CN106228316A - A kind of synchronism line loss statistical system - Google Patents

A kind of synchronism line loss statistical system Download PDF

Info

Publication number
CN106228316A
CN106228316A CN201610782762.0A CN201610782762A CN106228316A CN 106228316 A CN106228316 A CN 106228316A CN 201610782762 A CN201610782762 A CN 201610782762A CN 106228316 A CN106228316 A CN 106228316A
Authority
CN
China
Prior art keywords
line loss
data
statistical
same period
synchronism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610782762.0A
Other languages
Chinese (zh)
Inventor
张珍凤
查鸣
陈俊长
罗定志
屈永刚
罗耀强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING ESTABLE ELECTRIC POWER TECHNOLOGY Co Ltd
Original Assignee
NANJING ESTABLE ELECTRIC POWER TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING ESTABLE ELECTRIC POWER TECHNOLOGY Co Ltd filed Critical NANJING ESTABLE ELECTRIC POWER TECHNOLOGY Co Ltd
Priority to CN201610782762.0A priority Critical patent/CN106228316A/en
Publication of CN106228316A publication Critical patent/CN106228316A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention relates to a kind of synchronism line loss statistical system, including supervisory control and data acqui sition system, for the delivery within the same time period in the range of target area and electricity sales amount are carried out statistical metering, be calculated the line loss same period and the line loss per unit same period;Quality testing system, for being balanced analyzing to bus, main transformer, full station, shows balanced ratio curvilinear trend, abnormal data produces ALM event, and pushes alarm to Dispatching Control System and supervisory control and data acqui sition system.Present invention ensures that the data for statistical line losses are contemporaneous data, so that power grid enterprises can grasp practical line loss situation exactly.

Description

A kind of synchronism line loss statistical system
Technical field
The present invention relates to electricity statistical technique field, be specifically related to a kind of synchronism line loss statistical system.
Background technology
Currently, electricity and line loss per unit are the core business indicators of power grid enterprises, are intuitively reflection enterprise's income and cost Most important data.
But, for a long time, due to the timing statistics between delivery and electricity sales amount not same period, define that " solar month is large and small Month little " phenomenon, thus cause line loss fluctuation and negative wire to damage situation and can not get management and control effectively, mask in Controlling line loss and exist Intrinsic problem.Therefore, how to guarantee that for calculating between the delivery of line loss and electricity sales amount be the data of the same period, so that electrical network It is current problem demanding prompt solution that enterprise can grasp practical line loss situation exactly.
Summary of the invention
The technical problem to be solved is to overcome the deficiencies in the prior art, it is provided that a kind of synchronism line loss department of statistic System, it is ensured that the data for statistical line losses are contemporaneous data, so that power grid enterprises can grasp practical line loss feelings exactly Condition.
For solving above technical problem, a kind of technical scheme that the present invention takes is:
A kind of synchronism line loss statistical system, including
Supervisory control and data acqui sition system, for carrying out the delivery within the same time period in the range of target area and electricity sales amount Statistical metering, is calculated the line loss same period and the line loss per unit same period;
Quality testing system, for being balanced analyzing to bus, main transformer, full station, shows balanced ratio curvilinear trend, to different Regular data produces ALM event, and pushes alarm to Dispatching Control System and supervisory control and data acqui sition system.
Preferably, Dispatching Control System receives the alarm that quality testing system pushes, and to Supervisory control and data acquisition Various information in system carries out maintenance management.
Preferably, supervisory control and data acqui sition system connects the data collecting system having secure accessing district.
Preferably, quality testing system includes the Report Customization function of subregion, dividing potential drop, subelement.
Preferably, supervisory control and data acqui sition system includes for carrying out the delivery of output of arbitrary month in target area The delivery metering system of statistical metering, for the electricity sales amount of distribution of arbitrary month in target area is carried out selling of statistical metering Electric quantity measuring system and according to delivery arbitrary moon in one's duty same period and the electricity sales amount same period calculate this month the same period line loss and with The line loss calculation device same period of phase line loss per unit.
Due to the employing of above technical scheme, the present invention compared with prior art has the advantage that
1, contemporaneous data is acquired and calculates by the present invention, so that power grid enterprises can grasp practical line loss feelings exactly Condition;
2, invention increases quality testing system, for being balanced analyzing to bus, main transformer, full station, show balance Rate curvilinear trend, can produce ALM event and in time to Dispatching Control System and Supervisory control and data acquisition system to abnormal data System pushes alarm, makes power grid enterprises process in time;
3, quality testing system of the present invention includes the Report Customization function of subregion, dividing potential drop, subelement, it is possible to realize same type Equipment, the network loss relative analysis of different periods, support historical data contrast, analyze line loss variation tendency.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the structural representation of supervisory control and data acqui sition system of the present invention.
Detailed description of the invention
Below in conjunction with drawings and the specific embodiments, the present invention is described in further details.
As shown in Figure 1, one synchronism line loss statistical system of the present invention, including
Supervisory control and data acqui sition system, for carrying out the delivery within the same time period in the range of target area and electricity sales amount Statistical metering, is calculated the line loss same period and the line loss per unit same period;
Quality testing system, for being balanced analyzing to bus, main transformer, full station, shows balanced ratio curvilinear trend, to different Regular data produces ALM event, and pushes alarm to Dispatching Control System and supervisory control and data acqui sition system.
In the present embodiment, supervisory control and data acqui sition system includes for the power supply of output of arbitrary month in target area Amount carries out the delivery metering system of statistical metering, by carrying out the electricity sales amount of distribution of arbitrary month in target area based on statistics The electricity sales amount metering system measured and the line same period calculating this month according to delivery arbitrary moon in one's duty same period and the electricity sales amount same period Damage and the line loss calculation device same period of the line loss per unit same period.
In the present embodiment, supervisory control and data acqui sition system connects the data collecting system having secure accessing district.
In the present embodiment, Dispatching Control System receives the alarm that quality testing system pushes, and to monitoring and number Maintenance management is carried out according to the various information in acquisition system.
In the present embodiment, quality testing system includes the Report Customization function of subregion, dividing potential drop, subelement, it is possible to Realize the network loss relative analysis of same type equipment, different periods, support historical data contrast, analyze line loss variation tendency.
Contemporaneous data is acquired and calculates by the present invention, so that power grid enterprises can grasp practical line loss feelings exactly Condition, adds quality testing system, for being balanced analyzing to bus, main transformer, full station, shows that balanced ratio curve becomes Gesture, can produce ALM event and push announcement to Dispatching Control System and supervisory control and data acqui sition system in time abnormal data Alert, make power grid enterprises process in time.
Above the present invention is described in detail, the explanation of embodiment be only intended to help to understand the method for the present invention and Its core concept, its object is to allow the personage being familiar with this art will appreciate that present disclosure and to implement according to this, and Can not limit the scope of the invention with this.All equivalence changes made according to spirit of the invention or modification, all should contain Cover within protection scope of the present invention.

Claims (5)

1. a synchronism line loss statistical system, it is characterised in that: include
Supervisory control and data acqui sition system, for carrying out the delivery within the same time period in the range of target area and electricity sales amount Statistical metering, is calculated the line loss same period and the line loss per unit same period;
Quality testing system, for being balanced analyzing to bus, main transformer, full station, shows balanced ratio curvilinear trend, to different Regular data produces ALM event, and pushes alarm to Dispatching Control System and supervisory control and data acqui sition system.
Synchronism line loss statistical system the most according to claim 1, it is characterised in that: described Dispatching Control System receives institute State the alarm that quality testing system pushes, and carry out the various information in described supervisory control and data acqui sition system safeguarding pipe Reason.
Synchronism line loss statistical system the most according to claim 1, it is characterised in that: described supervisory control and data acqui sition system Connect the data collecting system having secure accessing district.
Synchronism line loss statistical system the most according to claim 1, it is characterised in that: described quality testing system bag Include the Report Customization function of subregion, dividing potential drop, subelement.
Synchronism line loss statistical system the most according to claim 1, it is characterised in that: described supervisory control and data acqui sition system Including for the delivery of output of arbitrary month in target area is carried out the delivery metering system of statistical metering, for mesh Mark region in arbitrary month distribution electricity sales amount carry out statistical metering electricity sales amount metering system and according to arbitrary moon in one's duty with Phase delivery and the electricity sales amount same period calculate the line loss and the line loss calculation device same period of the line loss per unit same period same period in this month.
CN201610782762.0A 2016-08-31 2016-08-31 A kind of synchronism line loss statistical system Pending CN106228316A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610782762.0A CN106228316A (en) 2016-08-31 2016-08-31 A kind of synchronism line loss statistical system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610782762.0A CN106228316A (en) 2016-08-31 2016-08-31 A kind of synchronism line loss statistical system

Publications (1)

Publication Number Publication Date
CN106228316A true CN106228316A (en) 2016-12-14

Family

ID=58071904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610782762.0A Pending CN106228316A (en) 2016-08-31 2016-08-31 A kind of synchronism line loss statistical system

Country Status (1)

Country Link
CN (1) CN106228316A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110174577A (en) * 2019-07-05 2019-08-27 广东电网有限责任公司 It is a kind of for 10kV and in the line loss anomalous discrimination method of Up Highway UHW
CN110320445A (en) * 2019-07-05 2019-10-11 广东电网有限责任公司 It is a kind of for 110kV and in the line loss anomalous discrimination method of Up Highway UHW
CN110472871A (en) * 2019-08-16 2019-11-19 广东电网有限责任公司 A kind of investigation method for management line loss abnormal cause

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104200302A (en) * 2014-08-04 2014-12-10 国家电网公司 Technical framework and method for power enterprise simultaneous line loss management
CN104200314A (en) * 2014-08-22 2014-12-10 国家电网公司 Electric quantity and line loss concurrent statistic method based on data remote synchronous acquisition technology
CN105139126A (en) * 2015-08-26 2015-12-09 国家电网公司 Contemporaneous 10kV line loss statistics method
CN105301421A (en) * 2015-11-27 2016-02-03 北京中电普华信息技术有限公司 Parallel period line loss measurement platform and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104200302A (en) * 2014-08-04 2014-12-10 国家电网公司 Technical framework and method for power enterprise simultaneous line loss management
CN104200314A (en) * 2014-08-22 2014-12-10 国家电网公司 Electric quantity and line loss concurrent statistic method based on data remote synchronous acquisition technology
CN105139126A (en) * 2015-08-26 2015-12-09 国家电网公司 Contemporaneous 10kV line loss statistics method
CN105301421A (en) * 2015-11-27 2016-02-03 北京中电普华信息技术有限公司 Parallel period line loss measurement platform and method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110174577A (en) * 2019-07-05 2019-08-27 广东电网有限责任公司 It is a kind of for 10kV and in the line loss anomalous discrimination method of Up Highway UHW
CN110320445A (en) * 2019-07-05 2019-10-11 广东电网有限责任公司 It is a kind of for 110kV and in the line loss anomalous discrimination method of Up Highway UHW
CN110174577B (en) * 2019-07-05 2021-05-28 广东电网有限责任公司 Line loss abnormity discrimination method for 10kV and above bus
CN110320445B (en) * 2019-07-05 2021-05-28 广东电网有限责任公司 Line loss abnormity discrimination method for 110kV and above bus
CN110472871A (en) * 2019-08-16 2019-11-19 广东电网有限责任公司 A kind of investigation method for management line loss abnormal cause
CN110472871B (en) * 2019-08-16 2023-07-07 广东电网有限责任公司 Investigation method for managing line loss abnormal reasons

Similar Documents

Publication Publication Date Title
CN104219315B (en) A kind of operation monitoring system of power information acquisition system and method for supervising thereof
CN105069527A (en) Zone area reasonable line loss prediction method based on data mining technology
US10908198B2 (en) Determining meter phase using interval voltage measurements
CN105337308A (en) Grid-side regional distributed photovoltaic operation and maintenance management system and management method
CN106600114A (en) Multi-dimensional quality evaluation method of collection operation and maintenance system
CN104360208A (en) Acquisition failure analyzing and processing method of electricity utilization information acquisition operating and maintaining system
CN103412182B (en) Method using electric power meter monitoring voltage qualification rate
Aravind et al. Smart meter based on real time pricing
CN106228316A (en) A kind of synchronism line loss statistical system
CN108037343A (en) A kind of voltage monitoring Management System Data deepens analysis method
CN109166051A (en) A kind of dispatching of power netwoks data programming count and multidimensional visualize application method
CN104569578A (en) Nuclear power plant electric energy monitoring system
CN106970558A (en) A kind of efficiency public administration system
De Capua et al. A smart energy meter for power grids
Bragatto et al. Innovative tools for demand response strategies: a real-life experience
CN105488342A (en) Method for accounting carbon emission reduction of power distribution network boosting operation project
CN105301421A (en) Parallel period line loss measurement platform and method
US9047757B2 (en) Systems and methods for remotely controlling an advanced metering infrastructure
CN205195432U (en) Energy station electric power direct -furnish management and control system for industrial park
Dujak et al. Machine-to-machine communication as key enabler in smart metering systems
de Macedo et al. Opportunities and challenges of DSM in smart grid environment
CN109443395B (en) Method and system for judging whether energy consumption intensity multipoint measurement difference value exceeds limit value
CN204287842U (en) Central processor equipment
CN116231757A (en) Power generation energy efficiency analysis management system of water-wind-solar power station group
CN104932417A (en) Industrial electricity utilization on-demand application data acquisition system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161214