CN105301421B - A kind of same period line loss measuring table and method - Google Patents
A kind of same period line loss measuring table and method Download PDFInfo
- Publication number
- CN105301421B CN105301421B CN201510894380.2A CN201510894380A CN105301421B CN 105301421 B CN105301421 B CN 105301421B CN 201510894380 A CN201510894380 A CN 201510894380A CN 105301421 B CN105301421 B CN 105301421B
- Authority
- CN
- China
- Prior art keywords
- same period
- month
- sales amount
- electricity sales
- line loss
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Description
Claims (8)
- A kind of 1. same period line loss measuring table, it is characterised in that including:Power consumption metering system, it is in office to power supply department at different levels in the range of target area for by Electric Energy Tariff Point Metering Device The delivery of January output carries out direct statistical metering, is correspondingly made available this month in one's duty same period delivery;Sale of electricity consumption metering system, for the statistical method using section metering, sends out the target area scope January in office Capable electricity sales amount carries out indirect statistical metering, is correspondingly made available this month in one's duty same period electricity sales amount;Same period line loss calculation device, for being connected respectively with the power supply consumption metering system and the sale of electricity consumption metering system Connect, and according to the in one's duty same period delivery and this month in one's duty same period electricity sales amount of any moon, the same period line in the month is calculated Damage and same period line loss per unit;Wherein, the power supply consumption metering system includes:Critical point management module, for being carried out maintenance management to the critical point information at power grid critical point at different levels in the range of the target area;Management module is switched, is carried out for pair information of the critical points at different levels switch connected corresponding to the power grid critical point progress at different levels Maintenance management, and the information progress pair the Electric Energy Tariff Point Metering Devices at different levels connected corresponding to critical points at different levels switch progresss Maintenance management;Delivery metering module, for by the Electric Energy Tariff Point Metering Devices at different levels, to the target area scope confessions at different levels The delivery of electric department's January output in office carries out direct statistical metering, is correspondingly made available this month in one's duty same period delivery.
- 2. same period line loss measuring table according to claim 1, it is characterised in that the critical point management module, is additionally operable to Corresponding maintenance management is carried out to the information at newly-increased power grid critical point or the power grid critical point changed.
- 3. same period line loss measuring table according to claim 2, it is characterised in that the same period line loss calculation device bag Include:Same period line loss calculation unit, for being connected respectively with the power supply consumption metering system and the sale of electricity consumption metering system Connect, and the in one's duty same period delivery of any moon is subtracted into same period electricity sales amount, obtain the same period line loss in the month;Same period line loss per unit computing unit, for by the same period delivery of the same period line loss in any month divided by the month, correspondingly Obtain the same period line loss per unit in the month.
- 4. same period line loss measuring table according to any one of claims 1 to 3, it is characterised in that the electricity sales amount metering System includes:Be segmented logging modle, for utilize intelligent electric meter terminal, in the range of the target area January in office first when The sum of electricity sales amount read is inscribed when carving with second to be recorded, wherein, first moment is the 1st day of the month When zero, when second moment is the zero of the N days of the month, N is the positive integer less than 28 more than 1;Electricity sales amount metering module, for by the sum of electricity sales amount corresponding to the second moment in any month subtract first the moment institute The corresponding sum of electricity sales amount, obtains the first segmentation electricity sales amount in the month;By corresponding to the first moment in the lower January Electricity sales amount sum subtracts the sum of electricity sales amount corresponding to the second moment in the month, obtains the second segmentation sale of electricity in the month Amount;The first segmentation electricity sales amount in the month is segmented electricity sales amount plus second, is correspondingly made available the same period electricity sales amount in the month.
- A kind of 5. same period line loss measurement method, it is characterised in that including:By Electric Energy Tariff Point Metering Device, to the delivery of the January in office of power supply department at different levels in the range of target area output into The direct statistical metering of row, is correspondingly made available this month in one's duty same period delivery;Using the statistical method of section metering, to the target area scope January in office, the electricity sales amount of distribution is united indirectly Meter metering, is correspondingly made available this month in one's duty same period electricity sales amount;According to the in one's duty same period delivery and this month in one's duty same period electricity sales amount of any moon, the same period line loss in the month is calculated With same period line loss per unit;Wherein, the delivery of power supply department January outputs in office at different levels carries out direct statistical metering in the range of to target area Process before, further include:The critical point information at power grid critical point at different levels in the range of the target area is carried out maintenance management;The information of pair corresponding to the power grid critical point progress at different levels critical points at different levels switch connected carries out maintenance management, and pair with The information for the Electric Energy Tariff Point Metering Devices at different levels that the critical point switch at different levels is accordingly connected carries out maintenance management;Corresponding maintenance management is carried out to the information at newly-increased power grid critical point or the power grid critical point changed.
- 6. same period line loss measurement method according to claim 5, it is characterised in that described to be filled by critical point electrical energy measurement Put, direct statistical metering is carried out to the delivery of the January in office of power supply department at different levels in the range of target area output, correspondingly The process of this month in one's duty same period delivery is obtained, including:By the Electric Energy Tariff Point Metering Devices at different levels, the target area scope power supply departments at different levels January in office is exported Delivery carry out direct statistical metering, be correspondingly made available this month in one's duty same period delivery.
- 7. same period line loss measurement method according to claim 6, it is characterised in that described according to any moon in one's duty same period Delivery and this month in one's duty same period electricity sales amount, are calculated the same period line loss in the month and the process of same period line loss per unit, including:The in one's duty same period delivery of any moon is subtracted into same period electricity sales amount, obtains the same period line loss in the month;By the same period line loss in the month divided by the same period delivery in the month, the same period line loss per unit in the month is correspondingly made available.
- 8. according to claim 5 to 7 any one of them same period line loss measurement method, it is characterised in that described to utilize segmentation meter The statistical method of amount, carries out indirect statistical metering, correspondingly to the electricity sales amount of target area scope January in office distribution The process of this month in one's duty same period electricity sales amount is obtained, including:Using intelligent electric meter terminal, the first moment to the January in office in the range of the target area and second when inscribe reading To the sum of electricity sales amount recorded, wherein, first moment for the 1st day of the month zero when, second moment For the N days of the month zero when, N be less than more than 1 28 positive integer;The sum of electricity sales amount corresponding to second moment in any month is subtracted into the sum of electricity sales amount corresponding to the first moment, Obtain the first segmentation electricity sales amount in the month;The sum of electricity sales amount corresponding to first moment in the lower January is subtracted into the month In the sum of electricity sales amount corresponding to the second moment, obtain the second segmentation electricity sales amount in the month;By first segmentation in the month Electricity sales amount is segmented electricity sales amount plus second, is correspondingly made available the same period electricity sales amount in the month.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510894380.2A CN105301421B (en) | 2015-11-27 | 2015-11-27 | A kind of same period line loss measuring table and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510894380.2A CN105301421B (en) | 2015-11-27 | 2015-11-27 | A kind of same period line loss measuring table and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105301421A CN105301421A (en) | 2016-02-03 |
CN105301421B true CN105301421B (en) | 2018-04-27 |
Family
ID=55198918
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510894380.2A Active CN105301421B (en) | 2015-11-27 | 2015-11-27 | A kind of same period line loss measuring table and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105301421B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106228316A (en) * | 2016-08-31 | 2016-12-14 | 南京易司拓电力科技股份有限公司 | A kind of synchronism line loss statistical system |
CN111191892A (en) * | 2019-12-20 | 2020-05-22 | 国电南瑞科技股份有限公司 | Network loss calculation method and system for electric quantity system |
CN113189404A (en) * | 2021-04-27 | 2021-07-30 | 上海英众信息科技有限公司 | Synchronous line loss measuring platform, loss measuring method and storage medium |
CN114167198B (en) * | 2021-10-18 | 2024-03-01 | 国网山东省电力公司平原县供电公司 | Method and platform for measuring synchronous line loss data |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101593978A (en) * | 2009-06-30 | 2009-12-02 | 深圳市科陆电子科技股份有限公司 | A kind of to high and low voltage line loss of distribution network analytical method and analytical system |
CN103995962A (en) * | 2014-05-06 | 2014-08-20 | 国家电网公司 | Online real-time calculation and analysis method of equipped wire loss |
CN104200314A (en) * | 2014-08-22 | 2014-12-10 | 国家电网公司 | Electric quantity and line loss concurrent statistic method based on data remote synchronous acquisition technology |
CN104200302A (en) * | 2014-08-04 | 2014-12-10 | 国家电网公司 | Technical framework and method for power enterprise simultaneous line loss management |
CN104467193A (en) * | 2014-12-29 | 2015-03-25 | 国家电网公司 | Four-division line loss quasi real-time on-line monitoring scheme based on daily frequentness monitoring |
-
2015
- 2015-11-27 CN CN201510894380.2A patent/CN105301421B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101593978A (en) * | 2009-06-30 | 2009-12-02 | 深圳市科陆电子科技股份有限公司 | A kind of to high and low voltage line loss of distribution network analytical method and analytical system |
CN103995962A (en) * | 2014-05-06 | 2014-08-20 | 国家电网公司 | Online real-time calculation and analysis method of equipped wire loss |
CN104200302A (en) * | 2014-08-04 | 2014-12-10 | 国家电网公司 | Technical framework and method for power enterprise simultaneous line loss management |
CN104200314A (en) * | 2014-08-22 | 2014-12-10 | 国家电网公司 | Electric quantity and line loss concurrent statistic method based on data remote synchronous acquisition technology |
CN104467193A (en) * | 2014-12-29 | 2015-03-25 | 国家电网公司 | Four-division line loss quasi real-time on-line monitoring scheme based on daily frequentness monitoring |
Non-Patent Citations (1)
Title |
---|
配电网非完全量测同期线损计算方法研究;张铁峰 等;《电测与仪表》;20150110;第52卷(第1期);第91-96页 * |
Also Published As
Publication number | Publication date |
---|---|
CN105301421A (en) | 2016-02-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105301421B (en) | A kind of same period line loss measuring table and method | |
CN102074954B (en) | Comprehensive energy-conservation evaluation and decision-making method for urban and rural distribution network | |
CN102116857B (en) | Method for checking electric quantity at power grid gate | |
CN102904247B (en) | Distribution line type selection method based on lowest composite cost | |
CN201789341U (en) | Monitoring system of intelligent micro-grid | |
CN103150600A (en) | Safety analyzing system of power network | |
CN102999975A (en) | Intelligent power consumption payment management system | |
CN103440531A (en) | Wind power plant short-term wind power prediction system in view of operating state of wind power plant draught fan | |
CN108258710A (en) | A kind of battery energy storage system Optimal Configuration Method counted and battery capacity decays | |
CN103390253A (en) | Evaluation method for increment energy efficiency of power grid energy conservation and loss reduction | |
CN104952003A (en) | Load management device and management method | |
CN103018548A (en) | Electricity-saving appliance with electricity saving quantity display and application method of electricity-saving appliance | |
CN106570635A (en) | Multi-dimensional analysis method for voltage qualified rate | |
CN106600145A (en) | Power distribution network reliability analysis method and device | |
CN111967658A (en) | Comprehensive power failure analysis method based on marketing and distribution information integration platform | |
CN112884228B (en) | Big data-based transformer area line loss management and control system | |
CN204906004U (en) | Distributed intelligent regional power grid of network layering | |
CN110417834A (en) | A kind of multi-Substation band time scale measurement data section transmission method and system | |
CN107749624A (en) | Distributed photovoltaic power generation operation mode Optimization Design and system | |
CN107167655A (en) | Power supply service system and method based on intelligent electric meter terminal | |
CN106228316A (en) | A kind of synchronism line loss statistical system | |
CN110688619A (en) | Theoretical line loss calculation system and method for power distribution network | |
CN104852470A (en) | End user selection method based on graphical topology | |
CN202854214U (en) | Full-voltage loss measuring device and intelligent electric meter | |
CN202948058U (en) | Power-saving appliance capable of displaying power-saving amount |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 building 710 room research Co-patentee after: STATE GRID INFORMATION & TELECOMMUNICATION GROUP Co.,Ltd. Patentee after: BEIJING CHINA POWER INFORMATION TECHNOLOGY Co.,Ltd. Co-patentee after: STATE GRID CORPORATION OF CHINA Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 building 710 room research Co-patentee before: STATE GRID INFORMATION & TELECOMMUNICATION GROUP Co.,Ltd. Patentee before: BEIJING CHINA POWER INFORMATION TECHNOLOGY Co.,Ltd. Co-patentee before: State Grid Corporation of China |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190726 Address after: 100085 Building 32-3-4108-4109, Pioneer Road, Haidian District, Beijing Co-patentee after: STATE GRID CORPORATION OF CHINA Patentee after: BEIJING GUODIANTONG NETWORK TECHNOLOGY Co.,Ltd. Co-patentee after: STATE GRID INFORMATION & TELECOMMUNICATION GROUP Co.,Ltd. Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 building 710 room research Co-patentee before: STATE GRID INFORMATION & TELECOMMUNICATION GROUP Co.,Ltd. Patentee before: BEIJING CHINA POWER INFORMATION TECHNOLOGY Co.,Ltd. Co-patentee before: STATE GRID CORPORATION OF CHINA |