CN105240064B - A kind of LNG energy recovery process - Google Patents

A kind of LNG energy recovery process Download PDF

Info

Publication number
CN105240064B
CN105240064B CN201510829824.4A CN201510829824A CN105240064B CN 105240064 B CN105240064 B CN 105240064B CN 201510829824 A CN201510829824 A CN 201510829824A CN 105240064 B CN105240064 B CN 105240064B
Authority
CN
China
Prior art keywords
lng
bog
hydraulic turbine
turbine installations
energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510829824.4A
Other languages
Chinese (zh)
Other versions
CN105240064A (en
Inventor
董雪松
江健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Jereh Hengri Natural Gas Engineering Co ltd
Original Assignee
Jereh Oil and Gas Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jereh Oil and Gas Engineering Corp filed Critical Jereh Oil and Gas Engineering Corp
Priority to CN201510829824.4A priority Critical patent/CN105240064B/en
Publication of CN105240064A publication Critical patent/CN105240064A/en
Application granted granted Critical
Publication of CN105240064B publication Critical patent/CN105240064B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The present invention relates to natural gas in low temperature equipment technical field, more particularly to a kind of LNG energy recovery process, the LNG of high pressure low temperature is by LNG hydraulic turbine installations(Or the expansion machinery of other forms)Turbine end pressure energy be converted into mechanical energy exported by the pressurized end of LNG hydraulic turbine installations.LNG after step-down further lowers the temperature, and the gas-liquid two-phase that pressure reduction is produced is separated by knockout drum, and liquid phase LNG send LNG storage tank, and gas phase BOG is together with the BOG of LNG storage tank through the pressurized end of LNG hydraulic turbine installations --- and BOG superchargers machine is pressurized.The present invention carries out expansion throttling using the J T valves of LNG hydraulic turbine installations substitution LNG product, because the temperature of LNG is lower, so as to reduce BOG yields, improves LNG yield, while mechanical energy can be pressurized the recovery that realize energy to BOG by BOG pressurized ends.

Description

A kind of LNG energy recovery process
Technical field
The present invention relates to natural gas in low temperature equipment technical field, more particularly to a kind of LNG energy recovery process.
Background technology
Liquefied natural gas (Liquefied Natural Gas, abbreviation LNG), main component is methane, and it is the earth to be recognized On the most clean energy.Colourless, tasteless, nontoxic and non-corrosiveness, its volume is about the 1/625 of same amount gaseous natural gas volume, The weight of liquefied natural gas is only 45% or so of consubstantiality ponding., Er Qiefang very small to air pollution after liquefied natural gas burning The heat for going out is big, so liquefied natural gas is a kind of more advanced energy.
The general manufacturing process of liquefied natural gas is that the natural gas after purification first is liquefied as into height by various refrigeration process Pressure, the LNG of low temperature, then by Joule-Thomson(J-T)The further reducing pressure by regulating flow of valve forms low pressure, the LNG of low temperature enters normal Pressure or low pressure storage tank, the significant losses that this process causes high-grade energy cause to waste.Meanwhile, the flash distillation generation of LNG BOG amounts are larger, increased the cost of BOG treatment.
The content of the invention
A kind of problem that the present invention exists for prior art, there is provided LNG energy recovery process.
The technical scheme is that:
A kind of LNG energy recovery process, comprises the following steps:
1)The natural gas purified by pretreatment unit enters ice chest, and being liquefied by precooling, cryogenic technology to form height and force down The LNG of temperature;
2)The LNG of the high pressure low temperature is depressurized by the expanding end of expansion machinery device, and the pressure energy of itself is converted into While mechanical energy, output low temperature, low pressure LNG;
3)After the low temperature, low pressure LNG carry out gas-liquid separation through knockout drum, liquid phase LNG send LNG storage tank to store, gas Phase BOG converges with the BOG from LNG storage tank 4, by the pressurized end of LNG hydraulic turbine installations, is pressurized into BOG superchargers defeated Go out, realize the recovery of energy.LNG temperature after step-down is lower, helps to reduce the generation of BOG.
Wherein, BOG superchargers, the supercharging of the BOG and the BOG of LNG storage tank that are produced for LNG expansion decompressions.
Preferably, described expansion machinery device is LNG hydraulic turbine installations.
Preferably, the expanding end of described LNG hydraulic turbine installations preferably centrifugal, or axial-flow type, screw Or it is reciprocating.
Preferably, driven based on the expanding end of described LNG hydraulic turbine installations, the electricity of the LNG hydraulic turbine installations Motivation is process auxiliary drive;Drive pattern switching device is provided between the LNG hydraulic turbine installations expanding end and motor 7.
Preferably, described drive pattern switching device is overrunning cluth or fluid coupling.It is with overrunning cluth Example:Without LNG hydraulic turbine installations(Or other expansion machinery)In the case that expanding end power output or power output are too small, Motor can be operated alone BOG superchargers.When the rotating speed of the rotating speed higher than motor of LNG hydraulic turbines or other expansion machinery When, overrunning cluth closure realizes the recovery of energy.When LNG hydraulic turbines(Or other expansion machinery)The rotating speed of expanding end is low During in the rotating speed of main motor or without output, overrunning cluth is disengaged, and the driving of BOG superchargers is by motor-driven.
Preferably, the rated power of described motor, can be single under the driving of the LNG hydraulic turbine expanding ends described in nothing Solely drive BOG superchargers.
Preferably, when the rotating speed of described LNG hydraulic turbine expanding ends is higher than the rotating speed of the motor, exceed the speed limit clutch Device is closed, and realizes the recovery of energy;When the rotating speed of described LNG hydraulic turbine expanding ends is less than the rotating speed of the motor, Described overrunning cluth is disengaged, and the driving of described BOG superchargers is by the motor-driven.
Preferably, the expanding end of the LNG hydraulic turbine installations is co-axially mounted with BOG superchargers, it would however also be possible to employ other The kind of drive.
Preferably, dual drive is used between the pressurized end of described LNG hydraulic turbine installations and the input of BOG superchargers Pattern.
The beneficial effects of the invention are as follows:
(1)Use LNG hydraulic turbine installations(Or the expansion machinery of other forms)Expanding end substitute LNG product J-T Valve carries out the expansion decompression of LNG, because the LNG temperature after decompression is lower, therefore LNG output increaseds, BOG amount reductions.
(2)LNG hydraulic turbine installations(Or the expansion machinery of other forms)Expanding end conversion gained mechanical energy export to Power take-off is pressurized for BOG, is capable of achieving effective recovery of energy, saves the power consumption of BOG superchargings.
(3)The driving of BOG superchargers uses LNG hydraulic turbine installations(Or the expansion machinery of other forms)Energy output With two kinds of drive patterns of motor, powershift can be carried out by overrunning cluth or fluid coupling, it is to avoid technological fluctuation It is larger, the unstable shortcoming of outer defeated power.
Brief description of the drawings
Accompanying drawing 1 is the schematic flow sheet of LNG energy recovery process;
Wherein, 1 is ice chest;2 is LNG hydraulic turbine installations(Or the expansion machinery of other forms)Expanding end;3 is gas-liquid Knockout drum;4 is LNG storage tank;5 is LNG hydraulic turbine installations(Or the expansion machinery of other forms)Pressurized end --- BOG be pressurized Machine;6 is drive pattern switching device;7 is motor.
Specific embodiment
Specific embodiment of the invention is as follows,
Embodiment 1:
LNG hydraulic turbine installations(Or the expansion machinery of other forms)By taking LNG hydraulic turbine installations as an example:
As shown in figure 1, be a kind of schematic flow sheet of LNG energy recovery process, including:
The natural gas purified by pretreatment unit enters ice chest 1, is exchanged heat with cryogen in heat exchanger in ice chest, by pre- Cold, cryogenic technology liquefies to form the LNG of high pressure low temperature, and the LNG depressurizes by the expanding end 2 of LNG hydraulic turbine installations, by itself Pressure energy be converted into mechanical energy, output low temperature, low pressure LNG;The low temperature, low pressure LNG carry out gas-liquid point through knockout drum 3 From rear, liquid phase LNG send LNG storage tank 4 to store, and gas phase BOG converges with the BOG from LNG storage tank 4, by LNG hydraulic turbine installations Pressurized end --- BOG superchargers 5 are pressurized, into BOG superchargers output, realize the recovery of energy.LNG temperature after step-down Degree is lower, helps to reduce the generation of BOG.
The expanding end 2 of LNG hydraulic turbine installations is centrifugal, and LNG hydraulic turbine installations expansion pressure reduction can be in pressure Carried out in power simple liquid phase higher, it is also possible to carried out in the relatively low Gas-liquid phase region of pressure.
BOG both can directly be pressurized under low-temperature condition, it is also possible to by ice chest or other exchange heat reclaim colds or It is pressurized through BOG superchargers again after person other mode of heating re-heat to normal temperature.By taking the LNG devices of 2,000,000 sides/d scales as an example, LNG Hydraulic turbine installation output shaft power can reach 170 ~ 190kW.
The energy input end of the pressurized end of LNG hydraulic turbine installations --- BOG superchargers 5 uses dual drive pattern, LNG liquid Driven based on power turbine installation expanding end 2, motor 7 is process auxiliary drive, LNG hydraulic turbine installations expanding end 2 and motor 7 it Between be provided with drive pattern switching device 6, drive pattern switching device 6 uses overrunning cluth;LNG hydraulic turbine installation expanding ends 2 are co-axially mounted with BOG superchargers 5, it is also possible to be driven otherwise.The rated power of motor 7 is without LNG fluid power BOG superchargers 5 can be operated alone under the assistance at turbine expansion end 2;When the rotating speed of LNG hydraulic turbines expanding end 2 is higher than electronic During the rotating speed of machine, overrunning cluth 6 is closed, and realizes the recovery of energy;When the rotating speed of LNG hydraulic turbines expanding end 2 is less than electronic During the rotating speed of machine, overrunning cluth 6 is disengaged, and the driving of BOG superchargers 5 is driven by motor 7.
By substantial amounts of test, using technique of the invention, than former LNG yield(Using Joule-Thomson(J-T)Valve)'s LNG yield can improve about 1% ~ 3%.
Embodiment 2:
LNG hydraulic turbine installations expanding end 2 is axial-flow type.
Drive pattern switching device 6, drive pattern switching are provided between LNG hydraulic turbine installations expanding end 2 and motor 7 Device 6 uses fluid coupling.
Other parts such as embodiment 1 sets identical.
By substantial amounts of test, using technique of the invention, than former LNG yield(Using Joule-Thomson(J-T)Valve)'s LNG yield can improve about 1% ~ 3%.
Embodiment 3:
LNG hydraulic turbine installations expanding end 2 is screw.
Drive pattern switching device 6, drive pattern switching are provided between LNG hydraulic turbine installations expanding end 2 and motor 7 Device 6 uses overrunning cluth.
Other parts such as embodiment 1 sets identical.
By substantial amounts of test, using technique of the invention, than former LNG yield(Using Joule-Thomson(J-T)Valve)'s LNG yield can improve about 1% ~ 3%.

Claims (6)

1. a kind of LNG energy recovery process, it is characterised in that comprise the following steps:
1) natural gas purified by pretreatment unit enters ice chest, liquefies to form high pressure low temperature by precooling, cryogenic technology LNG;
2) LNG of the high pressure low temperature is depressurized by the expanding end of expansion machinery device, and the pressure energy of itself is converted into machinery While energy, output low temperature, low pressure LNG;
3) after the low temperature, low pressure LNG carry out gas-liquid separation through knockout drum, liquid phase LNG send LNG storage tank to store, gas phase BOG Converge with the BOG from LNG storage tank, by the pressurized end of expansion machinery device -- the supercharging output of BOG superchargers, realize energy Reclaim;
Described expansion machinery device is LNG hydraulic turbine installations;Driven based on the expanding end of described LNG hydraulic turbine installations Dynamic, the expanding end of LNG hydraulic turbine installations connects the motor of LNG hydraulic turbine installations, and described motor is process auxiliary drive; Drive pattern switching device is provided between the expanding end and motor of the LNG hydraulic turbine installations.
2. LNG energy recovery process according to claim 1, it is characterised in that described LNG hydraulic turbine installations it is swollen Swollen end is centrifugal, axial-flow type.
3. LNG energy recovery process according to claim 1, it is characterised in that described drive pattern switching device is Overrunning cluth or fluid coupling.
4. LNG energy recovery process according to claim 3, it is characterised in that described motor is in the LNG described in nothing In the case of the assistance of the expanding end of hydraulic turbine installation, BOG superchargers can be operated alone.
5. the LNG energy recovery process according to claim 3 or 4, it is characterised in that when described LNG hydraulic turbines are filled When the rotating speed of the expanding end put is higher than the rotating speed of the motor, overrunning cluth closure realizes the recovery of energy;When described When the rotating speed of the expanding end of LNG hydraulic turbine installations is less than the rotating speed of the motor, described overrunning cluth is disengaged, described BOG superchargers by the motor-driven.
6. LNG energy recovery process according to claim 1 and 2, it is characterised in that the LNG hydraulic turbine installations Expanding end is co-axially mounted with BOG superchargers.
CN201510829824.4A 2015-11-25 2015-11-25 A kind of LNG energy recovery process Active CN105240064B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510829824.4A CN105240064B (en) 2015-11-25 2015-11-25 A kind of LNG energy recovery process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510829824.4A CN105240064B (en) 2015-11-25 2015-11-25 A kind of LNG energy recovery process

Publications (2)

Publication Number Publication Date
CN105240064A CN105240064A (en) 2016-01-13
CN105240064B true CN105240064B (en) 2017-06-16

Family

ID=55037855

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510829824.4A Active CN105240064B (en) 2015-11-25 2015-11-25 A kind of LNG energy recovery process

Country Status (1)

Country Link
CN (1) CN105240064B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11852001B2 (en) 2019-09-13 2023-12-26 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps

Families Citing this family (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105757455A (en) * 2016-04-28 2016-07-13 华电郑州机械设计研究院有限公司 Natural gas differential pressure energy recovery unit device
CN106437909B (en) * 2016-11-21 2018-11-02 郑成勋 A kind of system that liquid working substance acting is driven by vapour pressure
CN107061282A (en) * 2016-12-30 2017-08-18 山西易通环能科技集团有限公司 A kind of energy-saving screw rod air compressor machine
US11624326B2 (en) 2017-05-21 2023-04-11 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11560845B2 (en) 2019-05-15 2023-01-24 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
CA3197583A1 (en) 2019-09-13 2021-03-13 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11015536B2 (en) 2019-09-13 2021-05-25 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11002189B2 (en) 2019-09-13 2021-05-11 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US12065968B2 (en) 2019-09-13 2024-08-20 BJ Energy Solutions, Inc. Systems and methods for hydraulic fracturing
CA3191280A1 (en) 2019-09-13 2021-03-13 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11015594B2 (en) 2019-09-13 2021-05-25 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
CA3092865C (en) 2019-09-13 2023-07-04 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US10895202B1 (en) 2019-09-13 2021-01-19 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US10989180B2 (en) 2019-09-13 2021-04-27 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11555756B2 (en) 2019-09-13 2023-01-17 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11708829B2 (en) 2020-05-12 2023-07-25 Bj Energy Solutions, Llc Cover for fluid systems and related methods
US10968837B1 (en) 2020-05-14 2021-04-06 Bj Energy Solutions, Llc Systems and methods utilizing turbine compressor discharge for hydrostatic manifold purge
US11428165B2 (en) 2020-05-15 2022-08-30 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11208880B2 (en) 2020-05-28 2021-12-28 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US10961908B1 (en) 2020-06-05 2021-03-30 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11109508B1 (en) 2020-06-05 2021-08-31 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11208953B1 (en) 2020-06-05 2021-12-28 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11022526B1 (en) 2020-06-09 2021-06-01 Bj Energy Solutions, Llc Systems and methods for monitoring a condition of a fracturing component section of a hydraulic fracturing unit
US11066915B1 (en) 2020-06-09 2021-07-20 Bj Energy Solutions, Llc Methods for detection and mitigation of well screen out
US10954770B1 (en) 2020-06-09 2021-03-23 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11125066B1 (en) 2020-06-22 2021-09-21 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11933153B2 (en) 2020-06-22 2024-03-19 Bj Energy Solutions, Llc Systems and methods to operate hydraulic fracturing units using automatic flow rate and/or pressure control
US11028677B1 (en) 2020-06-22 2021-06-08 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11939853B2 (en) 2020-06-22 2024-03-26 Bj Energy Solutions, Llc Systems and methods providing a configurable staged rate increase function to operate hydraulic fracturing units
US11473413B2 (en) 2020-06-23 2022-10-18 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11466680B2 (en) 2020-06-23 2022-10-11 Bj Energy Solutions, Llc Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11149533B1 (en) 2020-06-24 2021-10-19 Bj Energy Solutions, Llc Systems to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation
US11220895B1 (en) 2020-06-24 2022-01-11 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11193361B1 (en) 2020-07-17 2021-12-07 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11639654B2 (en) 2021-05-24 2023-05-02 Bj Energy Solutions, Llc Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56116996A (en) * 1980-02-20 1981-09-14 Ishikawajima Harima Heavy Ind Co Ltd Drive method for bog compressor in regasification process of liquefied natural gas
FR2682964B1 (en) * 1991-10-23 1994-08-05 Elf Aquitaine PROCESS FOR DEAZOTING A LIQUEFIED MIXTURE OF HYDROCARBONS MAINLY CONSISTING OF METHANE.
JPH0972203A (en) * 1995-09-05 1997-03-18 Nkk Corp Method and device for recovering lng low temperature heat
MY140540A (en) * 2004-07-12 2009-12-31 Shell Int Research Treating liquefied natural gas
EP2047193A2 (en) * 2006-06-23 2009-04-15 T Baden Hardstaff Limited Lng production
CN102538390B (en) * 2011-12-22 2014-08-06 西安交通大学 Novel natural gas liquefaction system and natural gas liquefaction method
DE102013200572A1 (en) * 2013-01-16 2014-07-17 Siemens Aktiengesellschaft Liquefied natural gas regasification apparatus and related method
CN203731092U (en) * 2013-12-26 2014-07-23 新地能源工程技术有限公司 Device for pressurizing raw natural gas by using natural gas pipeline network pressure energy

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11852001B2 (en) 2019-09-13 2023-12-26 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps

Also Published As

Publication number Publication date
CN105240064A (en) 2016-01-13

Similar Documents

Publication Publication Date Title
CN105240064B (en) A kind of LNG energy recovery process
CN106640245B (en) Utilize the natural gas pipe network pressure energy recovery method and device of piston expansion engine
CN105114131A (en) Integrated device capable of achieving expansion power generation and compression refrigeration through natural gas pressure
JP2013510257A (en) Supercritical air energy storage system
CN101245956A (en) Method for utilizing pressure energy of natural gas
CN101008545A (en) Novel II-order mixed refrigeration process for natural gas liquefaction
WO2014114138A1 (en) Air separation apparatus for isobaric separation and production of oxygen and nitrogen
CN102352777A (en) Energy-storage and power-generation system and method of reversible single-screw compression expansion machine
CN102230403A (en) Method and equipment for realizing low-temperature thermal power generation by cryogenic technology
CN103791690A (en) Liquefied natural gas producing device and method for using pipeline pressure energy for power generation and refrigeration
CN201348420Y (en) Device capable of producing liquid nitrogen by utilizing cold energy of liquefied natural gas
CN203758165U (en) Liquefied natural gas production device applicable in electricity generation and refrigeration by pipeline pressure energy
CN104612761B (en) Realize that twin-stage flows the method that turbo-expander ORC produces compressed air entirely
CN104862025A (en) Fuel gas processing method for FLNG (floating liquefied natural gas) oil-gas storage and offloading device
CN107314234B (en) A kind of processing system and method solving LNG loss with LNG hydraulic turbine
CN103245167B (en) A kind of oxygenerator multicomputer associating variable load operation device and method
CN103266952B (en) Based on the energy comprehensive utilization system of supercritical air
CN203743002U (en) Energy-saving device for screw air compressor
CN204899999U (en) Lithium bromide refrigeration and power generation system
CN101975503A (en) Modified natural gas helium extraction process
CN203731092U (en) Device for pressurizing raw natural gas by using natural gas pipeline network pressure energy
CN105571200B (en) Expansion work reclaims refrigerating plant and method certainly
CN101749206B (en) Low-temperature liquefied energy recovery power supply system
CN203286856U (en) Multiunit united load-variable operation device for oxygenerator
CN207471915U (en) A kind of BOG compression sets

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230411

Address after: 610000 No. 1-16, 42 / F, building 2, No. 88, Jitai fifth road, high tech Zone, Chengdu, Sichuan

Patentee after: SICHUAN JEREH HENGRI NATURAL GAS ENGINEERING CO.,LTD.

Address before: 264000 No. 9 Jierui Road, Laishan District, Yantai City, Shandong Province

Patentee before: JEREH OIL & GAS ENGINEERING Corp.

TR01 Transfer of patent right