CN105269646A - Inner segment removing and yellow removing V-shaped clamping device achieving bamboo pipe floating - Google Patents

Inner segment removing and yellow removing V-shaped clamping device achieving bamboo pipe floating Download PDF

Info

Publication number
CN105269646A
CN105269646A CN201510833688.6A CN201510833688A CN105269646A CN 105269646 A CN105269646 A CN 105269646A CN 201510833688 A CN201510833688 A CN 201510833688A CN 105269646 A CN105269646 A CN 105269646A
Authority
CN
China
Prior art keywords
arrangement part
thick bamboo
bamboo tube
arrangement
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510833688.6A
Other languages
Chinese (zh)
Other versions
CN105269646B (en
Inventor
涂桥安
马晨波
何斌辉
潘慧
林石
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Peixian Hantang Construction Development Co ltd
Original Assignee
Nanjing Forestry University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Forestry University filed Critical Nanjing Forestry University
Priority to CN201510833688.6A priority Critical patent/CN105269646B/en
Publication of CN105269646A publication Critical patent/CN105269646A/en
Application granted granted Critical
Publication of CN105269646B publication Critical patent/CN105269646B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Clamps And Clips (AREA)

Abstract

An inner segment removing and yellow removing clamping device achieving bamboo pipe floating is composed of two bamboo pipe floating clamping mechanisms. Two vertical hanging shafts and two horizontal hanging shafts are mounted on an H support in each bamboo pipe floating clamping mechanism, and a left V-shaped piece and a right V-shaped piece are mounted on the two horizontal hanging shafts of each bamboo pipe floating clamping mechanism. After mounting and adjustment are carried out well, according to the bamboo pipe floating clamping mechanisms, the combination centers of the left V-shaped pieces and the right V-shaped pieces and the axes of two corresponding vertical hanging shafts coincide with the symmetric axis of four supporting lugs on a frame. In the processing process, a bamboo pipe is clamped below the left V-shaped pieces and the right V-shaped pieces; and when the center of the bamboo pipe and an inner segment removing and yellow removing combined tool are not concentric, the bamboo pipe clamped by the left V-shaped pieces and the right V-shaped pieces floats left and right along with the H support, or floats vertically in a hole of the H support along with the vertical hanging shafts, and automatic resetting can be achieved after floating. Compared with an existing bamboo pipe floating clamping device, the time of the inner segment removing and yellow removing clamping device achieving bamboo pipe floating for loading and unloading bamboo pipes is greatly shortened, one operation worker is omitted, the structure is simple, and cost is low.

Description

One goes internal segment de-etiolation thick bamboo tube to float V-arrangement clamping device
Technical field: the present invention relates to a kind of clamping device in bamboo processing method, specifically realizes thick bamboo tube horizontal and vertical directions and floats and energy self centering V-arrangement clamping device during a kind of taking inner bamboo joints and tabasheers out of intact bamboo tube.
Background technology: mao bamboon is a kind of fast-growing, high yield, high-quality, be easy to upgrade recover the important forest reserves.Not only growth cycle is short for it, and physical and mechanical property is superior.Compared with timber, because thick bamboo tube diameter is little, the thin hollow of wall, the large and cross section great majority of taperingness be all oval, have the geometrical feature such as to bend in various degree along its length, all these bring problems and difficulty to its processing and utilization.
Current bamboo wood is all by saw, cuts open or planing operation, only can be processed into width 15-20 millimeter, the bamboo chip that thickness is 5 ~ 8 millimeters, be difficult to direct utilization.Want to obtain the product that quality is good, added value is high, expand the application of bamboo processing product, improve utilization rate and resistance to worm, corrosion resistant and the anti-mildew ability of bamboo wood, unique processing technology and processing method must be adopted to carry out deep processing to mao bamboon.If it is dull and stereotyped mao bamboon to be launched into flawless bamboo, can obtain breadth wide for 250-400mm, long for 1300-3000mm, thickness be that the flawless bamboo of 5-10mm is dull and stereotyped.This bamboo flat board directly can be used as ornament materials, also can be used for doing bamboo flooring, its slicing can also be become the meagre bamboo of different-thickness to be pasted onto on various types of plate base, is used for making the various ornament materials such as composite floor board, furniture panel, wood-based plate.Realize whole thick bamboo tube flawless spreading, thick bamboo tube generate bamboo is dull and stereotyped, the internal segment in the surf green of thick bamboo tube outer surface, endoporus and tabasheer must be removed, after carrying out equal thickness processing along many to cracking, sofening treatment launches again.The internal segment that goes of current use mostly is manual removal, processes after going tabasheer to adopt the method for bore hole in the processing of floating boring tool metalloid or employing thick bamboo tube to be cutd open into bamboo chip by slicing method.In producing at bamboo plywood, in first manually removing every, then adopt floating boring tool to carry out de-etiolation processing; Cannot industrialization production requirements be reached because production efficiency is low, thus can only by Mao bamboo tube to being split into 2 half in actual bamboo plywood is produced, in removing every, be placed on after flattening in press and use planing tool de-etiolation; And in bamboo flooring is produced, be by cylindric bamboo wood radially subdivision be many impartial bamboo chips, in destroying every, adopt planing tool to carry out planing operation, sector crosssection bamboo chip is processed into square-section bamboo chip that is wide, uniform thickness, the utilization rate of this de-etiolation method material is low.The taking inner bamboo joints and tabasheers out of intact bamboo tube method adopted in patent (ZL200910183603.9) completes internal segment de-etiolation at one-pass, the utilization rate of production efficiency and material is greatly increased compared with original, but the thick bamboo tube clamping device adopted is two tripod chucks, during clamping thick bamboo tube, from the beginning thick bamboo tube need be gone up through two tripod chucks, then screw two tripod chuck clamping thick bamboo tubes respectively; After going internal segment de-etiolation to complete, two tripod chucks need be unscrewed, thick bamboo tube is extracted out (as shown in Figure 1) from two tripod chucks, this shows that the thick bamboo tube clamping time is longer, and clamping thick bamboo tube needs two people to come, constantly have impact on productivity ratio, and tripod chuck structure is complicated, processing cost is high.
Summary of the invention: realize thick bamboo tube horizontal and vertical directions when the object of this invention is to provide a kind of taking inner bamboo joints and tabasheers out of intact bamboo tube and float and the self centering V-arrangement clamping device of energy.
Remove the internal segment in thick bamboo tube and tabasheer in one-pass simultaneously, what adopt is internal segment de-etiolation gang tool, utilizing goes the numerous end-tooth in the conelet cutter in internal segment de-etiolation gang tool, auger cutter, three de-etiolation blades and front cutter tooth to be removed by internal segment, utilizes the numerous rear cutter tooth de-etiolation on three de-etiolation blades; When going internal segment de-etiolation, what adopt goes internal segment de-etiolation gang tool around the revolution at a high speed of dead axle line, and thick bamboo tube non rotating, due to every root thick bamboo tube, all to exist in various degree bending, for ensureing the processing request to thick bamboo tube endoporus, the mechanism of clamping thick bamboo tube internal segment de-etiolation gang tool and thick bamboo tube must be made at cutting position with one heart, so must be floating.
The object of the present invention is achieved like this: one goes the internal segment de-etiolation thick bamboo tube V-arrangement clamping device that floats to be made up of two thick bamboo tubes V-arrangement clamp system that floats, comprise nut I, adjustment screw, horizontal reset spring, spring hanging seat, stage clip, stage clip plate washer, left V-arrangement part, framework, dive key, roller, axle, right V-arrangement part lower hinge support, alignment pin, bearing pin, right V-arrangement part, latch, horizontal hanging scroll, socket on right V-arrangement part, vertical hanging scroll, H support, plate washer, vertical extension spring hanging seat, bolt, vertical extension spring, adjustment screw rod, nut II, journal stirrup, it is characterized in that: two vertical hanging scrolls are respectively charged in the hole of H support lower and upper cross-member, be matched in clearance between the two, load level hanging scroll in the hole of upper and lower two vertical hanging scrolls, realizes the axial restraint of horizontal hanging scroll and vertical hanging scroll with alignment pin, left V-arrangement part is enclosed within two horizontal hanging scrolls from the left side, on right V-arrangement part lower hinge support and right V-arrangement part, socket is enclosed within two horizontal hanging scrolls from the right respectively, on left V-arrangement part and right V-arrangement part lower hinge support, right V-arrangement part, the outside of socket is withstood with stage clip, stage clip baffle plate respectively, stage clip baffle plate is screwed the end at horizontal hanging scroll, right V-arrangement part lower end hinge, on right V-arrangement part lower hinge support, left V-arrangement part and right V-arrangement part lower hinge support, right V-arrangement part is matched in clearance between socket and horizontal hanging scroll, before and after handling thick bamboo tube, right V-arrangement part hangs on bearing pin, and the upper and lower two ends of H support are placed between the raceway of four roller compositions, during clamping thick bamboo tube, thick bamboo tube is pressed to left V-arrangement part, righter V-arrangement part is rotated until its upper end is inserted in the groove of socket on right V-arrangement part around bearing pin, then latch is inserted in the hole of right V-arrangement part upper end through the hole of socket on right V-arrangement part, pins right V-arrangement part, now, thick bamboo tube is clamped by left V-arrangement part and right V-arrangement part, on horizontal hanging scroll four stage clips effect under, thick bamboo tube center automatically returns on the axis of vertical hanging scroll.
Four stage clips on described horizontal hanging scroll, its size and rigidity are all identical.Because the diameter of every root thick bamboo tube is different, so position on horizontal hanging scroll is different after left V-arrangement part and right V-arrangement part clamping thick bamboo tube, but the invariant position of combination center, the decrement of four stage clips is different along with the diameter difference of clamped thick bamboo tube, the diameter of thick bamboo tube is less, the decrement of four stage clips is less, the pressure produced is also less, therefore, when designing stage clip, when ensureing the thick bamboo tube of clamping minimum diameter, the pressure that stage clip produces makes left V-arrangement part and right V-arrangement part clamp thick bamboo tube, and thick bamboo tube center can be made automatically to get back to fast on the axis of vertical hanging scroll.
Described two ends, H support lower and upper cross-member left and right are provided with four horizontal reset springs, be arranged symmetrically in vertical hanging scroll both sides, one end of four horizontal reset springs is hooked on the spring hanging seat on H rack beam, the other end is hooked on the adjustment screw in framework journal stirrup, the size of horizontal reset spring tension is regulated by adjustment screw and nut I, after H support produces and slides, under the effect of four horizontal reset springs, make on the axis of symmetry of four journal stirrups on the vertical hanging scroll axis Rapid reset to framework in H support; A vertical extension spring hanging seat is secured at vertical hanging scroll top bolt, two vertical extension springs one are hooked on vertical extension spring hanging seat two ends, other end is hooked on two adjustment screw rods on framework respectively, the size of two vertical tension spring tensions is regulated by adjustment screw rod and nut II, make itself and all parts on vertical hanging scroll and thick bamboo tube balanced, thus reach the object of center when adjusting left V-arrangement part and right V-arrangement part clamping thick bamboo tube in vertical direction.Add man-hour, remove internal segment de-etiolation gang tool High Rotation Speed, an edge thick bamboo tube moves axially, and thick bamboo tube non rotating; For adapting to the ovality of every root thick bamboo tube in the flexibility and cross section of length direction, ensure add thick bamboo tube in man-hour center and go internal segment de-etiolation gang tool centres, so thick bamboo tube needs to float at any time in both the horizontal and vertical directions; Because the center removing internal segment de-etiolation gang tool is motionless, so thick bamboo tube is except being clamped, also need to do small floating in horizontal and vertical direction; When thick bamboo tube need do in the horizontal direction small floating time, the left V-arrangement part on two horizontal hanging scrolls and right V-arrangement part clip left and right in the raceway that thick bamboo tube formed at four rollers along with two vertical hanging scrolls and H support and do small slip; When thick bamboo tube need do in the vertical direction small floating time, the left V-arrangement part on two horizontal hanging scrolls and right V-arrangement part clip thick bamboo tube along with vertical hanging scroll and do small slip up and down in the holes of H support lower and upper cross-member; Four the horizontal reset springs being arranged symmetrically in vertical hanging scroll both sides ensure that H support automatically resets after floating in the horizontal direction at any time, and namely thick bamboo tube automatically resets after floating in the horizontal direction at any time; With the weight of left V-arrangement part, right V-arrangement part, two horizontal hanging scrolls, two vertical hanging scrolls and thick bamboo tubes, two vertical extension springs ensure that left V-arrangement part and right V-arrangement part clip after thick bamboo tube vertically floats and automatically reset at any time.
Described framework is provided with four axles, each axle is equipped with a roller, each roller cylindrical is processed with annular groove, between four rollers, form a raceway; Two ends, H rack beam left and right upper and lower surface is processed with convex shoulder, its convex shoulder width is equal with the annular groove width on roller cylindrical, the convex shoulder of two ends, H rack beam left and right upper and lower surface embeds among the annular groove on roller cylindrical, when H support slides in the horizontal direction, and is rolling friction between roller.
Described frame right upper-lower position is provided with two baffle plates, is used for limiting the distance that H support level horizontally slips.
Hole on described vertical hanging scroll and H rack beam is matched in clearance, and the circumference realizing vertical hanging scroll and H support with dive key is fixed.
The advantage that the present invention has and good effect are: thick bamboo tube need penetrate from clamping device head, pass tripod chuck by existing clamping device, need multi-turn rotation tripod chuck could realize clamping, and during handling thick bamboo tube, need two people's operations, in addition, tripod chuck structure is complicated, manufacturing cost is high; And this thick bamboo tube floats, V-arrangement clamping device can rotate around bearing pin due to right V-arrangement part, so during handling thick bamboo tube, directly thick bamboo tube is put into left V-arrangement part, then rotate right V-arrangement part to be inserted on right V-arrangement part and to clamp thick bamboo tube in socket, four stage clips make thick bamboo tube center automatically get back to fast on the center line of vertical hanging scroll; Four horizontal reset spring extension springs vertical with two and the weight hanging over all parts on vertical hanging scroll make thick bamboo tube Hou Qi center of floating along the horizontal or vertical direction automatically return to the center of internal segment de-etiolation gang tool respectively; After thick bamboo tube goes internal segment de-etiolation to terminate, rotate right V-arrangement part, directly take out thick bamboo tube, greatly reduce the time of handling thick bamboo tube, only need one man operation during handling thick bamboo tube, and structure is simple, cheap.
Accompanying drawing illustrates:
Fig. 1 represents original tripod chuck thick bamboo tube float clamp mechanism schematic diagram
Fig. 2 represents that thick bamboo tube floats V-arrangement clamping device scheme of installation
Fig. 3 represents that thick bamboo tube handling front and back thick bamboo tube floats V-arrangement clamp system C to structure chart
After Fig. 4 represents the thick bamboo tube clamping of arbitrary diameter, thick bamboo tube floats V-arrangement clamp system C to structure chart
Fig. 5 is A-A sectional view, represents that vertical hanging scroll and H support, horizontal hanging scroll and H bracket end insert the assembly relation between raceway
Fig. 6 is B-B sectional view, represents that the situation that right V-arrangement part is pinned by latch in socket is inserted in right V-arrangement part upper end
Fig. 7 represents left V-arrangement part and right V-arrangement part combination center and goes to internal segment de-etiolation gang tool center to heart debug features schematic diagram
In figure: 1, thick bamboo tube floats V-arrangement clamp system 1-1, nut I1-2, adjustment screw 1-3, horizontal reset spring 1-4, spring hanging seat 1-5, stage clip 1-6, stage clip plate washer 1-7, left V-arrangement part 1-8, framework 1-9, dive key 1-10, roller 1-11, axle 1-12, right V-arrangement part lower hinge support 1-13, alignment pin 1-14, bearing pin 1-15, right V-arrangement part 1-16, latch 1-17, horizontal hanging scroll 1-18, socket 1-19 on right V-arrangement part, vertical hanging scroll 1-20, H support 1-21, plate washer 1-22, vertical extension spring hanging seat 1-23, bolt 1-24, vertical extension spring 1-25, adjustment screw rod 1-26, nut II1-27, journal stirrup 2, thick bamboo tube 3, remove internal segment de-etiolation gang tool 4, gang tool driver part 5, disk
Detailed description of the invention:
As shown in Figure 2: originally go the internal segment de-etiolation thick bamboo tube V-arrangement clamping device that floats to be made up of two thick bamboo tubes V-arrangement clamp system 1 that floats, float in V-arrangement clamp system 1 at each thick bamboo tube, two vertical hanging scroll 1-19 are respectively charged in the hole of H support 1-20 lower and upper cross-member, are matched in clearance between the two, load level hanging scroll 1-17 in the hole of upper and lower two vertical hanging scroll 1-19, realizes the axial restraint of horizontal hanging scroll 1-17 and vertical hanging scroll 1-19 with alignment pin 1-13, left V-arrangement part 1-7 is enclosed within two horizontal hanging scroll 1-17 from the left side, on right V-arrangement part lower hinge support 1-12 and right V-arrangement part, socket 1-18 is enclosed within two horizontal hanging scroll 1-17 from the right respectively, left V-arrangement part 1-7 and right V-arrangement part lower hinge support 1-12, on right V-arrangement part, stage clip 1-5 is used in the outside of socket 1-18 respectively, stage clip baffle plate 1-6 withstands, stage clip baffle plate 1-6 is screwed the end at horizontal hanging scroll 1-17, right V-arrangement part 1-15 lower end bearing pin 1-14 is hinged on right V-arrangement part lower hinge support 1-12, left V-arrangement part 1-7 and right V-arrangement part lower hinge support 1-12, right V-arrangement part is matched in clearance between socket 1-18 and horizontal hanging scroll 1-17, before and after handling thick bamboo tube 2, right V-arrangement part 1-15 hangs on bearing pin 1-14, and the upper and lower two ends of H support 1-20 are placed between raceway that four roller 1-10 form (as shown in Figure 3,4) respectively.
Due to every root thick bamboo tube 2 length direction all exist in various degree bending, be all oval on cross section, add and will ensure thick bamboo tube 2 center man-hour and go internal segment de-etiolation gang tool 3 centres, so before first time processing, need first by left V-arrangement part 1-7 and right V-arrangement part 1-15 combination center with go to internal segment de-etiolation gang tool 3 center to realize the heart, because floated by two thick bamboo tubes, V-arrangement clamp system 1 is arranged on after in frame, by adjusting four horizontal reset spring 1-3, just ensure on the axis of symmetry of left V-arrangement part 1-7 and right V-arrangement part 1-15 combination center four journal stirrup 1-27 on framework 1-8, namely horizontal direction is to the heart, so only need regulate in vertical direction, its method is: weight is seemingly closely equal with thick bamboo tube weight, two disks 5 with holes are put into two thick bamboo tubes left V-arrangement part 1-7 of V-arrangement clamp system 1 and right V-arrangement part 1-15 that floats respectively and are clamped (as shown in Figure 7), then will remove internal segment de-etiolation driver part 4 and go internal segment de-etiolation gang tool 3 to shift to first thick bamboo tube to float V-arrangement clamp system 1, the conelet cutter before internal segment de-etiolation gang tool 3 is allowed slowly to be inserted in the hole of clamped disk 5, until conelet cutter just contacts with limit, disk 5 hole, then the size of two vertical extension spring 1-24 pulling force is regulated by adjustment screw rod 1-25 and nut II1-26, left V-arrangement part 1-7 and right V-arrangement part 1-15 is moved up or down with disk 5, until the center in disk 5 hole with go internal segment de-etiolation to combine the centres of cutter 3, unclamp first thick bamboo tube to float V-arrangement clamp system 1, by gang tool driver part 4 and go internal segment de-etiolation gang tool 3 to shift to second thick bamboo tube to float V-arrangement clamp system 1, its center alignment method is the same.After heart work is completed, first thick bamboo tube 2 is pressed to left V-arrangement part 1-7, under thrust, left V-arrangement part 1-7 is moved to the left along two horizontal hanging scroll 1-17, on horizontal hanging scroll 1-17, the stage clip 1-5 on the left side is compacted, be moved to the left in the raceway simultaneously driving two vertical hanging scroll 1-19 and H support 1-20 to be formed at four roller 1-10, when the vertical beam of the top framework 1-8 of H support 1-20 crossbeam left end, H support no longer moves, stage clip is further compressed, again right V-arrangement part 1-15 is rotated until its upper end is inserted in the groove of socket 1-18 on right V-arrangement part around bearing pin 1-14, then latch 1-16 is inserted in the hole of right V-arrangement part 1-15 upper end through the hole of socket 1-18 on right V-arrangement part, pin right V-arrangement part 1-15 (as shown in Figure 6), now, thick bamboo tube 2 is clamped (as shown in Figure 4) by left V-arrangement part 1-7 and right V-arrangement part 1-15, on horizontal hanging scroll 1-17 four stage clip 1-5 effect under, thick bamboo tube 2 center automatically returns on the axis of vertical hanging scroll 1-19, add man-hour, remove internal segment de-etiolation gang tool 3 High Rotation Speed on one side, while along with going internal segment de-etiolation driver part 4 to move axially, and thick bamboo tube 2 non rotating, for adapting to the ovality of every root thick bamboo tube 2 in the flexibility and cross section of length direction, guarantee adds thick bamboo tube 2 in man-hour center and goes internal segment de-etiolation gang tool 3 centres, so thick bamboo tube 2 needs to float at any time in both the horizontal and vertical directions, when thick bamboo tube 2 needs to float in the horizontal direction, the left V-arrangement part 1-7 on two horizontal hanging scroll 1-17 and right V-arrangement part 1-15 clip in the raceway that thick bamboo tube 2 formed at four roller 1-10 along with two vertical hanging scroll 1-19 and H support 1-20 and horizontally slip, when thick bamboo tube 2 needs to float in the vertical direction, the left V-arrangement part 1-7 on two horizontal hanging scroll 1-17 and right V-arrangement part 1-15 clip thick bamboo tube 2 along with two vertical hanging scroll 1-19 and slide in the hole of H support 20 lower and upper cross-member, four the horizontal reset spring 1-3 being arranged symmetrically in vertical hanging scroll 1-19 both sides ensure that H support 1-20 automatically resets after floating in the horizontal direction at any time, and namely thick bamboo tube 2 automatically resets after floating in the horizontal direction at any time, with the weight of left V-arrangement part 1-7, right V-arrangement part 1-15, two horizontal hanging scroll 1-17, two vertical hanging scroll 1-19 and thick bamboo tubes 2, two vertical extension spring 1-24 ensure that left V-arrangement part 1-7 and right V-arrangement part 1-15 clamps after thick bamboo tube 2 vertically floats and automatically reset at any time.
After a thick bamboo tube 2 machines, the latch 1-16 in the right V-arrangement part 1-15 transfering to two thick bamboo tubes to float on V-arrangement clamp system 1 respectively, rotates two right V-arrangement part 1-15, takes out manufactured thick bamboo tube 2, repeat above-mentioned action, process next root thick bamboo tube 2.

Claims (6)

1. one kind is gone the internal segment de-etiolation thick bamboo tube V-arrangement clamping device that floats to be made up of two thick bamboo tubes V-arrangement clamp system (1) that floats, and comprises nut I (1-1), adjustment screw (1-2), horizontal reset spring (1-3), spring hanging seat (1-4), stage clip (1-5), stage clip plate washer (1-6), left V-arrangement part (1-7), framework (1-8), dive key (1-9), roller (1-10), axle (1-11), right V-arrangement part lower hinge support (1-12), alignment pin (1-13), bearing pin (1-14), right V-arrangement part (1-15), latch (1-16), horizontal hanging scroll (1-17), socket (1-18) on right V-arrangement part, vertical hanging scroll (1-19), H support (1-20), plate washer (1-21), vertical extension spring hanging seat (1-22), bolt (1-23), vertical extension spring (1-24), adjustment screw rod (1-25), nut II (1-26), journal stirrup (1-27), is characterized in that: two vertical hanging scrolls (1-19) are respectively charged in the hole of H support (1-20) lower and upper cross-member, are matched in clearance between the two, load level hanging scroll (1-17) in the hole of upper and lower two vertical hanging scrolls (1-19), realizes the axial restraint of horizontal hanging scroll (1-17) and vertical hanging scroll (1-19) with alignment pin (1-13), left V-arrangement part (1-7) is enclosed within two horizontal hanging scrolls (1-17) from the left side, on right V-arrangement part lower hinge support (1-12) and right V-arrangement part, socket (1-18) is enclosed within two horizontal hanging scrolls (1-17) from the right respectively, left V-arrangement part (1-7) and right V-arrangement part lower hinge support (1-12), on right V-arrangement part, stage clip (1-5) is used in the outside of socket (1-18) respectively, stage clip baffle plate (1-6) withstands, stage clip baffle plate (1-6) is screwed in the end of horizontal hanging scroll (1-17), right V-arrangement part (1-15) lower end bearing pin (1-14) is hinged on right V-arrangement part lower hinge support (1-12), left V-arrangement part (1-15) and right V-arrangement part lower hinge support (1-12), right V-arrangement part is matched in clearance between socket (1-18) and horizontal hanging scroll (1-17), before and after handling thick bamboo tube 2, right V-arrangement part (1-15) hangs on bearing pin (1-14), and H support (1-20) up and down two ends is inserted between the raceway that four rollers (1-10) form, during clamping thick bamboo tube 2, thick bamboo tube is pressed to left V-arrangement part (1-7), again right V-arrangement part (1-15) is rotated until its upper end is inserted in the groove of socket (1-18) on right V-arrangement part around bearing pin (1-14), then latch (1-16) is inserted into through the hole of socket (1-18) on right V-arrangement part in the hole of right V-arrangement part (1-15) upper end, pin right V-arrangement part (1-15), thick bamboo tube 2 is by left V-arrangement part (1-7) and right V-arrangement part (1-15) clamping, under the effect of upper four stage clips (1-5) of horizontal hanging scroll (1-17), thick bamboo tube 2 center automatically returns on the axis of vertical hanging scroll (1-19).
2. one as claimed in claim 1 goes internal segment de-etiolation thick bamboo tube to float V-arrangement clamping device, it is characterized in that: two ends, H support (1-20) lower and upper cross-member left and right are provided with four horizontal reset springs (1-3), be arranged symmetrically in vertical hanging scroll (1-19) both sides, one end of four horizontal reset springs (1-3) is hooked on spring hanging seat (1-4), the other end is hooked on the adjustment screw (1-2) in framework (1-8) journal stirrup (1-27), the size of horizontal reset spring (1-4) pulling force is regulated by adjustment screw (1-2) and nut I (1-1), after H support (1-20) produces and slides, under the effect of four horizontal reset springs (1-3), make vertical hanging scroll (1-19) axis Rapid reset on the axis of symmetry of upper four journal stirrups (1-27) of framework (1-8).
3. one as claimed in claim 1 goes internal segment de-etiolation thick bamboo tube to float V-arrangement clamping device, it is characterized in that: secure a vertical extension spring hanging seat (1-22) at vertical hanging scroll (1-19) top bolt (1-23), two vertical extension springs (1-24) are hooked on vertical extension spring hanging seat (1-22) two ends, other end is hooked on two adjustment screw rod (1-25) on framework (1-8) respectively, the size of two vertical extension spring (1-24) pulling force is regulated with nut II (1-26) by adjustment screw rod (1-25), thus reach the i's adjusting center when left V-arrangement part (1-7) and right V-arrangement part (1-15) clamp thick bamboo tube in vertical direction.
4. one as claimed in claim 1 goes internal segment de-etiolation thick bamboo tube to float V-arrangement clamping device, it is characterized in that: framework (1) is provided with four axles (1-11), a roller (1-10) each axle (1-11) is equipped with, each roller (1-10) cylindrical is processed with annular groove, between four roller 1-10, forms a raceway; Two ends, H support (1-20) crossbeam left and right upper and lower surface is processed with convex shoulder, its convex shoulder width is equal with the annular groove width on roller (1-10) cylindrical, the convex shoulder of two ends, H support (1-20) crossbeam left and right upper and lower surface embeds among the annular groove on roller (1-10) cylindrical, when H support (1-20) moves horizontally, and be rolling friction between roller (1-10).
5. one as claimed in claim 1 goes internal segment de-etiolation thick bamboo tube to float V-arrangement clamping device, it is characterized in that: framework (1-8) right side upper-lower position is provided with two baffle plates (1-21), the distance that restriction H support (1-20) level horizontally slips.
6. one as claimed in claim 1 goes internal segment de-etiolation thick bamboo tube to float V-arrangement clamping device, it is characterized in that: the circumference realizing vertical hanging scroll (1-19) and H support (1-20) with dive key (1-9) is fixed.
CN201510833688.6A 2015-11-23 2015-11-23 One kind removing internal segment de-etiolation thick bamboo tube floating V-arrangement clamping device Expired - Fee Related CN105269646B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510833688.6A CN105269646B (en) 2015-11-23 2015-11-23 One kind removing internal segment de-etiolation thick bamboo tube floating V-arrangement clamping device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510833688.6A CN105269646B (en) 2015-11-23 2015-11-23 One kind removing internal segment de-etiolation thick bamboo tube floating V-arrangement clamping device

Publications (2)

Publication Number Publication Date
CN105269646A true CN105269646A (en) 2016-01-27
CN105269646B CN105269646B (en) 2018-07-27

Family

ID=55139925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510833688.6A Expired - Fee Related CN105269646B (en) 2015-11-23 2015-11-23 One kind removing internal segment de-etiolation thick bamboo tube floating V-arrangement clamping device

Country Status (1)

Country Link
CN (1) CN105269646B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105904529A (en) * 2016-06-01 2016-08-31 安吉泰茂竹制品有限公司 Bamboo pipe inner bamboo joint cutting device capable of retracting according to hole diameter and bamboo pipe inner bamboo joint cutting method
CN105922388A (en) * 2016-06-22 2016-09-07 管炜 Full-automatic machining production line for bamboo tubes
CN105922380A (en) * 2016-06-01 2016-09-07 安吉泰茂竹制品有限公司 Device and method for cutting bamboo joints in bamboo tubes
CN106003287A (en) * 2016-05-25 2016-10-12 丽水学院 Full-automatic bamboo tube machining production line
CN109049239A (en) * 2018-07-12 2018-12-21 浙江农林大学暨阳学院 A kind of whole bamboo fibre separating machine and its fiber opening method
CN109176775A (en) * 2018-09-10 2019-01-11 福建农林大学 A kind of thick bamboo tube goes section to split all-in-one machine
CN111571742A (en) * 2020-05-08 2020-08-25 浙江科技学院 Automatic get rid of equipment of bamboo green ring
CN111571743A (en) * 2020-05-08 2020-08-25 浙江科技学院 Bamboo green joint removing device and method
CN113134882A (en) * 2021-04-13 2021-07-20 张晓芳 Environment-friendly degradable bamboo pipe processing trompil device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201385334Y (en) * 2008-12-04 2010-01-20 镇江中福马机械有限公司 Raw material clamping and conveying device of bamboo chipper
CN102189577A (en) * 2011-03-28 2011-09-21 南京林业大学 Method for removing inner segments and tabasheer of integral bamboo tube
CN202180500U (en) * 2011-03-28 2012-04-04 南京林业大学 Inner segment and yellow part removing device of Integral bamboo strip
CN205219346U (en) * 2015-11-23 2016-05-11 南京林业大学 Festival removes bambusa textile section of thick bamboo V -arrangement clamping device that floats in going

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201385334Y (en) * 2008-12-04 2010-01-20 镇江中福马机械有限公司 Raw material clamping and conveying device of bamboo chipper
CN102189577A (en) * 2011-03-28 2011-09-21 南京林业大学 Method for removing inner segments and tabasheer of integral bamboo tube
CN202180500U (en) * 2011-03-28 2012-04-04 南京林业大学 Inner segment and yellow part removing device of Integral bamboo strip
CN205219346U (en) * 2015-11-23 2016-05-11 南京林业大学 Festival removes bambusa textile section of thick bamboo V -arrangement clamping device that floats in going

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
金属工业发展中心: "《夹具1》", 30 June 1980 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106003287B (en) * 2016-05-25 2019-03-22 丽水学院 Thick bamboo tube full-automatic processing production line
CN106003287A (en) * 2016-05-25 2016-10-12 丽水学院 Full-automatic bamboo tube machining production line
CN105922380A (en) * 2016-06-01 2016-09-07 安吉泰茂竹制品有限公司 Device and method for cutting bamboo joints in bamboo tubes
CN105904529B (en) * 2016-06-01 2018-04-10 安吉泰茂竹制品有限公司 Ring eliminates apparatus and method in the thick bamboo tube that can be shunk according to aperture
CN105922380B (en) * 2016-06-01 2018-08-07 安吉泰茂竹制品有限公司 Device and method for cutting ring in thick bamboo tube
CN105904529A (en) * 2016-06-01 2016-08-31 安吉泰茂竹制品有限公司 Bamboo pipe inner bamboo joint cutting device capable of retracting according to hole diameter and bamboo pipe inner bamboo joint cutting method
CN105922388A (en) * 2016-06-22 2016-09-07 管炜 Full-automatic machining production line for bamboo tubes
CN109049239A (en) * 2018-07-12 2018-12-21 浙江农林大学暨阳学院 A kind of whole bamboo fibre separating machine and its fiber opening method
CN109049239B (en) * 2018-07-12 2023-09-01 浙江农林大学暨阳学院 Whole bamboo fiber opening machine and fiber opening method thereof
CN109176775A (en) * 2018-09-10 2019-01-11 福建农林大学 A kind of thick bamboo tube goes section to split all-in-one machine
CN109176775B (en) * 2018-09-10 2021-03-02 福建农林大学 Bamboo tube joint removing and splitting all-in-one machine
CN111571742A (en) * 2020-05-08 2020-08-25 浙江科技学院 Automatic get rid of equipment of bamboo green ring
CN111571743A (en) * 2020-05-08 2020-08-25 浙江科技学院 Bamboo green joint removing device and method
CN113134882A (en) * 2021-04-13 2021-07-20 张晓芳 Environment-friendly degradable bamboo pipe processing trompil device

Also Published As

Publication number Publication date
CN105269646B (en) 2018-07-27

Similar Documents

Publication Publication Date Title
CN105269646A (en) Inner segment removing and yellow removing V-shaped clamping device achieving bamboo pipe floating
CN205219346U (en) Festival removes bambusa textile section of thick bamboo V -arrangement clamping device that floats in going
CN204367089U (en) The clamping device that adjustable multi-layer bamboo chip punches simultaneously
CN209648915U (en) Drilling device is used in a kind of processing of medium density fiberboard
CN102658484A (en) Clamp special for valve holes of tubeless wheels of engineering truck
CN204036084U (en) A kind of clamping device for processing automobile gearbox back casing
CN209830490U (en) Section bar cutting machine for construction
CN207087549U (en) A kind of whole thick bamboo tube continuously removes blue or green device
CN205394026U (en) Longmen frame of finish milling machine
CN109434520B (en) Clamp for machining cylinder body
CN107471390A (en) A kind of clamping device of polymorphic type timber
CN204711305U (en) One clamps pipe cutting machine fast
CN220161871U (en) Steel pipe cutting machine
CN206567576U (en) The frock clamp processed beneficial to cylinder part
CN111822560A (en) Method for processing and preparing horseshoe
CN205735557U (en) Superthin stone cutting positioning machine tool
CN215967518U (en) Machining table for bottom plate seat
CN211252723U (en) Large-scale adjustable rotary paster vehicle
CN210336306U (en) Double-sided planer for bamboo plywood production
CN205519286U (en) A processing equipment for being directed at outer pot of cooking pot's interior pot heating
CN218696256U (en) Car sheet metal component positioning fixture
CN204195187U (en) A kind of press-loading apparatus
CN208895683U (en) A kind of slow wire feeding lathe stationary fixture
CN204339924U (en) The clamping device that multiple layered bamboo punches simultaneously
CN204277102U (en) The inner burr removal fixture of shifting vehicle gearbox fork dowel hole

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20160127

Assignee: Anhui Arrow Electronics Co.,Ltd.

Assignor: Nanjing Forestry University

Contract record no.: 2019320000235

Denomination of invention: Inner segment removing and yellow removing V-shaped clamping device achieving bamboo pipe floating

Granted publication date: 20180727

License type: Common License

Record date: 20190716

Application publication date: 20160127

Assignee: Chuzhou Monte tech Environmental Protection Technology Co.,Ltd.

Assignor: Nanjing Forestry University

Contract record no.: 2019320000234

Denomination of invention: Inner segment removing and yellow removing V-shaped clamping device achieving bamboo pipe floating

Granted publication date: 20180727

License type: Common License

Record date: 20190716

EE01 Entry into force of recordation of patent licensing contract
TR01 Transfer of patent right

Effective date of registration: 20190813

Address after: 221631 People's Government of Zhangzhuang Town, Peixian County, Xuzhou City, Jiangsu Province

Patentee after: Peixian Hantang Construction Development Co.,Ltd.

Address before: Nanjing City, Jiangsu province 210037 Longpan Road No. 159

Patentee before: Nanjing Forestry University

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180727