CN107893569B - Scrap electrical wires bar removes machine - Google Patents

Scrap electrical wires bar removes machine Download PDF

Info

Publication number
CN107893569B
CN107893569B CN201711087303.1A CN201711087303A CN107893569B CN 107893569 B CN107893569 B CN 107893569B CN 201711087303 A CN201711087303 A CN 201711087303A CN 107893569 B CN107893569 B CN 107893569B
Authority
CN
China
Prior art keywords
pedestal
hydraulic cylinder
electrical wires
pin shaft
scrap electrical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711087303.1A
Other languages
Chinese (zh)
Other versions
CN107893569A (en
Inventor
龙彦旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Power Supply Bureau Co Ltd
Shenzhen Comtop Information Technology Co Ltd
Original Assignee
Shenzhen Power Supply Bureau Co Ltd
Shenzhen Comtop Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Power Supply Bureau Co Ltd, Shenzhen Comtop Information Technology Co Ltd filed Critical Shenzhen Power Supply Bureau Co Ltd
Priority to CN201711087303.1A priority Critical patent/CN107893569B/en
Publication of CN107893569A publication Critical patent/CN107893569A/en
Application granted granted Critical
Publication of CN107893569B publication Critical patent/CN107893569B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • E04H12/348Arrangements for demolition towers or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

The present invention is that scrap electrical wires bar removes machine, is related to power construction equipment technical field.The present invention uses U-type groove, scrap electrical wires bar can be made to remove machine removal scrap electrical wires bar more convenient;It is connected using pin shaft, each component can be made more flexible;Using hitch frame, the mobility that scrap electrical wires bar removes machine can be greatly increased, is readily transported;Using motor and reel, scrap electrical wires bar removal machine can be made to sling electric pole more time saving and energy saving;Using tire support, scrap electrical wires bar can be made to remove machine installation and replacement tire more safe and reliable;Using control cabinet, scrap electrical wires bar can be made to remove machine operation more convenient safe and reliable;Using spring, can make to pull up device more easily holding electric pole;Using zigzag protrusion is equipped in A hold-fast ring, B hold-fast ring, scrap electrical wires bar can be made to remove machine and be easier to extract electric pole;Using steel wire set, scrap electrical wires bar can be made to remove machine and be easier to sling electric pole.

Description

Scrap electrical wires bar removes machine
Technical field
The present invention is that scrap electrical wires bar removes machine, is related to power construction equipment technical field.
Background technique
Basis of the electric power as the national economic development, power grid security and power supply reliability have been broad masses' life and society The important leverage that can develop, and electric power facility is the carrier of stable electric power production, transport and supply, therefore electric power facility work has Very important meaning.However due to road construction, electric wire upgrading, the transfer of transformation case etc., various regions often will appear one Discarded electric pole a bit, the hidden corner in each streets and lanes of these electric poles is not easy to be found, and waste and old cement electric wire Bar, it is not only incompatible with ambient enviroment, the discrepancy of surrounding vehicles is also affected, brings inconvenience to the people of surrounding. Some electric pole ages, reinforcing bar was exposed inside some electric poles for a long time, and some even tilts, and there are huge security risks.
Summary of the invention
The technical problems to be solved by the invention are to provide the shifting of scrap electrical wires bar for above-mentioned technical deficiency Except machine can make scrap electrical wires bar remove machine removal scrap electrical wires bar more convenient using U-type groove;Using pedestal, can make to give up It is more safe and reliable that electric pole removes airborne device fixation;It is connected using pin shaft, each component can be made more flexible;Using leading Draw frame, the mobility that scrap electrical wires bar removes machine can be greatly increased, be readily transported;Using motor and reel, can make to give up It is more time saving and energy saving that electric pole removal machine slings electric pole;Using tire support, scrap electrical wires bar can be made to remove machine installation Re-type is more safe and reliable;Using tire, scrap electrical wires bar can be made to remove machine mobile more efficient rapidly;Using support Foot can be removed more safe and reliable when machine work with scrap electrical wires bar;Using control cabinet, scrap electrical wires bar can be made to remove machine behaviour Make more convenient safe and reliable.
In order to solve the above technical problems, the technical scheme adopted by the invention is that: including bottom plate, one on floor length direction Side is provided with U-type groove;The upper surface U-type groove two sides of bottom plate are symmetrically installed with A pedestal, B pedestal;A pedestal, B pedestal are connected by pin shaft It is connected to and pulls up device;The plate upper surface side opposite with U-type groove is equipped with C pedestal;C pedestal is connected with traction by pin shaft Frame;D pedestal, E pedestal, F pedestal are installed between the U-type groove and C pedestal of plate upper surface;D pedestal is connected with volume by pin shaft Cylinder;D pedestal side is equipped with motor in plate upper surface width direction;The arbor and revolver flowers of motor are keyed;E pedestal, the bottom F Seat is connected with hoisting device by pin shaft;Two sides are respectively mounted there are two tire support on lower surface of base plate length direction;Tire branch Frame is connected with tire by pin shaft;Two sides are respectively mounted there are two support foot on floor length direction;Between two support foots of the same side Control cabinet is installed.
The technical program is advanced optimized, the device that pulls up includes A hydraulic cylinder, B hydraulic cylinder, A hold-fast ring, B holding Ring, A hydraulic cylinder top are connect with A hold-fast ring by pin shaft;A hydraulic cylinder bottom is connect with A pedestal by pin shaft;B hydraulic cylinder top Portion is connect with B hold-fast ring by pin shaft;B hydraulic cylinder bottom is connect with B pedestal by pin shaft;A hold-fast ring is equipped with A semicircular ring, B semicircular ring is installed between plate upper surface A pedestal and U-type groove;B hold-fast ring is equipped with C semicircular ring, plate upper surface B pedestal D semicircular ring is installed between U-type groove;A spring is installed between A semicircular ring and B semicircular ring;Between C semicircular ring and D semicircular ring B spring is installed;Zigzag protrusion is equipped on the inside of A hold-fast ring, B hold-fast ring.
Advanced optimize the technical program, the hoisting device include C hydraulic cylinder, D hydraulic cylinder, wirerope, steel wire set, A fixed pulley, B fixed pulley, C hydraulic cylinder bottom are connect with E base bearing pin;D hydraulic cylinder bottom is connect with F base bearing pin;C hydraulic cylinder Lower part is equipped with G pedestal;D hydraulic cylinder upper end is connect with G base bearing pin;C hydraulic cylinder top is equipped with A fixed pulley, B fixed pulley; Wirerope one end is connect with reel, and the other end connects around A fixed pulley, B are surely sliding with steel wire set.
The technical program is advanced optimized, the control cabinet surface is equipped with control panel;It is successively installed in control panel There are A control-rod, B control-rod, C control-rod, D control-rod, E control-rod, F control-rod.
The technical program is advanced optimized, the support foot includes hydraulic cylinder, support plate, and support plate is welded on cylinder bottom Portion.
Compared with prior art, the invention has the following advantages that 1, using U-type groove, scrap electrical wires bar can be made to remove machine It is more convenient to remove scrap electrical wires bar;2, using pedestal, scrap electrical wires bar removal airborne device can be made to fix more, and safety can It leans on;3, it is connected using pin shaft, each component can be made more flexible;4, using hitch frame, the shifting of scrap electrical wires bar can be greatly increased Except the mobility of machine, it is readily transported;5, using motor and reel, scrap electrical wires bar can be made to remove machine and sling electric pole more It is time saving and energy saving;6, using tire support, scrap electrical wires bar can be made to remove machine installation and replacement tire more safe and reliable;7, it uses Tire can make scrap electrical wires bar remove machine mobile more efficient rapidly;8, using support foot, machine can be removed with scrap electrical wires bar It is more safe and reliable when work;9, using control cabinet, scrap electrical wires bar can be made to remove machine operation more convenient safe and reliable; 10, using spring, can make to pull up device more easily holding electric pole;11, using in A hold-fast ring, B hold-fast ring be equipped with zigzag Protrusion can make scrap electrical wires bar remove machine and be easier to extract electric pole;12, using steel wire set, scrap electrical wires bar can be made to move Except machine is easier to sling electric pole.
Detailed description of the invention
Fig. 1 is the main view that scrap electrical wires bar removes machine.
Fig. 2 is the top view that scrap electrical wires bar removes machine.
Fig. 3 is that scrap electrical wires bars removes machine and pulls up schematic device.
Fig. 4 is the hoisting device main view that scrap electrical wires bar removes machine.
Fig. 5 is the hoisting device side view that scrap electrical wires bar removes machine.
Fig. 6 is the control panel schematic diagram that scrap electrical wires bar removes machine.
In figure, 1, bottom plate;2, U-type groove;3, A pedestal;4, B pedestal;5, C pedestal;6, hitch frame;7, D pedestal;8, E pedestal; 9, F pedestal;10, reel;11, motor;12, tire support;13, tire;14, device is pulled up;15, hoisting device;16, support foot; 17, control cabinet;18, A hydraulic cylinder;19, B hydraulic cylinder;20, A hold-fast ring;21, B hold-fast ring;28, C hydraulic cylinder;29, D hydraulic cylinder; 30, wirerope;31, steel wire set;32, A fixed pulley;33, B fixed pulley;34, G pedestal;35, control panel;36, A control-rod;37, B control-rod;38, C control-rod;39, D control-rod;40, E control-rod;41, F control-rod;42, hydraulic cylinder;43, support plate.
Specific embodiment
In order to make the objectives, technical solutions and advantages of the present invention clearer, With reference to embodiment and join According to attached drawing, the present invention is described in more detail.It should be understood that these descriptions are merely illustrative, and it is not intended to limit this hair Bright range.In addition, in the following description, descriptions of well-known structures and technologies are omitted, to avoid this is unnecessarily obscured The concept of invention.
Specific embodiment: in conjunction with shown in Fig. 1-6, including bottom plate 1, side is provided with U-type groove 2 on 1 length direction of bottom plate;Bottom 2 two sides of upper surface U-type groove of plate 1 are symmetrically installed with A pedestal 3, B pedestal 4;A pedestal 3, B pedestal 4 are connected with by pin shaft and are pulled up Device 14;1 upper surface of the bottom plate side opposite with U-type groove 2 is equipped with C pedestal 5;C pedestal 5 is connected with hitch frame 6 by pin shaft; D pedestal 7, E pedestal 8, F pedestal 9 are installed between the U-type groove 2 and C pedestal 5 of 1 upper surface of bottom plate;D pedestal 7 is connected by pin shaft There is reel 10;7 side of D pedestal is equipped with motor 11 on 1 upper surface width direction of bottom plate;The arbor and 10 spline of reel of motor 11 Connection;E pedestal 8, F pedestal 9 are connected with hoisting device 15 by pin shaft;Two sides are mounted on 1 lower surface length direction of bottom plate Two tire supports 12;Tire support 12 is connected with tire 13 by pin shaft;There are two two sides are respectively mounted on 1 length direction of bottom plate Support foot 16;Control cabinet 17 is installed between two support foots 16 of the same side;Pulling up device 14 includes A hydraulic cylinder 18, B hydraulic cylinder 19, A hold-fast ring 20, B hold-fast ring 21,18 top of A hydraulic cylinder are connect with A hold-fast ring 20 by pin shaft;18 bottom of A hydraulic cylinder and A Pedestal 3 is connected by pin shaft;19 top of B hydraulic cylinder is connect with B hold-fast ring 21 by pin shaft;19 bottom of B hydraulic cylinder and B pedestal 4 It is connected by pin shaft;A hold-fast ring 20 is equipped with A semicircular ring, is equipped with B semicircle between 1 upper surface A pedestal 3 of bottom plate and U-type groove 2 Ring;B hold-fast ring 21 is equipped with C semicircular ring, is equipped with D semicircular ring between 1 upper surface B pedestal 4 of bottom plate and U-type groove 2;A semicircular ring A spring is installed between B semicircular ring;B spring is installed between C semicircular ring and D semicircular ring;A hold-fast ring 20, B hold-fast ring 21 Inside is equipped with zigzag protrusion;Hoisting device 15 is fixed including C hydraulic cylinder 28, D hydraulic cylinder 29, wirerope 30, steel wire set 31, A Pulley 32, B fixed pulley 33,28 bottom of C hydraulic cylinder are connect with 8 pin shaft of E pedestal;29 bottom of D hydraulic cylinder is connect with 9 pin shaft of F pedestal; 28 lower part of C hydraulic cylinder is equipped with G pedestal 34;29 upper end of D hydraulic cylinder is connect with 34 pin shaft of G pedestal;28 top of C hydraulic cylinder is equipped with A fixed pulley 32, B fixed pulley 33;30 one end of wirerope is connect with reel 10, the other end around A fixed pulley 32, B fixed pulley 33 with 31 connection of steel wire set;17 surface of control cabinet is equipped with control panel 35;A control-rod 36, B control are sequentially installed in control panel 35 Bar 37, C control-rod 38, D control-rod 39, E control-rod 40, F control-rod 41;Support foot 16 includes hydraulic cylinder 42, support plate 43, support Plate 43 is welded on 42 bottom of hydraulic cylinder.
Wherein, as shown in fig. 6, being sequentially installed with A control-rod 36, B control-rod 37, C control-rod 38, D in control panel 35 Control-rod 39, E control-rod 40, F control-rod 41, A control-rod 36 are used to control the flexible of A hydraulic cylinder 18;B control-rod 37 is for controlling B hydraulic cylinder 19 processed stretches;C control-rod 38 is used to control the flexible of C hydraulic cylinder 28;D control-rod 39 is for controlling D hydraulic cylinder 29 It is flexible;E control-rod 40, to rotate with movable reel 10, is controlled for controlling rotating and reverse for motor 11 by wirerope 30 The height of steel wire set 31 processed;F control-rod 41 is used to control the flexible of 16 hydraulic cylinder 42 of support foot, so that scrap electrical wires bar is removed machine It is fixed on the ground by support plate 43.
In use, scrap electrical wires bar removal machine is moved to specified yard using the hitch frame 6 on bottom plate 1 by user Institute can be greatly increased the mobility that scrap electrical wires bar removes machine, be readily transported using hitch frame 6.Pass through the wheel under bottom plate 1 The mobile scrap electrical wires bar of tire 13 removes machine, is in electric pole in U-type groove 2, using U-type groove 2, scrap electrical wires bar can be made to remove It is more convenient that machine removes scrap electrical wires bar;Using tire 13, scrap electrical wires bar can be made to remove machine mobile more efficient rapidly. Control cabinet 17 is opened, scrap electrical wires bar is controlled by the F control-rod 40 on control panel 34 first and removes the support foot of machine two sides four 16 hydraulic cylinder 42 extends, in this way can be to prevent until the support plate 43 of 42 bottom of hydraulic cylinder supports scrap electrical wires bar and removes machine Senior general's tire 13 is crossed because of pressure when only working and presses quick-fried, using support foot 16, can be removed with scrap electrical wires bar safer when machine work Reliably;Hold A hold-fast ring 20, B hold-fast ring 21 tightly electric pole, A hold-fast ring 20, B hold-fast ring 21 are to set on the inside of semicircle and the two Have zigzag raised, frictional force can be increased, skidding when can prevent from holding electric pole tightly, secondly A hold-fast ring 20 and bottom plate 1 it Between, it is separately installed with A spring, B spring between B hold-fast ring 21 and bottom plate 1, A hold-fast ring 20 and B hold-fast ring 21 can be made to work It is drawn close always to electric pole direction in the process, A hold-fast ring 20 and B hold-fast ring 21 in the course of work can be prevented to be detached from electric pole, Smoothly scrap electrical wires bar cannot smoothly be extracted.Then C hydraulic cylinder 28 is controlled by C control-rod 37 to extend, pass through D control-rod 38 Control D hydraulic cylinder 29 extends to adjust the angle of C hydraulic cylinder 28, so that steel wire set 31 is exactly in the tops of electric pole, using steel Silk braid 31 can make scrap electrical wires bar remove machine and be easier fixed and sling electric pole.Reel 10 is controlled by E control-rod 39 Rotation increases the length of wirerope 30, so that steel wire set 31 is entangled scrap electrical wires bar, then inverts again reel 10, reduces steel The length of cord 30 makes steel wire set 31 be locked scrap electrical wires bar, and scrap electrical wires bar is kept to be constantly in vertical state, in this way may be used To prevent scrap electrical wires bar swing during extracting electric pole, there is security risk.After preparation, start It carries out extracting scrap electrical wires bar, extends A hydraulic cylinder 18 by A control-rod 35, extend B hydraulic cylinder 19 by B control-rod 36, It is worth noting that, user should operate A control-rod 35 and B control-rod 36 simultaneously, it is ensured that 18 elongation of A hydraulic cylinder and B are hydraulic 19 elongation of cylinder is consistent, prevents electric pole discontinuity, inclined danger occurs, with A hydraulic cylinder 18 and B hydraulic cylinder 19 Elongation, positioned at the A hold-fast ring 20 at A hydraulic cylinder 18 and the top of B hydraulic cylinder 19, B hold-fast ring 21 to the pressure of scrap electrical wires bar also with Increase;A spring, B spring also extend therewith, because A spring is fixed between A hold-fast ring 20 and bottom plate 1, B spring is fixed on B Between hold-fast ring 21 and bottom plate 1, A hold-fast ring 20, B hold-fast ring 21 can be prevented to be detached from scrap electrical wires bar, A bullet during the work time Spring, B spring elongation are more, bigger to the power of A hold-fast ring 20, B hold-fast ring 21, and A hold-fast ring 20, B hold-fast ring 21 are to waste and old The pressure of electric pole is bigger.During scrap electrical wires bar is pulled out next, user should control reel by E control-rod 39 10 so that reduce the length of wirerope 30, so that steel wire set 31 is locked scrap electrical wires bar, is constantly subjected to electric pole straight up Pulling force prevents electric pole during extracting scrap electrical wires bar from the case where swing occur, makes electric pole discontinuity, Operation failure.After scrap electrical wires bar is smoothly extracted, operation A control 35 and B control-rod 36 makes A hydraulic cylinder 18 and B hydraulic cylinder 19 shrink, and A hold-fast ring 20, B hold-fast ring 21 are also detached from scrap electrical wires bar therewith, and A spring, B spring restore to initial length.Pass through F control-rod 40 packs up support foot 16, and scrap electrical wires bar is removed machine by hitch frame 6 and tire 13 and is moved forward, while being controlled by E Bar 39 processed shortens wirerope 30, and scrap electrical wires bar bottom is made to land, and constantly moves forward as scrap electrical wires bar removes machine, finally makes Scrap electrical wires bar is fully seated at ground, finally takes off steel wire set 31.Scrap electrical wires bar removes machine like this easily will be waste and old Electric pole is extracted.
It should be understood that above-mentioned specific embodiment of the invention is used only for exemplary illustration or explains of the invention Principle, but not to limit the present invention.Therefore, that is done without departing from the spirit and scope of the present invention is any Modification, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.In addition, appended claims purport of the present invention Covering the whole variations fallen into attached claim scope and boundary or this range and the equivalent form on boundary and is repairing Change example.

Claims (1)

1. scrap electrical wires bar removes machine, it is characterised in that: including bottom plate (1), side is provided with U-type groove on bottom plate (1) length direction (2);Upper surface U-type groove (2) two sides of bottom plate (1) are symmetrically installed with A pedestal (3), B pedestal (4);A pedestal (3), B pedestal (4) It is connected with by pin shaft and pulls up device (14);Bottom plate (1) upper surface and U-type groove (2) opposite side are equipped with C pedestal (5);C Pedestal (5) is connected with hitch frame (6) by pin shaft;The bottom D is installed between the U-type groove (2) and C pedestal (5) of bottom plate (1) upper surface Seat (7), E pedestal (8), F pedestal (9);D pedestal (7) is connected with reel (10) by pin shaft;Bottom plate (1) upper surface width direction On in D pedestal (7) side motor (11) are installed;The arbor of motor (11) is connect with reel (10) spline;E pedestal (8), the bottom F Seat (9) is connected with hoisting device (15) by pin shaft;Two sides are respectively mounted there are two tire branch on the length direction of bottom plate (1) lower surface Frame (12);Tire support (12) is connected with tire (13) by pin shaft;On bottom plate (1) length direction two sides be respectively mounted there are two support Foot (16) is wherein equipped with control cabinet (17) between the two of side support foot (16);
Pulling up device (14) includes A hydraulic cylinder (18), B hydraulic cylinder (19), A hold-fast ring (20), B hold-fast ring (21), A hydraulic cylinder (18) top is connect with A hold-fast ring (20) by pin shaft;A hydraulic cylinder (18) bottom is connect with A pedestal (3) by pin shaft;B is hydraulic It is connect with B hold-fast ring (21) by pin shaft at the top of cylinder (19);B hydraulic cylinder (19) bottom is connect with B pedestal (4) by pin shaft;A is embraced Tight ring (20) is equipped with A semicircular ring, is equipped with B semicircular ring between bottom plate (1) upper surface A pedestal (3) and U-type groove (2);B is held tightly Ring (21) is equipped with C semicircular ring, is equipped with D semicircular ring between bottom plate (1) upper surface B pedestal (4) and U-type groove (2);A semicircular ring A spring is installed between B semicircular ring;B spring is installed between C semicircular ring and D semicircular ring;A hold-fast ring (20), B hold-fast ring (21) inside is equipped with zigzag protrusion;
Hoisting device (15) includes C hydraulic cylinder (28), D hydraulic cylinder (29), wirerope (30), steel wire set (31), A fixed pulley (32), B fixed pulley (33), C hydraulic cylinder (28) bottom are connect with E pedestal (8) pin shaft;D hydraulic cylinder (29) bottom and F pedestal (9) Pin shaft connection;C hydraulic cylinder (28) lower part is equipped with G pedestal (34);D hydraulic cylinder (29) upper end is connect with G pedestal (34) pin shaft;C Hydraulic cylinder (28) top is equipped with A fixed pulley (32), B fixed pulley (33);Wirerope (30) one end is connect with reel (10), another End connect around A fixed pulley (32), B fixed pulley (33) with steel wire set (31);
Control cabinet (17) surface is equipped with control panel (35);A control-rod (36), B control are sequentially installed in control panel (35) Bar (37), C control-rod (38), D control-rod (39), E control-rod (40), F control-rod (41);
Support foot (16) includes hydraulic cylinder (42), support plate (43), and support plate (43) is welded on hydraulic cylinder (42) bottom.
CN201711087303.1A 2016-06-24 2016-06-24 Scrap electrical wires bar removes machine Active CN107893569B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711087303.1A CN107893569B (en) 2016-06-24 2016-06-24 Scrap electrical wires bar removes machine

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201711087303.1A CN107893569B (en) 2016-06-24 2016-06-24 Scrap electrical wires bar removes machine
CN201610463604.9A CN105971371B (en) 2016-06-24 2016-06-24 Scrap electrical wires bar removes machine

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201610463604.9A Division CN105971371B (en) 2016-06-24 2016-06-24 Scrap electrical wires bar removes machine

Publications (2)

Publication Number Publication Date
CN107893569A CN107893569A (en) 2018-04-10
CN107893569B true CN107893569B (en) 2019-06-14

Family

ID=57022615

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201711087303.1A Active CN107893569B (en) 2016-06-24 2016-06-24 Scrap electrical wires bar removes machine
CN201610463604.9A Active CN105971371B (en) 2016-06-24 2016-06-24 Scrap electrical wires bar removes machine

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201610463604.9A Active CN105971371B (en) 2016-06-24 2016-06-24 Scrap electrical wires bar removes machine

Country Status (1)

Country Link
CN (2) CN107893569B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106517043B (en) * 2016-11-16 2019-01-04 国网山东省电力公司龙口市供电公司 A kind of power test anti-fall device for climbing
CN109826487B (en) * 2018-12-29 2020-08-18 国网山东省电力公司聊城供电公司 Rapid righting machine for inclined electric pole and use method thereof
CN110872071A (en) * 2019-11-28 2020-03-10 安徽省徽源电杆有限公司 Wire pole supporting device
CN112360226B (en) * 2020-11-30 2022-02-01 山东得胜电力股份有限公司 Telegraph pole mounting and dismounting integrated system
CN114776126B (en) * 2022-04-22 2023-04-21 国网山东省电力公司东明县供电公司 Auxiliary device is removed to abandonment wire pole

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20005968U1 (en) * 2000-03-31 2000-07-13 Rollwa Zelte Und Planen Gmbh Device for pulling out an anchoring element, preferably driven into the ground
CN201053209Y (en) * 2007-05-23 2008-04-30 上海市格致中学 Rod pulling device
CN103806735A (en) * 2014-03-18 2014-05-21 国家电网公司 Method for replacing electric pole in power pipe network
CN203755786U (en) * 2014-04-10 2014-08-06 长兴泗安科林植保专业合作社 Telegraph pole installation pulling machine
CN103982073A (en) * 2014-05-06 2014-08-13 国家电网公司 Pipe tower removing method
CN203879092U (en) * 2014-05-16 2014-10-15 国家电网公司 Telegraph pole lifting device
CN105464457A (en) * 2016-01-05 2016-04-06 江苏农林职业技术学院 Telegraph pole transporting, erecting and removing device
CN106948646A (en) * 2015-11-13 2017-07-14 高世龙 Power network electric pole sets up Self-loading-unloading tool car construction method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100591859C (en) * 2007-08-16 2010-02-24 江苏华东建设基础工程总公司 Pile pulling construction method for pile pulling machine
US8555563B1 (en) * 2008-05-13 2013-10-15 Thomas K. Wong Pole installation system
CN103953217B (en) * 2014-04-10 2016-04-06 长兴泗安科林植保专业合作社 A kind of electric pole installs pulling machine
CN106948645B (en) * 2015-11-13 2019-04-30 新昌县晋通机械有限公司 Power grid electric pole erecting tools vehicle and its construction method
CN205894837U (en) * 2016-06-24 2017-01-18 浙江海洋大学 Old and useless wire pole removes machine

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20005968U1 (en) * 2000-03-31 2000-07-13 Rollwa Zelte Und Planen Gmbh Device for pulling out an anchoring element, preferably driven into the ground
CN201053209Y (en) * 2007-05-23 2008-04-30 上海市格致中学 Rod pulling device
CN103806735A (en) * 2014-03-18 2014-05-21 国家电网公司 Method for replacing electric pole in power pipe network
CN203755786U (en) * 2014-04-10 2014-08-06 长兴泗安科林植保专业合作社 Telegraph pole installation pulling machine
CN103982073A (en) * 2014-05-06 2014-08-13 国家电网公司 Pipe tower removing method
CN203879092U (en) * 2014-05-16 2014-10-15 国家电网公司 Telegraph pole lifting device
CN106948646A (en) * 2015-11-13 2017-07-14 高世龙 Power network electric pole sets up Self-loading-unloading tool car construction method
CN105464457A (en) * 2016-01-05 2016-04-06 江苏农林职业技术学院 Telegraph pole transporting, erecting and removing device

Also Published As

Publication number Publication date
CN105971371A (en) 2016-09-28
CN105971371B (en) 2017-12-29
CN107893569A (en) 2018-04-10

Similar Documents

Publication Publication Date Title
CN107893569B (en) Scrap electrical wires bar removes machine
KR101873421B1 (en) Spatial Extendible Mechanization Working Device Using Live line Working Vehicle
CN102849587B (en) Method and device for replacing mine hoisting ropes
CN105421859B (en) A kind of electric power network electric pole stringer and construction method
CN203826828U (en) Maintenance and conveyance platform for switch cabinet breaker
CN107825623A (en) A kind of electric automobile tire recovery cutting equipment
CN105347206B (en) The intelligent assistance platform of GIS dismounting
CN106426034A (en) Tool bag for electrician
CN205159918U (en) Transmission line elevating gear
CN108821161B (en) Device for moving cable trench cover plate
CN104967050B (en) Electronic manned driving can be drawn
CN102219152B (en) Automatic connecting and electrifying system for tire crane cable reel
CN109066420A (en) A kind of handcart type breaker apparatus for examination and repair
CN202744154U (en) Device for replacing mine hoisting rope
CN210682174U (en) Movable belt hoisting device
CN205894837U (en) Old and useless wire pole removes machine
CN105439023A (en) Transformer substation weight lifting device
CN104261035A (en) Cable trench cover plate removing and placing tool
CN104118683A (en) Loading and stacking machine
CN203865930U (en) Cable cover plate lifting device
CN203402859U (en) Electric standard section introduction device of tower crane
CN102101622A (en) Fixed rotatable well conveying device
CN206232358U (en) A kind of switch cubicle simple and easy hoisting device
CN105152053B (en) Liquid pneumoelectric drilling extraction penetrating device
CN105775999A (en) Equipment for lifting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190424

Address after: 230000 Anhui Hefei high tech Zone Innovation Industrial Park two phase J2 District C block 18 floor.

Applicant after: Hefei dragon totem Information Technology Co., Ltd.

Address before: 652000 No. 66 Guanshang East Road, Guandu District, Kunming City, Yunnan Province

Applicant before: Long Yanxu

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190520

Address after: 518001 electric power dispatching and communication building, 4020 Shennan East Road, Luohu District, Shenzhen, Guangdong

Applicant after: Shenzhen Power Supply Bureau Co., Ltd.

Applicant after: Shenzhen Comtop Information Technology Co., Ltd.

Address before: 230000 Anhui Hefei high tech Zone Innovation Industrial Park two phase J2 District C block 18 floor.

Applicant before: Hefei dragon totem Information Technology Co., Ltd.

GR01 Patent grant
GR01 Patent grant