CN105201010B CN201510641831.1A CN201510641831A CN105201010B CN 105201010 B CN105201010 B CN 105201010B CN 201510641831 A CN201510641831 A CN 201510641831A CN 105201010 B CN105201010 B CN 105201010B
Authority
CN
China
Prior art keywords
construction
steel
blower fan
steel construction
pile foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510641831.1A
Other languages
Chinese (zh)
Other versions
CN105201010A (en
Inventor
朱斌
汤旅军
章刘洋
吴建国
祝周杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Energy Source In China Construction Group Zhejiang Province Power Design Institute Co Ltd
Zhejiang University ZJU
Original Assignee
Energy Source In China Construction Group Zhejiang Province Power Design Institute Co Ltd
Zhejiang University ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Energy Source In China Construction Group Zhejiang Province Power Design Institute Co Ltd, Zhejiang University ZJU filed Critical Energy Source In China Construction Group Zhejiang Province Power Design Institute Co Ltd
Priority to CN201510641831.1A priority Critical patent/CN105201010B/en
Publication of CN105201010A publication Critical patent/CN105201010A/en
Application granted granted Critical
Publication of CN105201010B publication Critical patent/CN105201010B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Wind Motors (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a kind of offshore wind turbine assembled taper pile basis.Including blower fan tower barrel, steel pile foundation and the conversion steel construction being connected between steel pile foundation and blower fan tower barrel, steel pile foundation is tilted to blower fan tower barrel and installed, and blower fan tower barrel, steel pile foundation are connected by ring flange with conversion steel construction respectively;Conversion steel construction is the fork-shaped structure for including multiple welding branches around central tube and central tube, and each branch bottom is coaxially connected by ring flange and steel pile foundation top, and central tube top is coaxially connected by ring flange and blower fan tower barrel bottom.Bearing capacity of the present invention is strong, reliability is high, fatigue performance is good, without Site Welding and grouting, and the requirement to engineering equipment and construction technology is relatively low.

Description

Offshore wind turbine assembled taper pile basis
Technical field
The present invention relates to a kind of pile foundation structure, a kind of more particularly to offshore wind turbine assembled taper pile basis is applicable In the larger blower fan of installed capacity and the deeper marine site of the depth of water.
Background technology
Wind energy be quickly grow at present, one of the regenerative resource that industrial prospect is best.Because marine wind speed is big, wind-force is held Stable and wind energy yield is high long, and less wind turbulent flow is small to Wind turbines life consumption, and wind-driven generator is built and using by soil Ground, ambient noise restriction are weaker, and Wind turbines move towards trend of the marine and maximization as international Wind Power Development from land.
Current offshore wind turbine typically using large diameter single pile foundation, tripod basis and four foot stools basis, jacket basis, The base forms such as High-Rise Pile Cap Foundation.But in actual application, because what each of which structure existed in itself various asks Topic, all more or less constrains their popularization and application.
Large diameter single pile foundation:Although its foundation structure stress is simple, convenient processing and manufacture, its stake footpath is big, High (need to introduce large hydraulic pile hammer) is required to construction equipment, special geology pile sinking difficulty is big;By seabottom geology condition and water Deep binding is larger, and water is too deep large curved deformation easily occurs;It is very sensitive to washing away, need well-designed protection against erosion measure;For a long time Stake horizontal distortion calculates theoretical imperfection under cyclic load.
Tripod basis and four foot stools basis:They have structure integral rigidity big, are applicable the wide advantage of depth of water scope.But It is that during practice of construction, the grouting connection construction difficulty between stake and tripod or four foot stools is very big, seriously hinders Their popularization and application;Their key dimension is big, it is necessary to which preprocessing place is larger;Rod member is more, it is necessary to lift welding;Structure Node is more, and commissure reason workload is big;Substantially, there is node fatigue rupture risk in welding node stress concentration;Basic leveling It is difficult, it is both needed to levelling device and pile clamping device under apolegamy dedicated water on general every pile.
Jacket basis:Due to big, small, larger suitable for the depth of water by environmental loads such as wave currents with structure integral rigidity The advantages of marine site, increasingly it is taken seriously in recent years.But it is the same with tripod basis or four foot stools basis, stake and jacket it Between grouting connection equally annoying design and construction personnel;Its key dimension is big, it is necessary to which preprocessing place is larger simultaneously;Bar Part is more, it is necessary to lift welding;Need to set more complicated transition connecting structure;Power transmission is complex;Node fatigue problem is dashed forward Go out;Basic leveling is difficult.
High-Rise Pile Cap Foundation:Comparatively the construction equipment of this kind of base form and experience be ripe, basis and blower fan tower barrel Connection is similar with land blower fan.But its bearing platform construction needs steel jacket box, reinforcing bar cage hoisting and concrete stirring etc. are a variety of to arrange Apply, curing time is long;During casting of concrete in mass, large area thermal cracking and contraction fissure easily are produced on cushion cap surface, Influence suspended deck structure durability;Large volume concrete structural high cantilever, antidetonation is unfavorable;Cost is big, long construction period.
Analyzed based on more than, nowadays lack the new pile foundation form of a kind of safe and reliable, easy construction, economical rationality, To promote offshore wind farm to advance more quickly.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of offshore wind turbine assembled taper pile basis, it is by blower fan tower The new steel structure basis suitable for offshore wind turbine foundation of cylinder, steel pile foundation and conversion steel construction composition.
The present invention solves above-mentioned existing gravity type foundation, single-pile foundation, tripod basis or four foot stools basis, conduit The problems of base form such as frame basis and High-Rise Pile Cap Foundation.
The technical solution of the present invention is as follows:
The present invention includes blower fan tower barrel, steel pile foundation and the conversion steel knot being connected between steel pile foundation and blower fan tower barrel Structure, steel pile foundation is tilted to blower fan tower barrel and installed, and blower fan tower barrel, steel pile foundation are connected by ring flange with conversion steel construction respectively Connect.
The conversion steel construction is the fork-shaped structure for including multiple welding branches around central tube and central tube, each Branch bottom is coaxially connected by ring flange and steel pile foundation top, and central tube top passes through ring flange and blower fan tower barrel bottom It is coaxially connected.
Branch's oblique weld of described conversion steel construction is to central tube side wall.
Described conversion steel construction has three branches, and three branches are mutually 120 degree.
Described conversion steel construction has four branches, and four branches are mutually 90 degree.
Described steel pile foundation is taper pile, and the scope of its gradient is 1/5~1/7.
Described steel construction of changing changes steel construction into lattice, is arranged on more than splash zone.
Described steel pile foundation is round steel pile tube.
The present invention has the following advantages compared with prior art:
1) compared with existing gravity type foundation and single-pile foundation, it is more suitable for, and the wind-powered electricity generation site depth of water is deeper, installs and holds The bigger Wind turbines of amount, with more preferable Stability and dependability;
2) compared with existing tripod basis, High-Rise Pile Cap Foundation and jacket basis, basic shape proposed by the present invention Formula is more concise, all has obvious advantage in terms of stability and fatigue resistance, and due to the big portion of its component Divide and use factory-made component, it is not necessary to scene grouting, reduce site operation risk and difficulty, shorten the construction period.
Conversion steel construction and taper pile basis designed by the present invention, can be dexterously by the horizontal loading suffered by superstructure The moment of flexure of caused basic top surface is converted into the axle power of taper pile to greatest extent, makes the overall stress more science of blower fan.
Brief description of the drawings
Fig. 1 is the front view of present invention when using three pile foundations.
Fig. 2 is the top view of present invention when using three pile foundations.
Fig. 3 is the top view of present invention when using four pile foundations.
In figure:1st, blower fan tower barrel, 2, steel pile foundation, 3, conversion steel construction, 4, ring flange, 5, splash zone absolute altitude.
Embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples:
As shown in Figure 1, Figure 2 and Figure 3, the present invention includes blower fan tower barrel 1, steel pile foundation 2 and is connected to the and of steel pile foundation 2 Conversion steel construction 3 between blower fan tower barrel 1, steel pile foundation 2 is tilted to blower fan tower barrel 1 and installed, 2 points of blower fan tower barrel 1, steel pile foundation It is not connected by ring flange 4 with conversion steel construction 3.
As shown in Figure 1, Figure 2 and Figure 3, conversion steel construction 3 is to include multiple branches around central tube and central tube Fork-shaped structure, each branch bottom is coaxially connected by ring flange 4 and the top of steel pile foundation 2, and central tube top passes through method Blue disk 4 and the bottom of blower fan tower barrel 1 are coaxially connected.
Wanted in the future and bottom steel as shown in figure 1, changing steel construction central tube side wall when stake number is three or four and accordingly welding The connected leg post of stake.This kind of structure can effectively improve the anti-fatigue ability of conversion steel construction, make structure stress mode more section Learn.
Branch's top oblique weld of steel construction 3 is changed to central tube side wall, so that bottom taper pile can be with gradient 1/6 ~1/7 buries.
Three branches or four branches can be had by changing steel construction 3, when the base form using three piles, such as be schemed Shown in 2, three branches that the central tube and steel pile foundation 2 for changing steel construction 3 are connected are at an angle to each other into 120 degree;When using four The base form of stake, as shown in figure 3, four branches being connected with steel pile foundation 2 of central tube of conversion steel construction 3 are at an angle to each other is 90 degree.
Steel pile foundation 2 is taper pile, and the scope of its gradient is 1/5~1/7.It is preferred that steel pile foundation 2 can be round steel pile tube.
Change steel construction 3 and change steel construction into lattice, be arranged on more than splash zone, as shown in figure 1, conversion steel construction 3 Bottom be higher than splash zone absolute altitude 5.
The Specific construction process of the present invention is as follows:
1) steel pile foundation 2 is squeezed into specified location by designated depth using pile driving equipment, and ensures that construction finishes rear piling bar The gradient on basis 2 is between 1/5~1/7;
2) steel construction 3 is changed according to the real standard position of live each stake stake top ring flange 4 and elevation design, it is ensured that conversion Can good connection between steel construction 3 and each steel pile foundation 2 and blower fan tower barrel 1.The improvement that is prefabricated in the factory is changed after steel construction and is transported to Scene;
3) conversion steel construction 3 is installed, steel construction 3 and blower fan tower barrel 1 will be changed by ring flange 4 and steel pile foundation 2 is consolidated It is fixed.This connected mode is purely mechanic connection, eliminates the cumbersome working procedure of scene grouting, greatlys save construction cost, Shorten the construction period;
4) lifting fan tower 4, installs affiliated facility such as berthing member and cable tube etc. on conversion steel construction and stake.
Compared with existing pile foundation, the present invention is dexterously maximum by moment of flexure caused by the horizontal loading suffered by superstructure The axle power of taper pile is converted into limit, is more suitable for that the wind-powered electricity generation site depth of water is deeper, the Wind turbines that installed capacity is bigger, with more Good Stability and dependability, and live need not be in the milk, site operation risk and difficulty are reduced, construction work is shortened Phase, obvious technical effects.

Claims (6)

1. a kind of construction method on offshore wind turbine assembled taper pile basis, it is characterized in that:
Using offshore wind turbine assembled taper pile basis, the offshore wind turbine assembled taper pile basis includes blower fan tower barrel (1), piling bar Basic (2) and the conversion steel construction (3) being connected between steel pile foundation (2) and blower fan tower barrel (1), steel pile foundation (2) is aweather Machine tower (1), which is tilted, to be installed, and blower fan tower barrel (1), steel pile foundation (2) are connected by ring flange (4) with conversion steel construction (3) respectively Connect;
1) steel pile foundation (2) is squeezed into specified location by designated depth using pile driving equipment, and ensures that construction finishes rear piling bar base The gradient of plinth (2) is between 1/5~1/7;
2) steel construction (3) is changed according to the real standard position of live each stake stake top ring flange (4) and elevation design, it is ensured that conversion Steel construction (3) is changed in energy good connection between steel construction (3) and each steel pile foundation (2) and blower fan tower barrel (1), the improvement that is prefabricated in the factory After be transported to scene;
3) conversion steel construction (3) is installed, steel construction (3) and blower fan tower barrel (1) and steel pile foundation will be changed by ring flange (4) (2) fixed, this connected mode is purely mechanic connection, eliminates the cumbersome working procedure of scene grouting, greatlys save construction Cost, shortens the construction period;
4) lifting fan tower (1), installs the affiliated facility such as berthing member and cable tube on conversion steel construction and stake.
2. a kind of construction method on offshore wind turbine assembled taper pile basis according to claim 1, it is characterised in that:It is described Conversion steel construction (3) is the fork-shaped structure for including multiple welding branches around central tube and central tube, each branch Bottom is coaxially connected by ring flange (4) and steel pile foundation (2) top, and central tube top passes through ring flange (4) and blower fan tower Cylinder (1) bottom is coaxially connected.
3. a kind of construction method on offshore wind turbine assembled taper pile basis according to claim 2, it is characterised in that:It is described Conversion steel construction (3) branch's oblique weld to central tube side wall.
4. a kind of construction method on offshore wind turbine assembled taper pile basis according to claim 2, it is characterised in that:It is described Conversion steel construction (3) there are three branches, three branches are mutually 120 degree.
5. a kind of construction method on offshore wind turbine assembled taper pile basis according to claim 2, it is characterised in that:It is described Conversion steel construction (3) there are four branches, four branches are mutually 90 degree.
6. a kind of construction method on offshore wind turbine assembled taper pile basis according to claim 1, it is characterised in that:It is described Change steel construction (3) into lattice change steel construction, be arranged on more than splash zone.
CN201510641831.1A 2015-09-30 2015-09-30 Offshore wind turbine assembled taper pile basis Active CN105201010B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510641831.1A CN105201010B (en) 2015-09-30 2015-09-30 Offshore wind turbine assembled taper pile basis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510641831.1A CN105201010B (en) 2015-09-30 2015-09-30 Offshore wind turbine assembled taper pile basis

Publications (2)

Publication Number Publication Date
CN105201010A CN105201010A (en) 2015-12-30
CN105201010B true CN105201010B (en) 2017-08-15

Family

ID=54948943

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510641831.1A Active CN105201010B (en) 2015-09-30 2015-09-30 Offshore wind turbine assembled taper pile basis

Country Status (1)

Country Link
CN (1) CN105201010B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023001879A1 (en) * 2021-07-23 2023-01-26 Vallourec Deutschland Gmbh Assembly for installing an above-surface structure in water-covered ground, in particular for the monopile-installation of an offshore wind turbine, and method for mounting same

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106545472A (en) * 2016-11-11 2017-03-29 青岛中天斯壮科技有限公司 The antifatigue combination steel construction wind tower of omnidirectional's prestressing force and its installation method
CN109868847B (en) * 2017-12-01 2024-01-19 大唐国信滨海海上风力发电有限公司 Corrosion on-line detection equipment for tidal range area of offshore wind power single pile foundation
CN109868848B (en) * 2017-12-01 2024-01-19 大唐国信滨海海上风力发电有限公司 Online corrosion detection equipment for splash zone of offshore wind power single pile foundation
CN108425377A (en) * 2018-05-18 2018-08-21 龙源(北京)风电工程设计咨询有限公司 A kind of offshore steel structure high-rise pile cap blower foundation and its construction method
DE102019218687A1 (en) * 2019-12-02 2021-06-02 Thyssenkrupp Steel Europe Ag Transition piece for a tower of a wind turbine and tower of a wind turbine
CN112376603A (en) * 2020-11-05 2021-02-19 上海电气风电集团股份有限公司 Assembly type fan foundation and assembly method thereof
CN113373967A (en) * 2021-06-10 2021-09-10 天津港航工程有限公司 Fan installation construction method based on portal frame type multi-pile fan foundation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2333163A1 (en) * 2009-12-11 2011-06-15 WeserWind GmbH Offshore structure
EP2647764A1 (en) * 2012-04-04 2013-10-09 STRABAG Offshore Wind GmbH Transition piece for connecting a tower or mast foot with the upper end of a grid-like foundation structure in the offshore area
DE102013110495A1 (en) * 2013-09-23 2015-03-26 Thyssenkrupp Steel Europe Ag Transition body between tower sections of a wind turbine and tower of a wind turbine comprising a transition body
CN104641059A (en) * 2012-07-25 2015-05-20 蒂森克虏伯钢铁欧洲股份公司 Modular tower for a wind power plant
CN205077507U (en) * 2015-09-30 2016-03-09 浙江大学 Marine fan assembled batter pile basis

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2333163A1 (en) * 2009-12-11 2011-06-15 WeserWind GmbH Offshore structure
EP2647764A1 (en) * 2012-04-04 2013-10-09 STRABAG Offshore Wind GmbH Transition piece for connecting a tower or mast foot with the upper end of a grid-like foundation structure in the offshore area
CN104641059A (en) * 2012-07-25 2015-05-20 蒂森克虏伯钢铁欧洲股份公司 Modular tower for a wind power plant
DE102013110495A1 (en) * 2013-09-23 2015-03-26 Thyssenkrupp Steel Europe Ag Transition body between tower sections of a wind turbine and tower of a wind turbine comprising a transition body
CN205077507U (en) * 2015-09-30 2016-03-09 浙江大学 Marine fan assembled batter pile basis

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023001879A1 (en) * 2021-07-23 2023-01-26 Vallourec Deutschland Gmbh Assembly for installing an above-surface structure in water-covered ground, in particular for the monopile-installation of an offshore wind turbine, and method for mounting same

Also Published As

Publication number Publication date
CN105201010A (en) 2015-12-30

Similar Documents

Publication Publication Date Title
CN105201010B (en) Offshore wind turbine assembled taper pile basis
CN101545462B (en) A steel-concrete combined weight type offshore wind fan foundation structure
CN107142918B (en) Marine half floading condition operational method of self-elevating work platform
CN107090844A (en) Offshore wind farm grouped piles cap composite foundation and construction method
CN201785765U (en) Secondary leveling structure for multi-pile base of marine wind power generator set
CN205152976U (en) Marine precast concrete cushion cap wind turbine foundation
CN211646450U (en) Offshore wind power single pile-wing plate-rockfill composite foundation
CN103205980A (en) Large-diameter mono-pile foundation of offshore wind turbine and construction method of large-diameter mono-pile foundation
CN110984214A (en) Offshore wind power single pile-wing plate-rockfill composite foundation and construction method thereof
CN103469808B (en) The offshore wind turbine foundation that a kind of concrete caisson and jacket combine
CN207277337U (en) The special leading truck of offshore wind farm multi-column pier foundation piling construction
CN103981867A (en) Piling limiting frame for intertidal zone offshore wind power foundation pile sinking and construction method thereof
CN102817341B (en) Construction method for segmented installation of offshore anemometer tower and combination of high-altitude manufactured parts for assembly
CN102041813A (en) Offshore wind generator single pile base structure with stabilizer fin
CN106013210A (en) Jacket type offshore wind turbine foundation with multiple negative pressure barrels
CN204825949U (en) Marine fan basis connection structure of pipe posture of driving piles in advance
CN113818476A (en) Foundation component for offshore wind power generation and construction method thereof
CN202247928U (en) Multi-pile gantry type marine wind turbine generator system base structure
CN201704699U (en) Steel structure foundation system of offshore fan
CN107795438B (en) A kind of construction method of assistance platform
CN204212174U (en) Single pile adds taper pile brace type offshore wind turbine foundation structure
CN201915419U (en) Single-pile foundation structure with stabilizing wings for offshore wind turbine
CN203475463U (en) Offshore wind turbine foundation with concrete caisson and steel pipe frame steel structure combined
CN205822228U (en) A kind of offshore fan tower base structure
CN218843097U (en) Deep water area underwater pile sinking positioning guide frame

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant