CN105297683B - 土工膜心墙山塘土石坝及施工方法 - Google Patents
土工膜心墙山塘土石坝及施工方法 Download PDFInfo
- Publication number
- CN105297683B CN105297683B CN201510668585.9A CN201510668585A CN105297683B CN 105297683 B CN105297683 B CN 105297683B CN 201510668585 A CN201510668585 A CN 201510668585A CN 105297683 B CN105297683 B CN 105297683B
- Authority
- CN
- China
- Prior art keywords
- geomembrane
- dam
- earth
- core
- clinosol
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 29
- 239000002689 soil Substances 0.000 claims abstract description 29
- 239000004927 clay Substances 0.000 claims abstract description 25
- 239000011435 rock Substances 0.000 claims abstract description 8
- 238000005056 compaction Methods 0.000 claims abstract description 4
- 239000000463 material Substances 0.000 claims description 5
- 238000000034 method Methods 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 4
- 238000007796 conventional method Methods 0.000 description 2
- 230000006378 damage Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000011144 upstream manufacturing Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
Landscapes
- Revetment (AREA)
Abstract
本发明公开了一种土工膜心墙山塘土石坝及施工方法,土工膜心墙山塘土石坝由坝体、土工膜、残积土、坡积土、粉质黏土组成,土工膜修建在坝体中间,残积土、坡积土铺设在土工膜心墙土石坝左右幅,分层压实,粉质黏土厚度大于20cm,铺设在土工膜左右,保护土工膜在土石坝施工、运行期间不被残积土、坡积土棱角刺破,本发明公开的土工膜心墙山塘土石坝,是利用土工膜代替山区珍贵的黏土做成心墙,降低工程成本,因土工膜具有良好的隔水性、延展性、耐久性,使用土工膜修建心墙土石坝成本低、施工方便,施工速度快。使用年限增长,土工膜隔水性能不会降低。
Description
技术领域
本发明涉及水利工程技术领域,具体是一种土工膜心墙山塘土石坝及施工方法。
背景技术
随着科学技术的发展,大中型水库一般均做成混凝土重力坝或混凝土拱坝,而星罗棋布于山区的中小型山塘,由于蓄水量小、蓄水水位低,破坏后造成的危害小,资金受限等多种因素影响,一般沿用传统的心墙土坝,平原地区黏土、粉质黏土赋存丰富,心墙两侧粉质黏土渗透系数较小,心墙宽度不需要太大尺寸既能满足规范要求,而星罗棋布于山区的中小型山塘,地质环境决定了黏土、粉质黏土极少,多为残积土、坡积土,如果将残积土、坡积土填筑在心墙两侧基本不具备防渗作用,黏土心墙宽度需要很大尺寸才能满足规范要求,地处黏土极少的山区建造大尺寸的黏土心墙使得建坝成本大大提高。为减少成本,就地取材,利用残积土、坡积土是其首选,而做成大尺寸的黏土心墙又会使得建坝成本大大提高,并且黏土心墙土石坝施工难度大,施工质量难以控制,随使用年限增长,频频出现坝身渗漏等问题。研究一种可就地取材,利用残积土、坡积土、粉质黏土的心墙坝非常必要。
发明内容
为了解决现有技术中存在的上述技术问题,本发明提供了一种土工膜心墙山塘土石坝,由坝体、土工膜、残积土、坡积土、粉质黏土组成,所述土工膜修建在坝体中间,残积土、坡积土铺设在土工膜心墙山塘土石坝左右幅,分层压实,所述的粉质黏土厚度大于20cm,铺设在土工膜左右,保护土工膜在土石坝施工、运行期间不被残积土、坡积土棱角刺破,土工膜心墙山塘土石坝的施工方法,包括以下步骤:
第一步:清理坝基至不透水岩土层顶面;
第二步,按规范要求的铺设厚度、压实度,分层铺设、压实右侧幅残积土、坡积土;
第三步,修整压实后的右侧幅残积土、坡积土左侧的搭接部位坡面,并在坡面上铺设大于20cm厚度粉质黏土;
第四步,将土工膜卷材铺设在粉质黏土上,并滚至已压实的残积土、坡积土表面;
第五步,在搭接部位坡面的土工膜上面铺设大于20cm厚度粉质黏土;一个施工单元完成;
第六步,按上面施工单元相同方法施工土石坝左侧幅,至该单元完成;
第七步,左右侧幅交替施工至坝顶,土工膜心墙山塘土石坝主体完成。
土工膜心墙山塘土石坝主体完成后,上下游边坡处理与常规方法相同。
本发明公开的土工膜心墙山塘土石坝及施工方法,是利用土工膜代替山区珍贵的黏土做成心墙,降低工程成本。因土工膜具有良好的隔水性、延展性、耐久性,使用土工膜修建心墙土石坝成本低、施工方便,施工速度快。使用年限增长,土工膜隔水性能不会降低。
附图说明
图1是土工膜心墙山塘土石坝断面示意图;
图2是黏土心墙土石坝断面示意图;
图3是土工膜心墙山塘土石坝右侧幅、左侧幅第一层施工顺序示意图;
图4是该土石坝右侧幅第二层施工顺序示意图。
具体实施方式
下面结合附图对发明作进一步说明。
如图1-4所示,本发明的土工膜心墙山塘土石坝由坝体1、土工膜2、残积土、坡积土3、粉质黏土4组成,所述土工膜2修建在坝体1中间,残积土、坡积土3铺设在土工膜心墙山塘土石坝左右幅,分层压实,所述粉质黏土4厚度大于20cm,铺设在土工膜2左右,保护土工膜2在土石坝施工、运行期间不被残积土、坡积土3棱角刺破,土工膜心墙山塘土石坝施工方法是:
第一步:清理坝基至不透水岩土层顶面;
第二步,按规范要求的铺设厚度、压实度,分层铺设、压实右侧幅残积土、坡积土;
第三步,修整压实后的右侧幅残积土、坡积土左侧的搭接部位坡面,并在坡面上铺设大于20cm厚度粉质黏土;
第四步,将土工膜卷材铺设在粉质黏土上,并滚至已压实的残积土、坡积土表面;
第五步,在搭接部位坡面的土工膜上面铺设大于20cm厚度粉质黏土;一个施工单元完成;
第六步,按上面施工单元相同方法施工土石坝左侧幅,至该单元完成;
第七步,左右侧幅交替施工至坝顶,土工膜心墙山塘土石坝主体完成。
上下游边坡处理与常规方法相同。
Claims (1)
1.土工膜心墙山塘土石坝,由坝体(1)、土工膜(2)、残积土、坡积土(3)、粉质黏土(4)组成,其特征在于:所述土工膜(2)修建在坝体(1)中间,残积土、坡积土(3)铺设在土工膜心墙山塘土石坝左右幅,分层压实,所述的粉质黏土(4)厚度大于20cm,铺设在土工膜(2)左右,保护土工膜(2)在土石坝施工、运行期间不被残积土、坡积土(3)棱角刺破;土工膜心墙山塘土石坝的施工方法包括以下步骤:
第一步:清理坝基至不透水岩土层顶面;
第二步,按规范要求的铺设厚度、压实度,分层铺设、压实右侧幅残积土、坡积土;
第三步,修整压实后的右侧幅残积土、坡积土左侧的搭接部位坡面,并在坡面上铺设大于20cm厚度粉质黏土;
第四步,将土工膜卷材铺设在粉质黏土上,并滚至已压实的残积土、坡积土表面;
第五步,在搭接部位坡面的土工膜上面铺设大于20cm厚度粉质黏土;一个施工单元完成;
第六步,按上面施工单元相同方法施工土石坝左侧幅,至该单元完成;
第七步,左右侧幅交替施工至坝顶,土工膜心墙山塘土石坝主体完成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510668585.9A CN105297683B (zh) | 2015-10-13 | 2015-10-13 | 土工膜心墙山塘土石坝及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510668585.9A CN105297683B (zh) | 2015-10-13 | 2015-10-13 | 土工膜心墙山塘土石坝及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105297683A CN105297683A (zh) | 2016-02-03 |
CN105297683B true CN105297683B (zh) | 2017-09-08 |
Family
ID=55195446
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510668585.9A Expired - Fee Related CN105297683B (zh) | 2015-10-13 | 2015-10-13 | 土工膜心墙山塘土石坝及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105297683B (zh) |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1080010A (zh) * | 1992-06-08 | 1993-12-29 | 辽宁省水利水电科学研究所 | 复合土工膜心(斜)墙土坝的建造方法 |
IT1304093B1 (it) * | 1998-12-10 | 2001-03-07 | Sibelon Srl | Diga in materiale sciolto e procedimento di impermeabilizzazione |
RU2470111C2 (ru) * | 2010-09-15 | 2012-12-20 | ПАО "Укргидропроект" | Каменно-насыпная плотина с асфальтобетонной диафрагмой |
CN201952805U (zh) * | 2010-12-08 | 2011-08-31 | 中国水电顾问集团华东勘测设计研究院 | 一种城市河道围堰结构 |
CN102660936A (zh) * | 2012-05-29 | 2012-09-12 | 中国水利水电第十四工程局有限公司 | 一种用聚氯乙烯膜进行坝墙防渗的方法 |
CN203256699U (zh) * | 2013-05-28 | 2013-10-30 | 中国水电顾问集团贵阳勘测设计研究院 | 一种过水土石坝的构筑构造 |
CN103410123B (zh) * | 2013-08-13 | 2016-03-02 | 中国电建集团成都勘测设计研究院有限公司 | 一种用于水利水电工程的挡水坝 |
CN203393682U (zh) * | 2013-08-13 | 2014-01-15 | 中国水电顾问集团成都勘测设计研究院有限公司 | 一种用于水利水电工程的挡水坝 |
CN103422510B (zh) * | 2013-08-29 | 2015-09-30 | 中国水电顾问集团华东勘测设计研究院 | 钢管框架式围堰结构及施工方法 |
CN203924006U (zh) * | 2014-07-07 | 2014-11-05 | 中国电建集团成都勘测设计研究院有限公司 | 用于水电工程冲沟或河道的挡水坝 |
CN205035769U (zh) * | 2015-10-13 | 2016-02-17 | 浙江水利水电学院 | 土工膜心墙山塘土石坝 |
-
2015
- 2015-10-13 CN CN201510668585.9A patent/CN105297683B/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN105297683A (zh) | 2016-02-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103031836B (zh) | 一种在新吹填淤泥地基上快速修筑道路的方法 | |
CN110359497B (zh) | 一种既有建构筑物地基高性能碎石桩抗液化处理方法 | |
CN103233454A (zh) | 湿陷性黄土地基的砂桩浸水真空预压及注浆处理方法 | |
CN113445396B (zh) | 一种高液限土路段的高填土路基填筑施工方法 | |
CN113106988B (zh) | 一种内排露天矿排土场内部坝体构筑方法 | |
CN105804007B (zh) | 一种基于滩涂软基的加筋土岸墙结构 | |
CN102660936A (zh) | 一种用聚氯乙烯膜进行坝墙防渗的方法 | |
CN102168430A (zh) | 一种减小膨胀岩土地区挡土墙土压力的方法 | |
CN111705752A (zh) | 具有防渗自愈功能的黏土心墙坝及其实施方法 | |
CN111593742B (zh) | 一种基于抛石挤淤法整改尾矿库的施工方法 | |
CN212052626U (zh) | 一种具有多重防渗结构的混凝土面板堆石坝 | |
CN104947650A (zh) | 砂井堆载预压后后注浆封闭加固方法 | |
CN112195910A (zh) | 一种振冲碎石桩与堆石体加筋的土石坝软基处理结构与施工方法 | |
CN107881987A (zh) | 深厚覆盖层上面板堆石坝坝基防渗结构 | |
CN207537975U (zh) | 深厚覆盖层上面板堆石坝坝基防渗结构 | |
CN103850244A (zh) | 一种冰冻环境下袋装砂垫层深层处理软土地基加固方法 | |
CN213390201U (zh) | 一种振冲碎石桩与堆石体加筋的土石坝软基处理结构 | |
CN206052653U (zh) | 一种基于混凝土桩的面板堆石坝用堆石体结构 | |
CN210238543U (zh) | 一种倾斜坡面分层回填强夯整平结构 | |
CN105297683B (zh) | 土工膜心墙山塘土石坝及施工方法 | |
CN108914959B (zh) | 一种适用于山区房建的基础结构及其施工方法 | |
CN205035769U (zh) | 土工膜心墙山塘土石坝 | |
CN215441993U (zh) | 一种混凝土面板堆石坝软弱地基加固结构 | |
CN205329429U (zh) | 一种连续减隔震蜂窝波阻带结构 | |
CN210916842U (zh) | 沙漠浅水湖区风积沙路基结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170908 Termination date: 20181013 |