CN105243244B - 电源送出工程的导线截面选择方法 - Google Patents
电源送出工程的导线截面选择方法 Download PDFInfo
- Publication number
- CN105243244B CN105243244B CN201510784197.7A CN201510784197A CN105243244B CN 105243244 B CN105243244 B CN 105243244B CN 201510784197 A CN201510784197 A CN 201510784197A CN 105243244 B CN105243244 B CN 105243244B
- Authority
- CN
- China
- Prior art keywords
- mrow
- power supply
- msub
- msubsup
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000005540 biological transmission Effects 0.000 title claims abstract description 47
- 238000000034 method Methods 0.000 title claims abstract description 21
- 239000004020 conductor Substances 0.000 claims description 21
- 230000005611 electricity Effects 0.000 claims description 7
- 238000010348 incorporation Methods 0.000 claims description 6
- 230000000694 effects Effects 0.000 claims description 3
- 230000000737 periodic effect Effects 0.000 claims 1
- 238000007726 management method Methods 0.000 abstract description 12
- 238000013461 design Methods 0.000 abstract description 7
- 238000010187 selection method Methods 0.000 abstract description 2
- 238000009825 accumulation Methods 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
Abstract
本发明公开了一种电源送出工程的导线截面选择方法,包括获取了类似电源送出工程的多年运行数据;计算电源年平均累计实时损耗功率;计算电源的年运行损耗等效平均电流和年运行损耗等效平均电流百分比;计算电源送出工程年运行损耗费用;计算全寿命周期范围内电源送出工程折现总费用;选择全寿命周期范围内电源送出工程折现总费用最小的导线型号,完成电源送出工程的导线截面选择。本发明针对指定电源的导线截面选择,提出了年运行损耗等效平均电流概念,解决了电源出力特性差异的问题,体现了不同类型电源在规模、出力特性和资源方面的经济差异,为电源导线截面提供了便捷、可靠、经济的选择方法,提高了电网线路设计和规划精益化水平。
Description
技术领域
本发明属于电力工程领域,具体涉及一种电源送出工程的导线截面选择方法。
背景技术
随着国家的发展和国民生活水平的提高,电力建设也在逐步加快。导线截面的选择是输电线路工程设计中的一项重要工作。如何选择导线经济截面,直接关系线路全寿命周期内的运行效率。
目前,实际输电线路工程设计一般采用按经济电流密度选择导线截面。该方法虽然操作简单,然而未考虑电源实际出力特性,且经济电流密度需要实时修正。因此,该计算方法很难精准得到电源导线经济截面。
发明内容
本发明的目的在于提供一种能够反映电源实际出力特性、受外界影响小、经济可行的电源送出工程的导线截面选择方法。
本发明提供的这种电源送出工程的导线截面选择方法,包括如下步骤:
S1.获取已有类似的电源送出工程的多年运行数据,包括导线电阻、线路实时采集功率、导线额定电压和全年采集点数;
S2.根据步骤S1获取的数据,计算电源的年平均累计实时损耗功率;
S3.根据步骤S2得到的年平均累计实时损耗功率,计算电源的年运行损耗等效平均电流:
其中为电源的年运行损耗等效平均电流;为电源的年平均累计实时损耗功率;Rl为导线电阻;Pt为线路实时采集功率;Ue为导线额定电压;n为全年采集点数;
S4.利用步骤S3得到的年运行损耗等效平均电流,计算电源的年运行损耗等效平均电流百分比:
其中Pe为电源满出力功率,且存在
S5.利用步骤S4得到的年运行损耗等效平均电流百分比,计算电源送出导线工程年运行损耗费用;
S6.选取所有可能符合电源送出工程的导线类型,并根据导线的单位造价,计算在全寿命周期范围内电源送出工程导线的折现总费用;
S7.根据所有备选导线的折现总费用,选择经济性最优的导线型号,完成电源送出工程的导线截面选择。
步骤S2所述的计算电源的年平均累计实时损耗功率,为采用如下算式进行计算:
其中为电源的年平均累计实时损耗功率;It为导线实时电流;Rl为导线电阻;Pt为线路实时采集功率;Ue为导线额定电压;n为全年采集点数。
步骤S5所述计算电源送出导线工程年运行损耗费用,为采用如下算式进行计算:
其中为电源送出导线工程年运行损耗费用;为电源的年运行损耗等效平均电流;Rl为导线电阻;λ为电源的上网电价。
步骤S6所述的计算在全寿命周期范围内电源送出导线的折现总费用,为采用如下算式进行计算:
其中Ct为全寿命周期范围内电源送出工程导线的折现总费用;Ci为电源送出工程的投资单位成本;m为年金现值系数;为电源送出工程年运行损耗费用;为电源的年运行损耗等效平均电流;Rl为导线电阻;λ为电源的上网电价。
所述年金现值系数为采用如下算式进行计算:
其中m为年金现值系数;r为折现率;y为工程使用全寿命周期。
步骤S7所述的选择经济性最优的导线型号,为选择全寿命周期范围内电源送出工程导线折现总费用最小的导线型号。
本发明提供的这种电源送出工程的导线截面选择方法,针对指定电源的导线截面选择,提出了年运行损耗等效平均电流百分比的概念,体现了电源的实际出力特性;设计单位可利用电源年运行损耗等效平均电流百分比推荐值进行倒推得到单位线路长度的累积损耗,然后结合不同型号线路的单位投资成本,在全寿命周期范围内进行经济比较,得到最优导线截面选择结果。本发明通过提出的电源的年运行损耗等效平均电流百分比指标,不仅解决了电源出力特性差异的问题,而且为电网设计、规划单位经济选择电源导线截面提供了便捷、可靠的途径,有利于整体提高电网线路设计、规划精益化水平;特别在可再生能源发电(如:风电、光伏、水电等)送出导线经济截面的选择方面,本方法体现了不同类型电源在规模、出力特性和资源方面的经济差异。
附图说明
图1为本发明的方法流程图。
具体实施方式
如图1所示,为本发明的电源送出工程的导线截面选择方法的方法流程图,具体包括如下步骤:
S1.获取已有类似的电源送出工程的多年运行数据,包括导线电阻、线路实时采集功率、导线额定电压和全年采集点数;
S2.根据步骤S1获取的数据,计算电源的年平均累计实时损耗功率:
采用如下算式进行计算:
其中为电源的年平均累计实时损耗功率;It为导线实时电流;Rl为导线电阻;Pt为线路实时采集功率;Ue为导线额定电压;n为全年采集点数。
S3.根据步骤S2得到的年平均累计实时损耗功率,计算电源的年运行损耗等效平均电流:
其中为电源的年运行损耗等效平均电流;为电源的年平均累计实时损耗功率;Rl为导线电阻;Pt为线路实时采集功率;Ue为导线额定电压;n为全年采集点数;
S4.利用步骤S3得到的年运行损耗等效平均电流,计算电源的年运行损耗等效平均电流百分比:
其中Pe为电源满出力功率,且存在
S5.利用步骤S4得到的年运行损耗等效平均电流百分比,计算电源送出工程年运行损耗费用:
采用如下算式进行计算:
其中为电源送出工程年运行损耗费用;为电源的年运行损耗等效平均电流;Rl为导线电阻;λ为电源的上网电价。
S6.选取所有可能符合电源送出工程的导线类型,并根据导线的单位造价,计算在全寿命周期范围内电源送出工程导线的折现总费用:
采用如下算式进行计算:
其中Ct为全寿命周期范围内电源送出工程导线的折现总费用;Ci为电源送出线路的投资单位成本;m为年金现值系数;为电源送出工程年运行损耗费用;为电源的年运行损耗等效平均电流;Rl为导线电阻;λ为电源的上网电价。
S7.根据所有备选导线的折现总费用,选择经济性最优的导线型号,完成电源送出工程的导线截面选择:选择方法为选取全寿命周期范围内电源送出工程导线折现总费用最小的导线型号。
以下结合一个算例,对本发明提供的电源送出工程的导线截面选择方法进行进一步说明:
对某一容量为150兆瓦风电场送出工程线路截面的选择。
已知条件:在设计风速23.5米/秒、覆冰15毫米、风电场并网电压等级110千伏、电价0.5元/千瓦时、工程寿命25年、折现率0.08的条件下,备选的五种导线型号为2×LGJ-240/40、LGJ-400/40、LGJ-300/40、LGJ-240/40和LGJ-185/40,其电阻参数分别为0.06045Ω/km、0.07389Ω/km、0.09614Ω/km、0.1209Ω/km和0.1564Ω/km,典型单位造价分别为105万元/km、110万元/km、80万元/km、78万元/km和76万元/km。
根据步骤S1~S4,由风电场实时出力大数据,计算得到150兆瓦风电场年运行损耗等效平均电流百分比约为33.3%;
根据步骤S5,计算得到2×LGJ-240/40、LGJ-400/40、LGJ-300/40、LGJ-240/40和LGJ-185/40五种典型线路的年损耗费用分别为63.7万元、77.2万元、103.2万元、127.3万元和164.0万元;
根据步骤S6,计算得到2×LGJ-240/40、LGJ-400/40、LGJ-300/40、LGJ-240/40和LGJ-185/40五种典型导线,在25年全寿命周期内的综合折现总费用为168.7万元、187.2万元、183.2万元、205.3万元、240.0万元,其中折现率为10.675;
根据步骤S7,比较得到综合折现总费用最小的导线型号为2×LGJ-240/40,即为该工程的经济最优选择导线截面。
Claims (6)
1.一种电源送出工程的导线截面选择方法,包括如下步骤:
S1.获取已有类似的电源送出工程的多年运行数据,包括导线电阻、线路实时采集功率、导线额定电压和全年采集点数;
S2.根据步骤S1获取的数据,计算电源的年平均累计实时损耗功率;
S3.根据步骤S2得到的年平均累计实时损耗功率,计算电源的年运行损耗等效平均电流:
<mrow>
<msubsup>
<mi>I</mi>
<mrow>
<mi>l</mi>
<mi>o</mi>
<mi>s</mi>
<mi>s</mi>
</mrow>
<mi>a</mi>
</msubsup>
<mo>=</mo>
<msup>
<mrow>
<mo>(</mo>
<mfrac>
<msubsup>
<mi>P</mi>
<mrow>
<mi>l</mi>
<mi>o</mi>
<mi>s</mi>
<mi>s</mi>
</mrow>
<mi>a</mi>
</msubsup>
<mrow>
<mn>3</mn>
<mo>&times;</mo>
<msub>
<mi>R</mi>
<mi>l</mi>
</msub>
<mo>&times;</mo>
<mn>8760</mn>
</mrow>
</mfrac>
<mo>)</mo>
</mrow>
<mrow>
<mn>1</mn>
<mo>/</mo>
<mn>2</mn>
</mrow>
</msup>
<mo>=</mo>
<msup>
<mrow>
<mo>(</mo>
<mfrac>
<mrow>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>t</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>n</mi>
</munderover>
<msup>
<mrow>
<mo>(</mo>
<msub>
<mi>P</mi>
<mi>t</mi>
</msub>
<mo>/</mo>
<msqrt>
<mn>3</mn>
</msqrt>
<msub>
<mi>U</mi>
<mi>e</mi>
</msub>
<mo>)</mo>
</mrow>
<mn>2</mn>
</msup>
</mrow>
<mi>n</mi>
</mfrac>
<mo>)</mo>
</mrow>
<mrow>
<mn>1</mn>
<mo>/</mo>
<mn>2</mn>
</mrow>
</msup>
</mrow>
其中为电源的年运行损耗等效平均电流;为电源的年平均累计实时损耗功率;Rl为导线电阻;Pt为线路实时采集功率;Ue为导线额定电压;n为全年采集点数;
S4.利用步骤S3得到的年运行损耗等效平均电流,计算电源的年运行损耗等效平均电流百分比:
<mrow>
<msubsup>
<mi>I</mi>
<mrow>
<mi>l</mi>
<mi>o</mi>
<mi>s</mi>
<mi>s</mi>
</mrow>
<mi>a</mi>
</msubsup>
<mi>%</mi>
<mo>=</mo>
<mfrac>
<msubsup>
<mi>I</mi>
<mrow>
<mi>l</mi>
<mi>o</mi>
<mi>s</mi>
<mi>s</mi>
</mrow>
<mi>a</mi>
</msubsup>
<msub>
<mi>I</mi>
<mi>e</mi>
</msub>
</mfrac>
<mo>&times;</mo>
<mn>100</mn>
<mi>%</mi>
<mo>=</mo>
<mfrac>
<msup>
<mrow>
<mo>(</mo>
<munderover>
<mi>&Sigma;</mi>
<mrow>
<mi>t</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>n</mi>
</munderover>
<msubsup>
<mi>P</mi>
<mi>t</mi>
<mn>2</mn>
</msubsup>
<mo>/</mo>
<mi>n</mi>
<mo>)</mo>
</mrow>
<mrow>
<mn>1</mn>
<mo>/</mo>
<mn>2</mn>
</mrow>
</msup>
<msub>
<mi>P</mi>
<mi>e</mi>
</msub>
</mfrac>
<mo>&times;</mo>
<mn>100</mn>
<mi>%</mi>
</mrow>
其中Pe为电源满出力功率,且存在
S5.利用步骤S4得到的年运行损耗等效平均电流百分比,计算电源送出工程年运行损耗费用;
S6.选取所有可能符合电源送出工程的导线类型,并根据导线的单位造价,计算在全寿命周期范围内电源送出工程导线的折现总费用;
S7.根据所有备选导线的折现总费用,选择经济性最优的导线型号,完成电源送出工程的导线截面选择。
2.根据权利要求1所述的电源送出工程的导线截面选择方法,其特征在于步骤S2所述的计算电源的年平均累计实时损耗功率,为采用如下算式进行计算:
<mrow>
<msubsup>
<mi>P</mi>
<mrow>
<mi>l</mi>
<mi>o</mi>
<mi>s</mi>
<mi>s</mi>
</mrow>
<mi>a</mi>
</msubsup>
<mo>=</mo>
<mn>3</mn>
<mo>&times;</mo>
<munderover>
<mo>&Integral;</mo>
<mrow>
<mi>t</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>n</mi>
</munderover>
<msubsup>
<mi>I</mi>
<mi>t</mi>
<mn>2</mn>
</msubsup>
<msub>
<mi>R</mi>
<mi>l</mi>
</msub>
<mi>d</mi>
<mi>t</mi>
<mo>&ap;</mo>
<mn>3</mn>
<mo>&times;</mo>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>t</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>n</mi>
</munderover>
<msup>
<mrow>
<mo>(</mo>
<msub>
<mi>P</mi>
<mi>t</mi>
</msub>
<mo>/</mo>
<msqrt>
<mn>3</mn>
</msqrt>
<msub>
<mi>U</mi>
<mi>e</mi>
</msub>
<mo>)</mo>
</mrow>
<mn>2</mn>
</msup>
<mo>&times;</mo>
<msub>
<mi>R</mi>
<mi>l</mi>
</msub>
<mo>&times;</mo>
<mfrac>
<mn>8760</mn>
<mi>n</mi>
</mfrac>
</mrow>
其中为电源的年平均累计实时损耗功率;It为导线实时电流;Rl为导线电阻;Pt为线路实时采集功率;Ue为导线额定电压;n为全年采集点数。
3.根据权利要求1所述的电源送出工程的导线截面选择方法,其特征在于步骤S5所述计算电源送出工程年运行损耗费用,为采用如下算式进行计算:
<mrow>
<msubsup>
<mi>C</mi>
<mrow>
<mi>l</mi>
<mi>o</mi>
<mi>s</mi>
<mi>s</mi>
</mrow>
<mi>a</mi>
</msubsup>
<mo>=</mo>
<mn>3</mn>
<mo>&times;</mo>
<msup>
<msubsup>
<mi>I</mi>
<mrow>
<mi>l</mi>
<mi>o</mi>
<mi>s</mi>
<mi>s</mi>
</mrow>
<mi>a</mi>
</msubsup>
<mn>2</mn>
</msup>
<mo>&times;</mo>
<msub>
<mi>R</mi>
<mi>l</mi>
</msub>
<mo>&times;</mo>
<mi>&lambda;</mi>
<mo>&ap;</mo>
<mn>3</mn>
<mo>&times;</mo>
<msup>
<mrow>
<mo>(</mo>
<msubsup>
<mi>I</mi>
<mrow>
<mi>l</mi>
<mi>o</mi>
<mi>s</mi>
<mi>s</mi>
</mrow>
<mi>a</mi>
</msubsup>
<mi>%</mi>
<mo>&times;</mo>
<msub>
<mi>I</mi>
<mi>e</mi>
</msub>
<mo>)</mo>
</mrow>
<mn>2</mn>
</msup>
<mo>&times;</mo>
<msub>
<mi>R</mi>
<mi>l</mi>
</msub>
<mo>&times;</mo>
<mi>&lambda;</mi>
</mrow>
其中为电源送出工程年运行损耗费用;为电源的年运行损耗等效平均电流;Rl为导线电阻;λ为电源的上网电价。
4.根据权利要求1~3之一所述的电源送出工程的导线截面选择方法,其特征在于步骤S6所述的计算在全寿命周期范围内电源送出工程的折现总费用,为采用如下算式进行计算:
<mrow>
<msub>
<mi>C</mi>
<mi>t</mi>
</msub>
<mo>=</mo>
<msub>
<mi>C</mi>
<mi>i</mi>
</msub>
<mo>+</mo>
<mi>m</mi>
<mo>&times;</mo>
<msubsup>
<mi>C</mi>
<mrow>
<mi>l</mi>
<mi>o</mi>
<mi>s</mi>
<mi>s</mi>
</mrow>
<mi>a</mi>
</msubsup>
<mo>=</mo>
<msub>
<mi>C</mi>
<mi>i</mi>
</msub>
<mo>+</mo>
<mi>m</mi>
<mo>&times;</mo>
<mn>3</mn>
<mo>&times;</mo>
<msup>
<msubsup>
<mi>I</mi>
<mrow>
<mi>l</mi>
<mi>o</mi>
<mi>s</mi>
<mi>s</mi>
</mrow>
<mi>a</mi>
</msubsup>
<mn>2</mn>
</msup>
<mo>&times;</mo>
<msub>
<mi>R</mi>
<mi>l</mi>
</msub>
<mo>&times;</mo>
<mi>&lambda;</mi>
</mrow>
其中Ct为全寿命周期范围内电源送出工程的折现总费用;Ci为电源送出线路的投资单位成本;m为年金现值系数;为电源送出工程年运行损耗费用;为电源的年运行损耗等效平均电流;Rl为导线电阻;λ为电源的上网电价。
5.根据权利要求4所述的电源送出工程的导线截面选择方法,其特征在于所述年金现值系数为采用如下算式进行计算:
<mrow>
<mi>m</mi>
<mo>=</mo>
<mfrac>
<mrow>
<mo>(</mo>
<msup>
<mrow>
<mo>(</mo>
<mrow>
<mn>1</mn>
<mo>+</mo>
<mi>r</mi>
</mrow>
<mo>)</mo>
</mrow>
<mi>y</mi>
</msup>
<mo>-</mo>
<mn>1</mn>
<mo>)</mo>
</mrow>
<mrow>
<mi>r</mi>
<msup>
<mrow>
<mo>(</mo>
<mn>1</mn>
<mo>+</mo>
<mi>r</mi>
<mo>)</mo>
</mrow>
<mi>y</mi>
</msup>
</mrow>
</mfrac>
</mrow>
其中m为年金现值系数;r为折现率;y为工程使用全寿命周期。
6.根据权利要求1~3之一所述的电源送出工程的导线截面选择方法,其特征在于步骤S7所述的选择经济性最优的导线型号,为选择全寿命周期范围内电源送出导线折现总费用最小的导线型号。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510784197.7A CN105243244B (zh) | 2015-11-16 | 2015-11-16 | 电源送出工程的导线截面选择方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510784197.7A CN105243244B (zh) | 2015-11-16 | 2015-11-16 | 电源送出工程的导线截面选择方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105243244A CN105243244A (zh) | 2016-01-13 |
CN105243244B true CN105243244B (zh) | 2018-06-01 |
Family
ID=55040892
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510784197.7A Active CN105243244B (zh) | 2015-11-16 | 2015-11-16 | 电源送出工程的导线截面选择方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105243244B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105870831B (zh) * | 2016-05-17 | 2018-06-12 | 利亚德光电股份有限公司 | 线缆选择方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101340088A (zh) * | 2008-06-30 | 2009-01-07 | 国网武汉高压研究院 | 特高压交流线路导线的选型及排列方法 |
CN102033999A (zh) * | 2010-12-10 | 2011-04-27 | 天津天大求实电力新技术股份有限公司 | 基于负荷分布计算中压配网近期规划年线损的方法 |
CN102411645A (zh) * | 2011-07-28 | 2012-04-11 | 中国电力科学研究院 | 一种基于城乡一体化的农村电网布局优化方法 |
CN103049799A (zh) * | 2012-12-10 | 2013-04-17 | 河海大学 | 一种基于多目标优化的电网规划设计方法 |
-
2015
- 2015-11-16 CN CN201510784197.7A patent/CN105243244B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101340088A (zh) * | 2008-06-30 | 2009-01-07 | 国网武汉高压研究院 | 特高压交流线路导线的选型及排列方法 |
CN102033999A (zh) * | 2010-12-10 | 2011-04-27 | 天津天大求实电力新技术股份有限公司 | 基于负荷分布计算中压配网近期规划年线损的方法 |
CN102411645A (zh) * | 2011-07-28 | 2012-04-11 | 中国电力科学研究院 | 一种基于城乡一体化的农村电网布局优化方法 |
CN103049799A (zh) * | 2012-12-10 | 2013-04-17 | 河海大学 | 一种基于多目标优化的电网规划设计方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105243244A (zh) | 2016-01-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106251095B (zh) | 一种电力系统碳排放实时计量的方法及碳表系统 | |
Zhang et al. | Optimal sizing of the grid-connected hybrid system integrating hydropower, photovoltaic, and wind considering cascade reservoir connection and photovoltaic-wind complementarity | |
CN103646356A (zh) | 一种特高压交流跨区电能交易中综合网损率的确定方法 | |
CN104281737A (zh) | 一种海上风电场集电系统拓扑结构选型方法 | |
CN106897793B (zh) | 一种可保证安全距离的基于遗传算法的风电场风力发电机排布优化方法 | |
CN103383718A (zh) | 含分布式电源的智能配电网碳排放计量方法 | |
CN105375477A (zh) | 一种农村配电网线损计算方法及系统 | |
CN112350369B (zh) | 光储充一体化电站能效评估方法 | |
Grant et al. | Environmental payback periods of multi-crystalline silicon photovoltaics in the United States–How prioritizing based on environmental impact compares to solar intensity | |
CN110954767A (zh) | 一种电力线路线损精准分析方法 | |
Pazouki et al. | Optimal planning of PEVs charging stations and demand response programs considering distribution and traffic networks | |
CN113364049A (zh) | 一种考虑交通流量捕获的风-氢-电网耦合规划方法 | |
CN105243244B (zh) | 电源送出工程的导线截面选择方法 | |
CN117081253A (zh) | 一种基于svg拓扑图对电量实时数据动态显示的方法 | |
CN106203742A (zh) | 一种基于节能回报率的电网设备节能评价及选型方法 | |
CN105488342A (zh) | 一种配电网升压运行项目碳减排量的核算方法 | |
Montoya-Bueno et al. | Optimal expansion model of renewable distributed generation in distribution systems | |
Keshmiri et al. | Multi-objective stochastic economic dispatch | |
Chapman et al. | Wind-powered electrical systems-highway rest areas, weigh stations, and team section buildings | |
Li et al. | Chance-constrained energy management for pumped storage hydropower plant to compensate for wind power uncertainties | |
Hadjsaid et al. | Considering local photovoltaic production in planning studies for low voltage distribution grids | |
CN205945095U (zh) | 一种并网型风光联合发电系统的电能计量系统 | |
CN117748502B (zh) | 一种智能识别训练数据分析方法 | |
CN110362874A (zh) | 一种光伏太阳能充电桩收益最优计算方法 | |
Yin et al. | Major problems concerning China's large-scale wind power integration |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |