CN105298207A CN201510773951.7A CN201510773951A CN105298207A CN 105298207 A CN105298207 A CN 105298207A CN 201510773951 A CN201510773951 A CN 201510773951A CN 105298207 A CN105298207 A CN 105298207A
Authority
CN
China
Prior art keywords
electric pole
chuck
vehicle frame
loading
self
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510773951.7A
Other languages
Chinese (zh)
Other versions
CN105298207B (en
Inventor
高世龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Changming Electrical Equipment Ltd By Share Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710246220.6A priority Critical patent/CN106978936B/en
Priority to CN201710246223.XA priority patent/CN106948646B/en
Priority to CN201510773951.7A priority patent/CN105298207B/en
Publication of CN105298207A publication Critical patent/CN105298207A/en
Application granted granted Critical
Publication of CN105298207B publication Critical patent/CN105298207B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F7/00Lifting frames, e.g. for lifting vehicles; Platform lifts
    • B66F7/10Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported directly by jacks
    • B66F7/12Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported directly by jacks by mechanical jacks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • E04H12/347Arrangements for setting poles in the ground

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Earth Drilling (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Electric Cable Installation (AREA)

Abstract

The invention discloses a self-loading and unloading tool car for power grid telegraph pole erecting. The self-loading and unloading tool car comprises a frame, a support is installed under the frame, wheels are installed on the support, and universal wheels are installed at the front end of the frame. The self-loading and unloading tool car is characterized in that the two sides of the frame are provided with screw rods, and sliding blocks which are controlled by screw rod hand wheels to slide on the screw rods back and forth are installed on the screw rods; one end of the middle of the frame is provided with a first clamp sleeve which is formed by assembling a fixing fastening frame upper cover and a fixing fastening frame lower cover, and the two sides of the first clamp sleeve are provided with rotating shafts which are inserted into the frame. The self-loading and unloading tool car for power grid telegraph pole erecting and a construction method thereof have the advantages that when a telegraph pole is erected with the tool car through the method, use is convenient, labors are saved, walking is stable, and the construction speed is high; meanwhile, the self-loading and unloading tool car for power grid telegraph pole erecting and the construction method thereof are not only suitable for a region with sufficient electric power and flat roads in a construction region, but also suitable for a remote region with rugged mountain roads, high in practicability and suitable for usage and popularization.

Description

Electrical network electric pole erection Self-loading-unloading tool car and construction method thereof
Technical field
The present invention relates to a kind of electric power network construction equipment, be specifically related to a kind of electrical network electric pole erection Self-loading-unloading tool car and construction method thereof, belong to technical field of electric power construction.
Background technology
Power engineering, namely relevant with the production of electric energy, conveying, distribution engineering, broadly also comprises the engineering that electricity is applied in multiple fields as power and energy.Its bubbling area is made up of angle steel mutually arranged side by side, and the orientation of angle steel is parallel with liquid flow path direction.
If an application number is that CN104088501A discloses a kind of concrete wire pole stringing vehicle, it comprises vehicle frame and the electric pole lifting gear be located on vehicle frame and electric pole bracing or strutting arrangement; The front end of vehicle frame is provided with axle sleeve; Vehicle frame is provided with connecting rod, and this connecting rod one end is connected with the first snap ring; Bracing or strutting arrangement comprises channel-section steel and is located at the slide rail above channel-section steel; Channel-section steel offers chute, channel-section steel is equipped with bearing pin, bearing pin is provided with roller; Extreme is provided with the second snap ring for fettering concrete wire pole; Electric pole lifting gear comprises the hoist cylinder be located on vehicle frame, axis and connecting lever, and connecting lever is movably connected on axis, and connecting lever comprises galianconism and long-armed, and its galianconism is flexibly connected with the cylinder bar of hoist cylinder, its long-armed and pinned connection; Middle beam warp support bar is connected with axle sleeve.This stringing vehicle lifting gear is provided with connecting lever and hoist cylinder, and landing have employed regulations and parameters principle, and operation is very easy, time saving and energy saving, and operating efficiency improves greatly.
And for example an application number be CN204663113U disclose one can Fast Installation electric pole, belong to electric power conveying technology field.Comprise the electric pole body of rod, it is characterized in that, be also provided with round metal tapered sleeve and be partly embedded in the concrete bed of underground, described round metal tapered sleeve is cast in the cavity at concrete bed center; Described electric pole body of rod bottom is cone, and the tapering of round metal tapered sleeve endoporus is equal with the external conicity of electric pole body of rod bottom, and electric pole body of rod bottom is placed in the endoporus of round metal tapered sleeve.The utility model is simple and reasonable, manufactures easily, convenient to use, change the mounting means that electric pole is loaded down with trivial details, solve problem that is time-consuming in electric pole erection process, effort, avoid the trip affecting people around, improve operating efficiency, there is the wide market space.
Current electric pole occupies very important effect in electric power conveying, this bar that just makes to install electric wiring is essential, application number be 201410297193.1 patent discloses a kind of concrete wire pole stringing vehicle, this design can reach the object of the bar that installs electric wiring, but electric pole is placed from ground and must be realized by extra mechanism or device on the apparatus, operate relatively loaded down with trivial details in the wild when working and can not be used alone to realize the erection of electric pole, cost is relatively high, and this mechanism only has two wheels, unstable in the process of walking, easily send out accident.
Summary of the invention
Instant invention overcomes prior art Problems existing, propose electrical network electric pole erection Self-loading-unloading tool car and construction method thereof, this device and construction method thereof are when installing electric wiring bar, easy to use, save manpower, and walking is stable, and speed of application is fast.
Concrete technical scheme of the present invention is as follows:
Electrical network electric pole erection Self-loading-unloading tool car, comprise vehicle frame, be provided with support below described vehicle frame, wheel is rack-mount, and described vehicle frame front end is provided with universal wheel; It is characterized in that, described vehicle frame both sides are provided with screw mandrel, and the slide block controlling to slidably reciprocate on screw mandrel by leading screw handwheel is arranged on described screw mandrel; One end of described central frame beam is provided with the chuck one that fixing fastening frame upper cover and fixing fastening frame lower cover assemble, and the both sides of described chuck one are provided with turning cylinder and insert in vehicle frame; The other end of described central frame beam is provided with chuck two; Described slide block is provided with jack, is connected with hoisting bracket between described jack and chuck two, jack pressure hand is arranged on the side of jack;
The side of described vehicle frame is provided with rotating disk, is connected with rotary tray motor below described rotating disk, and top is provided with triangle pylon, and one end, described pylon bottom is hinged on rotating disk, and the other end is connected to above hydraulic cylinder; Described triangle tower top of the trellis is provided with pull wire pulley; Be provided with reel bottom described pylon, reel side is connected with reel motor.Described vehicle frame is provided with motor two, below motor two, is connected with elevating lever, described elevating lever is connected with drill bit.
Preferentially, described screw mandrel both sides are laid with leading screw guide peg.
Preferentially, described vehicle frame both sides are provided with handlebar.
Preferentially, uniform inside described chuck two pulley is installed.
Preferentially, between described chuck one and chuck two, V-arrangement trogue is also installed.
Preferentially, below described rotating disk, spiral leg is installed.
Based on said apparatus, present invention also offers a kind of electrical network electric pole erection Self-loading-unloading construction method, it is characterized in that, comprise the following steps:
1) unitized frame is moved to the accumulation position of electric pole, and spiral leg is threaded to kiss the earth makes car body steady;
2) utilize suspension ring to be enclosed within the electric pole two ends needing lifting, and fasten bracing wire at suspension ring, and by bracing wire by setting fastening after pull wire pulley on reel;
3) lower mandrel member is driven to pack up bracing wire and then sling by electric pole reel electric motor starting, the height reached higher than vehicle frame stops, and electric pole toward pulling back, raises and the stretching position near bedstead by hydraulic cylinder by A-frame, now rotary tray motor operation, is transferred to the top of vehicle frame by electric pole;
4) electric pole is arranged on chuck one and chuck two internal fixtion, utilize motor two to drive bit to excavate electric pole groove hole, adjustment car body after completing, is convenient to lower beam operation;
5) operate jack pressure hand jack is risen thus promotes chuck two, constantly the position of rotating threaded shaft handwheel adjustment jack adapts to the elevated height of chuck two simultaneously, in the process, electric pole is with chuck one for the center of circle, and electric pole is holded up and made to enter bottom it in electric pole groove hole by chuck two 90-degree rotation;
6) to banket and closely knit to electric pole groove hole, open chuck and chuck two, make electric pole lose about collar, construction completes.
Beneficial effect of the present invention: this device and construction method thereof are when installing electric wiring bar, easy to use, saves manpower, walking is stable, and speed of application is fast, simultaneously the road flat country of construction area electric power abundance, also rough terrain, remote hill path is applicable to, practical, be applicable to promoting the use of.
Accompanying drawing explanation
Fig. 1 is the structural representation of electrical network electric pole of the present invention erection Self-loading-unloading tool car;
Fig. 2 is electrical network electric pole of the present invention erection Self-loading-unloading tool car top view;
Fig. 3 is electrical network electric pole erection Self-loading-unloading tool car lateral view;
Fig. 4 is the present invention's operating diagram when constructing;
Fig. 5 is the present invention's operating diagram when constructing;
Fig. 6 is the present invention's operating diagram when constructing.
Fig. 7 is the present invention's operating diagram when constructing.
Detailed description of the invention
As shown in the figure, electrical network electric pole erection Self-loading-unloading tool car, comprise vehicle frame 4, be provided with support 20 below described vehicle frame 4, wheel 21 is arranged on support 20, and described vehicle frame 4 front end is provided with universal wheel 3; Described vehicle frame 4 both sides are provided with screw mandrel 16, and the slide block 25 controlling to slidably reciprocate on screw mandrel 16 by leading screw handwheel 2 is arranged on described screw mandrel 16, and screw mandrel 16 both sides are laid with leading screw guide peg 15.Vehicle frame 4 both sides are provided with handlebar 5, and constructor pull handle can control the travel direction of vehicle.
One end in the middle of vehicle frame 4 is provided with the chuck one that fixing fastening frame upper cover 18 assembles with fixing fastening frame lower cover 19, and the both sides of described chuck one are provided with turning cylinder and insert in vehicle frame 4; The other end in the middle of described vehicle frame 4 is provided with chuck 2 23; Uniform inside chuck 2 23 pulley 29 is installed.Described slide block 25 is provided with jack 7, is connected with hoisting bracket 22 between described jack 7 and chuck 2 23, jack pressure hand 6 is arranged on the side of jack 7.Chuck 2 23 and chuck one can be opened by securing member and lock.
The side of vehicle frame 4 is provided with rotating disk 9, and be connected with rotary tray motor 28 below described rotating disk 9, top is provided with triangle pylon 12, and one end, described pylon 12 bottom is hinged on rotating disk 9, and the other end is connected to above hydraulic cylinder 14; Described triangle pylon 12 top is provided with pull wire pulley 11; Be provided with reel 13 bottom described pylon 12, reel 13 side is connected with reel motor 10.Between chuck one and chuck 2 23, V-arrangement trogue 40 is also installed.Spiral leg 27 is installed below rotating disk 9.Described vehicle frame 4 is provided with motor 2 50, is connected with elevating lever 52 below motor 2 50, described elevating lever 52 is connected with drill bit 53, motor 2 50 screws in car body by bolt 51 and is fixed on vehicle frame 4.
Based on said apparatus, present invention also offers a kind of electrical network electric pole erection Self-loading-unloading construction method, it is characterized in that, comprise the following steps:
1) unitized frame 4 is moved to the accumulation position of electric pole 17, and spiral leg 27 is threaded to kiss the earth makes car body steady;
2) utilize suspension ring 30 to be enclosed within electric pole 17 two ends needing lifting, and fasten bracing wire 31 at suspension ring 30, and by bracing wire 31 by setting fastening after pull wire pulley 11 on reel 13;
3) reel motor 10 is started drive lower mandrel member 13 pack up bracing wire 31 and then electric pole 17 is sling, the height reached higher than vehicle frame 4 stops, hydraulic cylinder 14 is pulled back past for A-frame 12, electric pole 17 is raised and the stretching position near bedstead 4, now rotary tray motor 28 operation, is transferred to the top of vehicle frame 4 by electric pole 17;
4) electric pole 17 is arranged on chuck one and chuck 2 23 internal fixtion, utilize motor 2 50 to drive drill bit 53 to rotate excavation electric pole groove hole, adjustment car body after completing, is convenient to lower beam operation;
5) operate jack pressure hand 6 jack 7 is risen thus promotes chuck 2 23, constantly rotating threaded shaft handwheel 2 adjusts the position of jack 7 to adapt to the elevated height of chuck 2 23 simultaneously, in the process, electric pole 17 is with chuck one for the center of circle, and electric pole 17 is holded up and made to enter bottom it in electric pole groove hole by chuck 2 23 90-degree rotation;
6) to banket and closely knit to electric pole groove hole, open chuck and chuck 2 23, make electric pole 17 lose about collar, construction completes.
In addition to the implementation, the present invention can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection domain of application claims.

Claims (5)

1. electrical network electric pole erection Self-loading-unloading tool car, comprises vehicle frame (4), and described vehicle frame (4) below is provided with support (20), and wheel (21) is arranged on support (20), and described vehicle frame (4) front end is provided with universal wheel (3); It is characterized in that, described vehicle frame (4) both sides are provided with screw mandrel (16), and the slide block (25) controlling to slidably reciprocate on screw mandrel (16) by leading screw handwheel (2) is arranged on described screw mandrel (16); One end in the middle of described vehicle frame (4) is provided with the chuck one that fixing fastening frame upper cover (18) assembles with fixing fastening frame lower cover (19), and the both sides of described chuck one are provided with turning cylinder and insert in vehicle frame (4); The other end in the middle of described vehicle frame (4) is provided with chuck two (23); Described slide block (25) is provided with jack (7), is connected with hoisting bracket (22) between described jack (7) and chuck two (23), jack pressure hand (6) is arranged on the side of jack (7);
The side of described vehicle frame (4) is provided with rotating disk (9), described rotating disk (9) below is connected with rotary tray motor (28), top is provided with triangle pylon (12), and described pylon (12) one end, bottom is hinged on rotating disk (9), and the other end is connected to above hydraulic cylinder (14); Described triangle pylon (12) top is provided with pull wire pulley (11); Described pylon (12) bottom is provided with reel (13), and reel (13) side is connected with reel motor (10); Described vehicle frame (4) is provided with motor two (50), motor two (50) below is connected with elevating lever (52), described elevating lever (52) is connected with drill bit (53).
2. electrical network electric pole erection Self-loading-unloading tool car as claimed in claim 1, is characterized in that: described screw mandrel (16) both sides are laid with leading screw guide peg (15).
3. electrical network electric pole erection Self-loading-unloading tool car as claimed in claim 1, is characterized in that: described vehicle frame (4) both sides are provided with handlebar (5).
4. as the electrical network electric pole erection Self-loading-unloading tool car in claim 1-3 as described in any one, it is characterized in that: described chuck two (23) inner side is uniform is provided with pulley (29).
5. an electrical network electric pole erection Self-loading-unloading construction method, is characterized in that, comprise the following steps:
1) unitized frame (4) is moved to the accumulation position of electric pole (17), and spiral leg (27) is threaded to kiss the earth makes car body steady;
2) utilize suspension ring (30) to be enclosed within electric pole (17) two ends needing lifting, and fasten bracing wire (31) at suspension ring (30), and by bracing wire (31) by setting fastening after pull wire pulley (11) on reel (13);
3) reel motor (10) is started drive lower mandrel member (13) pack up bracing wire (31) and then electric pole (17) is sling, the height reached higher than vehicle frame (4) stops, hydraulic cylinder (14) is pulled back past for A-frame (12), electric pole (17) is raised and the stretching position near bedstead (4), now rotary tray motor (28) operation, is transferred to the top of vehicle frame (4) by electric pole (17);
4) electric pole (17) is arranged on chuck one and chuck two (23) internal fixtion, utilize motor two (50) to drive drill bit (53) to rotate excavation electric pole groove hole, adjustment car body after completing, is convenient to lower beam operation;
5) operate jack pressure hand (6) jack (7) is risen thus promotes chuck two (23), constantly the position of rotating threaded shaft handwheel (2) adjustment jack (7) adapts to the elevated height of chuck two (23) simultaneously, in the process, electric pole (17) is with chuck one for the center of circle, and electric pole (17) is holded up and made to enter bottom it in electric pole groove hole by chuck two (23) 90-degree rotation;
6) to banket and closely knit to electric pole groove hole, open chuck and chuck two (23), make electric pole (17) lose about collar, construction completes.
CN201510773951.7A 2015-11-13 2015-11-13 Power network electric pole sets up Self-loading-unloading tool car and its construction method Expired - Fee Related CN105298207B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201710246220.6A CN106978936B (en) 2015-11-13 2015-11-13 Power grid electric pole sets up Self-loading-unloading tool car and its construction method
CN201710246223.XA CN106948646B (en) 2015-11-13 2015-11-13 Power grid electric pole sets up Self-loading-unloading tool car construction method
CN201510773951.7A CN105298207B (en) 2015-11-13 2015-11-13 Power network electric pole sets up Self-loading-unloading tool car and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510773951.7A CN105298207B (en) 2015-11-13 2015-11-13 Power network electric pole sets up Self-loading-unloading tool car and its construction method

Related Child Applications (2)

Application Number Title Priority Date Filing Date
CN201710246223.XA Division CN106948646B (en) 2015-11-13 2015-11-13 Power grid electric pole sets up Self-loading-unloading tool car construction method
CN201710246220.6A Division CN106978936B (en) 2015-11-13 2015-11-13 Power grid electric pole sets up Self-loading-unloading tool car and its construction method

Publications (2)

Publication Number Publication Date
CN105298207A true CN105298207A (en) 2016-02-03
CN105298207B CN105298207B (en) 2017-09-26

Family

ID=55195953

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201710246223.XA Active CN106948646B (en) 2015-11-13 2015-11-13 Power grid electric pole sets up Self-loading-unloading tool car construction method
CN201710246220.6A Active CN106978936B (en) 2015-11-13 2015-11-13 Power grid electric pole sets up Self-loading-unloading tool car and its construction method
CN201510773951.7A Expired - Fee Related CN105298207B (en) 2015-11-13 2015-11-13 Power network electric pole sets up Self-loading-unloading tool car and its construction method

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201710246223.XA Active CN106948646B (en) 2015-11-13 2015-11-13 Power grid electric pole sets up Self-loading-unloading tool car construction method
CN201710246220.6A Active CN106978936B (en) 2015-11-13 2015-11-13 Power grid electric pole sets up Self-loading-unloading tool car and its construction method

Country Status (1)

Country Link
CN (3) CN106948646B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013816A (en) * 2016-06-02 2016-10-12 济宁山云宇内机电科技有限公司 Novel stand column robot
CN106121343A (en) * 2016-08-25 2016-11-16 无锡市同腾复合材料有限公司 Compound polyurethane material electric pole and installation method thereof
CN106193781A (en) * 2016-08-25 2016-12-07 无锡市同腾复合材料有限公司 Mechanical type device for erecting pole
CN106223710A (en) * 2016-08-24 2016-12-14 周科言 A kind of electric pole supporting device
CN106351503A (en) * 2016-08-25 2017-01-25 无锡市同腾复合材料有限公司 Mechanical upright installing method of polyurethane composite material pole
CN106368498A (en) * 2016-09-28 2017-02-01 国网山东省电力公司章丘市供电公司 Intelligent field electric-pole erecting device
CN107021423A (en) * 2017-06-07 2017-08-08 国网山东省电力公司济南市章丘区供电公司 A kind of electric pole location and installation equipment
CN107327202A (en) * 2017-08-01 2017-11-07 南昌叁润科技有限公司 It is a kind of that the vertical equipment directly installed can be carried out to concrete wire pole
CN109252809A (en) * 2018-07-25 2019-01-22 国网山东省电力公司枣庄供电公司 A kind of 10KV electric power transmission line foundation excavation device
CN110836039A (en) * 2019-11-26 2020-02-25 安徽省徽源电杆有限公司 Telegraph pole mounting equipment
CN110886531A (en) * 2019-12-05 2020-03-17 陈小雨 Overhead transmission line electric power tower installation construction method
CN112064534A (en) * 2020-09-07 2020-12-11 安徽引航人广告标识有限公司 Installation device and installation method of road traffic sign
CN112360226A (en) * 2020-11-30 2021-02-12 贺绍博 Telegraph pole mounting and dismounting integrated system

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107893569B (en) * 2016-06-24 2019-06-14 深圳供电局有限公司 Waste telegraph pole removing machine
CN109017505B (en) * 2018-08-08 2020-12-25 长沙中联恒通机械有限公司 Vehicle-mounted object transportation erecting device
CN118407715B (en) * 2024-07-01 2024-09-03 中铁七局集团西安铁路工程有限公司 Tunnel vault drilling equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IE35440B1 (en) * 1971-07-06 1976-02-18 Roche T Device for erecting poles
US4203266A (en) * 1977-12-15 1980-05-20 Dresser Industries, Inc. Mast leveling and support apparatus
US5794387A (en) * 1997-03-20 1998-08-18 Musco Corporation Device and method to lift and manipulate poles which are mounted onto a base
CN203961423U (en) * 2014-06-28 2014-11-26 国家电网公司 A kind of tool car of the bar that installs electric wiring
CN104213746A (en) * 2014-08-25 2014-12-17 国家电网公司 Convenient and fast transport cart for transporting buried wire pole
CN204126358U (en) * 2014-07-08 2015-01-28 国家电网公司 The high electric pole of a kind of safety carries establishes device

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8991777B2 (en) * 2013-04-23 2015-03-31 Gabriel Madril Post stabilization apparatus and method
CN203567604U (en) * 2013-11-15 2014-04-30 国家电网公司 Telegraph pole transporter
CN104120911B (en) * 2014-08-05 2016-07-13 江苏省电力公司扬州供电公司 A kind of adjustable angle type electric pole installing car
CN204152294U (en) * 2014-08-08 2015-02-11 国网山东省电力公司泰安供电公司 Portable multi-function pole centralizing device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IE35440B1 (en) * 1971-07-06 1976-02-18 Roche T Device for erecting poles
US4203266A (en) * 1977-12-15 1980-05-20 Dresser Industries, Inc. Mast leveling and support apparatus
US5794387A (en) * 1997-03-20 1998-08-18 Musco Corporation Device and method to lift and manipulate poles which are mounted onto a base
CN203961423U (en) * 2014-06-28 2014-11-26 国家电网公司 A kind of tool car of the bar that installs electric wiring
CN204126358U (en) * 2014-07-08 2015-01-28 国家电网公司 The high electric pole of a kind of safety carries establishes device
CN104213746A (en) * 2014-08-25 2014-12-17 国家电网公司 Convenient and fast transport cart for transporting buried wire pole

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013816B (en) * 2016-06-02 2019-05-10 济宁山云宇内机电科技有限公司 A kind of column robot
CN106013816A (en) * 2016-06-02 2016-10-12 济宁山云宇内机电科技有限公司 Novel stand column robot
CN106223710A (en) * 2016-08-24 2016-12-14 周科言 A kind of electric pole supporting device
CN106223710B (en) * 2016-08-24 2018-08-31 湖南福景电力建设有限公司 A kind of electric pole supporting device
CN106121343A (en) * 2016-08-25 2016-11-16 无锡市同腾复合材料有限公司 Compound polyurethane material electric pole and installation method thereof
CN106193781A (en) * 2016-08-25 2016-12-07 无锡市同腾复合材料有限公司 Mechanical type device for erecting pole
CN106351503A (en) * 2016-08-25 2017-01-25 无锡市同腾复合材料有限公司 Mechanical upright installing method of polyurethane composite material pole
CN106351503B (en) * 2016-08-25 2018-07-24 无锡市同腾复合材料有限公司 The mechanical pole type installation method of compound polyurethane material electric pole
CN106368498B (en) * 2016-09-28 2018-08-07 国网山东省电力公司章丘市供电公司 Field electric pole intelligence stringer
CN106368498A (en) * 2016-09-28 2017-02-01 国网山东省电力公司章丘市供电公司 Intelligent field electric-pole erecting device
CN107021423B (en) * 2017-06-07 2018-04-13 国网山东省电力公司济南市章丘区供电公司 A kind of electric pole location and installation equipment
CN107021423A (en) * 2017-06-07 2017-08-08 国网山东省电力公司济南市章丘区供电公司 A kind of electric pole location and installation equipment
CN107327202A (en) * 2017-08-01 2017-11-07 南昌叁润科技有限公司 It is a kind of that the vertical equipment directly installed can be carried out to concrete wire pole
CN109252809A (en) * 2018-07-25 2019-01-22 国网山东省电力公司枣庄供电公司 A kind of 10KV electric power transmission line foundation excavation device
CN110836039A (en) * 2019-11-26 2020-02-25 安徽省徽源电杆有限公司 Telegraph pole mounting equipment
CN110886531A (en) * 2019-12-05 2020-03-17 陈小雨 Overhead transmission line electric power tower installation construction method
CN110886531B (en) * 2019-12-05 2020-11-27 盛隆电气集团电力工程有限公司 Overhead transmission line electric power tower installation construction method
CN112064534A (en) * 2020-09-07 2020-12-11 安徽引航人广告标识有限公司 Installation device and installation method of road traffic sign
CN112360226A (en) * 2020-11-30 2021-02-12 贺绍博 Telegraph pole mounting and dismounting integrated system

Also Published As

Publication number Publication date
CN105298207B (en) 2017-09-26
CN106948646B (en) 2019-07-12
CN106978936A (en) 2017-07-25
CN106978936B (en) 2019-05-21
CN106948646A (en) 2017-07-14

Similar Documents

Publication Publication Date Title
CN105298207A (en) Self-loading and unloading tool car for power grid telegraph pole erecting and construction method thereof
CN105442931A (en) Power-grid telegraph-pole erecting self-loading-unloading device and construction method thereof
CN105442933A (en) Power-grid telegraph-pole erecting tool vehicle and construction method thereof
CN105421859A (en) Electricity grid telegraph pole erecting device and construction method
CN105442932A (en) Power grid pole burying device and construction method
CN105421860A (en) Electricity grid telegraph pole erecting device and construction method
CN204343771U (en) A kind of convenient line bar
CN204675699U (en) There is the balance crane from walking function
CN204185182U (en) A kind of manned vehicle Combined-type portable lifting device
CN208700331U (en) A kind of cable unwinding device
CN206685848U (en) A kind of communications cable is interim to cross line framework
CN204343778U (en) A kind of line bar
CN203567780U (en) Device used for carrying and installing distribution transformer
CN203903648U (en) Power line winding device
CN108063398B (en) 750V polyvinyl chloride insulation control cable installation vehicle capable of automatically fixing and lifting
CN219826384U (en) Combined tamping device for power construction
CN204691381U (en) A kind of electric pole rectifier
CN204905726U (en) Transformer substation uses simple and easy elevating gear
CN203547215U (en) Telegraph pole straightener
CN204754283U (en) Interim pole is changed to 10KV transmission line cement pole
CN108915346A (en) Electric pole sets up vehicle
CN204559003U (en) Electric power overhaul two wheeled electric insulation strand mill
CN109869035B (en) Portable device for horizontally placing or vertically erecting rod piece body
CN218778507U (en) Cable wire barrow
CN113838641B (en) Transformer with auxiliary mounting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Li Rongxi

Inventor after: Li Qinghui

Inventor before: Gao Shilong

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170714

Address after: Yi Shan Zhen Jia Wa Cun, Jining City, Shandong Province, 273500 west of Zoucheng city (West Po industry)

Applicant after: Shandong Changming electrical equipment Limited by Share Ltd

Address before: Eight Township village of Yongchang County in Gansu province 737200 Yubao six No. 22 dam in Jinchang City

Applicant before: Gao Shilong

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170926

Termination date: 20171113