CN105201174B - Dried hanging hang structure is adjusted in steelframe - Google Patents

Dried hanging hang structure is adjusted in steelframe Download PDF

Info

Publication number
CN105201174B
CN105201174B CN201510580445.6A CN201510580445A CN105201174B CN 105201174 B CN105201174 B CN 105201174B CN 201510580445 A CN201510580445 A CN 201510580445A CN 105201174 B CN105201174 B CN 105201174B
Authority
CN
China
Prior art keywords
steel pipe
adjusted
steelframe
pedestal
strip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510580445.6A
Other languages
Chinese (zh)
Other versions
CN105201174A (en
Inventor
杨尔全
胡元刚
李波
袁优平
赵宏
陈朝立
孙传进
田小倩
唐晓烨
梁飞
邱志
谢国强
周经纬
周浩
王晓明
郭宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Gold Mantis Construction Decoration Co Ltd
Original Assignee
Suzhou Gold Mantis Construction Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Gold Mantis Construction Decoration Co Ltd filed Critical Suzhou Gold Mantis Construction Decoration Co Ltd
Priority to CN201510580445.6A priority Critical patent/CN105201174B/en
Publication of CN105201174A publication Critical patent/CN105201174A/en
Application granted granted Critical
Publication of CN105201174B publication Critical patent/CN105201174B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of steelframes, and dried hanging hang structure is adjusted, including vertical steel pipe, lateral steel pipe and angle steel, the vertical steel pipe and Bolted angle connection, it further includes cuffs that dried hanging hang structure, which is adjusted, in the steelframe, first connector and pedestal, the vertical steel pipe is equipped with vertical strip-shaped hole, the transverse direction steel pipe is connect by cuffs with vertical strip-shaped hole, cuffs can be moved with respect to vertical steel pipe, the pedestal is equipped with the first slot hole, the transverse direction steel pipe is equipped with lateral strip-shaped hole, lateral steel pipe is connect with pedestal by the first connector, first connector is arranged in the first slot hole and lateral strip-shaped hole, pedestal can relatively transverse steel pipe movement.The present invention improves the accuracy of installation, and cost of labor is relatively low;Lateral steel pipe can carry out finely tuning up and down, and deviation, which occurs, in in-site installation to be adjusted flexibly, and only need to adjust cross bar position, greatly reduce consumptive material.

Description

Dried hanging hang structure is adjusted in steelframe
Technical field
The present invention relates to a kind of decoration construction technology, more particularly to dried hanging hang structure is adjusted in a kind of steelframe.
Background technology
At present in building decoration installation field, to the cladding installation base keel construction of large area 3D moulding mainly with Shaped steel is welded as leading.For the moulding of plane big rise and fall, because of cladding corner brace length limitation, traditional steelframe welding production needs root It is made according to concave-convex rise and fall of molding surface, more demanding to the technical merit for making worker, space coordinate positioning needs to expend A large amount of manpower and materials, while welding job, there are serious security risk, operating personnel must have special work post operation licence Book, and be easy to cause fire when welding.
Invention content
The present invention in order to solve problems in the prior art, provides that a kind of cost of labor is relatively low, and installation can be adjusted flexibly, Dried hanging hang structure is adjusted convenient for the steelframe of adjusting.
Specific technical solution is as follows:A kind of adjustable dried hanging hang structure of steelframe, including vertical steel pipe, lateral steel pipe and angle steel, The vertical steel pipe and Bolted angle connection, it further includes cuffs, the first connector and pedestal that dried hanging hang structure, which is adjusted, in the steelframe, described Vertical steel pipe is equipped with vertical strip-shaped hole, and the transverse direction steel pipe is connect by cuffs with vertical strip-shaped hole, and cuffs can be relatively vertical Steel pipe moves, and the pedestal is equipped with the first slot hole, and the transverse direction steel pipe is equipped with lateral strip-shaped hole, and lateral steel pipe is logical with pedestal The connection of the first connector is crossed, the first connector is arranged in the first slot hole and lateral strip-shaped hole, and pedestal can relatively transverse steel pipe movement.
It is the attached technical scheme of the present invention below.
Preferably, it further includes corner brace and the second connector that dried hanging hang structure, which is adjusted, in the steelframe, and the corner brace is equipped with the Two slot holes, the second connector are arranged in the second slot hole and are connect with pedestal.
Preferably, the pedestal is equipped with extension, and extension is equipped with matching hole, and second connector, which is arranged in, matches Connect hole.
Preferably, the matching hole is strip-shaped hole.
Preferably, the pedestal is equipped with U-lag, and the first slot hole setting is in U-lag both sides, the transverse direction steel pipe receiving In U-lag.
Preferably, institute's cuffs includes groove, and the transverse direction steel pipe can be housed in the groove.
Preferably, the cuffs includes fastener and fixinig plate, and the fixinig plate is arranged in groove both sides, the fixinig plate It is connect with vertical strip-shaped hole by fastener.
Preferably, the fastener is to wearing fastening bolt.
The technique effect of the present invention:The present invention steelframe be adjusted dried hanging hang structure, improve the accuracy of installation, manually at This is relatively low;And professional's operation is not needed, popular construction improves speed of application, is conducive to standardized work;Secondly, horizontal It can carry out finely tuning up and down to steel pipe, deviation, which occurs, in in-site installation to be adjusted flexibly, and only need to adjust cross bar position, greatly Reduce consumptive material;Using lateral steel pipe lateral strip-shaped hole carry out left and right adjusting, it is front and back carry out it is secondary extension have enough tune Pitch is from meeting the cladding demand of Different Plane finishing material.
Description of the drawings
Fig. 1 is the schematic diagram that dried hanging hang structure is adjusted in steelframe of the present invention.
Fig. 2 is another schematic diagram that dried hanging hang structure is adjusted in steelframe of the present invention.
Fig. 3 is the exploded view that dried hanging hang structure is adjusted in steelframe of the present invention.
Specific implementation mode
The present invention will be further described below in conjunction with the accompanying drawings.
As shown in Figure 1 to Figure 3, it includes vertical steel pipe 1,2 He of lateral steel pipe that dried hanging hang structure, which is adjusted, in the steelframe of the present embodiment Angle steel 3, the vertical steel pipe 1 with angle steel 3 by being connect to wearing part 31, by expansion bolt 32 and wall 100 fixed by angle steel 3, To which vertical steel pipe 1 is fixed on wall 100.It further includes cuffs 4, the first connector 5 that dried hanging hang structure, which is adjusted, in the steelframe With pedestal 6, the vertical steel pipe 1 is equipped with multiple vertical strip-shaped holes 11, and the transverse direction steel pipe 2 passes through cuffs 4 and vertical bar shaped Hole 11 connects, to which when installing lateral steel pipe 2, cuffs 4 can be moved with respect to vertical steel pipe 1, and lateral steel pipe 2 can carry out downward Section, if there is installation deviation, can facilitate to be adjusted.For being connect with decoration panel 200, pedestal 6 is equipped with the pedestal 6 First slot hole 61, the transverse direction steel pipe 2 are equipped with lateral strip-shaped hole 21, and lateral steel pipe 2 is connected with pedestal 6 by the first connector 5 It connects.First connector 5 is arranged in the first slot hole 61 and lateral strip-shaped hole 21, so that pedestal 6 can the fortune of relatively transverse steel pipe 2 It is dynamic, left, right, front and rear adjusting is carried out, more position installations may be implemented.The transverse direction strip-shaped hole 21 is arranged in lateral steel pipe 2 Opposite two faces on, in the present embodiment, the transverse direction steel pipe 2 and vertical steel pipe 1 are multi-hole square tube.
Further, it further includes corner brace 7 and the second connector 8 that dried hanging hang structure, which is adjusted, in the steelframe, is set in the corner brace 7 There are the second slot hole 71, the second connector 8 to be arranged in the second slot hole 71 and connect with pedestal 6.Pass through the second slot hole in corner brace 7 71 can carry out secondary extension when can realize front and back adjust, and increase adjustable range, meet the cladding demand of different finishing materials.It is described Pedestal 6 is equipped with extension 62, and extension 62 is equipped with matching hole 621, and second connector 8 is arranged in matching hole 621, institute It is strip-shaped hole to state matching hole 621.Adjustable range can be further expanded by extension 62.The pedestal 6 is equipped with U-lag 63, institute The setting of the first slot hole 61 is stated in 63 both sides of U-lag, the transverse direction steel pipe 2 is housed in U-lag 63, to make lateral steel pipe 2 can It is so more firm that be connect with pedestal 6.Institute's cuffs 4 includes groove 41, and the transverse direction steel pipe 2 can be housed in the groove 41 so that Lateral steel pipe 2 connect more firm with vertical steel pipe 1.The cuffs 4 further includes fastener 42 and fixinig plate 43, the fixinig plate 43 It is arranged in 41 both sides of groove, the fixinig plate 43 is connect by fastener 42 with vertical strip-shaped hole 11, and the fastener 42 is pair Fastening bolt is worn, consequently facilitating the connection of cuffs 4 and vertical steel pipe 1.In the present embodiment, first connector 5, the second connection Part 8 is to wearing fastening bolt to wearing part 31;The strip-shaped hole and slot hole refer to the trepanning for having certain length.
Dried hanging hang structure is adjusted in the steelframe of the present embodiment, improves the accuracy of large-scale Different Plane 3D moulding installation, section About a large amount of man power and material weld, antirust treatment, cost of labor is relatively low.And professional's operation is not needed, greatly Crowdization is constructed, and speed of application is improved, and is conducive to standardized work;Secondly, lateral steel pipe can carry out finely tuning up and down, and in-site installation goes out Existing deviation can be adjusted flexibly, and only need to adjust cross bar position, greatly reduce consumptive material;Using the lateral bar shaped of lateral steel pipe Hole carry out left and right adjusting, it is front and back carry out it is secondary extension have enough adjustable ranges, meet the cladding of Different Plane finishing material Demand.Dried hanging hang structure material uses hot rolling galvanized steel strip one-step die casting, and perception is beautiful, durable, securely and reliably.
It is pointed out that the technical concepts and features of above-mentioned preferred embodiment only to illustrate the invention, its object is to Those skilled in the art can understand the contents of the present invention and implements according to this, and the protection of the present invention can not be limited with this Range.Any equivalent change or modification in accordance with the spirit of the invention should be covered by the protection scope of the present invention.

Claims (7)

1. dried hanging hang structure, including vertical steel pipe, lateral steel pipe and angle steel is adjusted in a kind of steelframe, the vertical steel pipe connects with angle steel It connects, it is characterised in that:It further includes cuffs, the first connector and pedestal, the vertical steel pipe that dried hanging hang structure, which is adjusted, in the steelframe It is equipped with vertical strip-shaped hole, the transverse direction steel pipe is connect by cuffs with vertical strip-shaped hole, and cuffs can be moved with respect to vertical steel pipe, The pedestal is equipped with the first slot hole, and the lateral steel pipe is equipped with lateral strip-shaped hole, and every lateral steel pipe is equipped with two groups of transverse directions Strip-shaped hole, two groups of transverse direction strip-shaped holes are oppositely arranged, and lateral steel pipe is connect with pedestal by the first connector, and the pedestal is equipped with U Shape slot, first slot hole setting are housed in U-lag both sides, the transverse direction steel pipe in U-lag, and the first connector is arranged in the One slot hole and lateral strip-shaped hole, pedestal can relatively transverse steel pipe movements.
2. dried hanging hang structure is adjusted in steelframe as described in claim 1, it is characterised in that:Dried hanging hang structure is adjusted also in the steelframe Including corner brace and the second connector, the corner brace be equipped with the second slot hole, the second connector be arranged in the second slot hole and with bottom Seat connection.
3. dried hanging hang structure is adjusted in steelframe as claimed in claim 2, it is characterised in that:The pedestal is equipped with extension, prolongs Extending portion is equipped with matching hole, and second connector is arranged in matching hole.
4. dried hanging hang structure is adjusted in steelframe as claimed in claim 3, it is characterised in that:The matching hole is strip-shaped hole.
5. dried hanging hang structure is adjusted in the steelframe as described in any claim in Claims 1-4, it is characterised in that:Institute's cuffs Including groove, the transverse direction steel pipe can be housed in the groove.
6. dried hanging hang structure is adjusted in steelframe as claimed in claim 5, it is characterised in that:The cuffs includes fastener and fixation Piece, the fixinig plate are arranged in groove both sides, and the fixinig plate is connect by fastener with vertical strip-shaped hole.
7. dried hanging hang structure is adjusted in steelframe as claimed in claim 6, it is characterised in that:The fastener is to wearing fastening spiral shell Bolt.
CN201510580445.6A 2015-09-14 2015-09-14 Dried hanging hang structure is adjusted in steelframe Active CN105201174B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510580445.6A CN105201174B (en) 2015-09-14 2015-09-14 Dried hanging hang structure is adjusted in steelframe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510580445.6A CN105201174B (en) 2015-09-14 2015-09-14 Dried hanging hang structure is adjusted in steelframe

Publications (2)

Publication Number Publication Date
CN105201174A CN105201174A (en) 2015-12-30
CN105201174B true CN105201174B (en) 2018-07-13

Family

ID=54949101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510580445.6A Active CN105201174B (en) 2015-09-14 2015-09-14 Dried hanging hang structure is adjusted in steelframe

Country Status (1)

Country Link
CN (1) CN105201174B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113463869A (en) * 2021-07-07 2021-10-01 浙江亚厦装饰股份有限公司 Multi-curved-surface adjustable GRG hanging plate and mounting method thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101197548B1 (en) * 2009-05-18 2012-11-09 (주)석촌 Apparatus for fixing stone panel
CN102312541A (en) * 2011-06-29 2012-01-11 苏州金螳螂建筑装饰股份有限公司 Vertical-surface stone dry-hang installing system
KR20140045754A (en) * 2012-10-09 2014-04-17 권종길 Constructing apparatus for exterior panel of outer wall in buildings
CN103276871B (en) * 2013-05-29 2015-05-20 常熟市金龙装饰有限责任公司 Modularized splice type steel keel structure for veneer decoration and construction method thereof
CN204983518U (en) * 2015-09-14 2016-01-20 苏州金螳螂建筑装饰股份有限公司 Adjustable structure of hanging futilely of steelframe

Also Published As

Publication number Publication date
CN105201174A (en) 2015-12-30

Similar Documents

Publication Publication Date Title
CN105201174B (en) Dried hanging hang structure is adjusted in steelframe
CN206800622U (en) A kind of assembled integral concrete shear force wall balcony attachment structure
CN104372911A (en) Multi-direction adjustable assembly of decorative plate
CN206873739U (en) A kind of triangular element formula aluminium sheet installation of ceiling fixing device
CN206233420U (en) A kind of installation system of back-bolt type stone curtain wall
CN204899108U (en) Node structure is hung futilely to marble
CN204983518U (en) Adjustable structure of hanging futilely of steelframe
CN106088516A (en) A kind of double hook sheet material metope hanger structure and installation method thereof
CN206053093U (en) Furred ceiling component
CN205840303U (en) A kind of button bar adaptor
CN102953498A (en) Plastic grid ceiling system
CN204754267U (en) Adhere to molding die utensil formula and prevent guardrail bar based on buckle
CN207846823U (en) A kind of construction and decoration indoor suspended ceiling horizontal position adjustment component
CN204899049U (en) Curved surface glass daylighting roof system
CN204199554U (en) Adjustable eaves plaque support
CN207244463U (en) A kind of adjustable guardrail template
CN208748926U (en) A kind of device for hanging installation for curtain wall and point
CN207620297U (en) A kind of insulating decoration integral board for building exterior wall corner brace Combined hanger
CN219569442U (en) Integrated plate composite hanging piece structure
CN207921720U (en) A kind of steel reinforced type steel firm banking
CN206110421U (en) Stone material curtain adjustable combination pendant is hung futilely to back of body bolt formula
CN207672840U (en) Steel construction ceiling
CN207079858U (en) It is interior to hang fast keel
CN205685507U (en) Button type extensible member for building
CN205153127U (en) Stabilize steel construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant