CN205002364U - Special boiler of bathing - Google Patents

Special boiler of bathing Download PDF

Info

Publication number
CN205002364U
CN205002364U CN201520724124.4U CN201520724124U CN205002364U CN 205002364 U CN205002364 U CN 205002364U CN 201520724124 U CN201520724124 U CN 201520724124U CN 205002364 U CN205002364 U CN 205002364U
Authority
CN
China
Prior art keywords
water tank
boiler
pipe
connects
preheating water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520724124.4U
Other languages
Chinese (zh)
Inventor
谷哲学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Jinjing Boiler Co Ltd
Original Assignee
Harbin Jinjing Boiler Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Jinjing Boiler Co Ltd filed Critical Harbin Jinjing Boiler Co Ltd
Priority to CN201520724124.4U priority Critical patent/CN205002364U/en
Application granted granted Critical
Publication of CN205002364U publication Critical patent/CN205002364U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Provided is a special boiler of bathing, including wastewater collection case, a preheating water tank, the 2nd preheating water tank, boiler, filter chamber, spray room, wastewater collection case lower extreme pass through the connecting pipe and connect a preheating water tank, a preheating water tank bottom pass through the connecting pipe and connect the filter chamber left end, the filter chamber right -hand member pass through the connecting pipe and connect the spray room, preheating water tank right side lower extreme pass through the connecting pipe and connect the 2nd preheating water tank, the 2nd preheating water tank lower extreme pass through the connecting pipe and connect the spray room, the 2nd preheating water tank right -hand member connect the inside heating the water tank of boiler, boiler upper end through flue gas union coupling draught fan, the draught fan other end passes through the 2nd preheating water tank top of flue gas union coupling. The utility model discloses can utilize the waste heat in the bathing waste water, waste heat recovery among the exhaust gas of boiler, for the cold water that gets into in the boiler preheats, improve heating efficiency, practice thrift the energy. (B, )

Description

A kind of bathing is boiler dedicated
Technical field
the utility model relates to boiler manfacturing field, and particularly a kind of bathing is boiler dedicated.
Background technology
the boiler in bathing place needs long-term continual use, the use amount of coal is comparatively large, and not only energy resource consumption is comparatively large, and boiler also can produce a large amount of waste gas in running, with partial heat energy in this type of waste gas, if not treated just discharge, meeting serious environment pollution, the client of bathing field is in bathing process in addition, use a large amount of hot water, these hot water, still can with a large amount of heat energy when flowing into sewer, and energy utilization rate is lower.Therefore, market is badly in need of one and effectively can reclaims heat energy in bath wastewater, boiler waste gas heat energy, and effectively can process waste gas, it is boiler dedicated to fall oligosaprobic bathing.
Utility model content
it is boiler dedicated that the purpose of this utility model is to provide a kind of bathing, can by the waste heat in bath wastewater, the heat recovery in boiler waste gas, for entering the preheating cold water in boiler, both improve the utilization rate of the energy, be preheating cold water again effectively, the process that hot-water boiler is heating for water shortened, and saves coal, improve the efficiency of heating surface, saved the energy, there is great economic worth and social benefit.
the purpose of this utility model is achieved through the following technical solutions:
a kind of bathing is boiler dedicated, comprise sewage collecting box, first preheating water tank, second preheating water tank, hot-water boiler, filter chamber, spray chamber, described sewage collecting box lower end connects the first preheating water tank by tube connector, the first described preheating water tank bottom connects filter chamber's left end by tube connector, described filter chamber's right-hand member connects spray chamber by tube connector, tube connector connects the spray equipment of spray chamber inside, first described preheating water tank's bottom righthand side connects the second preheating water tank by tube connector, the second described preheating water tank lower end connects spray chamber by tube connector, second described preheating water tank's right-hand member connects micro pump by tube connector, the micro pump other end connects the heating water tank of Hot Water Boiler Internal by tube connector, described hot-water boiler upper end connects air-introduced machine by fume pipe, the air-introduced machine other end connects the second preheating water tank top by fume pipe.
described sewage collecting box upper end left-hand unit wastewater inlet pipe.
first described preheating water tank's left end arranges boiler water water inlet pipe, inside arranges heat exchanging water pipe, described heat exchanging water pipe is the swan-neck with multiple back bending place, and described boiler water water inlet pipe connects heat exchanging water pipe's left end mouth of pipe, and heat exchanging water pipe's right-hand member mouth of pipe connects first preheating water tank's right-hand member tube connector.
second described preheating water tank's interior arrangement waste gas heat exchange tube, described waste gas heat exchange tube is the swan-neck with multiple back bending place, the upper end mouth of pipe of waste gas heat exchange tube connects the second preheating water tank upper end fume pipe, and the lower end mouth of pipe connects the tube connector that the second preheating water tank connects spray chamber.
described Hot Water Boiler Internal arranges fire grate, flue, heating water tank, slag notch, waste slag chamber, and hot-water boiler lower-left end arranges air-blast device.
described inside, filter chamber arranges two-layer activated-carbon filter stratum reticulare.
described spray chamber inside arranges spray equipment, and spray chamber upper end arranges waste gas exhaust pipe, and bottom righthand side arranges wastewater drainage pipe.
described sewage collecting box collects bath wastewater, waste water enters into the first preheating water tank by tube connector, for the cool water heating in heat exchanging water pipe, then waste water flows in filter chamber and filters, enter after filtration in spray chamber, for spray equipment provides water source, cold water in heat exchanging water pipe is after first preheating water tank's preheating, enter in the second preheating water tank, in second preheating water tank, waste gas heat exchange tube is set, the waste gas produced after hot-water boiler runs enters waste gas heat exchange tube by fume pipe, it is the water preheat in the second preheating water tank, after preheating, current enter in hot-water boiler heating water tank through micro pump and heat.
the beneficial effects of the utility model: a kind of bathing of the present utility model is boiler dedicated, can by the waste heat in bath wastewater, the heat recovery in boiler waste gas, for entering the preheating cold water in boiler, both improve the utilization rate of the energy, be preheating cold water again effectively, the process that hot-water boiler is heating for water shortened, and saves coal, improve the efficiency of heating surface, saved the energy, there is great economic worth and social benefit.
Accompanying drawing explanation
fig. 1 is overall structure schematic diagram of the present utility model;
in figure, 1-sewage collecting box; 2-first preheating water tank; 3-second preheating water tank; 4-hot-water boiler; 5-filter chamber; 6-spray chamber; 7-spray equipment; 8-micro pump; 9-heating water tank; 10-fume pipe; 11-air-introduced machine; 12-wastewater inlet pipe; 13-boiler water water inlet pipe; 14-heat exchanging water pipe; 15-waste gas heat exchange tube; 16-fire grate; 17-flue; 18-slag notch; 19-waste slag chamber; 20-air-blast device; 21-waste gas exhaust pipe; 22-wastewater drainage pipe.
Detailed description of the invention
below in conjunction with accompanying drawing, the utility model is described in further detail.
embodiment 1
as shown in Figure 1, a kind of bathing is boiler dedicated, comprise sewage collecting box 1, first preheating water tank 2, second preheating water tank 3, hot-water boiler 4, filter chamber 5, spray chamber 6, described sewage collecting box 1 lower end connects the first preheating water tank 2 by tube connector, the first described preheating water tank 2 bottom connects filter chamber 5 left end by tube connector, described filter chamber 5 right-hand member connects spray chamber 6 by tube connector, tube connector connects the spray equipment 7 of spray chamber 6 inside, the first described preheating water tank 2 bottom righthand side connects the second preheating water tank 3 by tube connector, the second described preheating water tank 3 lower end connects spray chamber 6 by tube connector, the second described preheating water tank 3 right-hand member connects micro pump 8 by tube connector, micro pump 8 other end connects the heating water tank 9 of hot-water boiler 4 inside by tube connector, described hot-water boiler 4 upper end connects air-introduced machine 11 by fume pipe 10, air-introduced machine 11 other end connects the second preheating water tank 3 top by fume pipe 10.
embodiment 2
as shown in Figure 1, described sewage collecting box 1 upper end left-hand unit wastewater inlet pipe 12.
embodiment 3
as shown in Figure 1, the first described preheating water tank 2 left end arranges boiler water water inlet pipe 13, inside arranges heat exchanging water pipe 14, described heat exchanging water pipe 14 is the swan-neck with multiple back bending place, described boiler water water inlet pipe 13 connects the heat exchanging water pipe 14 left end mouth of pipe, and the heat exchanging water pipe 14 right-hand member mouth of pipe connects the first preheating water tank 2 right-hand member tube connector.
embodiment 4
as shown in Figure 1, the second described preheating water tank 3 interior arrangement waste gas heat exchange tube 15, described waste gas heat exchange tube 15 is the swan-neck with multiple back bending place, the upper end mouth of pipe of waste gas heat exchange tube 15 connects the second preheating water tank 3 upper end fume pipe 10, and the lower end mouth of pipe connects the tube connector that the second preheating water tank 3 connects spray chamber 6.
embodiment 5
as shown in Figure 1, described hot-water boiler 4 inside arranges fire grate 16, flue 17, heating water tank 9, slag notch 18, waste slag chamber 19, and hot-water boiler 4 lower-left end arranges air-blast device 20.
embodiment 6
as shown in Figure 1, described inside, filter chamber 5 arranges two-layer activated-carbon filter stratum reticulare.
embodiment 7
as shown in Figure 1, described spray chamber 6 inside arranges spray equipment 7, and spray chamber 6 upper end arranges waste gas exhaust pipe 21, and bottom righthand side arranges wastewater drainage pipe 22.
embodiment 8
in the utility model, described sewage collecting box collects bath wastewater, waste water enters into the first preheating water tank by tube connector, for the cool water heating in heat exchanging water pipe, then waste water flows in filter chamber and filters, enter after filtration in spray chamber, for spray equipment provides water source, cold water in heat exchanging water pipe is after first preheating water tank's preheating, enter in the second preheating water tank, in second preheating water tank, waste gas heat exchange tube is set, the waste gas produced after hot-water boiler runs enters waste gas heat exchange tube by fume pipe, it is the water preheat in the second preheating water tank, after preheating, current enter in hot-water boiler heating water tank through micro pump and heat.

Claims (7)

1. a bathing is boiler dedicated, comprise sewage collecting box, first preheating water tank, second preheating water tank, hot-water boiler, filter chamber, spray chamber, it is characterized in that: described sewage collecting box lower end connects the first preheating water tank by tube connector, the first described preheating water tank bottom connects filter chamber's left end by tube connector, described filter chamber's right-hand member connects spray chamber by tube connector, tube connector connects the spray equipment of spray chamber inside, first described preheating water tank's bottom righthand side connects the second preheating water tank by tube connector, the second described preheating water tank lower end connects spray chamber by tube connector, second described preheating water tank's right-hand member connects micro pump by tube connector, the micro pump other end connects the heating water tank of Hot Water Boiler Internal by tube connector, described hot-water boiler upper end connects air-introduced machine by fume pipe, the air-introduced machine other end connects the second preheating water tank top by fume pipe.
2. a kind of bathing according to claim 1 is boiler dedicated, it is characterized in that: described sewage collecting box upper end left-hand unit wastewater inlet pipe.
3. a kind of bathing according to claim 1 is boiler dedicated, it is characterized in that: first described preheating water tank's left end arranges boiler water water inlet pipe, inside arranges heat exchanging water pipe, described heat exchanging water pipe is the swan-neck with multiple back bending place, described boiler water water inlet pipe connects heat exchanging water pipe's left end mouth of pipe, and heat exchanging water pipe's right-hand member mouth of pipe connects first preheating water tank's right-hand member tube connector.
4. a kind of bathing according to claim 1 is boiler dedicated, it is characterized in that: second described preheating water tank's interior arrangement waste gas heat exchange tube, described waste gas heat exchange tube is the swan-neck with multiple back bending place, the upper end mouth of pipe of waste gas heat exchange tube connects the second preheating water tank upper end fume pipe, and the lower end mouth of pipe connects the tube connector that the second preheating water tank connects spray chamber.
5. a kind of bathing according to claim 1 is boiler dedicated, it is characterized in that: described Hot Water Boiler Internal arranges fire grate, flue, heating water tank, slag notch, waste slag chamber, and hot-water boiler lower-left end arranges air-blast device.
6. a kind of bathing according to claim 1 is boiler dedicated, it is characterized in that: described inside, filter chamber arranges two-layer activated-carbon filter stratum reticulare.
7. a kind of bathing according to claim 1 is boiler dedicated, it is characterized in that: described spray chamber inside arranges spray equipment, and spray chamber upper end arranges waste gas exhaust pipe, and bottom righthand side arranges wastewater drainage pipe.
CN201520724124.4U 2015-09-18 2015-09-18 Special boiler of bathing Expired - Fee Related CN205002364U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520724124.4U CN205002364U (en) 2015-09-18 2015-09-18 Special boiler of bathing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520724124.4U CN205002364U (en) 2015-09-18 2015-09-18 Special boiler of bathing

Publications (1)

Publication Number Publication Date
CN205002364U true CN205002364U (en) 2016-01-27

Family

ID=55159249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520724124.4U Expired - Fee Related CN205002364U (en) 2015-09-18 2015-09-18 Special boiler of bathing

Country Status (1)

Country Link
CN (1) CN205002364U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105757969A (en) * 2016-04-25 2016-07-13 句容鼎勤容惠金属制品有限公司 Rotary boiler
CN106123640A (en) * 2016-08-12 2016-11-16 无锡欧玛森远洋工程设备有限公司 A kind of boiler afterheat recycle device
CN106123630A (en) * 2016-08-12 2016-11-16 无锡欧玛森远洋工程设备有限公司 A kind of Industrial Boiler waste-heat recovery device
CN111795424A (en) * 2020-07-03 2020-10-20 安徽康特姆新能源股份有限公司 Air source and pollution source composite heat pump water supply system for healthy epidemic prevention large bathing place
CN112344561A (en) * 2020-10-27 2021-02-09 湖南怀化俊诚环保节能科技有限公司 Energy-saving and environment-friendly hot water system
CN112611109A (en) * 2021-01-18 2021-04-06 王成勇 Solar-assisted waste water and waste heat recovery gas boiler

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105757969A (en) * 2016-04-25 2016-07-13 句容鼎勤容惠金属制品有限公司 Rotary boiler
CN106123640A (en) * 2016-08-12 2016-11-16 无锡欧玛森远洋工程设备有限公司 A kind of boiler afterheat recycle device
CN106123630A (en) * 2016-08-12 2016-11-16 无锡欧玛森远洋工程设备有限公司 A kind of Industrial Boiler waste-heat recovery device
CN111795424A (en) * 2020-07-03 2020-10-20 安徽康特姆新能源股份有限公司 Air source and pollution source composite heat pump water supply system for healthy epidemic prevention large bathing place
CN112344561A (en) * 2020-10-27 2021-02-09 湖南怀化俊诚环保节能科技有限公司 Energy-saving and environment-friendly hot water system
CN112611109A (en) * 2021-01-18 2021-04-06 王成勇 Solar-assisted waste water and waste heat recovery gas boiler

Similar Documents

Publication Publication Date Title
CN205002364U (en) Special boiler of bathing
CN105258337A (en) Boiler special for bathing
CN207622580U (en) A kind of waste-heat recovery device of boiler tubing
CN104990113A (en) Comprehensive kitchen waste heat recycling smoke exhaust ventilator
CN105258335A (en) Boiler with exhaust gas heat utilizing device
CN205119108U (en) Waste heat utilizing system for boiler
CN205002365U (en) Energy -saving and environment -friendly boiler
CN104406144A (en) Double-medium waste heat boiler
CN204372879U (en) A kind of two medium waste heat boiler
CN204026649U (en) Device for utilizing waste of boiler
CN204062972U (en) Steam generator
CN203375859U (en) Waste water waste heat recovery tank
CN204240377U (en) A kind of oil burning boiler flue gas energy-saving duster
CN206204607U (en) Vapours heating system is pressed through in a kind of forming machine baking oven
CN205448780U (en) Plate heat exchanger
CN204780277U (en) Printing and dyeing wastewater recovery unit
CN205002357U (en) Boiler with preheating water tank
CN205027135U (en) Hot stove in ore deposit heat sink for cooling water
CN205119111U (en) Boiler waste heat cyclic utilization system
CN205807814U (en) Gas fired-boiler flue gas waste heat recovery formula heating plant
CN205782829U (en) A kind of boiler feed water scale removal preheating water tank
CN205026916U (en) Hanging stove owner interchanger
CN206279347U (en) Vapours heating system is pressed through in a kind of case residual heat utilization-type forming machine baking oven end to end
CN205372523U (en) Sled dress combination that fuel gas steam boiler and waste heat degree of depth of discharging fume were retrieved
CN204345602U (en) Steam boiler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160127