CN105298108B - 一种快速联结脚手架钢管 - Google Patents
一种快速联结脚手架钢管 Download PDFInfo
- Publication number
- CN105298108B CN105298108B CN201510618270.3A CN201510618270A CN105298108B CN 105298108 B CN105298108 B CN 105298108B CN 201510618270 A CN201510618270 A CN 201510618270A CN 105298108 B CN105298108 B CN 105298108B
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- pipe body
- bearing
- jointing
- quick
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
本发明公开了一种快速联结脚手架钢管,包括钢管本体,所述钢管本体上对称安装有两个支座,且两个支座之间的距离大于钢管本体的直径,所述钢管本体上还设置有插销,支座上开设有与插销的销杆相匹配的销孔,当两个钢管本体交叉连接时,两个钢管本体分别命名为第一钢管本体和第二钢管本体,第一钢管本体的插销的销杆插入第二钢管本体的支座上的销孔内,第二钢管本体的插销的销杆也插入第一钢管本体的支座上的销孔内;该快速联结脚手架钢管改变了传统脚手架钢管扣件连接的方式,无需使用螺栓,将支座直接焊接在钢管的预设安装位置,大大提高了脚手架的安装和拆卸效率,避免了长时间拧螺栓作业。
Description
技术领域
本发明涉及脚手架技术领域,具体是一种快速联结脚手架钢管。
背景技术
脚手架是指施工现场为工人操作并解决垂直和水平运输而搭设的各种支架。目前市场上最常用的脚手架为扣件式钢管脚手架,扣件式钢管脚手架具有维修简单、使用寿命长以及投入成本低等多种优点。扣件式钢管脚手架在立设钢管与横设钢管的连接处采用扣件联结。按GB 15831-2006由可锻铸铁或铸钢制造的钢管脚手架扣件,通过螺栓联结加固。在实际使用过程中,工人需花费很长时间来拧紧螺栓或松开螺栓,安装及拆卸麻烦,用时长。另外脚手架一般安装在室外建筑工地,扣件的螺栓螺纹容易受磕碰、生锈或被混凝土包裹破坏,影响脚手架的牢固性。而且立管扣件的紧固力依赖于摩擦力,而摩擦力由工人对螺栓的拧紧程度决定,若没有拧紧,摩擦力过小,则立管扣件容易打滑,存在安全隐患,若拧过头,则容易出现螺栓断裂的状况。因此通过螺栓紧固安装的脚手架,不但安装效率低,而且可靠性差。
发明内容
本发明的目的在于提供一种快速联结脚手架钢管,以解决上述背景技术中提出的问题。
为实现上述目的,本发明提供如下技术方案:
一种快速联结脚手架钢管,包括钢管本体,所述钢管本体上对称安装有两个支座,且两个支座之间的距离大于钢管本体的直径,所述钢管本体上还设置有插销,支座上开设有与插销的销杆相匹配的销孔,当两个钢管本体交叉连接时,两个钢管本体分别命名为第一钢管本体和第二钢管本体,第一钢管本体的插销的销杆插入第二钢管本体的支座上的销孔内,第二钢管本体的插销的销杆也插入第一钢管本体的支座上的销孔内。
作为本发明进一步的方案:所述支座焊接固定在钢管本体上。
作为本发明再进一步的方案:所述插销焊接固定在钢管本体上,插销的数量与支座的数量相同。
与现有技术相比,本发明的有益效果是:该快速联结脚手架钢管改变了传统脚手架钢管扣件连接的方式,无需使用螺栓,将支座直接焊接在钢管的预设安装位置,大大提高了脚手架的安装和拆卸效率,避免了长时间拧螺栓作业,另外横设钢管直接压在立设钢管的支座上,而不是依靠摩擦力紧固,因此联结更加可靠。
附图说明
图1为快速联结脚手架钢管的结构示意图。
图2为两个快速联结脚手架钢管交叉安装的示意图。
图中:1-支座、2-插销、3-钢管本体。
具体实施方式
下面结合具体实施方式对本专利的技术方案作进一步详细地说明。
请参阅图1-2,一种快速联结脚手架钢管,包括钢管本体3,所述钢管本体3上对称安装有两个支座1,且两个支座1之间的距离大于钢管本体3的直径,支座1位于钢管本体3的安装位置处,该安装位置用于安装与该钢管本体3交叉设置的另一钢管,优选的,所述支座1焊接固定在钢管本体3上,两个支座1之间的距离略大于钢管本体3的直径,在组装过程中,将立设的钢管本体3与横设的钢管本体3交叉结合,且横设的钢管本体3的管体嵌入立设的钢管本体3的两个支座1之间,横设的钢管本体3直接压在立设的钢管本体3的支座1上,依靠正压力承重,稳定可靠,为了防止两个钢管本体3在非受力方向侧滑,所述钢管本体3上还设置有插销2,支座1上开设有与插销2的销杆相匹配的销孔,当两个钢管本体3交叉连接时,两个钢管本体3分别命名为第一钢管本体和第二钢管本体,第一钢管本体的插销2的销杆插入第二钢管本体的支座1上的销孔内,第二钢管本体的插销2的销杆也插入第一钢管本体的支座1上的销孔内,以防止侧滑,所述插销2焊接固定在钢管本体3上,插销2的数量与支座1的数量相同。
本发明的工作原理是:所述快速联结脚手架钢管,在进行立设钢管与横设钢管之间的组装时,将立设的钢管本体3与横设的钢管本体3交叉结合,且横设的钢管本体3的管体嵌入立设的钢管本体3的两个支座1之间,横设的钢管本体3直接压在立设的钢管本体3的支座1上,依靠正压力承重,稳定可靠,立设的钢管本体3的管体也嵌入横设的钢管本体3的两个支座1之间,使两者连接稳定。将立设的钢管本体3的插销2的销杆插入横设的钢管本体3的支座1上的销孔内,横设的钢管本体3的插销2的销杆也插入立设的钢管本体3的支座1上的销孔内。从而将立设的钢管本体3与横设的钢管本体3组装完毕。需要拆卸时,只需要拔出插销的销杆,即可将钢管本体3分开。
所述快速联结脚手架钢管改变了传统脚手架钢管扣件连接的方式,无需使用螺栓,将支座直接焊接在钢管的预设安装位置,大大提高了脚手架的安装和拆卸效率,避免了长时间拧螺栓作业,另外横设钢管直接压在立设钢管的支座上,而不是依靠摩擦力紧固,因此联结更加可靠。
上面对本专利的较佳实施方式作了详细说明,但是本专利并不限于上述实施方式,在本领域的普通技术人员所具备的知识范围内,还可以在不脱离本专利宗旨的前提下作出各种变化。
Claims (3)
1.一种快速联结脚手架钢管,包括钢管本体(3),其特征在于,所述钢管本体(3)上对称安装有两个支座(1),且两个支座(1)之间的距离大于钢管本体(3)的直径,所述钢管本体(3)上还设置有插销(2),支座(1)上开设有与插销(2)的销杆相匹配的销孔,当两个钢管本体(3)交叉连接时,两个钢管本体(3)分别命名为第一钢管本体和第二钢管本体,第一钢管本体的插销(2)的销杆插入第二钢管本体的支座(1)上的销孔内,第二钢管本体的插销(2)的销杆也插入第一钢管本体的支座(1)上的销孔内。
2.根据权利要求1所述的快速联结脚手架钢管,其特征在于,所述支座(1)焊接固定在钢管本体(3)上。
3.根据权利要求1或2所述的快速联结脚手架钢管,其特征在于,所述插销(2)焊接固定在钢管本体(3)上,插销(2)的数量与支座(1)的数量相同。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510618270.3A CN105298108B (zh) | 2015-09-24 | 2015-09-24 | 一种快速联结脚手架钢管 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510618270.3A CN105298108B (zh) | 2015-09-24 | 2015-09-24 | 一种快速联结脚手架钢管 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105298108A CN105298108A (zh) | 2016-02-03 |
CN105298108B true CN105298108B (zh) | 2017-11-17 |
Family
ID=55195858
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510618270.3A Expired - Fee Related CN105298108B (zh) | 2015-09-24 | 2015-09-24 | 一种快速联结脚手架钢管 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105298108B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109339432A (zh) * | 2018-10-30 | 2019-02-15 | 宁波职业技术学院 | 一种重力自锁脚手架的搭接结构及其安装方法 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0796833B2 (ja) * | 1992-09-25 | 1995-10-18 | 政太郎 佐藤 | 管材連結用クランプ金具組立体 |
CN2516647Y (zh) * | 2001-11-26 | 2002-10-16 | 上海新雄室内装潢设计室 | 脚手架固定装置 |
JP4111889B2 (ja) * | 2003-07-17 | 2008-07-02 | 株式会社国元商会 | クランプ装置 |
CN2804266Y (zh) * | 2005-05-10 | 2006-08-09 | 白虹 | 快速装卸钢管脚手架的扣件 |
JP3154680U (ja) * | 2009-08-06 | 2009-10-22 | 株式会社荒井製作所 | 幅木用クランプ |
CN205012639U (zh) * | 2015-09-24 | 2016-02-03 | 宁波职业技术学院 | 一种快速联结脚手架钢管 |
-
2015
- 2015-09-24 CN CN201510618270.3A patent/CN105298108B/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN105298108A (zh) | 2016-02-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104847129B (zh) | 一种钢筋混凝土梁与楼板的加固装置的施工方法 | |
CN104179341B (zh) | 一种悬挑承力架组合定位装置安装方法 | |
CN205400024U (zh) | 一种可以拆卸重复使用的工具式外脚手架螺栓连墙件 | |
CN101250943B (zh) | 用于改造扣件式钢管脚手架的连接装置 | |
CN206859719U (zh) | 一种用于临边防护的高效装配式安全护栏 | |
CN105298108B (zh) | 一种快速联结脚手架钢管 | |
CN205531248U (zh) | 一种建筑脚手架构件 | |
CN208982068U (zh) | 隧道全断面施工整体支护钢拱架用顶升固定装置 | |
CN205012639U (zh) | 一种快速联结脚手架钢管 | |
CN209244225U (zh) | 一种可调节长度的斜撑杆 | |
CN2835437Y (zh) | 一种脚手架紧固扣件 | |
CN206769350U (zh) | 大型电站锅炉钢构架上的外挑网脚手架 | |
CN206753015U (zh) | 一种装饰脚手架后置连墙件装置 | |
CN204163073U (zh) | 桩基钢筋笼套筒钢筋接头结构 | |
CN109024885B (zh) | 一种输送廊道安保结构 | |
CN203891453U (zh) | 带梅花头螺栓的钢管脚手架扣件 | |
CN208966008U (zh) | 一种可重复利用的外墙钢管脚手架连墙件装置 | |
CN102174854B (zh) | 可拆除式自锁型外脚手架与建筑物连接器 | |
CN201152014Y (zh) | 一种脚手架连接件 | |
CN206299110U (zh) | 一种装配式脚手架的连墙件 | |
CN215331398U (zh) | 一种钢管脚手架连墙构件 | |
CN108425490A (zh) | 一种土木工程脚手架连接件 | |
CN215717121U (zh) | 可调节盘扣脚手架配套连墙杆 | |
CN108005375A (zh) | 一种脚手架连墙组件及其施工方法 | |
CN205064467U (zh) | 一种l形角钢与c形钢的连接结构及用于连接的螺栓 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210419 Address after: 315000 3rd floor, 29 Lane 66, Shenghai Road, Haishu District, Ningbo City, Zhejiang Province Patentee after: Ningbo Kexiang Engineering Project Management Co.,Ltd. Address before: 315800 No. 1069, new road, Ningbo economic and Technological Development Zone, Zhejiang Patentee before: NINGBO POLYTECHNIC |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171117 Termination date: 20210924 |
|
CF01 | Termination of patent right due to non-payment of annual fee |