CN106088516A - A kind of double hook sheet material metope hanger structure and installation method thereof - Google Patents

A kind of double hook sheet material metope hanger structure and installation method thereof Download PDF

Info

Publication number
CN106088516A
CN106088516A CN201610620283.9A CN201610620283A CN106088516A CN 106088516 A CN106088516 A CN 106088516A CN 201610620283 A CN201610620283 A CN 201610620283A CN 106088516 A CN106088516 A CN 106088516A
Authority
CN
China
Prior art keywords
suspension member
hook
sheet material
connecting plate
disjunctor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610620283.9A
Other languages
Chinese (zh)
Inventor
黄超伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610620283.9A priority Critical patent/CN106088516A/en
Publication of CN106088516A publication Critical patent/CN106088516A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0832Separate fastening elements without load-supporting elongated furring elements between wall and covering elements
    • E04F13/0853Separate fastening elements without load-supporting elongated furring elements between wall and covering elements adjustable perpendicular to the wall
    • E04F13/0855Separate fastening elements without load-supporting elongated furring elements between wall and covering elements adjustable perpendicular to the wall adjustable in several directions, one of which is perpendicular to the wall

Abstract

The invention discloses a kind of double hook sheet material metope hanger structure and installation method thereof, including support member, disjunctor suspension member, suspension member can be raised and suspension member can be lowered, support member includes the cooperate gripper shoe forming inverted L shape structure and metope connecting plate, and metope connecting plate is provided with vertical kidney slot for support member is connected and fixed on wall;Gripper shoe connects the connection flat board of disjunctor suspension member one end;Disjunctor suspension member includes connecting flat board and about two hook-shaped grooves being distributed, and wherein connects flat board and is provided with the horizontal kidney slot connecting fixed support plate, and two hook-shaped grooves extend the most in left-right direction;Suspension member can be raised with can lower suspension member be all formed with sheet material connecting plate and hook bar, sheet material connecting plate all be reserved with connect dalle vertical kidney slot, hook bar extends the most in left-right direction and coordinate with hook-shaped groove composition left and right directions on being slidably connected.This suspension member is reasonable in design, can all around move up and down, and is suitable for irregular metope, environmental protection, stablizes firmly.

Description

A kind of double hook sheet material metope hanger structure and installation method thereof
Technical field
The present invention relates to construction wall decoration technique field, especially relate to a kind of double hook sheet material metope hanger structure and Its installation method.
Background technology
Along with the development of society, building industry develops the most therewith with decoration market, and the kind of wall decorating plate is also got over Coming the most diversified, the most more common have stone material, pottery, timber and a composite board etc., and the most traditional wallboard, decorative panel Paste installation have that consumptive material is many, time length, pollute destroy big with change the shortcomings such as trouble, therefore people work out employing suspension member Method, i.e. by being connected and fixed on suspension member by wallboard, then is fixed on suspension member on wall, has so reached province's material and has saved time, more Change the purposes such as convenient;But in existing suspension member technology, many suspension members just can not move forward and backward after fixing on the wall up and down, difficult To adapt to irregular metope, and the specification of suspension member is fixed, it is difficult to installs the wallboard of many variety classes specifications, also has, wall Plate is often to be mounted on suspension member by suspension member component, and the flatness the most easily making wallboard is relatively low, causes wallboard After installation built on the sand, safety and the durability that wallboard uses is reduced.
Summary of the invention
For the deficiencies in the prior art, it is an object of the invention to provide the wall of a kind of applicable multiple variety classes specification Plate, removable and use double hook sheet material metope suspension members safer, that the life-span is longer and installation method thereof.
To achieve these goals, the scheme that the present invention provides is: a kind of double hook sheet material metope hanger structures and peace thereof Dress method, including support member, disjunctor suspension member, can raise suspension member and can lower suspension member, it is characterised in that: described support member includes phase Interworking is combined into gripper shoe and the metope connecting plate of inverted L shape structure, and described metope connecting plate is provided with and suspension member can be made to move up and down Vertical kidney slot for support member is connected and fixed on wall;Described gripper shoe connects the connection of described disjunctor suspension member one end and puts down Plate;Described disjunctor suspension member includes connecting flat board and about two hook-shaped grooves being distributed, and wherein said connection flat board is provided with connection The horizontal kidney slot of fixed support plate, can make disjunctor suspension member move forward and backward, and described in two, hook-shaped groove extends the most in left-right direction;Described Suspension member can be raised with can lower suspension member be all formed with sheet material connecting plate and hook bar, described sheet material connecting plate all be reserved with connection dress The vertical kidney slot of decoratice board, described hook bar extends the most in left-right direction and coordinates the cunning constituted on left and right directions with hook-shaped groove Being dynamically connected, the hook bar that wherein can raise suspension member forms in the downside of its sheet material connecting plate, and the hook bar that can lower suspension member shapes Upside in its sheet material connecting plate.
Further, described disjunctor suspension member upper and lower both sides hook-shaped groove is equipped with connecting hole, is used for institute by lock-bit part State and can raise suspension member and described suspension member of lowering and be fixed on hook-shaped groove.
Further, described hook-shaped groove is equipped with slip plastic cement with the junction described raising suspension member, can lower suspension member Bar, is used for making described to raise suspension member, can lowering suspension member and be close to described hook-shaped groove.
Further, the described L-shaped structure of sheet material connecting plate raising suspension member.
Further, the described sheet material connecting plate lowering suspension member is inverted l-shaped structure.
The present invention also provides for the installation method of this pair of hook sheet material metope hanger structure: first support member is installed on body of wall On, then by disjunctor suspension member connect plate alignment place connect in the gripper shoe of support member fixing, then can raise suspension member with The hook bar that can lower suspension member is individually placed in the hook-shaped groove of correspondence, completes the installation of wall decoration suspension member;Carry out dalle Installation time, use the adjustable lower pendant of a wall decoration suspension member jointly to install with the raised suspension member of another wall decoration suspension member Fixing dalle.
The invention have the benefit that 1, smart structural design reasonable, suspension member can all around move up and down, the most adjustable Distance between joint wallboard and metope, it is also possible to adapt to irregular metope, solve owing to metope out-of-flatness causes making up By situation about increasing;2, meet the building requirements of national regulation, building and indoor and outdoor furnishing fields can be widely used in, this Bright suspension member uses the component of a suspension member to be jointly connected fixing wallboard, simultaneously structure with the component of another suspension member with wallboard junction Part is provided with kidney slot, fixation, it is ensured that the stability that wallboard is installed, and also can install the wall of many variety classes specifications Plate, and the suspension member environmental protection of the present invention, save material save time, good concealment, do not affect the attractive in appearance of metope.
Accompanying drawing explanation
Fig. 1 is the three-dimensional structure diagram of the present invention.
Fig. 2 is the front view of the present invention.
Fig. 3 is the side view of the present invention.
Fig. 4 is the top view of the present invention.
Fig. 5 is the rearview of the present invention.
Fig. 6 is the side view that the present invention coordinates with body of wall and dalle.
Fig. 7 is the three-dimensional structure diagram of the raised suspension member of the present invention.
Fig. 8 is the three-dimensional structure diagram of the suspension member lowered of the present invention.
Fig. 9 is the three-dimensional structure diagram of the slip plastic strip of the present invention.
Figure 10 is the three-dimensional structure diagram of the disjunctor suspension member of the present invention.
Figure 11 is the three-dimensional structure diagram of the support member of the present invention.
Wherein 1 for can raise suspension member, and 2 is fixture, and 3 is slip plastic strip, and 4 is connection hanging piece, and 41 for connecting flat board, and 5 For lowering suspension member, 6 is setscrew, and 7 is support member, and 71 is metope connecting plate, and 72 is gripper shoe, and 8 is fixed screw, and 9 are Lock-bit part, 10 is kidney slot, and 11 is hook-shaped groove, and 12 is dalle, and 13 is body of wall.
Specific embodiments
Below in conjunction with specific embodiment, the invention will be further described:
See suspension member graphics shown in accompanying drawing 1 to accompanying drawing 2, a kind of double hook sheet material metope hanger structures described in the present embodiment and Its installation method, including raising suspension member 1, can lower suspension member 5, support member 7 and disjunctor suspension member 4, wherein support member 7 includes metope Connecting plate 71 and gripper shoe 72(see accompanying drawing 11), and metope connecting plate 71 is provided with the kidney slot 10 that suspension member can be made to move up and down For support member 7 is connected and fixed on wall;Disjunctor suspension member 4 includes connecting flat board 41 and about two hook-shaped groove being distributed (ginsengs See accompanying drawing 10), the flat board 41 that connects of one end is connected with the gripper shoe 72 of support member 7, and connects that be provided with on flat board 41 can the company of making The movable kidney slot of body suspension member 4, this groove is for being connected and fixed on gripper shoe 72 by fixed screw 8 by disjunctor suspension member 4; Disjunctor suspension member 4 other end upper and lower sides be all formed with for place the hook-shaped groove 11 that can raise suspension member 1 and suspension member 5 can be lowered simultaneously should Groove extends in left-right direction, and hook-shaped groove 11 can make to raise suspension member 1 and move left and right in groove with lowering suspension member 5, also has this groove Sidewall is provided with connecting hole placement can raise suspension member 1 and the lock-bit part 9 that can lower suspension member 3, hook-shaped groove simultaneously for fixing locking 11 with can raise suspension member 1, can lower suspension member 5 junction be provided with see accompanying drawing 9 for the plastic strip 3(that slides) be used for being adjacent to fixing before State suspension member.
See accompanying drawing 3 to accompanying drawing 5, suspension member 1(can be raised and see accompanying drawing 7) with can lower suspension member 5(and see accompanying drawing 8) all shape Having sheet material connecting plate and hook bar, sheet material connecting plate is all reserved with the vertical kidney slot connecting dalle 12, links up with the equal edge of bar Left and right directions extends and coordinates being slidably connected on composition left and right directions with hook-shaped groove 11, wherein can raise the hook bar of suspension member 1 Forming in the downside of its sheet material connecting plate, the hook bar that can lower suspension member 5 forms in the upside of its sheet material connecting plate.
Seeing accompanying drawing 6, described in the present embodiment, the installation process of double hook sheet material metope suspension members is: first pacified by support member 7 It is loaded on body of wall 13, then aligns to place to connect in the gripper shoe 72 of support member 7 by the connection flat board 41 of disjunctor suspension member 4 and fix, Again the hook bar that can raise suspension member 1 and can lower suspension member 5 is individually placed in corresponding hook-shaped groove 11, completes wall decoration suspension member Installation;When carrying out the installation of dalle 12, by fixture 2, use the adjustable lower pendant 5 of a wall decoration suspension member simultaneously With the raised suspension member 1 of another wall decoration suspension member, fixing dalle 12 is installed jointly.
The L-shaped structure of sheet material connecting plate of suspension member 1 can be raised;The sheet material connecting plate that can lower suspension member 5 is inverted l-shaped structure; Aforementioned fixture 2 is back of the body bolt screw, and lock-bit part 9 is limited screw, and disjunctor suspension member 4 and support member 7 are by fixed screw 8 and spiral shell Female is fixedly connected.
The embodiment of the above is only presently preferred embodiments of the present invention, and the present invention not does any pro forma limit System.Any those of ordinary skill in the art, without departing under technical solution of the present invention ambit, may utilize the disclosure above Technology contents technical solution of the present invention is made more possible variation and retouching, or be revised as the equivalence enforcement of equivalent variations Example.Therefore all contents without departing from technical solution of the present invention, the equivalent equivalence change made according to the thinking of the present invention, all should contain In protection scope of the present invention.

Claims (6)

1. double hook sheet material metope hanger structures, including support member (7), disjunctor suspension member (4), can raise suspension member (1) with can Lower suspension member (5), it is characterised in that: described support member (7) includes cooperating and forms gripper shoe (72) and the wall of inverted L shape structure Face connecting plate (71), described metope connecting plate (71) is provided with the vertical kidney slot (10) that suspension member can be made to move up and down for propping up Support member (7) is connected and fixed on wall;Described gripper shoe (72) connects the connection flat board (41) of described disjunctor suspension member (4) one end;Institute State disjunctor suspension member (4) to include connecting flat board (41) and about two hook-shaped grooves (11) being distributed, wherein said connection flat board (41) It is provided with the horizontal kidney slot connecting fixed support plate (72), disjunctor suspension member (4) can be made to move forward and backward, hook-shaped groove described in two (11) All become and extend in left-right direction;Described raise suspension member (1) and suspension member (5) can be lowered all be formed with sheet material connecting plate and hook Bar, described sheet material connecting plate is all reserved with the vertical kidney slot connecting dalle, and described hook bar extends the most in left-right direction And being slidably connected on composition left and right directions is coordinated with hook-shaped groove (11), the hook bar that wherein can raise suspension member (1) forms in it The downside of sheet material connecting plate, the hook bar that can lower suspension member (5) forms in the upside of its sheet material connecting plate.
One the most according to claim 1 double hook sheet material metope hanger structure, it is characterised in that: described disjunctor suspension member (4) it is equipped with connecting hole, for raising suspension member (1) and institute by lock-bit part (9) by described on upper and lower both sides hook-shaped groove (11) State and can lower suspension member (5) and be fixed on hook-shaped groove (11).
One the most according to claim 1 double hook sheet material metope hanger structure, it is characterised in that: described hook-shaped groove (11) It is equipped with slip plastic strip (3) with the junction described raising suspension member (1), can lower suspension member (5), is used for making described can raising Suspension member (1), suspension member (5) can be lowered it is close to described hook-shaped groove (11).
One the most according to claim 1 double hook sheet material metope hanger structure, it is characterised in that: described raise suspension member (1) the L-shaped structure of sheet material connecting plate.
One the most according to claim 1 double hook sheet material metope hanger structure, it is characterised in that: described lower suspension member (5) sheet material connecting plate is inverted l-shaped structure.
6. the installation method of double hook sheet material metope hanger structures as claimed in claim 1, it is characterised in that: first will Support member (7) is installed on body of wall (13), is then alignd by the connection flat board (41) of disjunctor suspension member (4) and places support member (7) Gripper shoe (72) is upper to be connected fixing, then can raise suspension member (1) and is individually placed to corresponding hook with the hook bar that can lower suspension member (5) In shape groove (11), complete the installation of wall decoration suspension member;When carrying out the installation of dalle (12), use a wall decoration suspension member The raised suspension member (1) of adjustable lower pendant (5) and another wall decoration suspension member fixing dalle (12) is installed jointly.
CN201610620283.9A 2016-08-02 2016-08-02 A kind of double hook sheet material metope hanger structure and installation method thereof Pending CN106088516A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610620283.9A CN106088516A (en) 2016-08-02 2016-08-02 A kind of double hook sheet material metope hanger structure and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610620283.9A CN106088516A (en) 2016-08-02 2016-08-02 A kind of double hook sheet material metope hanger structure and installation method thereof

Publications (1)

Publication Number Publication Date
CN106088516A true CN106088516A (en) 2016-11-09

Family

ID=57478180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610620283.9A Pending CN106088516A (en) 2016-08-02 2016-08-02 A kind of double hook sheet material metope hanger structure and installation method thereof

Country Status (1)

Country Link
CN (1) CN106088516A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107013005A (en) * 2017-05-17 2017-08-04 张志军 Dry-hanging component and apply its dried hanging method
CN107013006A (en) * 2017-05-17 2017-08-04 张志军 Dry-hanging component and its application method
CN112942720A (en) * 2021-01-27 2021-06-11 青岛比佐迪家居有限公司 Hanging part system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2451647Y (en) * 2000-11-28 2001-10-03 林富商 Apparatus for building wall stone material construction
CN201254808Y (en) * 2008-03-20 2009-06-10 上海江蓝实业有限公司 Light composite thermal insulation curtain wall plate wall decoration
CN202595967U (en) * 2012-04-18 2012-12-12 天津市皇冠幕墙装饰有限公司 Curtain wall stone hanging piece system
WO2015010493A1 (en) * 2013-07-22 2015-01-29 Xie Xiaobin Wall brick installation structure and wall brick installation method
CN105484466A (en) * 2015-11-19 2016-04-13 李剑峰 Point-supporting-type stone suspension member
CN205330072U (en) * 2015-12-31 2016-06-22 深圳市卓艺装饰设计工程有限公司 But panel hook structure of multidimension adjustment and locking
CN105888179A (en) * 2016-06-03 2016-08-24 中冶建工集团有限公司 Facing brick dry-hanging structure and facing brick dry-hanging technology
CN205875593U (en) * 2016-08-02 2017-01-11 黄超伟 Two hook plate material wall pendant structures

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2451647Y (en) * 2000-11-28 2001-10-03 林富商 Apparatus for building wall stone material construction
CN201254808Y (en) * 2008-03-20 2009-06-10 上海江蓝实业有限公司 Light composite thermal insulation curtain wall plate wall decoration
CN202595967U (en) * 2012-04-18 2012-12-12 天津市皇冠幕墙装饰有限公司 Curtain wall stone hanging piece system
WO2015010493A1 (en) * 2013-07-22 2015-01-29 Xie Xiaobin Wall brick installation structure and wall brick installation method
CN105484466A (en) * 2015-11-19 2016-04-13 李剑峰 Point-supporting-type stone suspension member
CN205330072U (en) * 2015-12-31 2016-06-22 深圳市卓艺装饰设计工程有限公司 But panel hook structure of multidimension adjustment and locking
CN105888179A (en) * 2016-06-03 2016-08-24 中冶建工集团有限公司 Facing brick dry-hanging structure and facing brick dry-hanging technology
CN205875593U (en) * 2016-08-02 2017-01-11 黄超伟 Two hook plate material wall pendant structures

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107013005A (en) * 2017-05-17 2017-08-04 张志军 Dry-hanging component and apply its dried hanging method
CN107013006A (en) * 2017-05-17 2017-08-04 张志军 Dry-hanging component and its application method
CN107013006B (en) * 2017-05-17 2019-08-16 内蒙古北方时代设计研究院股份有限公司 Dry-hanging component and its application method
CN112942720A (en) * 2021-01-27 2021-06-11 青岛比佐迪家居有限公司 Hanging part system

Similar Documents

Publication Publication Date Title
CN106088516A (en) A kind of double hook sheet material metope hanger structure and installation method thereof
CN104018610B (en) Suspended ceiling
CN205875593U (en) Two hook plate material wall pendant structures
CN205046799U (en) Dry pendant of decorative board
CN104179282A (en) Suspended ceiling
CN207177178U (en) A kind of single hook sheet material metope hanger structure
CN205954981U (en) Connection of use can be made up and piece is increased
CN104032914A (en) Suspended ceiling section bar
CN204343521U (en) A kind of decoration panel connector of dark keel furred ceiling
CN203008295U (en) Multi-column-shaped insertion type multi-purpose pendant
CN207277770U (en) A kind of prefabricated gypsum suspended ceiling member and integral prefabricated gypsum furred ceiling
CN206256578U (en) A kind of dry hanging stone structure
CN205421802U (en) Mould polyvinyl chloride in fact and decorate combination panel
CN214614961U (en) General embedded decorative board mosaic structure of furred ceiling
CN205046785U (en) Square profile brick of environmental protection and energy saving
CN203867112U (en) Dry-hanging wall tile structure
CN210342531U (en) Three-dimensional combined ceramic modeling installation structure
CN204199518U (en) Position, angle syndeton and secondary furred ceiling
CN206352379U (en) Indoor wall decorating structure
CN207405849U (en) Integrated modular flat-top
CN207620297U (en) A kind of insulating decoration integral board for building exterior wall corner brace Combined hanger
CN204940770U (en) A kind of dry-hang stone being applicable to low carrying metope
CN206337776U (en) A kind of decorating structure of metope
CN207392634U (en) A kind of built-in hung and buckled combination inside lock wallboard installing structure
CN208769423U (en) A kind of finishing uses wall hook

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161109

RJ01 Rejection of invention patent application after publication