CN105262003A - 用于输电线路中高压导线的紧线方法 - Google Patents

用于输电线路中高压导线的紧线方法 Download PDF

Info

Publication number
CN105262003A
CN105262003A CN201510600808.8A CN201510600808A CN105262003A CN 105262003 A CN105262003 A CN 105262003A CN 201510600808 A CN201510600808 A CN 201510600808A CN 105262003 A CN105262003 A CN 105262003A
Authority
CN
China
Prior art keywords
pulley
wire
conducting wires
voltage conducting
grinding machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510600808.8A
Other languages
English (en)
Inventor
李卫民
张凯
李文
许琰
吴一千
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510600808.8A priority Critical patent/CN105262003A/zh
Publication of CN105262003A publication Critical patent/CN105262003A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

一种可减少农作物破坏,降低经济损失,在紧线过程中横担不易向下弯曲变形的用于输电线路中高压导线的紧线方法,其具体步骤如下:1、在横担上对应瓷瓶处安装滑轮I,在铁塔和横担交叉处安装与滑轮I处于同一高度的滑轮II,在滑轮II下方的塔基上放置绞磨机,并通过地锚固定。2、将高压导线的待固定端依次绕过瓷瓶、滑轮I和滑轮II后,固定在绞磨机的绕线轮上。3、启动绞磨机,使高压导线在绞磨机的绕线轮上缠绕,从而将高压导线拉紧。4、对高压导线的张紧力检测,达到规定的张紧力后停止绞磨机的绕线轮转动,并将高压导线绑扎使之固定在瓷瓶上。

Description

用于输电线路中高压导线的紧线方法
技术领域
本发明涉及一种用于输电线路中高压导线的紧线方法。
背景技术
在新建或更换输电线路中高压导线时,需要将高压导线拉紧,再将高压导线绑扎使其固定在横担上的瓷瓶上。现有的紧线方式是将高压导线的预固定端穿过瓷瓶后,固定在瓷瓶下方地面上的牵引车上,通过牵引车的运行将高压导线拉紧;或将高压导线的预固定端穿过瓷瓶后,缠绕在瓷瓶下方地面上的绞磨机的绕线轮上,绞磨机启动后通过绕线轮的转动将高压导线拉紧。当输电线路设置在耕地时,设置在瓷瓶下方地面上的牵引车或绞磨机占用大面积耕地,破坏农作物严重,造成经济损失;而且在紧线过程中,横担受到高压导线斜向下的作用力,易造成横担向下弯曲变形。
发明内容
本发明是为了解决上述技术问题,提供一种可减少农作物破坏,降低经济损失,在紧线过程中横担不易向下弯曲变形的用于输电线路中高压导线的紧线方法。
一种用于输电线路中高压导线的紧线方法,其具体步骤如下:
1、在横担上对应瓷瓶处安装滑轮I,在铁塔和横担交叉处安装与滑轮I处于同一高度的滑轮II,在滑轮II下方的塔基上放置绞磨机,并通过地锚固定。
2、将高压导线的待固定端依次绕过瓷瓶、滑轮I和滑轮II后,固定在绞磨机的绕线轮上。
3、启动绞磨机,使高压导线在绞磨机的绕线轮上缠绕,从而将高压导线拉紧。
4、对高压导线的张紧力检测,达到规定的张紧力后停止绞磨机的绕线轮转动,并将高压导线绑扎使之固定在瓷瓶上。
本发明的有益效果是:由于滑轮I和滑轮II位于同一高度,高压导线在滑轮I和滑轮II之间处于水平状态,从而在紧线的过程中,横担受高压导线水平方向的作用力,有效地避免了因紧线产生的作用力破坏横担结构和强度,防止横担向下弯曲。由于滑轮II位于铁塔和横担的交叉处,改变了高压导线的路径,绞磨机放置在滑轮II下方的塔基上,不占用耕地,有效的避免了对农作物的破坏,结构简单,施工方便。
附图说明
图1是本发明的结构示意图;
图中:1-横担,2-瓷瓶,3-高压导线,4-滑轮I,5-滑轮II,6-绞磨机。
具体实施方式
如图所示,一种用于输电线路中高压导线的紧线方法,其具体步骤如下:
1、首先在横担1上对应瓷瓶2处安装滑轮I,在铁塔和横担1交叉处安装与滑轮I4处于同一高度的滑轮II5,在滑轮II5下方的塔基上放置绞磨机6,并通过地锚固定。
2、再将高压导线3的待固定端依次绕过瓷瓶2、滑轮I4和滑轮II5后,固定在绞磨机6的绕线轮上。
3、启动绞磨机6,使高压导线3在绞磨机6的绕线轮上缠绕,从而将高压导线3拉紧。
4、对高压导线3的张紧力检测,达到规定的张紧力后停止绞磨机6的绕线轮转动,并将高压导线3绑扎使之固定在瓷瓶2上。
以上仅为本发明的具体实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (1)

1.一种用于输电线路中高压导线的紧线方法,其特征在于,具体步骤如下:
1)、在横担上对应瓷瓶处安装滑轮I,在铁塔和横担交叉处安装与滑轮I处于同一高度的滑轮II,在滑轮II下方的塔基上放置绞磨机,并通过地锚固定。
2)、将高压导线的待固定端依次绕过瓷瓶、滑轮I和滑轮II后,固定在绞磨机的绕线轮上。
3)、启动绞磨机,使高压导线在绞磨机的绕线轮上缠绕,从而将高压导线拉紧。
4)、对高压导线的张紧力检测,达到规定的张紧力后停止绞磨机的绕线轮转动,并将高压导线绑扎使之固定在瓷瓶上。
CN201510600808.8A 2015-09-21 2015-09-21 用于输电线路中高压导线的紧线方法 Pending CN105262003A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510600808.8A CN105262003A (zh) 2015-09-21 2015-09-21 用于输电线路中高压导线的紧线方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510600808.8A CN105262003A (zh) 2015-09-21 2015-09-21 用于输电线路中高压导线的紧线方法

Publications (1)

Publication Number Publication Date
CN105262003A true CN105262003A (zh) 2016-01-20

Family

ID=55101561

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510600808.8A Pending CN105262003A (zh) 2015-09-21 2015-09-21 用于输电线路中高压导线的紧线方法

Country Status (1)

Country Link
CN (1) CN105262003A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105896382A (zh) * 2016-06-01 2016-08-24 国网山东省电力公司龙口市供电公司 架空线路拉紧装置及方法
CN106193761A (zh) * 2016-08-31 2016-12-07 国网山东省电力公司栖霞市供电公司 一种电力高压传输设备
CN106368492A (zh) * 2016-10-11 2017-02-01 华北电力大学 电力铁塔防攀爬装置
CN108614334A (zh) * 2018-05-04 2018-10-02 德州职业技术学院(德州市技师学院) 一种网络光纤固定装置
CN109167302A (zh) * 2018-08-17 2019-01-08 安徽送变电工程有限公司 一种用于输电线路紧挂线施工的导线端部牵拉方法
CN112158781A (zh) * 2020-09-16 2021-01-01 国家电网有限公司 一种基于机动牵引装置的带电作业装置及使用方法
CN112594446A (zh) * 2020-12-04 2021-04-02 中国五冶集团有限公司 一种管道共用支架安装方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070158093A1 (en) * 2006-01-10 2007-07-12 Barthold Lionel O Systems, Methods and Apparatus for Transmission Line Re-Conductoring
CN201518399U (zh) * 2009-09-18 2010-06-30 江苏省电力公司宜兴市供电公司 一种用于收紧导线的钢管杆结构
CN202633831U (zh) * 2012-06-25 2012-12-26 福建省建瓯市供电有限公司 手动多功能紧线装置
CN203233106U (zh) * 2013-03-14 2013-10-09 国家电网公司 高压输电线接线拉线装置
CN103594976A (zh) * 2013-11-25 2014-02-19 国家电网公司 用于线路导线紧线的组合紧线工具

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070158093A1 (en) * 2006-01-10 2007-07-12 Barthold Lionel O Systems, Methods and Apparatus for Transmission Line Re-Conductoring
CN201518399U (zh) * 2009-09-18 2010-06-30 江苏省电力公司宜兴市供电公司 一种用于收紧导线的钢管杆结构
CN202633831U (zh) * 2012-06-25 2012-12-26 福建省建瓯市供电有限公司 手动多功能紧线装置
CN203233106U (zh) * 2013-03-14 2013-10-09 国家电网公司 高压输电线接线拉线装置
CN103594976A (zh) * 2013-11-25 2014-02-19 国家电网公司 用于线路导线紧线的组合紧线工具

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105896382A (zh) * 2016-06-01 2016-08-24 国网山东省电力公司龙口市供电公司 架空线路拉紧装置及方法
CN106193761A (zh) * 2016-08-31 2016-12-07 国网山东省电力公司栖霞市供电公司 一种电力高压传输设备
CN106193761B (zh) * 2016-08-31 2018-10-16 国网山东省电力公司栖霞市供电公司 一种电力高压传输设备
CN106368492A (zh) * 2016-10-11 2017-02-01 华北电力大学 电力铁塔防攀爬装置
CN106368492B (zh) * 2016-10-11 2019-07-30 华北电力大学 电力铁塔防攀爬装置
CN108614334A (zh) * 2018-05-04 2018-10-02 德州职业技术学院(德州市技师学院) 一种网络光纤固定装置
CN108614334B (zh) * 2018-05-04 2020-03-31 德州职业技术学院(德州市技师学院) 一种网络光纤固定装置
CN109167302A (zh) * 2018-08-17 2019-01-08 安徽送变电工程有限公司 一种用于输电线路紧挂线施工的导线端部牵拉方法
CN112158781A (zh) * 2020-09-16 2021-01-01 国家电网有限公司 一种基于机动牵引装置的带电作业装置及使用方法
CN112158781B (zh) * 2020-09-16 2022-04-01 国家电网有限公司 一种基于机动牵引装置的带电作业装置及使用方法
CN112594446A (zh) * 2020-12-04 2021-04-02 中国五冶集团有限公司 一种管道共用支架安装方法

Similar Documents

Publication Publication Date Title
CN105262003A (zh) 用于输电线路中高压导线的紧线方法
CN204663121U (zh) 可移动式绝缘支撑线杆
CN105610093B (zh) 一种锚固装置及锚固方法
CN206928739U (zh) 一种电力铺设电线杆斜拉线张紧装置
CN102669085A (zh) 架空供电线路防鸟害装置
CN105314457B (zh) 一种电力线卷线装置
CN107299772A (zh) 确保电网设施运转正常的电网电线杆加固加高装置
CN104370157A (zh) 便携式接地线绕线架
CN104037658A (zh) 悬垂玻璃绝缘子串提升系统
CN202339358U (zh) 试验引线支撑装置
CN102611057A (zh) 跨越网
CN203632183U (zh) 防风偏的架空避雷线支架
CN203233106U (zh) 高压输电线接线拉线装置
CN203294962U (zh) 一种线盘
CN206685794U (zh) 一种10kV线路地电位带电更换耐张杆绝缘子的装置
CN205289315U (zh) 一种弹簧成型机上的钢筋输出架
CN105006773A (zh) 一种输电线路非锚固导地线作业方法
CN106025923B (zh) 一种张力式电力线路保护网的施工方法
CN104064996B (zh) 架空地线提线器
CN204265112U (zh) 便携式接地线绕线架
CN204118374U (zh) 接地线的接地导线接连点保护装置
CN202474756U (zh) 跨越网
CN102882156B (zh) 配电线路导线绑扎装置
CN203475923U (zh) 拉线绑扎器
CN104071639A (zh) 一种接地线绕线器

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160120