing being made up of distributed power station grid-connected system and its connected load System.The generation of island effect can bring serious potential safety hazard to system equipment and related personnel, including:(1)Island effect makes Voltage and frequency are out of hand, and larger fluctuation will occur for the voltage and frequency in islanded system, so as to power network and user Equipment causes to damage;(2)When islanded system is accessed power network again, distributed power generation unit during due to reclosing in system can Can be asynchronous with power network and release unit is damaged, and there may be very high dash current, so as to damage isolated island Distributed power generation unit in system, even result in power network and trip again;(3)Island effect may cause failure to remove, So as to cause the infringement of grid equipment, and the automatic or manual of power network normal power supply system is disturbed to recover;(4)Island effect makes Obtaining some is considered as powered with the circuit of all power supplys disconnection, and this can bring the danger of electric shock to related personnel.Therefore exist In distributed generation system, if in public power net side quick obtaining isolated island information and emergent control can be carried out, it can avoid Personnel and equipment breakdown occur.
The isolated island protection of distributed generation system has two kinds, based on the local electrical quantities collected by monitoring grid-connecting apparatus With the anti-islanding protection based on communication.Isolated island protection based on communication is divided into the protection of intertripping isolated island and the protection of carrier wave isolated island Deng.Traditional intertripping isolated island protection wiring is complicated, it is necessary to connect substantial amounts of control cable.Isolated island based on local measurement is protected Shield is protected comprising passive type and active alone island, and the protection of passive type isolated island is there is check frequency, and active alone island protection needs Disturbing signal is added to system, and can only be installed in distributed electrical source.
The content of the invention
The technical problem to be solved in the present invention is to propose a kind of automated security control system suitable for anti-isolated island defencive function.
In order to solve the above technical problems, the automated security control system of the offer of the present invention, including:
The control terminal of distributed electrical source is installed in, for synchronizing measurement frequency to the distributed power source, and is beaten Upper markers, synchro measure frequency data are sent to public power net side by 3G network;
The control terminal of public power net side is installed in, for synchronizing measurement frequency to utility network, and stamps markers, Receive the synchro measure frequency data sent on distributed electrical source simultaneously;
The control terminal of public power net side is installed according to markers, calculates the frequency of public power net side and distributed electrical source Difference, if the frequency difference is more than a set action value(The set action value is generally ± 0.5Hz, and concrete numerical value refers to national grid Incorporated business standard Q/GDW617-2011:Photovoltaic plant access electric power network technique regulation), by given delay(Generally less than 160 milliseconds)Backward distributed electrical source sends trip signal;If the frequency difference is beyond a setting initiation value(Generally 0.1Hz, setting initiation value requirement are more than terminal acquisition precision), but not less than the set action value, then using equation below (1)Calculate frequency difference energy product score value Kdf
…(1)
In formula, Df:The frequency difference of public power net side and distributed electrical source;
If KdfMore than a frequency difference energy integral setting value, then trip signal is sent to distributed electrical source.
The control terminal of distributed electrical source is installed in, in the trip signal for the control terminal for receiving public power net side Afterwards, the grid-connected breaker of tripping, island operation state is eliminated.
The method of work of the automated security control system, including:
The control terminal of distributed electrical source is installed in, for synchronizing measurement frequency to the distributed power source, and is beaten Upper markers, synchro measure frequency data are sent to public power net side by 3G network;
The control terminal of public power net side is installed in, for synchronizing measurement frequency to utility network, and stamps markers, Receive the synchro measure frequency data sent on distributed electrical source simultaneously;
The control terminal of public power net side is installed according to markers, calculates the frequency of public power net side and distributed electrical source Difference, if the frequency difference is more than a set action value(The set action value is generally ± 0.5Hz, and concrete numerical value refers to national grid Incorporated business standard Q/GDW617-2011:Photovoltaic plant access electric power network technique regulation), then to distribution after 150 millisecond time-delay Formula mains side sends trip signal;If the frequency difference is beyond a setting initiation value(Generally 0.1Hz, the setting initiation value will Ask and be more than terminal acquisition precision), but not less than the set action value, then using equation below(1)Calculate frequency difference energy integral Value Kdf
…(1)
In formula, Df:The frequency difference of public power net side and distributed electrical source;
If KdfMore than a frequency difference energy integral setting value, then trip signal is sent to distributed electrical source.
The control terminal of distributed electrical source is installed in, in the trip signal for the control terminal for receiving public power net side Afterwards, the grid-connected breaker of tripping, island operation state is eliminated.
Relative to prior art, technique effect that the solution of the present invention has:(1)The present invention is by gathering public power net side Frequency and distributed electrical source frequency, method is simple and reliable, and the mode of connection is simple, is easy to engineering construction, realizes from grid-connected Detection of the breaker to isolated island in the range of utility network side bus.When frequency difference exceeds setting initiation value, not less than set action value When, differentiated using frequency difference method of energy integral, be effectively reduced check frequency, effectively ensured the isolated island inspection of distributed energy Survey rate, isolated island detection range is expanded, improves safe operation of electric network.(2)The isolated island for distributed energy of the present invention Detecting system includes:Synchro measure and control terminal based on 3G network of distributed electrical source, transformer substation side.Transformer substation side Terminal and the terminal of distributed electrical source beat is unified by global clock synchronization system, carry out strange land high-speed synchronous sampling, adopt Current collection air volume calculation frequency, the frequency data with absolute time mark are formed, distributed electrical source is by the dynamic frequency with absolute time mark Data are sent to transformer substation side terminal by 3G wireless networks.Transformer station's terminal is according to distributed electrical source and transformer substation side frequency Data, distributed power source running status is differentiated using frequency difference energy integral principle, by 3G network to distributed electrical source side termination The corresponding command is sent, solves the grid-connected derivative islanding problem of distributed power source.
Brief description of the drawings
Fig. 1 is the isolated island testing process schematic diagram of the embodiment of the present invention;
In figure:Df:Public power net side and distributed electrical source difference on the frequency are calculated for utility network lateral terminal;Fsys:For public affairs Public network frequency is calculated with grid side terminal;Fdg:Distributed electrical source frequency;Fset1:Set action value, the given delays of Tset1; Kdf:Frequency difference energy product score value, Kset2 frequency difference energy set-points;
Fig. 2 is the distributed power source access system automated security control system and its terminal device layout drawing of the present invention.
Embodiment
The automated security control system of the present embodiment, including:
The control terminal of distributed electrical source is installed in, for synchronizing measurement frequency to the distributed power source, and is beaten Upper markers, synchro measure frequency data are sent to public power net side by 3G network;
The control terminal of public power net side is installed in, for synchronizing measurement frequency to utility network, and stamps markers, Receive the synchro measure frequency data sent on distributed electrical source simultaneously;
The control terminal of public power net side is installed according to markers, calculates the frequency of public power net side and distributed electrical source Difference, if the frequency difference is more than a set action value(The set action value is generally ± 0.5Hz, and concrete numerical value reference may also be made to country Grid company company standard Q/GDW617-2011:Photovoltaic plant access electric power network technique regulation), by given delay(Typically Less than 160 milliseconds)Backward distributed electrical source sends trip signal;If the frequency difference is beyond a setting initiation value(Generally 0.1Hz, setting initiation value requirement are more than terminal acquisition precision), but not less than the set action value, then using equation below (1)Calculate frequency difference energy product score value Kdf
…(1)
In formula, Df:The frequency difference of public power net side and distributed electrical source;
If KdfMore than a frequency difference energy integral setting value, then trip signal is sent to distributed electrical source.
The control terminal of distributed electrical source is installed in, in the trip signal for the control terminal for receiving public power net side Afterwards, the grid-connected breaker of tripping, island operation state is eliminated.
When frequency difference beyond setting initiation value, not less than set action value when, using frequency difference method of energy integral differentiate, effectively Reduce check frequency, effectively ensured the isolated island verification and measurement ratio of distributed energy, expanded isolated island detection range, improve electricity Network operation security.
The terminal of transformer substation side and the terminal of distributed electrical source unify beat by global clock synchronization system, carry out strange land High-speed synchronous samples, and collection electrical quantity calculates frequency, forms the frequency data with absolute time mark, and distributed electrical source will be with absolute When target dynamic frequency data transformer substation side terminal is sent to by 3G wireless networks.Transformer station's terminal is according to distributed electrical source With transformer substation side frequency data, distributed power source running status is differentiated using frequency difference energy integral principle, by 3G network to dividing Cloth power source side terminal sends the corresponding command, solves the grid-connected derivative islanding problem of distributed power source.

Claims (1)

  1. A kind of 1. method of work of Automatic safety control system for island detection for distributed energy, it is characterised in that bag Include:
    It is installed in the control terminal-pair of the distributed electrical source distributed power source and synchronizes measurement frequency, and stamps markers, will Synchro measure frequency data are sent to public power net side by 3G network;
    The control terminal-pair utility network for being installed in public power net side synchronizes measurement frequency, and stamps markers, receives simultaneously The synchro measure frequency data sent on distributed electrical source;
    The control terminal of public power net side is installed according to markers, calculates public power net side and the frequency difference of distributed electrical source, such as The fruit frequency difference then sends trip signal after 150 millisecond time-delay more than a set action value to distributed electrical source;It is if described Frequency difference sets initiation value beyond one, but not less than the set action value, then using equation below(1)Calculate frequency difference energy integral Value Kdf
    …(1)
    In formula, Df:The frequency difference of public power net side and distributed electrical source;
    If KdfMore than a frequency difference energy integral setting value, then trip signal is sent to distributed electrical source;
    The control terminal of distributed electrical source is installed in, after the trip signal of control terminal of public power net side is received, is jumped Grid-connected breaker is opened, eliminates island operation state.
CN201510719147.0A 2012-12-05 2012-12-05 Method of work for the Automatic safety control system for island detection of distributed energy Active CN105305629B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510719147.0A CN105305629B (en) 2012-12-05 2012-12-05 Method of work for the Automatic safety control system for island detection of distributed energy

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201210515888.3A CN102969794B (en) 2012-12-05 2012-12-05 For the automated security control system of the islanding detect of distributed energy
CN201510719147.0A CN105305629B (en) 2012-12-05 2012-12-05 Method of work for the Automatic safety control system for island detection of distributed energy

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201210515888.3A Division CN102969794B (en) 2012-12-05 2012-12-05 For the automated security control system of the islanding detect of distributed energy

Publications (2)

Publication Number Publication Date
CN105305629A CN105305629A (en) 2016-02-03
CN105305629B true CN105305629B (en) 2017-11-21

Family

ID=47799748

Family Applications (6)

Application Number Title Priority Date Filing Date
CN201210515888.3A Active CN102969794B (en) 2012-12-05 2012-12-05 For the automated security control system of the islanding detect of distributed energy
CN201510719197.9A Active CN105375531B (en) 2012-12-05 2012-12-05 Method of work for Automatic safety control system for island detection
CN201510719732.0A Active CN105305630B (en) 2012-12-05 2012-12-05 One kind is used for Automatic safety control system for island detection
CN201510719147.0A Active CN105305629B (en) 2012-12-05 2012-12-05 Method of work for the Automatic safety control system for island detection of distributed energy
CN201510716859.7A Active CN105281437B (en) 2012-12-05 2012-12-05 For Automatic safety control system for island detection
CN201510719486.9A Active CN105245008B (en) 2012-12-05 2012-12-05 A kind of Automatic safety control system for island detection for distributed energy

Family Applications Before (3)

Application Number Title Priority Date Filing Date
CN201210515888.3A Active CN102969794B (en) 2012-12-05 2012-12-05 For the automated security control system of the islanding detect of distributed energy
CN201510719197.9A Active CN105375531B (en) 2012-12-05 2012-12-05 Method of work for Automatic safety control system for island detection
CN201510719732.0A Active CN105305630B (en) 2012-12-05 2012-12-05 One kind is used for Automatic safety control system for island detection

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN201510716859.7A Active CN105281437B (en) 2012-12-05 2012-12-05 For Automatic safety control system for island detection
CN201510719486.9A Active CN105245008B (en) 2012-12-05 2012-12-05 A kind of Automatic safety control system for island detection for distributed energy

Country Status (1)

Country Link
CN (6) CN102969794B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104764961B (en) * 2012-12-05 2017-11-21 国网江苏省电力公司常州供电公司 A kind of island detection method of the distributed energy of automated security control system
CN103296643B (en) * 2013-03-19 2017-02-22 昆明理工大学 Comparative isolated island detection and protection method based on wide range information phase difference
US9520819B2 (en) 2014-02-28 2016-12-13 General Electric Company System and method for controlling a power generation system based on a detected islanding event
CN105262067B (en) * 2015-10-08 2018-02-02 南京南瑞继保电气有限公司 A kind of anti-isolated island protection system and method
CN106443501B (en) * 2016-10-27 2017-10-20 广东电网有限责任公司茂名供电局 Distributed generator islanding detection method and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100025439A (en) * 2008-08-27 2010-03-09 창원대학교 산학협력단 Single phase photovoltaic power generation system for anti-islanding driver
CN101794988A (en) * 2010-03-30 2010-08-04 华中科技大学 Method for detecting piconet island state
CN101834431A (en) * 2010-05-21 2010-09-15 深圳市科陆电子科技股份有限公司 Method for preventing grid-connected island effect of distributed power source
CN102255330A (en) * 2011-04-19 2011-11-23 河南电力试验研究院 Device and method for detecting island of micro power grid system

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE69623692T2 (en) * 1995-05-31 2003-05-22 Kabushiki Kaisha Meidensha, Tokio/Tokyo Method and device for detecting the islanding operation of a distributed generator
US7106564B2 (en) * 2002-01-16 2006-09-12 Ballard Power Systems Corporation Devices and methods for detecting islanding operation of a static power source
CN201438201U (en) * 2009-04-03 2010-04-14 江苏省电力公司苏州供电公司 Secondary loop circuit voltage drop synchronous detection device for voltage mutual inductor
CN102270844B (en) * 2011-07-27 2013-07-31 西藏电力有限公司 Novel low-frequency unloading setting method aiming at isolated power grid

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100025439A (en) * 2008-08-27 2010-03-09 창원대학교 산학협력단 Single phase photovoltaic power generation system for anti-islanding driver
CN101794988A (en) * 2010-03-30 2010-08-04 华中科技大学 Method for detecting piconet island state
CN101834431A (en) * 2010-05-21 2010-09-15 深圳市科陆电子科技股份有限公司 Method for preventing grid-connected island effect of distributed power source
CN102255330A (en) * 2011-04-19 2011-11-23 河南电力试验研究院 Device and method for detecting island of micro power grid system

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
一种新的分布式发电孤岛检测方法;甘忠等;《电力系统保护与控制》;20110101;第39卷(第1期);第123-127、138页 *
分布式发电新型孤岛检测原理与装置开发;候梅毅 等;《山东电力高等专科学校学报》;20101231;第13卷(第3期);第1-5页 *
分布式电源接入配电网的通信方式研究;李国清;《现代电力》;20110430;第28卷(第2期);第79-83页 *

Also Published As

Publication number Publication date
CN105281437A (en) 2016-01-27
CN105305630B (en) 2017-11-21
CN105245008B (en) 2017-11-21
CN102969794B (en) 2015-11-18
CN102969794A (en) 2013-03-13
CN105281437B (en) 2017-11-21
CN105375531A (en) 2016-03-02
CN105305629A (en) 2016-02-03
CN105305630A (en) 2016-02-03
CN105245008A (en) 2016-01-13
CN105375531B (en) 2017-11-21

Similar Documents

Publication Publication Date Title
CN104764960B (en) A kind of isolated island detection of distributed energy, control method
CN105305629B (en) Method of work for the Automatic safety control system for island detection of distributed energy
Almas et al. RT-HIL implementation of the hybrid synchrophasor and GOOSE-based passive islanding schemes
CN102611086B (en) Centralized protection system and method for region distribution network
CN102684175B (en) A kind of implementation method of micro-capacitance sensor protection
CN203324364U (en) Leakage-current early warning system for low-voltage distribution network
CN104714142B (en) CT, PT wire break detection method suitable for intelligence/digital transformer substation
Zhang et al. PMU based islanding detection to improve system operation
Ravikumar et al. State-of-the-art islanding detection and decoupling systems for utility and industrial power systems
CN101714756A (en) Equivalent negative sequence impedance-based distributed generator islanding protection method
CN104852405A (en) Small hydropower station protection control system based on wide-area data sharing
CN105067960B (en) A kind of Distribution Fault Location System and its method based on big data
CN103915900A (en) Rail transit power monitoring direct current load monitoring method
CN103941160B (en) Power distribution network loop closing detection device and method
CN109031036A (en) A kind of synchronized phasor line protective devices and its measurement method based on IEC61850 standard
CN202940577U (en) Safe automatic control system for islanding detection of distributed energy
Rampurkar et al. PMU based identification of low frequency oscillations—A case study
CN208125808U (en) A kind of synchronized phasor line protective devices based on IEC61850 standard
CN202424140U (en) Micro grid bus differential protective device
Skok et al. Dynamic analysis of wind farm operation integrated in power system based on synchronized measurements
CN102122140A (en) Demarcation switch system
CN103730914A (en) Electrical quantity based anti-islanding device and operation method thereof
CN108132421A (en) Arc extinction cabinet failure phase judgment method based on transient high-frequency component
CN202309048U (en) Medium-voltage switch protecting controller having zero sequence direction judging function
Lee A comprehensive protection scheme for distribution systems

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Wang Yiping

Inventor after: Yan Yizhen

Inventor after: Liu Shaodong

Inventor after: Cao Liang

Inventor before: Cao Liang

CB03 Change of inventor or designer information
CP03 Change of name, title or address

Address after: 213003 No. 27, West Front Street, Changzhou, Jiangsu

Co-patentee after: STATE GRID JIANGSU ELECTRIC POWER COMPANY

Patentee after: State Grid Jiangsu Electric Power Company, Changzhou Power Supply Company

Co-patentee after: State Grid Corporation of China

Address before: 213003 Jiangsu province Changzhou City Tianning District Bureau Street No. 27

Co-patentee before: Jiangsu Electric Power Company

Patentee before: Changzhou Power Supply Co, Jiangsu Provincial Power Corp.

Co-patentee before: State Grid Corporation of China

CP03 Change of name, title or address