CN105297760B - 钻头锚固桩复合地基加固结构 - Google Patents
钻头锚固桩复合地基加固结构 Download PDFInfo
- Publication number
- CN105297760B CN105297760B CN201510780082.0A CN201510780082A CN105297760B CN 105297760 B CN105297760 B CN 105297760B CN 201510780082 A CN201510780082 A CN 201510780082A CN 105297760 B CN105297760 B CN 105297760B
- Authority
- CN
- China
- Prior art keywords
- drill bit
- pile
- reinforcing
- composite foundation
- stabilization structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
钻头锚固桩复合地基加固结构,以在软土层内能稳定地设置加固桩,有效解决基岩上覆软土地基的加固难题。包括在软土层内纵向、横向间隔设置的加固桩,所述各加固桩的下端与位于基岩内的钻头固定连接,上端与软土层表面齐平;加固桩、钻头侧壁外包覆布袋;软土层表面与填方体之间设置有垫层。
Description
技术领域
本发明涉及岩土工程,特别涉及基岩体上覆软土的地基加固工程。
背景技术
在西部山区存在许多基岩上覆软土的地基,当在这种地基上修建填方工程时,需要对软土进行加固处理。当基岩上覆软土条件较差时,如为淤泥质软土、淤泥质泥炭土以及有机质含量较多的软土时,传统的软土加固处理措施如水泥土搅拌桩、高压旋喷桩、CFG桩等均不能适用,且其桩底施工至下覆基岩时,不能进入基岩稳定桩体;如果采用目前的钻孔灌注桩,则工程投资巨大。因此,在此情况下需要一种加固效果好、经济、施工方便的特殊软土地基加固措施,并符合环保要求。
发明内容
本发明所要解决的技术问题是提供一种钻头锚固桩复合地基加固结构,以在软土层内能稳定地设置加固桩,有效解决基岩上覆软土地基的加固难题。
本发明解决其技术问题所采用的技术方案如下:
本发明的钻头锚固桩复合地基加固结构,包括在软土层内纵向、横向间隔设置的加固桩,其特征是:所述各加固桩的下端与位于基岩内的钻头固定连接,上端与软土层表面齐平;加固桩、钻头侧壁外包覆布袋;布袋作为加固桩体成桩袋,施工时套管下端与钻头螺纹连接,顶部齐平地基面,布袋设置在套管内部,下端外包钻头并与之固定连接,钻杆下端与钻头采用卡套连接,当钻头钻入下覆基岩后,钻杆松套取出,混凝土混合料振动灌入布袋中形成加固桩桩体;软土层表面与填方体之间设置有垫层。
本发明的有益效果是,利用钻头锚固式桩体加固基岩上覆软土,可解决传统地基加固措施不能在特殊软土中成桩和加固桩不能进入基岩中固定桩底的问题,同时该结构施工简单、经济性好,具有广阔推广应用前景。
附图说明
本说明书包括如下三幅附图:
图1是本发明钻头锚固桩复合地基加固结构的断面示意图;
图2是本发明钻头锚固桩复合地基加固结构的施工截面示意图;
图3是本发明钻头锚固桩复合地基加固结构的钻头示意大样图。
图中示出构件、部位名称及所对应的标记:钻头10、钢筋11、套管20、布袋30、钻杆40、加固桩体50、垫层60、基岩A、软土B、填方体C。
具体实施方式
下面结合附图和实施例对本发明进一步说明。
参照图1和图2,本发明的钻头锚固桩复合地基加固结构,包括在软土层B纵向、横向间隔设置的加固桩50,其特征是:所述各加固桩50的下端与位于基岩A内的钻头10固定连接,上端与软土层B表面齐平;加固桩50、钻头10侧壁外包覆布袋30;布袋30作为加固桩体50成桩袋,施工时套管20下端与钻头10螺纹连接,顶部齐平地基面,布袋30设置在套管20内部,下端外包钻头10并与之固定连接,钻杆40下端与钻头10采用卡套连接,当钻头10钻入下覆基岩A后,钻杆40松套取出,混凝土混合料振动灌入布袋30中形成加固桩50桩体;软土层B表面与填方体C之间设置有垫层60。所述钻头10进入基岩的深度通常不小于30cm,其上端在基岩A岩面上。参照图3,所述钻头10的上部固定设置有钢筋11,该钢筋11延伸入加固桩50内。
参照图2和图3,所述钻头10的上部外壁具有与套管20形成螺纹连接的接口,其端中部则具有与钻杆40形成卡套连接的接口。施工时套管20下端与钻头10螺纹连接,顶部齐平地基面,布袋30,设置在套管20内部,下端外包钻头10并与之固定连接。钻杆40下端与钻头10采用卡套连接,当钻头10钻入下覆基岩A后,钻杆40松套取出。套管20通常采用PVC管材。加固桩50,采用混凝土混合料制作,振动灌入布袋30中形成受力桩体。
本发明利用钻头10钻入下覆基岩A中,作为加固桩50的固定端,通过出露钢筋11可使加固桩50与钻头10能形成固定连接。利用套管20作为加固桩体50在软土B中施工前的护壁,并固定布袋30,其可取出重复利用。利用布袋30作为加固桩体50成桩袋,并便于套管20在加固桩50的施工过程中抽出而不影响成桩。利用垫层60作为加固桩体50形成的复合地基与上部填体C的缓冲协调层。该结构有效解决传统地基加固措施不能在特殊软土中成桩和加固桩不能进入基岩中固定桩底的问题,同时该结构施工简单、经济性好,具有广阔推广应用前景。
套管20内径根据设计桩径确定,其壁厚能抵抗软土层B底部的土压力,其与钻头10连接后容易脱开。布袋30展开直径满足设计加固桩50的直径要求。所述加固桩50设置间距及直径满足设计要求,直径一般为0.4~0.6m,设置间距一般为1.4~1.6m。
参照图1和图2,本发明的钻头锚固桩复合地基加固结构的施工步骤如下:
套管20与布袋30套接;
套管20与钻头10连接;
钻头10与钻杆40连接
垂直压入连接体使其进入软土层B中至基岩A顶面;
起动钻杆40,使钻头10钻入基岩A中固定;
套管20与钻头10脱开;
钻杆40与钻头10松套并取出钻杆40;
在布袋30中分段灌入混凝土混合料,边灌注混凝土混合料边提升套管20;
待加固桩50形成并达到设计强度后施工垫层60;
施工填方体C。
以上所述只是用图解说明本发明钻头锚固桩复合地基加固结构的一些原理,并非是要将本发明局限在所示和所述的具体结构和适用范围内,故凡是所有可能被利用的相应修改以及等同物,均属于本发明所申请的专利范围。
Claims (4)
1.钻头锚固桩复合地基加固结构,包括在软土层(B)纵向、横向间隔设置的加固桩(50),其特征是:所述各加固桩(50)的下端与位于基岩(A)内的钻头(10)固定连接,上端与软土层(B)表面齐平;加固桩(50)、钻头(10)侧壁外包覆布袋(30);布袋(30)作为加固桩体(50)成桩袋,施工时套管(20)下端与钻头(10)螺纹连接,顶部齐平地基面,布袋(30)设置在套管(20)内部,下端外包钻头(10)并与之固定连接,钻杆(40)下端与钻头(10)采用卡套连接,当钻头(10)钻入下覆基岩(A)后,钻杆(40)松套取出,混凝土混合料振动灌入布袋(30)中形成加固桩(50)桩体;软土层(B)表面与填方体(C)之间设置有垫层(60)。
2.如权利要求1所述的钻头锚固桩复合地基加固结构,其特征是:所述钻头(10)进入基岩的深度不小于30cm,其上端在基岩(A)岩面上。
3.如权利要求1所述的钻头锚固桩复合地基加固结构,其特征是:所述钻头(10)的上部固定设置有钢筋(11),该钢筋(11)延伸入加固桩(50)内。
4.如权利要求3所述的钻头锚固桩复合地基加固结构,其特征是:所述钻头(10)的上部外壁具有与套管(20)形成螺纹连接的接口,其端中部则具有与钻杆(40)形成卡套连接的接口。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510780082.0A CN105297760B (zh) | 2015-11-13 | 2015-11-13 | 钻头锚固桩复合地基加固结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510780082.0A CN105297760B (zh) | 2015-11-13 | 2015-11-13 | 钻头锚固桩复合地基加固结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105297760A CN105297760A (zh) | 2016-02-03 |
CN105297760B true CN105297760B (zh) | 2018-01-05 |
Family
ID=55195522
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510780082.0A Active CN105297760B (zh) | 2015-11-13 | 2015-11-13 | 钻头锚固桩复合地基加固结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105297760B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108130826A (zh) * | 2018-01-18 | 2018-06-08 | 中铁二院工程集团有限责任公司 | 一种喀斯特地区铁路路基基底抗倾覆地基加固结构 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2160680Y (zh) * | 1993-02-16 | 1994-04-06 | 肖铁英 | 预制成品螺旋桩 |
NO311184B1 (no) * | 2000-03-10 | 2001-10-22 | Norsk Miljoekraft As | Fremgangsmåte og anordning for fastgjöring av et fundament til fjellgrunn |
CN103243702A (zh) * | 2013-05-07 | 2013-08-14 | 中化二建集团有限公司 | 一种砂裹体碎石桩施工方法 |
CN104294821A (zh) * | 2014-09-30 | 2015-01-21 | 杭州江润科技有限公司 | 一种约束增强水泥土桩成桩方法 |
CN205224070U (zh) * | 2015-11-13 | 2016-05-11 | 中铁二院工程集团有限责任公司 | 钻头锚固桩复合地基加固结构 |
-
2015
- 2015-11-13 CN CN201510780082.0A patent/CN105297760B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2160680Y (zh) * | 1993-02-16 | 1994-04-06 | 肖铁英 | 预制成品螺旋桩 |
NO311184B1 (no) * | 2000-03-10 | 2001-10-22 | Norsk Miljoekraft As | Fremgangsmåte og anordning for fastgjöring av et fundament til fjellgrunn |
CN103243702A (zh) * | 2013-05-07 | 2013-08-14 | 中化二建集团有限公司 | 一种砂裹体碎石桩施工方法 |
CN104294821A (zh) * | 2014-09-30 | 2015-01-21 | 杭州江润科技有限公司 | 一种约束增强水泥土桩成桩方法 |
CN205224070U (zh) * | 2015-11-13 | 2016-05-11 | 中铁二院工程集团有限责任公司 | 钻头锚固桩复合地基加固结构 |
Non-Patent Citations (1)
Title |
---|
袋装碎石桩复合型地基处理工艺在施工中易产生的质量问题及预防控制措施;吕强;《地基基础工程》;20091230;第12卷(第3期);期刊正文第43-44页第2-3节 * |
Also Published As
Publication number | Publication date |
---|---|
CN105297760A (zh) | 2016-02-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103835284B (zh) | 一种岩溶地区钻孔灌注桩结构及施工方法 | |
CN102691296B (zh) | 一种桩侧静压注浆桩底旋喷注浆的管桩基础及其施工方法 | |
CN101768961B (zh) | 一种型钢三轴水泥土搅拌桩的施工方法 | |
CN102943466B (zh) | 微型钢管混凝土桩穿透路基层加固软弱地基施工工法 | |
CN107975375B (zh) | 一种城市隧道微型钢管桩加固软弱地基施工方法 | |
US10501905B2 (en) | Wave-shaped grouting bulb of micropile and method for forming same | |
CN105714834B (zh) | 一种硬质地层预成孔后注浆h型钢桩的施工工艺 | |
CN104499479A (zh) | 一种穿越砂砾石回填层的挖孔桩施工方法 | |
CN203741820U (zh) | 一种岩溶地区钻孔灌注桩结构 | |
CN106930321A (zh) | 一种大直径顶管结合洞桩修建地下结构新工法 | |
WO2021004007A1 (zh) | 一种用于传统建筑的地基加固方法 | |
CN110374677A (zh) | 高原富水软岩隧道控排水施工工法 | |
CN103603379A (zh) | 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系及其施工工艺 | |
CN104790408A (zh) | 不规则基坑施工方法 | |
CN208136918U (zh) | 一种管式土钉支护结构 | |
CN107339122A (zh) | 一种钢管柱处理采空区工法 | |
CN102808407B (zh) | 软土地基钢筋混凝土灌注桩施工方法 | |
CN104032763A (zh) | 一种组合式防渗止水帷幕结构及其施工方法 | |
CN101793027B (zh) | 一种桩心注浆静压锚杆桩 | |
CN111364449A (zh) | 一种针对预制管桩贯穿溶洞的施工方法及结构 | |
CN105133641A (zh) | 一种薄壁型连续墙式地基基础加固结构及方法 | |
CN203613568U (zh) | 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系 | |
CN103821140B (zh) | 一种加固松软土地基的施工方法 | |
CN205576957U (zh) | 桩底桩结构 | |
CN105113492A (zh) | 一种适用于粘性土、砂土、粉土地基的组合桩施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |