CN105223919A - 一种用于发电厂的事件顺序记录方法 - Google Patents
一种用于发电厂的事件顺序记录方法 Download PDFInfo
- Publication number
- CN105223919A CN105223919A CN201510603625.1A CN201510603625A CN105223919A CN 105223919 A CN105223919 A CN 105223919A CN 201510603625 A CN201510603625 A CN 201510603625A CN 105223919 A CN105223919 A CN 105223919A
- Authority
- CN
- China
- Prior art keywords
- sync signal
- clock sync
- generating plant
- analog signals
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 31
- 230000008569 process Effects 0.000 claims abstract description 9
- 238000004891 communication Methods 0.000 claims abstract description 6
- 238000005516 engineering process Methods 0.000 abstract description 3
- 238000004458 analytical method Methods 0.000 description 3
- 230000009471 action Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000009191 jumping Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/4183—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by data acquisition, e.g. workpiece identification
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/23—Pc programming
- G05B2219/23009—Automatic documentation of program
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Monitoring And Testing Of Nuclear Reactors (AREA)
- Testing And Monitoring For Control Systems (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510603625.1A CN105223919B (zh) | 2015-09-21 | 2015-09-21 | 一种用于发电厂的事件顺序记录方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510603625.1A CN105223919B (zh) | 2015-09-21 | 2015-09-21 | 一种用于发电厂的事件顺序记录方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105223919A true CN105223919A (zh) | 2016-01-06 |
CN105223919B CN105223919B (zh) | 2018-08-28 |
Family
ID=54992952
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510603625.1A Expired - Fee Related CN105223919B (zh) | 2015-09-21 | 2015-09-21 | 一种用于发电厂的事件顺序记录方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105223919B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106911543A (zh) * | 2017-02-17 | 2017-06-30 | 国核电力规划设计研究院有限公司 | 一种应用于发电厂的组网系统 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR0128223Y1 (ko) * | 1993-10-14 | 1998-12-15 | 성기설 | 에스오이 실시간 발생회로 |
CN102055544A (zh) * | 2010-12-09 | 2011-05-11 | 成都引众数字设备有限公司 | 电力系统二次设备时间同步监测系统及监测方法 |
US20110173241A1 (en) * | 2009-01-29 | 2011-07-14 | International Business Machines Corporation | Data integration in service oriented architectures |
CN104570889A (zh) * | 2015-02-13 | 2015-04-29 | 西安热工研究院有限公司 | 电厂事件顺序记录模件及方法 |
-
2015
- 2015-09-21 CN CN201510603625.1A patent/CN105223919B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR0128223Y1 (ko) * | 1993-10-14 | 1998-12-15 | 성기설 | 에스오이 실시간 발생회로 |
US20110173241A1 (en) * | 2009-01-29 | 2011-07-14 | International Business Machines Corporation | Data integration in service oriented architectures |
CN102055544A (zh) * | 2010-12-09 | 2011-05-11 | 成都引众数字设备有限公司 | 电力系统二次设备时间同步监测系统及监测方法 |
CN104570889A (zh) * | 2015-02-13 | 2015-04-29 | 西安热工研究院有限公司 | 电厂事件顺序记录模件及方法 |
Non-Patent Citations (1)
Title |
---|
乔记平: "基于虚拟仪器技术的事件顺序记录系统的设计与研究", 《中国优秀硕士学位论文全文数据库信息科技辑》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106911543A (zh) * | 2017-02-17 | 2017-06-30 | 国核电力规划设计研究院有限公司 | 一种应用于发电厂的组网系统 |
Also Published As
Publication number | Publication date |
---|---|
CN105223919B (zh) | 2018-08-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103545922B (zh) | 基于多场景分析的智能告警推理方法 | |
CN203350377U (zh) | 自动化继电保护测试仪 | |
CN101334439B (zh) | 一种电参量三态数据综合采集装置 | |
CN102055544B (zh) | 电力系统二次设备时间同步监测系统及监测方法 | |
CN102520288B (zh) | 基于一次升流的电流差动保护同步性能测试系统及测试方法 | |
CN103048589B (zh) | 一种电网故障诊断中装置时标容错处理的方法 | |
CN104935079A (zh) | 一种智能变电站站域保护系统及功能调试方法 | |
CN109066754A (zh) | 直流配电网实时仿真系统和方法 | |
CN102426309B (zh) | 主站机房环境下区域备自投系统的测试方法 | |
CN105720684B (zh) | 一种基于fpga的微机保护方法及其系统 | |
CN202217149U (zh) | 高精度电力时间同步装置 | |
CN105606919A (zh) | 一种智能变电站分层分布式无线组网仿真闭环测试方法 | |
CN105511444A (zh) | 空间相机外场模拟测试设备 | |
CN101799504B (zh) | 畸变数据对继电保护装置影响的测试方法 | |
CN105223919A (zh) | 一种用于发电厂的事件顺序记录方法 | |
CN102929757A (zh) | 一种电网故障时保护动作事件的iec61850/mms通信仿真方法 | |
CN203588039U (zh) | 一种数控机床机器人自动诊断及修复系统 | |
CN202615137U (zh) | 电力系统的统一授时装置 | |
CN105529826A (zh) | 一种基于pxi总线的便携式模拟智能单元 | |
CN202393853U (zh) | 一种变电站数字化继电保护测试装置 | |
CN105021876A (zh) | 电流监测仪和电流监测系统 | |
CN104237681A (zh) | 数字化继电保护测试设备 | |
CN102508052A (zh) | 区域网络备自投系统现场带通道运行的测试方法 | |
CN203251142U (zh) | 一种开关柜综合监测终端 | |
CN106374443B (zh) | 一种基于epon的层次化保护方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100095 Beijing City, Haidian District Zhongguancun environmental science and Technology Park P.Tricuspidata Road No. 6 in the Institute of nuclear power Co-patentee after: SNPTC (BEIJING) NUCLEAR POWER CONVENTIONAL ISLAND AND POWER ENGINEERING RESEARCH CENTER Co.,Ltd. Patentee after: STATE NUCLEAR ELECTRIC POWER PLANNING DESIGN AND RESEARCH INSTITUTE Co.,Ltd. Address before: 100095 Beijing City, Haidian District Zhongguancun environmental science and Technology Park P.Tricuspidata Road No. 6 in the Institute of nuclear power Co-patentee before: SNPTC (BEIJING) NUCLEAR POWER CONVENTIONAL ISLAND AND POWER ENGINEERING RESEARCH CENTER Co.,Ltd. Patentee before: State Nuclear Electric Power Planning Design & Research Institute |
|
CP01 | Change in the name or title of a patent holder | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190823 Address after: 100095 Beijing City, Haidian District Zhongguancun environmental science and Technology Park P.Tricuspidata Road No. 6 in the Institute of nuclear power Co-patentee after: SNPTC (BEIJING) NUCLEAR POWER CONVENTIONAL ISLAND AND POWER ENGINEERING RESEARCH CENTER Co.,Ltd. Patentee after: STATE NUCLEAR ELECTRIC POWER PLANNING DESIGN AND RESEARCH INSTITUTE Co.,Ltd. Co-patentee after: CLP WISDOM INTEGRATION ENERGY Co.,Ltd. Address before: 100095 Beijing City, Haidian District Zhongguancun environmental science and Technology Park P.Tricuspidata Road No. 6 in the Institute of nuclear power Co-patentee before: SNPTC (BEIJING) NUCLEAR POWER CONVENTIONAL ISLAND AND POWER ENGINEERING RESEARCH CENTER Co.,Ltd. Patentee before: STATE NUCLEAR ELECTRIC POWER PLANNING DESIGN AND RESEARCH INSTITUTE Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180828 |
|
CF01 | Termination of patent right due to non-payment of annual fee |