CN105245007A - Power transmission line early warning system - Google Patents

Power transmission line early warning system Download PDF

Info

Publication number
CN105245007A
CN105245007A CN201510719016.2A CN201510719016A CN105245007A CN 105245007 A CN105245007 A CN 105245007A CN 201510719016 A CN201510719016 A CN 201510719016A CN 105245007 A CN105245007 A CN 105245007A
Authority
CN
China
Prior art keywords
information
transmission line
surveillance center
end monitoring
monitoring apparatus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510719016.2A
Other languages
Chinese (zh)
Inventor
赵锐
张峰
许晓君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datong Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Original Assignee
Datong Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datong Power Supply Co of State Grid Shanxi Electric Power Co Ltd filed Critical Datong Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Priority to CN201510719016.2A priority Critical patent/CN105245007A/en
Publication of CN105245007A publication Critical patent/CN105245007A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to a power transmission line early warning system. The system comprises multiple front-end monitoring assemblies and a rear-end monitoring center. Each front-end monitoring assembly is provided with one first front-end monitoring device (1) and a second front-end monitoring device (2). The system is characterized in that the front-end monitoring devices (1) comprise cameras, temperature acquisition devices, voltage detection devices and current detection devices which are arranged at different roads of a power transmission line; the second front-end monitoring devices (2) can acquire video information of each tower footing of the power transmission line in real time, at the same time, can acquire video information of multiple base iron towers of the same line in real time, and accordingly, sends the acquired video information to a monitoring center (4). When the base iron towers crack, information about cracks of the base iron towers is sent to the monitoring center (4), the monitoring center (4) sends alarm information content to a receiving apparatus (5) of an operator one duty in the mode of mobile phone short messages, and the receiving apparatus (5), after receiving an alarm, analyzes and determines the safety states of the tower footings by means of the monitoring center (4).

Description

Transmission line early warning system
Technical field
The present invention relates to a kind of detection system of transmission line, particularly relate to a kind of transmission line early warning system.
Background technology
In recent years, China's Urbanization Construction progress faster, each department are built on a large scale and are on the increase, and during construction, heavy mechanical equipment digs power-off cable; Vehicle smashes electric pole; The heavy mechanical equipment such as crane, crane extension when constructing touches wire and happens occasionally, in addition quarrying is blown out, screen of trees is left in capital construction, foreign matter hangs and steal the events such as tower material, serious threat is to the normal operation of electrical network, set up transmission line early warning system for this reason, the monitoring of remote ultra-high-tension power transmission line environment corridor can be realized, understand circuit running status in real time.
Summary of the invention
In order to can timing monitoring and and alarm, the invention provides a kind of transmission line early warning system.
Technical scheme of the present invention there is provided a kind of transmission line early warning system, comprise multiple front ends monitor component and rear end Surveillance center, each front end monitor component has the first front end monitoring apparatus and the second leading portion supervising device, it is characterized in that: the first front end monitoring apparatus comprises the camera that transmission line different sections of highway is arranged, temperature collecting device, voltage check device, current sensing means, first front end monitoring apparatus can gather the on-the-spot Weather information of transmission line, temperature information, information of voltage and current information, the information that first front end monitoring apparatus collects by network by information back to Surveillance center, Surveillance center is according to the on-the-spot Weather information collected, temperature information, information of voltage and current information are compared with empirical data with the historical data of broken wire information with the line security information prestored in database, thus judge whether the work of transmission line is in normal condition, when transmission line is in abnormal condition, warning information content is sent to the receiving system of operator on duty by Surveillance center by the mode of SMS, can carry out analysis judge after receiving system receives alert by Surveillance center to dangerous matter sources,
Second front end monitoring apparatus can the video information of each column foot of Real-time Collection transmission line, simultaneously can the video information of the same circuit of Real-time Collection many bases steel tower, and then the video information collected is sent to Surveillance center; When base steel tower ftractures, the information of base steel tower cracking is sent to Surveillance center, warning information content is sent to the receiving system of operator on duty by Surveillance center by the mode of SMS, can carry out analysis judge after receiving system receives alert by Surveillance center to column foot safe condition.
The invention has the beneficial effects as follows and can provide timing monitoring to transmission line, ensured the safe operation of transmission line.
Accompanying drawing explanation
Fig. 1 is transmission line early warning system schematic diagram of the present invention;
1-first front end monitoring apparatus, 2-second front end monitoring apparatus, 3-transmission line, 4-Surveillance center, 5-receiving system.
Embodiment
Below with reference to accompanying drawing 1, technical scheme of the present invention is described in detail.
As shown in Figure 1, transmission line early warning system of the present invention comprises multiple front ends monitor component and rear end Surveillance center, and each front end monitor component has the first front end monitoring apparatus 1 and the second leading portion supervising device 2.
First front end monitoring apparatus 1 can carry out Real-time Collection on Changes in weather to transmission line 3 impact.
Such as, first front end monitoring apparatus 1 comprises the camera that transmission line different sections of highway is arranged, temperature collecting device, voltage check device, current sensing means etc., first front end monitoring apparatus 1 can gather the on-the-spot Weather information of transmission line 3, temperature information, information of voltage and current information, the information that first front end monitoring apparatus collects by network by information back to Surveillance center 4, Surveillance center 4 is according to the on-the-spot Weather information collected, temperature information, information of voltage and current information are compared with empirical data with the historical data of broken wire information with the line security information prestored in database, thus judge whether the work of transmission line is in normal condition, through judging, when transmission line is in abnormal condition, warning information content is sent to the receiving system 5 of operator on duty by Surveillance center 4 by the mode of SMS, analysis can be carried out by Surveillance center's 4 pairs of dangerous matter sources after receiving system 5 receives alert to judge.
Second front end monitoring apparatus 2 can each column foot video information of real-time reception transmission line, and can the same circuit of real-time reception many bases steel tower real-time video information, and then the information of collection is sent to Surveillance center 4.
Such as, second front end monitoring apparatus 2 gathers column foot video and judges that whether column foot is in a safe condition, if column foot ftractures, relevant information is sent to Surveillance center 4, warning information content is sent to the receiving system 5 of operator on duty by Surveillance center 4 by the mode of SMS, can carry out analysis judge after receiving system 5 receives alert by Surveillance center's 4 pairs of column foot safe conditions.
Transmission line early warning system can realize multi-site and log in, connects; Multiple online website can be supported simultaneously;
Rear end Surveillance center 4 has and long-rangely arranges function and image memory function, adopts video flowing mode storage policy in seconds, realizes the video timing signal video recording, manually video recording, the alarm triggered video recording etc. that collect station end system;
Transmission line early warning system of the present invention with the unified management of man-machine interface mode and can also watch history video and picture, can by the combination condition retrieval such as alarm event, time period;
Transmission line early warning system possesses playback video single frames and captures and continuous candid photograph ability, has hard drive space management function, hard drive space deficiency alarm.All warning information all show in real time at alarm window, and displaying contents comprises date-time, area and column foot name, watch-dog, warning content; Transmission line early warning system has and realizes alarm interlock, and system has interlock after alarm and starts video, and automatic video recording.
Although describe in detail invention has been in conjunction with the embodiments; but those skilled in the art are with being to be understood that; the present invention is not limited only to specific embodiment; on the contrary; do not exceeding the various corrections of the application's spirit and essence, distortion and replacement all drop among the protection range of the application.

Claims (1)

1. a transmission line early warning system, comprises multiple front ends monitor component and rear end Surveillance center, and each front end monitor component has the first front end monitoring apparatus (1) and the second leading portion supervising device (2), it is characterized in that:
First front end monitoring apparatus (1) first front end monitoring apparatus (1) comprises the camera that transmission line different sections of highway is arranged, temperature collecting device, voltage check device, current sensing means, first front end monitoring apparatus (1) can gather the on-the-spot Weather information of transmission line (3), temperature information, information of voltage and current information, the information that first front end monitoring apparatus collects by network by information back to Surveillance center (4), Surveillance center (4) is according to the on-the-spot Weather information collected, temperature information, information of voltage and current information are compared with empirical data with the historical data of broken wire information with the line security information prestored in database, thus judge whether the work of transmission line is in normal condition, when transmission line is in abnormal condition, warning information content is sent to the receiving system (5) of operator on duty by Surveillance center (4) by the mode of SMS, can carry out analysis judge after receiving system (5) receives alert by Surveillance center (4) to dangerous matter sources,
Second front end monitoring apparatus (2) can the video information of each column foot of Real-time Collection transmission line, simultaneously can the video information of the same circuit of Real-time Collection many bases steel tower, and then the video information collected is sent to Surveillance center (4); When base steel tower ftractures, the information of base steel tower cracking is sent to Surveillance center (4), warning information content is sent to the receiving system (5) of operator on duty by Surveillance center (4) by the mode of SMS, can carry out analysis judge after receiving system (5) receives alert by Surveillance center (4) to column foot safe condition.
CN201510719016.2A 2015-10-29 2015-10-29 Power transmission line early warning system Pending CN105245007A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510719016.2A CN105245007A (en) 2015-10-29 2015-10-29 Power transmission line early warning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510719016.2A CN105245007A (en) 2015-10-29 2015-10-29 Power transmission line early warning system

Publications (1)

Publication Number Publication Date
CN105245007A true CN105245007A (en) 2016-01-13

Family

ID=55042538

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510719016.2A Pending CN105245007A (en) 2015-10-29 2015-10-29 Power transmission line early warning system

Country Status (1)

Country Link
CN (1) CN105245007A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110599715A (en) * 2019-10-21 2019-12-20 深圳华海通讯股份有限公司 Monitoring box anti-theft device based on 5G communication
CN112165159A (en) * 2020-08-05 2021-01-01 安徽华希电力科技有限公司 Comprehensive transmission line fault on-line monitoring system
CN113098136A (en) * 2021-04-20 2021-07-09 上海环能新科节能科技股份有限公司 Comprehensive control system for online monitoring equipment of ultra-high voltage transmission line

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003317171A (en) * 2002-04-25 2003-11-07 Hitachi Ltd Monitor system
CN203104671U (en) * 2013-03-12 2013-07-31 孙海燕 Equipment monitoring device for power transmission and transformation system
CN203204743U (en) * 2013-04-08 2013-09-18 西安英诺视通信息技术有限公司 Mobile external-damage-preventive remote monitoring device of electric transmission line
CN204330010U (en) * 2014-11-24 2015-05-13 云南电网公司昭通供电局 A kind of high-voltage power transmission tower monitoring system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003317171A (en) * 2002-04-25 2003-11-07 Hitachi Ltd Monitor system
CN203104671U (en) * 2013-03-12 2013-07-31 孙海燕 Equipment monitoring device for power transmission and transformation system
CN203204743U (en) * 2013-04-08 2013-09-18 西安英诺视通信息技术有限公司 Mobile external-damage-preventive remote monitoring device of electric transmission line
CN204330010U (en) * 2014-11-24 2015-05-13 云南电网公司昭通供电局 A kind of high-voltage power transmission tower monitoring system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110599715A (en) * 2019-10-21 2019-12-20 深圳华海通讯股份有限公司 Monitoring box anti-theft device based on 5G communication
CN112165159A (en) * 2020-08-05 2021-01-01 安徽华希电力科技有限公司 Comprehensive transmission line fault on-line monitoring system
CN113098136A (en) * 2021-04-20 2021-07-09 上海环能新科节能科技股份有限公司 Comprehensive control system for online monitoring equipment of ultra-high voltage transmission line

Similar Documents

Publication Publication Date Title
CN102842211B (en) Monitoring and early warning system and monitoring and early warning method for prevention of external force of transmission line based on image recognition
CN103366516A (en) Intelligent power transmission line monitoring system and method
CN201424042Y (en) Rail transportation road condition automatic alarm system
CN102493845A (en) Monitoring and prewarning system for urban rail transit operating tunnel based on GIS (Geographic Information System)
CN204758751U (en) Power line's trouble supervisory equipment
CN207650323U (en) A kind of electric fire monitoring system
CN105245007A (en) Power transmission line early warning system
CN103035104B (en) Preposing electric transmission line long-distance intelligent preventing external loss monitoring system based on digital signal processor (DSP)
CN104210928A (en) Escalator remote real-time monitoring and managing system based on cloud service platform
CN111429600A (en) Active early warning type external damage prevention dangerous point control method for power transmission and distribution line
CN104900001B (en) GPS is with the online external force destruction supervising device of the transmission line of electricity that video analysis are combined
CN105427519A (en) Intelligent three-in-one alarm system for tunnel
CN203206397U (en) Remote visual integrated monitoring system for power distribution network
CN104902223A (en) Fault monitoring system of power line
CN203084848U (en) Tower antitheft monitoring system
CN210222962U (en) Intelligent electronic fence system
CN112150773A (en) Electric power facility external damage hidden danger supervision method and system
CN108663970B (en) Electric power operation safety monitoring system
CN206901517U (en) A kind of zone elevator management system based on big data
CN107248251A (en) A kind of anti-mountain fire external force destruction management-control method of transmission line of electricity
CN201965718U (en) Fire alarm network monitor system
CN201616881U (en) Digital video monitoring and alarm remote network management system
CN204596069U (en) A kind of cable stake supervising device
CN103593929A (en) Anti-theft tower monitoring system and method
CN203350994U (en) Intelligent power transmission line monitoring system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160113

RJ01 Rejection of invention patent application after publication