CN102426309B - 主站机房环境下区域备自投系统的测试方法 - Google Patents

主站机房环境下区域备自投系统的测试方法 Download PDF

Info

Publication number
CN102426309B
CN102426309B CN2011102887266A CN201110288726A CN102426309B CN 102426309 B CN102426309 B CN 102426309B CN 2011102887266 A CN2011102887266 A CN 2011102887266A CN 201110288726 A CN201110288726 A CN 201110288726A CN 102426309 B CN102426309 B CN 102426309B
Authority
CN
China
Prior art keywords
automatic switching
power automatic
spare power
scada
switching system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2011102887266A
Other languages
English (en)
Other versions
CN102426309A (zh
Inventor
黄红远
刘玮
陈炯聪
周伊琳
孙建伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Original Assignee
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Guangdong Power Grid Co Ltd filed Critical Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority to CN2011102887266A priority Critical patent/CN102426309B/zh
Publication of CN102426309A publication Critical patent/CN102426309A/zh
Application granted granted Critical
Publication of CN102426309B publication Critical patent/CN102426309B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开了一种主站机房环境下区域备自投系统的测试方法,包括如下步骤:(1)在EMS系统的SCADA中建立多个模拟变电站;(2)在主站机房内建立模拟环境,用于分别模拟每个模拟变电站内的电网故障,并将模拟的电网故障数据对应分别发送至每个模拟变电站;(3)被测区域备自投系统将各个带有故障数据的模拟变电站串供建立形成链式串供模型,输出区域备自投的动作处理方法至SCADA,并通过SCADA将该动作处理方法显示出来;(4)对比步骤(3)中的动作处理方法与理论上正确的区域备自投动作处理方法是否一致。本发明可保证区域备自投系统输出的动作处理方法的正确性和可靠性。

Description

主站机房环境下区域备自投系统的测试方法
技术领域
本发明属于电力系统自动化工程领域,具体涉及一种在主站机房内区域备自投系统的测试方法。
背景技术
中国发明专利(申请号201110020894.7)公开了基于EMS系统的110KV区域备自投动作处理方法,该方法包括在EMS系统中嵌入区域备自投系统,EMS系统在主站(电力调度中心)机房内运行,该区域备自投系统可自动获得EMS系统中各变电站的电网数据,区域备自投系统能够对链式串供模型进行自动建模,利用SCADA系统采集的各变电站遥信、遥测等实时信息判断区域备自投动作的充电条件、启动条件、闭锁条件,在满足条件时生成控制指令,由SCADA系统以遥控操作的方式合上或切开相关设备,投入备用电源,实现工作电源和备用电源不在同一变电站的备用电源智能投入。
区域备自投动作处理方法的最终目的是对链式结构电网实现闭环控制,对区域备自投系统的安全性、准确性以及可靠性要求极高。若区域备自投系统在投运前未作测试,将会给电网带来巨大安全隐患,另外,若未经测试而出现误动情况,可能会导致大面积停电;若串供线路或变压器有人检修时,还可能会导致人身事故的危险。
发明内容
本发明的目的在于提供一种主站机房环境下区域备自投系统的测试方法,可实现对区域备自投系统在投运前的主站机房内进行测试,以保证区域备自投系统输出的动作处理方法的正确性和可靠性。
本发明的目的通过以下技术方案实现:一种主站机房环境下区域备自投系统的测试方法,包括如下步骤:
(1)在EMS系统的SCADA中建立多个模拟变电站;
(2)在主站机房内建立模拟环境,用于分别模拟每个模拟变电站内的电网故障,并将模拟的电网故障数据对应分别发送至每个模拟变电站;
(3)被测区域备自投系统将各个带有故障数据的模拟变电站串供建立形成链式串供模型,输出区域备自投的动作处理方法至SCADA,并通过SCADA将该动作处理方法显示出来;
(4)对比步骤(3)中的动作处理方法与理论上正确的区域备自投动作处理方法是否一致,获得测试结果。
本发明所述步骤(4)中理论上正确的区域备自投动作处理方法由包括以下步骤获得:
(a)建立具有用于生成区域备自投动作方法的区域备自投系统模块、用于采集变电站量测数据及下发开关遥控命令的SCADA系统模块、用于能够模拟电力系统在正常和故障状态下的静态/动态过程的DTS系统模块的区域备自投测试系统;
(b)将所述步骤(3)中的链式串供模型数据导入区域备自投测试系统,由DTS系统模块模拟电网故障,该DTS系统模块模拟的电网故障与所述步骤(2)中模拟环境模拟的电网故障相同;
(c)区域备自投系统功能模块获得DTS系统模块模拟的电网故障后,由区域备自投系统模块输出理论上正确的区域备自投动作处理方法,由SCADA系统模块下发开关控制命令执行动作,并将该执行动作在DTS系统模块中模拟显示出来。
本发明所述步骤(2)中的模拟环境由包括以下步骤建立:
(A)将用于模拟变电站故障数据的站端动模测试仪、用于采集故障数据的测控装置、用于发送故障数据至模拟变电站的远动装置依次分别连接于主站机房内;
(B)同时触发每个站端动模测试仪模拟其对应的变电站故障,由测控装置采集该变电站故障的数据,再由远动装置将该变电站故障的数据发送至对应的模拟变电站。
本发明所述步骤(B)中,在主站机房内放置一个分别连接每个站端动模测试仪的GPS时间同步触发装置,通过GPS时间同步触发装置同时触发站端动模测试仪模拟其对应的变电站故障。
与现有技术相比,该发明技术具有以下优点:
本发明的方法可在主站机房内对区域备自投系统进行投运前的测试,以保证区域备自投系统输出的动作处理方法的正确性和可靠性,确保区域备自投系统投运后的电网安全、稳定。
附图说明
图1为本发明测试方法的流程示意框图;
图2为本发明区域备自投测试系统的工作流程示意框图;
图3为本发明测试方法所建立的链式结构的串供电网模型。
具体实施方式
下面结合具体实施例对本发明作进一步加以阐述。
如图1所示,主站机房环境下区域备自投系统的测试方法,包括如下步骤:
(1)在EMS系统的SCADA中建立n个模拟变电站,n=1~+∞;
(2)在主站机房内建立模拟环境来分别模拟每个模拟变电站内的电网故障,该模拟环境包括依次连接的GPS时间同步触发装置、用于模拟变电站故障数据的站端动模测试仪、用于采集故障数据的测控装置、用于发送故障数据至模拟变电站的远动装置,通过GPS时间同步触发装置同时触发每个站端动模测试仪模拟其对应连接的模拟变电站的变电站故障,由测控装置采集该变电站故障的数据,再由远动装置将该变电站故障的数据分别发送至对应的模拟变电站;
其中,站端动模测试仪、测控装置、远动装置的数量均与建立的模拟变电站的数量相同,以对应连接;站端动模测试仪是置于主站机房内的用于动态模拟变电站的电压、电流、开关状态等的动态模拟仪器,可预先定义需要模拟的模拟变电站的故障;测控装置是置于主站机房内的用于采集电网故障数据的装置;远动装置是置于主站机房内的用于发送电网故障数据给主站EMS系统的装置;
(3)被测区域备自投系统将各个带有故障数据的模拟变电站串供建立形成链式串供模型,输出区域备自投的动作处理方法至SCADA,由SCADA对模拟变电站下发区域备自投动作,并通过SCADA将该实际动作的情况显示出来;由于被测区域备自投系统只针对其对应的模拟变电站输出的动作处理方法,该动作处理方法将只与所建立的模拟变电站相关联,所以被测区域备自投系统不会对EMS系统中的真实变电站发出动作指令;
(4)对比步骤(3)中的实际动作情况与理论上正确的区域备自投动作情况是否一致,获得测试结果;
其中,如图2所示,理论上正确的区域备自投动作处理方法由包括以下步骤获得:
(a)建立包括有用于生成区域备自投动作方法的区域备自投系统模块、用于采集变电站量测数据及下发开关遥控命令的SCADA系统模块、用于能够模拟电力系统在正常和故障状态下的静态/动态过程的DTS系统模块的区域备自投测试系统,即该区域备自投测试系统具有真实EMS系统中区域备自投系统、SCADA、DTS的功能,该区域备自投测试系统可建立在任一独立的软件系统环境中,其不受真实EMS系统的干扰,也不对真实EMS系统发出数据;
(b)将上述步骤(3)中的链式串供模型数据导入区域备自投测试系统这些链式串供模型数据包括串供模型的XML文件、量测E格式文件和图形SVG文件,将XML文件分别导入区域备自投系统模块、SCADA系统模块、DTS系统模块,将量测E格式文件、SVGA文件均导入DTS系统模块,用户可预先在DTS系统模块中模拟设置电网串行供电的正常运行状态,并由DTS系统模块模拟电网故障,该DTS系统模块模拟的电网故障与上述步骤(2)中模拟环境模拟的电网故障相同;
(c)区域备自投系统功能模块获得DTS系统模块模拟的电网故障后运算处理,输出理论上正确的区域备自投动作处理方法,由SCADA系统模块下发开关命令执行动作,将该实际执行动作在DTS系统模块中模拟显示出来。
上述步骤(2)所建立的链式串供模型如图3所示,由站端动模测试仪模拟发生线路L1故障,同时区域备自投测试系统模拟线路L1故障,如下表1所示,对比被测区域备自投系统的实际动作情况与区别备自投测试系统的理论正确的动作情况是否一致;
表1
Figure BDA0000094401080000051
对比得出被测区域备自投系统实际动作情况与区域备自投测试系统动作情况相一致,该被测区域备自投系统输出的实际动作正确,符合实际运行的要求。
本发明的实施方式不限于此,按照本发明的上述内容,利用本领域的普通技术知识和惯用手段,在不脱离本发明上述基本技术思想前提下,本发明中具体实施电路还可以做出其它多种形式的修改、替换或变更,均落在本发明权利保护范围之内。

Claims (1)

1.一种主站机房环境下区域备自投系统的测试方法,其特征在于包括如下步骤:
(1)在EMS系统的SCADA中建立多个模拟变电站;
(2)在主站机房内建立模拟环境,用于分别模拟每个模拟变电站内的电网故障,并将模拟的电网故障数据对应分别发送至每个模拟变电站;
(3)被测区域备自投系统将各个带有故障数据的模拟变电站串供建立形成链式串供模型,输出区域备自投的动作处理方法至SCADA,由SCADA对模拟变电站下发区域备自投动作,并通过SCADA将该实际动作的情况显示出来;
(4)对比步骤(3)中的实际动作情况与理论上正确的区域备自投动作情况是否一致,获得测试结果。
CN2011102887266A 2011-09-26 2011-09-26 主站机房环境下区域备自投系统的测试方法 Active CN102426309B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102887266A CN102426309B (zh) 2011-09-26 2011-09-26 主站机房环境下区域备自投系统的测试方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102887266A CN102426309B (zh) 2011-09-26 2011-09-26 主站机房环境下区域备自投系统的测试方法

Publications (2)

Publication Number Publication Date
CN102426309A CN102426309A (zh) 2012-04-25
CN102426309B true CN102426309B (zh) 2013-11-20

Family

ID=45960315

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102887266A Active CN102426309B (zh) 2011-09-26 2011-09-26 主站机房环境下区域备自投系统的测试方法

Country Status (1)

Country Link
CN (1) CN102426309B (zh)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102707169B (zh) * 2012-05-21 2014-07-16 上海毅昊自动化有限公司 继电保护事故镜像检测系统及其检测方法
CN104897984A (zh) * 2013-05-22 2015-09-09 江苏省电力公司常州供电公司 操作方便的备用电源自动投切装置智能校验系统
WO2014187133A1 (zh) 2013-05-22 2014-11-27 江苏省电力公司常州供电公司 备用电源自动投切装置智能校验系统
CN104849383B (zh) * 2015-04-16 2016-08-24 衢州出入境检验检疫局综合技术服务中心 快速溶剂萃取-凝胶色谱净化-lc/ms/ms结合测定蜂花粉中硝基咪唑类药物的方法
CN106655462B (zh) * 2015-10-29 2023-03-28 贵州电网公司兴义供电局 一种双主站区域备自投方法
CN109633300A (zh) * 2018-11-30 2019-04-16 北京电力自动化设备有限公司 高压链式svg功率单元满功率老化试验系统及方法
CN113533889A (zh) * 2021-07-26 2021-10-22 南方电网数字电网研究院有限公司 基于数字模拟断路器的备自投不停电可视测试方法和装置
CN114200244B (zh) * 2022-02-17 2022-04-29 北京芯可鉴科技有限公司 用于电力二次设备的环境应力试验系统

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1739438A1 (ru) * 1990-06-12 1992-06-07 Всесоюзный Научно-Исследовательский, Проектно-Конструкторский И Технологический Институт Релестроения Способ автоматического включени резервного питани потребителей
CN101286653A (zh) * 2008-05-07 2008-10-15 清华大学 一种基于ems的电网备用电源自投控制方法
CN201392392Y (zh) * 2009-03-13 2010-01-27 江苏省电力公司常州供电公司 备自投装置的试验测试仪
CN101834469A (zh) * 2010-04-16 2010-09-15 清华大学 一种变电站-调度中心两级分布式恢复控制方法
CN101951016A (zh) * 2010-04-22 2011-01-19 广东电网公司 基于广域信息的备用电源自动投入自适应建模和控制方法
CN102075005A (zh) * 2011-01-18 2011-05-25 广东电网公司电力科学研究院 基于ems系统的110kv区域备自投动作处理方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1739438A1 (ru) * 1990-06-12 1992-06-07 Всесоюзный Научно-Исследовательский, Проектно-Конструкторский И Технологический Институт Релестроения Способ автоматического включени резервного питани потребителей
CN101286653A (zh) * 2008-05-07 2008-10-15 清华大学 一种基于ems的电网备用电源自投控制方法
CN201392392Y (zh) * 2009-03-13 2010-01-27 江苏省电力公司常州供电公司 备自投装置的试验测试仪
CN101834469A (zh) * 2010-04-16 2010-09-15 清华大学 一种变电站-调度中心两级分布式恢复控制方法
CN101951016A (zh) * 2010-04-22 2011-01-19 广东电网公司 基于广域信息的备用电源自动投入自适应建模和控制方法
CN102075005A (zh) * 2011-01-18 2011-05-25 广东电网公司电力科学研究院 基于ems系统的110kv区域备自投动作处理方法

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
一种基于EMS的广域备自投控制系统;杨浚文等;《电力系统自动化》;20100610;第34卷(第11期);第61-66页 *
余涛等.地区电网广域备自投控制系统研制.《电力自动化设备》.2011,第31卷(第3期),第121-125页.
地区电网广域备自投控制系统研制;余涛等;《电力自动化设备》;20110331;第31卷(第3期);第121-125页 *
基于Hypersim实时仿真系统的备自投装置测试;杨佳等;《电力自动化设备》;20080430;第28卷(第4期);第117-121页 *
杨佳等.基于Hypersim实时仿真系统的备自投装置测试.《电力自动化设备》.2008,第28卷(第4期),第117-121页.
杨浚文等.一种基于EMS的广域备自投控制系统.《电力系统自动化》.2010,第34卷(第11期),第61-66页.

Also Published As

Publication number Publication date
CN102426309A (zh) 2012-04-25

Similar Documents

Publication Publication Date Title
CN102426309B (zh) 主站机房环境下区域备自投系统的测试方法
CN103105550B (zh) 一种智能化继电保护装置检测方法及系统
CN103123758B (zh) 一种调度自动化数字物理混合仿真培训系统
CN202159106U (zh) 一种智能电网自愈控制技术的智能测试仪
CN102361346B (zh) 配电自动化系统的主站全数字化场景测试法
CN102208801B (zh) 一种将线路保护装置安全用于风电场的做法
CN103200051B (zh) 智能变电站报文仿真测试与关联报文分析系统及方法
CN103778230B (zh) 一种黑启动方案在线自动生成方法
CN202735445U (zh) 智能变电站二次设备场景测试系统
CN103529418A (zh) 电力系统同步相量测量装置动态测试方法及装置
CN105403793A (zh) 一种自动化变电站数字继电保护测试仪
CN204291050U (zh) 一种调度监控信息核对系统
CN104537936A (zh) 一种农网低压配电箱的低压台区模拟实训装置
CN103885438A (zh) 一种变电站测控设备的自动测试系统和方法
CN103984335B (zh) 配电自动化系统的测试方法及系统
CN105449847A (zh) 一种数字化变电站测试系统
CN107491569A (zh) 基于iec61850标准goose、sv技术的变电站系统故障在线仿真方法
CN105914884A (zh) 一种一对多的智能变电站过程层虚拟二次设备及实现方法
CN205354423U (zh) 智能变电站仿真培训系统
CN106681313A (zh) 一种稳控系统功能测试方法及系统
CN104076807A (zh) 智能变电站的自动化系统的调试方法
CN105847076A (zh) 变电站站控层设备的信号测试系统、方法及装置
CN110611312B (zh) 一种变电站间隔层全景数据在线模拟系统及方法
CN102508052B (zh) 区域网络备自投系统现场带通道运行的测试方法
CN105680441A (zh) 基于模拟替代技术的模拟对点装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8

Patentee after: Electric Power Research Institute of Guangdong Power Grid Co.,Ltd.

Address before: Guangzhou City, Guangdong province Yuexiu District 510080 Dongfeng East Road, No. 8 building water Kong Guangdong

Patentee before: ELECTRIC POWER RESEARCH INSTITUTE OF GUANGDONG POWER GRID Corp.

CP03 Change of name, title or address