CN105201206B - Method and trapezoidal mold for adjusting elevation of aluminum alloy formwork - Google Patents

Method and trapezoidal mold for adjusting elevation of aluminum alloy formwork Download PDF

Info

Publication number
CN105201206B
CN105201206B CN201410511453.0A CN201410511453A CN105201206B CN 105201206 B CN105201206 B CN 105201206B CN 201410511453 A CN201410511453 A CN 201410511453A CN 105201206 B CN105201206 B CN 105201206B
Authority
CN
China
Prior art keywords
aluminum alloy
trapezoidal
mould plate
structure floor
alloy formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410511453.0A
Other languages
Chinese (zh)
Other versions
CN105201206A (en
Inventor
杨广海
王加鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau Third Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau Third Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau Third Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau Third Construction Engineering Co Ltd
Priority to CN201410511453.0A priority Critical patent/CN105201206B/en
Publication of CN105201206A publication Critical patent/CN105201206A/en
Application granted granted Critical
Publication of CN105201206B publication Critical patent/CN105201206B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a method and trapezoidal mold for adjusting elevation of an aluminum alloy formwork. The trapezoidal mold is a double-row trapezoidal mold formed by connecting two single trapezoidal molds through at least two connecting rods. The two single trapezoidal molds are parallel. The single trapezoidal molds are of a big end up inverted-trapezoid-shaped structure. Before the aluminum alloy formwork is mounted, a trapezoidal groove is manufactured in a structural floor in advance, the groove is adopted as space for adjusting the elevation of the aluminum alloy formwork when the aluminum alloy formwork is mounted, the aluminum alloy formwork is closely attached to the structural floor, and therefore the clearance between the aluminum alloy formwork and the structural floor is removed, and the slurry leakage phenomenon of the aluminum alloy formwork is avoided.

Description

A kind of method and trapezoidal mould of adjustment aluminum alloy mould plate absolute altitude
Technical field
The present invention relates to the method and trapezoidal mould of a kind of adjustment aluminum alloy mould plate absolute altitude, belong to building construction technology neck Domain.
Background technology
Aluminum alloy mould plate system since the U.S. is born, there is the applicating history of nearly 50 years from 1962.In the U.S., add Developed country, and the building of the country of infant industry as Mexico, Brazil, Malaysia, Korea, India such as put on airs In, it is widely used.Various countries during promoting the use of, be also accumulated from the design of a large amount of aluminum alloy pattern plates, manufacture, should With and construction experience.However, in the actual application of aluminum alloy mould plate, being commonly encountered due to structure floor ground convex-concave not Flat, the absolute altitude on structure floor of aluminum alloy mould plate is inconsistent, so as to cause the top or bottom of aluminum alloy mould plate There is spillage phenomenon, have a strong impact on the quality of molding body of wall and attractive in appearance.
The content of the invention
The purpose of the present invention is:A kind of simple structure, easy construction are provided, the method that aluminum alloy mould plate absolute altitude can be adjusted And trapezoidal mould, so as to eliminate the gap between structure floor of aluminum alloy mould plate, it is to avoid aluminum alloy mould plate spillage occurs and shows As to overcome the deficiencies in the prior art.
A kind of method of adjustment aluminum alloy mould plate absolute altitude of the present invention, including existing aluminum alloy mould plate construction method, Before the concrete of pouring structure floor, trapezoidal mould is arranged on into the edge positions of wall column both sides and binding is fixed on wall column reinforcing bar On, make the upper surface of trapezoidal mould higher than the upper surface of structure floor, then the concrete of pouring structure floor, treats structure floor After reaching intensity requirement, trapezoidal mould is removed, one group of trapezoidal groove is now formed on structure floor, aluminum alloy mould plate is installed When in the trapezoidal groove, by trapezoidal groove bottom pad last layer concrete to adjust aluminum alloy mould plate needed for absolute altitude.
The depth of described trapezoidal groove is 15~30mm.
A kind of trapezoidal mould, described trapezoidal mould is using the connecting rod of at least more than two by the trapezoidal mould of two monomers The double trapezoidal mould for linking together.
The described trapezoidal mould of two monomers is parallel to each other.
The trapezoidal mould of described monomer is up big and down small inverted trapezoidal structure, wherein upper bottom is 40~60mm, is gone to the bottom as 30 ~50mm, a height of 20~40mm.
Compared with prior art, it is an advantage of the current invention that:The present invention install aluminum alloy mould plate before, in advance in structure building Trapezoidal groove is made on plate, the space of its absolute altitude is adjusted during by the use of the groove as installation aluminum alloy mould plate, enable aluminum alloy to template Be brought into close contact with structure floor, so as to eliminate the gap between structure floor of aluminum alloy mould plate, it is to avoid aluminum alloy mould plate There is spillage phenomenon.Therefore, the present invention be not only simple in structure, easy construction, and overcome aluminum alloy mould plate spillage occur because of absolute altitude Problem, improve the quality of body of wall and attractive in appearance, be worth being promoted in aluminum alloy formwork system.
Description of the drawings
Fig. 1 is the top view of structural representation when trapezoidal mould is implemented in the present invention;
Fig. 2 is the A-A sectional views of Fig. 1;
Fig. 3 is structural representation when aluminum alloy mould plate is installed in the present invention.
Description of reference numerals:1- structure floors, 2- wall column reinforcing bars, 3- connecting rods, the trapezoidal mould of 4- monomers, 5- trapezoidal grooves, 6- aluminum alloy mould plates.
Specific embodiment
In order that the object, technical solutions and advantages of the present invention are clearer, with reference to the accompanying drawings and examples to this It is bright to be described in further detail.
Embodiment
Referring to Fig. 1~2, a kind of trapezoidal mould of the present invention, described trapezoidal mould is adopted by the trapezoidal mould 4 of two monomers The double trapezoidal mould linked together with four connecting rods 3.The described trapezoidal mould 4 of two monomers is parallel to each other, and monomer ladder Shape mould 4 is up big and down small inverted trapezoidal structure, wherein upper bottom is 40mm, is gone to the bottom as 30mm, a height of 20mm.
Referring to Fig. 3, before the concrete of pouring structure floor 1, trapezoidal mould is arranged on into the edge positions of wall column both sides And binding is fixed on wall column reinforcing bar 2, the upper surface of trapezoidal mould is made higher than the upper surface of structure floor 1, then pouring structure The concrete of floor 1, after structure floor 1 reaches intensity requirement, removes trapezoidal mould, now forms one on structure floor 1 Group trapezoidal groove 5, the depth of the trapezoidal groove 5 is 15mm;By aluminum alloy mould plate 6 be arranged on the trapezoidal groove 5 in when, by The bottom pad last layer concrete absolute altitude needed for adjust aluminum alloy mould plate 6 of trapezoidal groove 5, you can with 15mm deep trapezoidal groove The absolute altitude of 5 adjustment aluminum alloy mould plates 6.

Claims (2)

1. a kind of method of adjustment aluminum alloy mould plate absolute altitude, including existing aluminum alloy mould plate construction method, it is characterised in that: Pouring structure floor(1)Concrete before, by trapezoidal mould be arranged on wall column both sides edge positions and binding be fixed on wall column Reinforcing bar(2)On, the upper surface for making trapezoidal mould is higher than structure floor(1)Upper surface, then pouring structure floor(1)Coagulation Soil, treats structure floor(1)After reaching intensity requirement, trapezoidal mould is removed, now in structure floor(1)Upper one group of formation is trapezoidal recessed Groove(5), by aluminum alloy mould plate(6)Installed in the trapezoidal groove(5)When interior, by trapezoidal groove(5)Bottom pad last layer is mixed Solidifying soil is adjusting aluminum alloy mould plate(6)Required absolute altitude.
2. it is according to claim 1 adjustment aluminum alloy mould plate absolute altitude method, it is characterised in that:Described trapezoidal groove (5)Depth be 15~30mm.
CN201410511453.0A 2014-09-29 2014-09-29 Method and trapezoidal mold for adjusting elevation of aluminum alloy formwork Active CN105201206B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410511453.0A CN105201206B (en) 2014-09-29 2014-09-29 Method and trapezoidal mold for adjusting elevation of aluminum alloy formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410511453.0A CN105201206B (en) 2014-09-29 2014-09-29 Method and trapezoidal mold for adjusting elevation of aluminum alloy formwork

Publications (2)

Publication Number Publication Date
CN105201206A CN105201206A (en) 2015-12-30
CN105201206B true CN105201206B (en) 2017-05-17

Family

ID=54949132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410511453.0A Active CN105201206B (en) 2014-09-29 2014-09-29 Method and trapezoidal mold for adjusting elevation of aluminum alloy formwork

Country Status (1)

Country Link
CN (1) CN105201206B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2426136Y (en) * 1999-12-15 2001-04-04 许恒嘉 Height mark device for floor slab pouring
CN101089314A (en) * 2003-07-07 2007-12-19 邱则有 Hollow component for concrete
KR20120055856A (en) * 2010-11-24 2012-06-01 한국건설기술연구원 Making Method and Mold Device for Making Reverse Taper Shape Recess in Concrete
CN203594230U (en) * 2013-11-08 2014-05-14 广东一百建筑科技有限公司 Aluminum formwork adjusting device
CN204174932U (en) * 2014-09-29 2015-02-25 中建四局第三建筑工程有限公司 A kind of trapezoidal mould adjusting aluminum alloy mould plate absolute altitude

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2426136Y (en) * 1999-12-15 2001-04-04 许恒嘉 Height mark device for floor slab pouring
CN101089314A (en) * 2003-07-07 2007-12-19 邱则有 Hollow component for concrete
KR20120055856A (en) * 2010-11-24 2012-06-01 한국건설기술연구원 Making Method and Mold Device for Making Reverse Taper Shape Recess in Concrete
CN203594230U (en) * 2013-11-08 2014-05-14 广东一百建筑科技有限公司 Aluminum formwork adjusting device
CN204174932U (en) * 2014-09-29 2015-02-25 中建四局第三建筑工程有限公司 A kind of trapezoidal mould adjusting aluminum alloy mould plate absolute altitude

Also Published As

Publication number Publication date
CN105201206A (en) 2015-12-30

Similar Documents

Publication Publication Date Title
CN105926803B (en) A kind of 3D printing reinforced masonry shear wall structure with concave convex texture
CN103291001B (en) Control method and the mould therefor of floor reinforced bar mesh surface protection layer thickness
CN103628575A (en) Large-altitude-difference variable-section concrete structure construction joint and construction method thereof
CN102765122B (en) Curb production system and method
CN105201206B (en) Method and trapezoidal mold for adjusting elevation of aluminum alloy formwork
JP2014151926A5 (en)
CN203213597U (en) Built-in type formwork for cast-in-situ fair-faced concrete stairs
CN206109997U (en) Two -sided sliding chute device
CN204174932U (en) A kind of trapezoidal mould adjusting aluminum alloy mould plate absolute altitude
CN204435858U (en) Cast-in-place structural ater-casting typified form
CN204139466U (en) A kind of concrete prefabricated cushion block
CN107237436B (en) A kind of method of temporarily fixing when cavity floor is constructed
CN203755514U (en) Casting die structure
CN207775725U (en) A kind of special disposable light filling composite core mould of bridge
CN205857241U (en) Different-thickness raft plate underground structure with post-cast strip
CN207972104U (en) A kind of separately-loaded flowerpot frame molding die
CN202298565U (en) Template
CN106677419A (en) Manufacturing method of prefabricated concrete member with connecting steel bars
CN208563755U (en) A kind of precast hollow constructional column for wall connecting
CN201818048U (en) Disposable formwork for building construction
CN206256372U (en) The wet seam of bridge stops sizing device
CN204199692U (en) A kind of steel pipe making concrete hole
CN209308400U (en) A kind of rotten prevention and treatment system of wall
CN204418664U (en) A kind of frame construction constructional column steel form
CN103758092B (en) Quick construction method of concrete dam gallery

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Beijing road 563000 in Guizhou province Zunyi city Honghuagang District No. 57

Patentee after: The Third Construction Co., Ltd. of China Construction Fourth Engineering Bureau

Address before: Beijing road 563003 in Guizhou province Zunyi city Honghuagang District No. 57

Patentee before: THE THIRD CONSTRUCTION & ENGINEERING CO. OF CCFED