CN105220689B - A kind of photovoltaic piling machine - Google Patents

A kind of photovoltaic piling machine Download PDF

Info

Publication number
CN105220689B
CN105220689B CN201510709434.3A CN201510709434A CN105220689B CN 105220689 B CN105220689 B CN 105220689B CN 201510709434 A CN201510709434 A CN 201510709434A CN 105220689 B CN105220689 B CN 105220689B
Authority
CN
China
Prior art keywords
piling
bearing
governor motion
main base
hydraulic cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510709434.3A
Other languages
Chinese (zh)
Other versions
CN105220689A (en
Inventor
罗万友
范正峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Hehai Intelligent Equipment Manufacturing Co ltd
Original Assignee
Anhui Kundi Ground Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Kundi Ground Foundation Engineering Co Ltd filed Critical Anhui Kundi Ground Foundation Engineering Co Ltd
Priority to CN201510709434.3A priority Critical patent/CN105220689B/en
Publication of CN105220689A publication Critical patent/CN105220689A/en
Application granted granted Critical
Publication of CN105220689B publication Critical patent/CN105220689B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Photovoltaic Devices (AREA)

Abstract

The present invention relates to a kind of photovoltaic piling machine, including the piling mechanism arranged in walking mechanism, walking mechanism and the measuring mechanism for measuring to the piling of mechanism of driving piles, the signal for measuring is delivered to measuring mechanism the running status that control unit is analyzed the result regulation and control walking mechanism processed and according to analyzing and processing.Measuring mechanism is measured to the geographical position of piling point, skew two between comparative analysiss piling point and predetermined piling point, moved according to the result regulation and control walking mechanism of analysis so that piling point is coincided with predetermined piling point, it is ensured that the pile of piling is located along the same line.

Description

A kind of photovoltaic piling machine
Technical field
The present invention relates to photovoltaic construction equipment field, and in particular to a kind of photovoltaic piling machine.
Background technology
Photovoltaic installation needs to be driven piles, and is usually driven piles using piling machine, and traditional piling machine is driven piles When, it is difficult to ensure pile on same straight line, photovoltaic particularly waterborne is driven piles.Meanwhile, traditional photovoltaic piling waterborne is adopted and is enclosed The mode that dike draws water is carried out, although which can be applied to the shallower riverbank of the water surface or loke shore side, however it is necessary that building Other constructions such as road, dykes and dams, construction cost is high and easily causes land used dispute with local resident, brings greatly not to construction Just.In addition, which is also poorly suitable for the deeper region of the water surface being constructed.
The content of the invention
It is an object of the invention to provide a kind of photovoltaic piling machine, which can effectively ensure that photovoltaic pile is in same straight line On.
For achieving the above object, present invention employs technical scheme below:
A kind of photovoltaic piling machine, it is characterised in that:Including the piling mechanism and use that arrange in walking mechanism, walking mechanism In the measuring mechanism that the piling point to mechanism of driving piles is measured, the signal for measuring is delivered to control unit and is carried out by measuring mechanism The running status of analyzing and processing the result regulation and control walking mechanism according to analyzing and processing.
In above-mentioned technical proposal, the positioning of piling point by piling machine while walking, is realized, it is ensured that owned after piling Stake holes or pile can locate on the same line, it is ensured that the installation of photovoltaic.
Description of the drawings
Fig. 1 is the top view of the present invention;
Fig. 2 is the front view of the present invention;
Fig. 3 is the side view of the present invention.
Specific embodiment
In order that objects and advantages of the present invention become more apparent, with reference to embodiments the present invention is carried out specifically It is bright.It should be appreciated that following word is only to describe one or more specific embodiments of the invention, not to the present invention The protection domain of concrete request carries out considered critical.
Technical scheme that the present invention takes as shown in figure 1, a kind of photovoltaic piling machine, including in walking mechanism, walking mechanism The piling mechanism of setting and for the piling measuring mechanism that measures of point to mechanism of driving piles, measuring mechanism is by the letter for measuring Number it is delivered to control unit and is analyzed the result processed and according to analyzing and processing and regulates and controls the running status of walking mechanism.Piling point Carry out digging stake holes in earth's surface for mechanism of driving piles or pressure sets the place of pile, measuring mechanism is carried out to the geographical position of piling point Measurement, the skew two between comparative analysiss piling point and predetermined piling point are moved according to the result regulation and control walking mechanism of analysis It is dynamic so that piling point is coincided with predetermined piling point, it is ensured that the pile of piling is located along the same line.Measurement assembly can be adopted Ke Lida K9T measuring apparatus etc. can carry out the device of positioning measurement, between measurement assembly and control device can adopt GPS or Beidou satellite navigation system is positioned and is communicated, and control unit can be PLC control unit.
As shown in Figure 1, 2, 3, walking mechanism includes that main base 11 and 11 both sides of main base are respectively provided with to specific scheme First and second bearing 12,13, piling mechanism is arranged on main base 11, and first and second bearing 12,13 is connected by connecting bracket Connect, d1 constitutes slide-and-guide cooperation to main base 11 in the first direction with connecting bracket, and the first governor motion adjusts main 11 He of base Relative motion in d1 to connecting bracket in the first direction there is, first and second bearing 12,13 respectively with connecting bracket d2 structures in a second direction Coordinate into slide-and-guide connection, the second governor motion adjusts first and second bearing 12,13 and connecting bracket d2 in a second direction respectively Generation relative motion, is provided with main base 11 for supporting the first leg 41 of positioning, first and second bearing 12, It is separately provided for supporting the second leg 42 of positioning on 13, the 3rd governor motion adjusts the first leg 41 and carries out Lifting and drop action, the 4th governor motion adjust the second leg 42 and carry out lifting and drop action, and first and second direction is perpendicular Arrangement, first direction d1 is the spacing direction between first and second bearing 12,13, and control unit regulation and control first, second, third and fourth are adjusted The running status of mechanism.The running status of first, second, third and fourth governor motion is adjusted according to the result of analysis manually can, or Running status of the control unit by direct first, second, third and fourth governor motion of intelligent control of programming.
The idiographic flow that above-mentioned photovoltaic piling machine carries out precise positioning operation is as follows:When photovoltaic piling machine is driven piles, the First, two legs fall and main base 11 and first and second bearing 12,13 are supported and are positioned, and after piling terminates, the 4th is adjusted Mechanism adjusts the second leg 42 and lifts, and the second governor motion adjusts first and second bearing 12,13 and connecting bracket d2 in a second direction Generation relative motion(That is, d2 is moved in a second direction to adjust first and second bearing 12,13, first and second bearing 12,13 Spacing between displacement and adjacent photovoltaic stake is consistent), first and second bearing 12,13 move into place after the 4th governor motion Adjust the second leg 42 and fall and first and second bearing 12,13 is supported and is positioned;Second leg 42 starts the 3rd tune after falling Section mechanism adjusts the first leg 41 and lifts, and after the first leg 41 is lifted, the second governor motion adjusts connecting bracket, 11 phase of main base For first and second bearing 12,13, there is relative motion in d2 in a second direction(As main base 11 in connecting bracket, is also arranged on D2 is moved in a second direction to adjust main base 11, the spacing phase between the displacement of main base 11 and adjacent photovoltaic stake Unanimously), after main base 11 is moved into place, due to being affected by walking skew and inevitable factor, often main base 11 is arrived Behind position, in addition it is also necessary to piling point is finely tuned, now the piling point of mechanism of driving piles is measured by measuring mechanism, control is single Unit is analyzed to the side-play amount between piling point and predetermined piling point, and the result regulation and control first and second according to analysis adjust machine Structure adjusts main base 11 and carries out micro-shifting along first and second direction respectively(Small distance is moved), until piling mechanism piling point with it is pre- Fixed piling point coincides, and the first leg of now the 3rd governor motion regulation to fall and be supported positioning to main base 11, Ran Houqi Power driver structure carries out piling operation, so repeatedly said process so that the stake holes or pile after piling is all located at always On line.
Foregoing description is the piling machine in a second direction process driven piles by d2, if corresponding piling machine is along first party Driven piles to d1, which is adjusted, and process is similar, and concrete operations are as follows:When photovoltaic piling machine is driven piles, first and second leg is equal Fall and main base 11 and first and second bearing 12,13 are supported and are positioned, after piling terminates, the 4th governor motion adjusts the Two legs are lifted, and the first governor motion adjusts connecting bracket, first and second bearing 12,13, and d1 sends out in the first direction with main base 11 Raw relative motion(As first and second bearing 12,13 is arranged in connecting bracket, that is, first and second bearing 12,13 is adjusted along the One direction d1 is moved, and the displacement of first and second bearing 12,13 is consistent with the spacing between adjacent photovoltaic stake), the First, after two bearings 12,13 are moved into place, the second leg of the 4th governor motion regulation falls and first and second bearing 12,13 is carried out propping up Support and positioning;Second leg starts the 3rd governor motion the first leg of regulation and lifts after falling, after the first leg is lifted, first adjusts Section mechanism adjusts main base 11, and relative to connecting bracket, there is relative motion in d1 in the first direction(That is, main base 11 is adjusted along the One direction d1 is moved, and the displacement of main base 11 is consistent with the spacing between adjacent photovoltaic stake), main base 11 moves After in place, due to being affected by walking skew and inevitable factor, often main base 11 in place after, in addition it is also necessary to point of driving piles It is finely adjusted, now the piling point of mechanism of driving piles is measured by measuring mechanism, control unit is beaten with predetermined to piling point Side-play amount between stake point is analyzed, and result first and second governor motion of regulation and control of foundation analysis adjusts main base 11 and distinguishes Micro-shifting is carried out along first and second direction(Small distance is moved), until the piling point of piling mechanism is coincided with predetermined piling point, now 3rd governor motion the first leg of regulation is fallen and main base 11 is supported positioning, and then starting piling mechanism carries out piling behaviour Make, so repeatedly said process so that the stake holes or pile after piling is all located on same straight line.
Above-mentioned piling machine can be used for both road and marine piling, particularly for during marine piling, now, main base 11 and the First, two bearings 12,13 are buoyancy tank composition.It can with effectively solving tradition embankment draw water piling construction is loaded down with trivial details, high cost with And marine piling is difficult to ensure that pile is in a collinear difficult problem.Piling mechanism can refer to existing piling machine and be implemented, Can be pressed into the mechanism of pile in ground in the perforating mechanism punched by ground or by prefabricated pile.First and second leg can The upper end and first and second bearing 12,13, main base 11 for thinking telescopic or first and second leg is articulated and connected.
Detailed operation is that first, second, third and fourth governor motion is hydraulic regulator.First leg 41 is in main base Four turnings be respectively provided with, the second leg is respectively provided with the two ends of first and second bearing 12,13.For the piling of land piling Machine, the first leg arrange four;For the piling machine of water surface piling, the first leg can d1 interval settings two in the first direction. Second leg arranges two respectively on first and second bearing 12,13.Connecting bracket include two in the first direction d1 arrangement first Guide rod 21, is respectively provided with the second guide rod 22 of d2 arrangements in a second direction, sets on the first guide rod 21 on first and second bearing 12,13 Put with its in the first direction d1 constitute the first sliding sleeve that slide-and-guide be connected cooperation, the first sliding sleeve is connected with main base 11, the The two ends of one guide rod 21 be respectively provided with the second guide rod 22 in a second direction d2 constitute slide-and-guide be connected cooperation the second sliding sleeve, First and second governor motion is respectively first and second hydraulic cylinder 31,32 and constitutes, and the cylinder body of first hydraulic cylinder 31 is connected with main base 11 Connect, the piston rod of first hydraulic cylinder 31 is connected with first and second bearing 12,13, the cylinder body of second hydraulic cylinder 32 and the second sliding sleeve It is connected, the piston rod of second hydraulic cylinder 32 is connected with first and second bearing 12,13.Based on 3rd governor motion on base 11 The 3rd hydraulic cylinder that vertical shape is installed is constituted, and the first leg 41 is connected with the piston rod of the 3rd hydraulic cylinder, and the 4th governor motion is The 4th hydraulic cylinder composition that shape is installed is found on first and second bearing 12,13, the second leg 42 is connected with the piston rod of the 4th hydraulic cylinder Connect.First, second, third and fourth governor motion that hydraulic cylinder is constituted, which improves the safety of water surface photovoltaic piling.
In a word, the photovoltaic piling machine that the present invention is provided, which can realize determining for piling point by piling machine while walking Position, it is ensured that all of stake holes or pile can be located on the same line after piling, it is ensured that the installation of photovoltaic.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, after content described in the present invention is known, under the premise without departing from the principles of the invention, which can also be made some Equal conversion and replacement, these convert on an equal basis and substitute and belong to protection scope of the present invention.

Claims (2)

1. a kind of photovoltaic piling machine, it is characterised in that:Including the piling mechanism arranged in walking mechanism, walking mechanism and it is used for The signal for measuring is delivered to control unit and is carried out point by the piling measuring mechanism that measures of point to mechanism of driving piles, measuring mechanism Analysis is processed and regulates and controls the running status of walking mechanism according to the result for analyzing and processing;Walking mechanism includes main base and main base First and second bearing that both sides are respectively provided with, piling mechanism are arranged on main base, and first and second bearing is connected by connecting bracket Connect, main base constitutes slide-and-guide cooperation in the first direction with connecting bracket, the first governor motion adjusts main base and connection There is relative motion in frame, first and second bearing constitutes slide-and-guide with connecting bracket and is connected in the first direction respectively in a second direction Coordinate, the second governor motion adjusts first and second bearing respectively and connecting bracket occurs relative motion in a second direction, on main base It is provided with for supporting the first leg of positioning, is separately provided for supporting on first and second bearing Second leg of positioning, the 3rd governor motion adjust the first leg and carry out lifting and drop action, and the 4th governor motion adjusts the Two legs carry out lifting and drop action, the perpendicular arrangement in first and second direction, first direction be between first and second bearing between Away from direction, control unit regulates and controls the running status of first, second, third and fourth governor motion;
Main base and first and second bearing are buoyancy tank composition;First, second, third and fourth governor motion is hydraulic regulator;
Connecting bracket includes two the first guide rods arranged in the first direction, and cloth in a second direction is respectively provided with first and second bearing The second guide rod put, on the first guide rod arrange with its constitute in the first direction slide-and-guide be connected cooperation the first sliding sleeve, first Sliding sleeve is connected with main base, and the two ends of the first guide rod are respectively provided with and constitute slide-and-guide in a second direction with the second guide rod and be connected The second sliding sleeve for coordinating, first and second governor motion are respectively first and second hydraulic cylinder composition, the cylinder body of first hydraulic cylinder and main bottom Seat is connected, and the piston rod of first hydraulic cylinder is connected with first and second bearing, and the cylinder body of second hydraulic cylinder is connected with the second sliding sleeve Connect, the piston rod of second hydraulic cylinder is connected with first and second bearing.
2. photovoltaic piling machine according to claim 1, it is characterised in that:Found shape to install based on 3rd governor motion on base The 3rd hydraulic cylinder constitute, the first leg is connected with the piston rod of the 3rd hydraulic cylinder, and the 4th governor motion is first and second bearing The 4th hydraulic cylinder that upper vertical shape is installed is constituted, and the second leg is connected with the piston rod of the 4th hydraulic cylinder.
CN201510709434.3A 2015-10-28 2015-10-28 A kind of photovoltaic piling machine Active CN105220689B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510709434.3A CN105220689B (en) 2015-10-28 2015-10-28 A kind of photovoltaic piling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510709434.3A CN105220689B (en) 2015-10-28 2015-10-28 A kind of photovoltaic piling machine

Publications (2)

Publication Number Publication Date
CN105220689A CN105220689A (en) 2016-01-06
CN105220689B true CN105220689B (en) 2017-04-05

Family

ID=54989921

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510709434.3A Active CN105220689B (en) 2015-10-28 2015-10-28 A kind of photovoltaic piling machine

Country Status (1)

Country Link
CN (1) CN105220689B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735315A (en) * 2016-05-09 2016-07-06 安徽恒坤地基基础工程有限公司 Photovoltaic pile driver convenient to locate
CN112960542A (en) * 2020-12-30 2021-06-15 青海黄河上游水电开发有限责任公司 A excavator for snatching photovoltaic pile gripping apparatus and have it
CN113322840A (en) * 2021-07-05 2021-08-31 昆山市交通航务工程有限公司 Construction method and equipment for bridge dismantling
CN113565095B (en) * 2021-09-22 2021-12-07 海门市重型矿山机械厂 Hand-push type positioning and punching trolley for rock and soil drilling

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101265705A (en) * 2008-04-25 2008-09-17 上海工程机械厂有限公司 Walking type pile-driving frame turning and running mechanism
CN101831912A (en) * 2010-02-05 2010-09-15 江苏盛裕风电设备有限公司 Self-displacement universal adjustable pile driving frame and use method thereof
CN102535463A (en) * 2012-02-15 2012-07-04 三一电气有限责任公司 Positioning control method and positioning control system for beach crawler pile driver
CN205100217U (en) * 2015-10-28 2016-03-23 安徽恒坤地基基础工程有限公司 Photovoltaic pile driver

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5248361B2 (en) * 2009-02-12 2013-07-31 日本車輌製造株式会社 Pile driver stability measuring apparatus and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101265705A (en) * 2008-04-25 2008-09-17 上海工程机械厂有限公司 Walking type pile-driving frame turning and running mechanism
CN101831912A (en) * 2010-02-05 2010-09-15 江苏盛裕风电设备有限公司 Self-displacement universal adjustable pile driving frame and use method thereof
CN102535463A (en) * 2012-02-15 2012-07-04 三一电气有限责任公司 Positioning control method and positioning control system for beach crawler pile driver
CN205100217U (en) * 2015-10-28 2016-03-23 安徽恒坤地基基础工程有限公司 Photovoltaic pile driver

Also Published As

Publication number Publication date
CN105220689A (en) 2016-01-06

Similar Documents

Publication Publication Date Title
CN105220689B (en) A kind of photovoltaic piling machine
CN104018512B (en) The caisson sinking construction method dynamic to environment micro-turbulence
CN103114599B (en) Deep basal pit sealing dewatering device and construction method thereof
CN103866817B (en) Water intake pumping station
CN202865828U (en) Fast-draining pipe pile
CN203741801U (en) Suction pile mat type self-lifting platform
CN203729348U (en) Water storage structure anti-floating device
CN204780836U (en) Fixed drilling platform of adjustable floating
CN106287117A (en) A kind of adjustable type pumping plant machine unit support
CN203960942U (en) Water intake pumping station
CN103669383B (en) A kind of method of installation and leveling caisson on ground, seabed
CN108149775A (en) A kind of prefabricated Boosting pumping station of PE and its mounting process
CN201351289Y (en) Variable operation space continuous wall device
CN102720211B (en) Wedge type bottom-end deviation fine-rectifying system for immersed pipe and rectifying process of wedge type bottom-end deviation fine-rectifying system
CN102704512B (en) Immersed tube bottom jack type deviation rectifying fine adjusting system and adjusting technology
CN204461907U (en) There is the waters vane shear test platform on tub truss basis
CN201679008U (en) Rigid water drainage device for foundation pit
CN204418194U (en) For high water-permeability layer of sand foundation pit dewatering device
KR20170080051A (en) Supporting system for tide generator
CN105220690A (en) A kind of walking mechanism of photovoltaic pile driver
CN208136938U (en) A kind of marine four floating drums-buoyancy tank combined type foundation structure
CN205077485U (en) Running gear of photovoltaic pile driver
CN203613541U (en) Driving device for vertical pipe sinking in shallow sea reclamation area
CN205100217U (en) Photovoltaic pile driver
CN205604273U (en) Last cofferdam of sandy silt

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 1103, Phase I Project of Aozhong Wealth Center, No. 916 Jinzhai South Road, Hefei Economic and Technological Development Zone, Anhui Province, 230031

Patentee after: Anhui Hengkun Construction Technology Co.,Ltd.

Address before: Room 903, Unit 2, West Central Shopping Center, South Feicui Road, Fanhua Avenue, Economic and Technological Development Zone, Hefei City, Anhui Province, 230601

Patentee before: ANHUI HENGKUN FOUNDATION ENGINEERING CO.,LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240821

Address after: Room 1107, Phase I, Auspicious Wealth Center, No. 916 Jinzhai South Road, Economic and Technological Development Zone, Hefei City, Anhui Province, China 230000

Patentee after: Anhui Hehai Intelligent Equipment Manufacturing Co.,Ltd.

Country or region after: China

Address before: 1103, Phase I Project of Aozhong Wealth Center, No. 916 Jinzhai South Road, Hefei Economic and Technological Development Zone, Anhui Province, 230031

Patentee before: Anhui Hengkun Construction Technology Co.,Ltd.

Country or region before: China