CN105258337A - Boiler special for bathing - Google Patents
Boiler special for bathing Download PDFInfo
- Publication number
- CN105258337A CN105258337A CN201510592465.5A CN201510592465A CN105258337A CN 105258337 A CN105258337 A CN 105258337A CN 201510592465 A CN201510592465 A CN 201510592465A CN 105258337 A CN105258337 A CN 105258337A
- Authority
- CN
- China
- Prior art keywords
- water tank
- boiler
- pipe
- connects
- preheating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Heat Treatment Of Water, Waste Water Or Sewage (AREA)
- Water Treatment By Sorption (AREA)
Abstract
A boiler special for bathing comprises a waste water collecting tank, a first preheating water tank, a second preheating water tank, a hot water boiler, a filter chamber and a spraying chamber. The lower end of the waste gas collecting tank is connected with the first preheating water tank through a connection pipe. The bottom end of the first preheating water tank is connected with the left end of the filter chamber through a connection pipe. The right end of the filter chamber is connected with the spraying chamber through a connection pipe. The lower right end of the first preheating water tank is connected with the second preheating water tank through a connection pipe. The lower end of the second preheating water tank is connected with the spraying chamber through a connection pipe. The right end of the second preheating water tank is connected with a heating water tank in the hot water boiler. The upper end of the hot water boiler is connected with an induced fan through a flue gas pipe, and the other end of the induced fan is connected with the top end of the second preheating water tank through a flue gas pipe. The waste heat in waste bathing water and waste heat in waste gas of the boiler can be recycled for preheating cold water entering the boiler, so that the heating efficiency is improved and energy is saved.
Description
Technical field
the present invention relates to boiler manfacturing field, particularly a kind of bathing is boiler dedicated.
Background technology
the boiler in bathing place needs long-term continual use, the use amount of coal is comparatively large, and not only energy resource consumption is comparatively large, and boiler also can produce a large amount of waste gas in running, with partial heat energy in this type of waste gas, if not treated just discharge, meeting serious environment pollution, the client of bathing field is in bathing process in addition, use a large amount of hot water, these hot water, still can with a large amount of heat energy when flowing into sewer, and energy utilization rate is lower.Therefore, market is badly in need of one and effectively can reclaims heat energy in bath wastewater, boiler waste gas heat energy, and effectively can process waste gas, it is boiler dedicated to fall oligosaprobic bathing.
Summary of the invention
the object of this invention is to provide a kind of bathing boiler dedicated, can by the waste heat in bath wastewater, the heat recovery in boiler waste gas, for entering the preheating cold water in boiler, both improve the utilization rate of the energy, be preheating cold water again effectively, the process that hot-water boiler is heating for water shortened, and saves coal, improve the efficiency of heating surface, saved the energy, there is great economic worth and social benefit.
object of the present invention is achieved through the following technical solutions:
a kind of bathing is boiler dedicated, comprise sewage collecting box, first preheating water tank, second preheating water tank, hot-water boiler, filter chamber, spray chamber, described sewage collecting box lower end connects the first preheating water tank by tube connector, the first described preheating water tank bottom connects filter chamber's left end by tube connector, described filter chamber's right-hand member connects spray chamber by tube connector, tube connector connects the spray equipment of spray chamber inside, first described preheating water tank's bottom righthand side connects the second preheating water tank by tube connector, the second described preheating water tank lower end connects spray chamber by tube connector, second described preheating water tank's right-hand member connects micro pump by tube connector, the micro pump other end connects the heating water tank of Hot Water Boiler Internal by tube connector, described hot-water boiler upper end connects air-introduced machine by fume pipe, the air-introduced machine other end connects the second preheating water tank top by fume pipe.
described sewage collecting box upper end left-hand unit wastewater inlet pipe.
first described preheating water tank's left end arranges boiler water water inlet pipe, inside arranges heat exchanging water pipe, described heat exchanging water pipe is the swan-neck with multiple back bending place, and described boiler water water inlet pipe connects heat exchanging water pipe's left end mouth of pipe, and heat exchanging water pipe's right-hand member mouth of pipe connects first preheating water tank's right-hand member tube connector.
second described preheating water tank's interior arrangement waste gas heat exchange tube, described waste gas heat exchange tube is the swan-neck with multiple back bending place, the upper end mouth of pipe of waste gas heat exchange tube connects the second preheating water tank upper end fume pipe, and the lower end mouth of pipe connects the tube connector that the second preheating water tank connects spray chamber.
described Hot Water Boiler Internal arranges fire grate, flue, heating water tank, slag notch, waste slag chamber, and hot-water boiler lower-left end arranges air-blast device.
described inside, filter chamber arranges two-layer activated-carbon filter stratum reticulare.
described spray chamber inside arranges spray equipment, and spray chamber upper end arranges waste gas exhaust pipe, and bottom righthand side arranges wastewater drainage pipe.
described sewage collecting box collects bath wastewater, waste water enters into the first preheating water tank by tube connector, for the cool water heating in heat exchanging water pipe, then waste water flows in filter chamber and filters, enter after filtration in spray chamber, for spray equipment provides water source, cold water in heat exchanging water pipe is after first preheating water tank's preheating, enter in the second preheating water tank, in second preheating water tank, waste gas heat exchange tube is set, the waste gas produced after hot-water boiler runs enters waste gas heat exchange tube by fume pipe, it is the water preheat in the second preheating water tank, after preheating, current enter in hot-water boiler heating water tank through micro pump and heat.
beneficial effect of the present invention: a kind of bathing of the present invention is boiler dedicated, can by the waste heat in bath wastewater, the heat recovery in boiler waste gas, for entering the preheating cold water in boiler, both improve the utilization rate of the energy, be preheating cold water again effectively, the process that hot-water boiler is heating for water shortened, and saves coal, improve the efficiency of heating surface, saved the energy, there is great economic worth and social benefit.
Accompanying drawing explanation
fig. 1 is overall structure schematic diagram of the present invention;
in figure, 1-sewage collecting box; 2-first preheating water tank; 3-second preheating water tank; 4-hot-water boiler; 5-filter chamber; 6-spray chamber; 7-spray equipment; 8-micro pump; 9-heating water tank; 10-fume pipe; 11-air-introduced machine; 12-wastewater inlet pipe; 13-boiler water water inlet pipe; 14-heat exchanging water pipe; 15-waste gas heat exchange tube; 16-fire grate; 17-flue; 18-slag notch; 19-waste slag chamber; 20-air-blast device; 21-waste gas exhaust pipe; 22-wastewater drainage pipe.
Detailed description of the invention
below in conjunction with accompanying drawing, the present invention is described in further detail.
embodiment 1
as shown in Figure 1, a kind of bathing is boiler dedicated, comprise sewage collecting box 1, first preheating water tank 2, second preheating water tank 3, hot-water boiler 4, filter chamber 5, spray chamber 6, described sewage collecting box 1 lower end connects the first preheating water tank 2 by tube connector, the first described preheating water tank 2 bottom connects filter chamber 5 left end by tube connector, described filter chamber 5 right-hand member connects spray chamber 6 by tube connector, tube connector connects the spray equipment 7 of spray chamber 6 inside, the first described preheating water tank 2 bottom righthand side connects the second preheating water tank 3 by tube connector, the second described preheating water tank 3 lower end connects spray chamber 6 by tube connector, the second described preheating water tank 3 right-hand member connects micro pump 8 by tube connector, micro pump 8 other end connects the heating water tank 9 of hot-water boiler 4 inside by tube connector, described hot-water boiler 4 upper end connects air-introduced machine 11 by fume pipe 10, air-introduced machine 11 other end connects the second preheating water tank 3 top by fume pipe 10.
embodiment 2
as shown in Figure 1, described sewage collecting box 1 upper end left-hand unit wastewater inlet pipe 12.
embodiment 3
as shown in Figure 1, the first described preheating water tank 2 left end arranges boiler water water inlet pipe 13, inside arranges heat exchanging water pipe 14, described heat exchanging water pipe 14 is the swan-neck with multiple back bending place, described boiler water water inlet pipe 13 connects the heat exchanging water pipe 14 left end mouth of pipe, and the heat exchanging water pipe 14 right-hand member mouth of pipe connects the first preheating water tank 2 right-hand member tube connector.
embodiment 4
as shown in Figure 1, the second described preheating water tank 3 interior arrangement waste gas heat exchange tube 15, described waste gas heat exchange tube 15 is the swan-neck with multiple back bending place, the upper end mouth of pipe of waste gas heat exchange tube 15 connects the second preheating water tank 3 upper end fume pipe 10, and the lower end mouth of pipe connects the tube connector that the second preheating water tank 3 connects spray chamber 6.
embodiment 5
as shown in Figure 1, described hot-water boiler 4 inside arranges fire grate 16, flue 17, heating water tank 9, slag notch 18, waste slag chamber 19, and hot-water boiler 4 lower-left end arranges air-blast device 20.
embodiment 6
as shown in Figure 1, described inside, filter chamber 5 arranges two-layer activated-carbon filter stratum reticulare.
embodiment 7
as shown in Figure 1, described spray chamber 6 inside arranges spray equipment 7, and spray chamber 6 upper end arranges waste gas exhaust pipe 21, and bottom righthand side arranges wastewater drainage pipe 22.
embodiment 8
in the present invention, described sewage collecting box collects bath wastewater, waste water enters into the first preheating water tank by tube connector, for the cool water heating in heat exchanging water pipe, then waste water flows in filter chamber and filters, enter after filtration in spray chamber, for spray equipment provides water source, cold water in heat exchanging water pipe is after first preheating water tank's preheating, enter in the second preheating water tank, in second preheating water tank, waste gas heat exchange tube is set, the waste gas produced after hot-water boiler runs enters waste gas heat exchange tube by fume pipe, it is the water preheat in the second preheating water tank, after preheating, current enter in hot-water boiler heating water tank through micro pump and heat.
Claims (7)
1. a bathing is boiler dedicated, comprise sewage collecting box, first preheating water tank, second preheating water tank, hot-water boiler, filter chamber, spray chamber, it is characterized in that: described sewage collecting box lower end connects the first preheating water tank by tube connector, the first described preheating water tank bottom connects filter chamber's left end by tube connector, described filter chamber's right-hand member connects spray chamber by tube connector, tube connector connects the spray equipment of spray chamber inside, first described preheating water tank's bottom righthand side connects the second preheating water tank by tube connector, the second described preheating water tank lower end connects spray chamber by tube connector, second described preheating water tank's right-hand member connects micro pump by tube connector, the micro pump other end connects the heating water tank of Hot Water Boiler Internal by tube connector, described hot-water boiler upper end connects air-introduced machine by fume pipe, the air-introduced machine other end connects the second preheating water tank top by fume pipe.
2. a kind of bathing according to claim 1 is boiler dedicated, it is characterized in that: described sewage collecting box upper end left-hand unit wastewater inlet pipe.
3. a kind of bathing according to claim 1 is boiler dedicated, it is characterized in that: first described preheating water tank's left end arranges boiler water water inlet pipe, inside arranges heat exchanging water pipe, described heat exchanging water pipe is the swan-neck with multiple back bending place, described boiler water water inlet pipe connects heat exchanging water pipe's left end mouth of pipe, and heat exchanging water pipe's right-hand member mouth of pipe connects first preheating water tank's right-hand member tube connector.
4. a kind of bathing according to claim 1 is boiler dedicated, it is characterized in that: second described preheating water tank's interior arrangement waste gas heat exchange tube, described waste gas heat exchange tube is the swan-neck with multiple back bending place, the upper end mouth of pipe of waste gas heat exchange tube connects the second preheating water tank upper end fume pipe, and the lower end mouth of pipe connects the tube connector that the second preheating water tank connects spray chamber.
5. a kind of bathing according to claim 1 is boiler dedicated, it is characterized in that: described Hot Water Boiler Internal arranges fire grate, flue, heating water tank, slag notch, waste slag chamber, and hot-water boiler lower-left end arranges air-blast device.
6. a kind of bathing according to claim 1 is boiler dedicated, it is characterized in that: described inside, filter chamber arranges two-layer activated-carbon filter stratum reticulare.
7. a kind of bathing according to claim 1 is boiler dedicated, it is characterized in that: described spray chamber inside arranges spray equipment, and spray chamber upper end arranges waste gas exhaust pipe, and bottom righthand side arranges wastewater drainage pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510592465.5A CN105258337A (en) | 2015-09-17 | 2015-09-17 | Boiler special for bathing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510592465.5A CN105258337A (en) | 2015-09-17 | 2015-09-17 | Boiler special for bathing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105258337A true CN105258337A (en) | 2016-01-20 |
Family
ID=55098130
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510592465.5A Pending CN105258337A (en) | 2015-09-17 | 2015-09-17 | Boiler special for bathing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105258337A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106052423A (en) * | 2016-07-08 | 2016-10-26 | 中山市道享节能技术服务有限公司 | Smoke waste heat and waste water waste heat recycling system |
CN106623228A (en) * | 2017-01-09 | 2017-05-10 | 京东方科技集团股份有限公司 | Water tank for washing base plate, water tank heating system and method and base plate washing device |
CN106679193A (en) * | 2017-03-01 | 2017-05-17 | 河北工业大学 | Integral bathroom automatic control system |
CN110327742A (en) * | 2019-08-05 | 2019-10-15 | 巢湖云海镁业有限公司 | A kind of exhaust gas absorption device of aluminum alloy die casting production |
CN111795424A (en) * | 2020-07-03 | 2020-10-20 | 安徽康特姆新能源股份有限公司 | Air source and pollution source composite heat pump water supply system for healthy epidemic prevention large bathing place |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101846306A (en) * | 2009-03-27 | 2010-09-29 | 孙诚刚 | Residual heat conversion device for boiler |
JP2012098021A (en) * | 2010-10-05 | 2012-05-24 | Shinki Active Center:Kk | Device for removal of smoke and dust in kitchen |
JP2012102908A (en) * | 2010-11-08 | 2012-05-31 | Nippon Thermoener Co Ltd | Heat recovery apparatus of exhaust gas in vacuum water heating machine and heat recovery method using the same |
CN203223926U (en) * | 2013-04-11 | 2013-10-02 | 钟博梁 | Heat energy recycle and purification device of boiler flue |
CN203231539U (en) * | 2012-10-30 | 2013-10-09 | 湖南工业大学 | Public bathhouse hot water system with condensing boiler as heat source |
CN104266343A (en) * | 2014-09-28 | 2015-01-07 | 无锡昊瑜节能环保设备有限公司 | Method for recycling bathing wastewater |
CN104422133A (en) * | 2013-08-19 | 2015-03-18 | 珠海格力电器股份有限公司 | Hot water system and control method of water mixing valve thereof |
CN104913292A (en) * | 2015-05-18 | 2015-09-16 | 芜湖鸣人热能设备有限公司 | Flue gas waste heat utilization device for civil boiler |
-
2015
- 2015-09-17 CN CN201510592465.5A patent/CN105258337A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101846306A (en) * | 2009-03-27 | 2010-09-29 | 孙诚刚 | Residual heat conversion device for boiler |
JP2012098021A (en) * | 2010-10-05 | 2012-05-24 | Shinki Active Center:Kk | Device for removal of smoke and dust in kitchen |
JP2012102908A (en) * | 2010-11-08 | 2012-05-31 | Nippon Thermoener Co Ltd | Heat recovery apparatus of exhaust gas in vacuum water heating machine and heat recovery method using the same |
CN203231539U (en) * | 2012-10-30 | 2013-10-09 | 湖南工业大学 | Public bathhouse hot water system with condensing boiler as heat source |
CN203223926U (en) * | 2013-04-11 | 2013-10-02 | 钟博梁 | Heat energy recycle and purification device of boiler flue |
CN104422133A (en) * | 2013-08-19 | 2015-03-18 | 珠海格力电器股份有限公司 | Hot water system and control method of water mixing valve thereof |
CN104266343A (en) * | 2014-09-28 | 2015-01-07 | 无锡昊瑜节能环保设备有限公司 | Method for recycling bathing wastewater |
CN104913292A (en) * | 2015-05-18 | 2015-09-16 | 芜湖鸣人热能设备有限公司 | Flue gas waste heat utilization device for civil boiler |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106052423A (en) * | 2016-07-08 | 2016-10-26 | 中山市道享节能技术服务有限公司 | Smoke waste heat and waste water waste heat recycling system |
CN106623228A (en) * | 2017-01-09 | 2017-05-10 | 京东方科技集团股份有限公司 | Water tank for washing base plate, water tank heating system and method and base plate washing device |
US10864556B2 (en) | 2017-01-09 | 2020-12-15 | Boe Technology Group Co., Ltd. | Tank for substrate cleaning, tank heating apparatus, tank heating method, and substrate cleaning apparatus |
CN106679193A (en) * | 2017-03-01 | 2017-05-17 | 河北工业大学 | Integral bathroom automatic control system |
CN110327742A (en) * | 2019-08-05 | 2019-10-15 | 巢湖云海镁业有限公司 | A kind of exhaust gas absorption device of aluminum alloy die casting production |
CN111795424A (en) * | 2020-07-03 | 2020-10-20 | 安徽康特姆新能源股份有限公司 | Air source and pollution source composite heat pump water supply system for healthy epidemic prevention large bathing place |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205002364U (en) | Special boiler of bathing | |
CN105258337A (en) | Boiler special for bathing | |
CN105222332A (en) | A kind of energy-saving, environmental protection boiler | |
CN205119108U (en) | Waste heat utilizing system for boiler | |
CN205002365U (en) | Energy -saving and environment -friendly boiler | |
CN104654385A (en) | Waste heat recycling device | |
CN204372879U (en) | A kind of two medium waste heat boiler | |
CN204062972U (en) | Steam generator | |
CN204026649U (en) | Device for utilizing waste of boiler | |
CN203614179U (en) | Gas electrical generation waste heat recovery device | |
CN204780277U (en) | Printing and dyeing wastewater recovery unit | |
CN104913292A (en) | Flue gas waste heat utilization device for civil boiler | |
CN204240377U (en) | A kind of oil burning boiler flue gas energy-saving duster | |
CN208365798U (en) | A kind of environment-protection boiler with off-gas recovery function | |
CN204100222U (en) | A kind of hot type boiler softened water tank | |
CN204224285U (en) | A kind of desalination process system utilizing waste heat | |
CN204063983U (en) | The retracting device of a kind of fume afterheat and water | |
CN205119111U (en) | Boiler waste heat cyclic utilization system | |
CN206279347U (en) | Vapours heating system is pressed through in a kind of case residual heat utilization-type forming machine baking oven end to end | |
CN205773869U (en) | A kind of water treatment facilities | |
CN104019543A (en) | Waste water heat energy recycling device | |
CN205535708U (en) | Modular flue gas steam generator | |
CN204574422U (en) | Industrial water filters desalination heater | |
CN103344042A (en) | Shower room | |
CN205027160U (en) | Conversion equipment is retrieved to fountain media rotation heat source |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160120 |
|
WD01 | Invention patent application deemed withdrawn after publication |