CN105184432A - Tree-shaped structure organization method of engineering management - Google Patents

Tree-shaped structure organization method of engineering management Download PDF

Info

Publication number
CN105184432A
CN105184432A CN201510260964.4A CN201510260964A CN105184432A CN 105184432 A CN105184432 A CN 105184432A CN 201510260964 A CN201510260964 A CN 201510260964A CN 105184432 A CN105184432 A CN 105184432A
Authority
CN
China
Prior art keywords
engineering
department
management
tree structure
organizing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510260964.4A
Other languages
Chinese (zh)
Inventor
翁建广
余立刚
王冰心
吴军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Huaji Electric Power Engineering Technology Co Ltd
Original Assignee
Zhejiang Huaji Electric Power Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Huaji Electric Power Engineering Technology Co Ltd filed Critical Zhejiang Huaji Electric Power Engineering Technology Co Ltd
Priority to CN201510260964.4A priority Critical patent/CN105184432A/en
Publication of CN105184432A publication Critical patent/CN105184432A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a tree-shaped structure organization method of engineering management. A tree-shaped organization structure is used to show management of labor and material resources related to engineering tasks of general power facility inspection. The engineering management method uses the tree-shaped organization structure to show engineering task, staff and equipment and the relation among the relation thereof, so that staff can be planned as a whole, works can be adjusted, the working efficiency is improved, the work flow of cable network construction is standardized, the cost is reduced, and the economic efficiency is improved.

Description

A kind of engineering management tree structure method for organizing
Technical field
The present invention relates to project management technique field, be specifically related to a kind of engineering management tree structure method for organizing.
Background technology
After entering modern society, due to reasons such as urban land is nervous, traffic pressure is large, appearance of the city construction, big city generally adopts underground cable power transmission mode, and underground pipe network is inseparable with the operation and development in city.The reason of city expansion in addition, economic construction is also increase day by day not subtract to the demand of electricity consumption net.
Along with cable distribution in underground on the ground pipe network and pipe network, day by day to spread alternation sum huge, and the scale of project assignment and manpower and materials cost also grows steadily, and becomes and is difficult to control and management.Based on this reality, engineering management needs immediately following trend.In order to further specification flow process, reduce the difficulty of personnel and resource allocation, control cost, improve effects, need to plan effective scheme, intelligent management platform reasonable in design.
Summary of the invention
For the technical matters existed in prior art, the invention provides a kind of engineering management tree structure method for organizing, the management of the human and material resources that electric power facility generaI investigation engineering duty is correlated with is showed with tree-shaped institutional framework, this project management method by relation between tree-shaped institutional framework performance engineering duty, personnel, equipment and this three, can overall arrangement personnel, regulate work in every, increase work efficiency, and specification cable pipe network construction project work flow, reduce costs, increase economic benefit.
To achieve these goals, the present invention adopts following technical scheme.
A kind of engineering management tree structure method for organizing, the method shows relation between the engineering duty of engineering management, personnel, equipment and this three by tree-shaped institutional framework.
Preferably, described engineering management comprises the management to the human and material resources that electric power facility generaI investigation engineering duty is correlated with.
In above-mentioned arbitrary technical scheme preferably, described engineering management is divided into the organizational structure pattern of an one-level management unit and multiple classify management unit, and this organizational structure pattern presents with tree structure.
In above-mentioned arbitrary technical scheme preferably, described one-level management unit is engineering corporation.
In above-mentioned arbitrary technical scheme preferably, described classify management unit comprises an our department of engineering department, market department, multiple project management department.
In above-mentioned arbitrary technical scheme preferably, our department of described engineering department is the Nei Ye department of engineering corporation; Our department of engineering department comprises the management in our department post, and the management of all resources.
In above-mentioned arbitrary technical scheme preferably, the management in described our department post carries out Classification Management in the mode of post group, each post group is unique, and post group comprises multiple posies type, and each post type is made up of one or more on-the-job personnel.
In above-mentioned arbitrary technical scheme preferably, described all resources are all people's power material resources in engineering corporation, comprise: all on-job and post-waiting personnel, all unallocated and equipment of having distributed, and need GPS to locate under all engineering corporatioies and seek employee and the working group of track; Under all resources, comprise personnel's node, a device node and a GPS in tree structure seek the performance of track node.
In above-mentioned arbitrary technical scheme preferably, described market department comprises a service groups, has and have a business personnel more in service groups.
In above-mentioned arbitrary technical scheme preferably, described project management department is the field operation department under engineering corporation, is responsible for the execution of project operation; An our department of project management department, all resources of this subordinate of project management department and multiple engineering duty is comprised under project management department.
In above-mentioned arbitrary technical scheme preferably, our department of described project management department, comprises: the GPS that our department managerial personnel of non-field process in project management department, engineering department are assigned to the post-waiting personnel also not arranging post of project management department, engineering department is assigned to personnel or working group in the unallocated equipment to engineering duty of project management department, engineering duty Service Management, project management department seeks track; In tree structure, this subordinate of project management department comprises personnel's node, device node, a GPS seek track node and a Service Management node performance; Comprise all posies node of our department of project management department under personnel's node, under the node of post, comprise staff member.
In above-mentioned arbitrary technical scheme preferably, all resources of described this subordinate of project management department are all human and material resources under project management department, comprising: all duty hilllocks and the personnel awaited job assignment under project management department, allly distributed and the unallocated equipment to engineering duty, allly to have assigned and working group to be assigned a task; Under all resources, personnel's node, a device node and working group's node performance is comprised in tree structure.
In above-mentioned arbitrary technical scheme preferably, the engineering duty of described this subordinate of project management department is a planned construction task having life cycle, be issued to by our department of engineering department chief inspector of engineering corporation the cycle starting point that respective item portion is engineering duty, and plan the engineering duty life cycle deadline by our department of engineering department chief inspector; Each engineering duty comprises and is assigned to a device node of this engineering duty, multiple working groups node.
Project management method is work pattern to above and below ground cable networking task, job content, operation supervision, assessment, and the management method of human and material resources of being correlated with to networking, and its tree structure method for organizing is the one in project management method.Engineering management tree structure method for organizing of the present invention, the management of the human and material resources that electric power facility generaI investigation engineering duty is correlated with is showed with tree-shaped institutional framework, such as, in project management department, employee can be assigned in working group to perform certain engineering duty, the operation of engineering duty is performed by the one or more working groups in project management department, the equipment that performance of work required by task is wanted; The post tenure that personnel can be arranged in our department of engineering department, project management department, market department.Engineering management tree structure method for organizing of the present invention, can realize the efficient management of cable pipe network project under construction, and further for the application of intelligent management platform provides solution.This project management method by relation between tree-shaped institutional framework performance engineering duty, personnel, equipment and this three, can overall arrangement personnel, regulate work in every, increase work efficiency, and specification cable pipe network construction project work flow, reduce costs, increase economic benefit.
Accompanying drawing explanation
Fig. 1 is engineering corporation's tree structure membership credentials schematic diagram of the preferred embodiment according to engineering management tree structure method for organizing of the present invention;
Fig. 2 is engineering corporation's membership credentials schematic diagram of the preferred embodiment according to engineering management tree structure method for organizing of the present invention;
Fig. 3 is our department of engineering department membership credentials schematic diagram of the preferred embodiment according to engineering management tree structure method for organizing of the present invention;
Fig. 4 is project management department's membership credentials schematic diagram of the preferred embodiment according to engineering management tree structure method for organizing of the present invention.
Embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is elaborated, below describe only exemplarily and explain, any pro forma restriction is not done to the present invention.
Embodiment 1
The human and material resources relevant to electric power facility generaI investigation engineering duty, manages with tree structure method for organizing.
As shown in Figure 1, engineering corporation is the maximum management unit of this programme, our department of Xia Youyige engineering department of engineering corporation, a market department and multiple project management department.
Our department of engineering department is the Nei Ye department of engineering corporation; Our department of engineering department comprises the post management of our department, and the management of all resources.The post of our department, be carry out Classification Management in the mode of post group, each post group is unique, and post group comprises multiple posies type, and each post type is made up of one or more on-the-job personnel.All resources are that in engineering corporation, all people's power material resources then comprises: all on-job and post-waiting personnel, all unallocated and equipment of having distributed, and need GPS to locate under all engineering corporatioies and seek employee and the working group of track; Under all resources, comprise personnel's node, a device node and a GPS in tree structure seek the performance of track node.
Market department comprises a service groups, has and have a business personnel more in service groups.Project management department is the field operation department under engineering corporation, is responsible for the execution of project operation; An our department of project management department, all resources of this subordinate of project management department and multiple engineering duty is comprised under project management department.Our department of project management department then comprises: the GPS that our department managerial personnel of non-field process in project management department, engineering department are assigned to the post-waiting personnel also not arranging post of project management department, engineering department is assigned to personnel or working group in the unallocated equipment to engineering duty of project management department, engineering duty Service Management, project management department seeks track; In tree structure, this subordinate of project management department comprises personnel's node, device node, a GPS seek track node and a Service Management node performance; Comprise all posies node of our department of project management department under personnel's node, under the node of post, comprise staff member.All resources are all human and material resources under project management department, comprising: all duty hilllocks and the personnel awaited job assignment under project management department, allly distributed and the unallocated equipment to engineering duty, allly to have assigned and working group to be assigned a task; Under all resources, personnel's node, a device node and working group's node performance is comprised in tree structure.Engineering duty is a planned construction task having life cycle, is issued to the cycle starting point that respective item portion is engineering duty, and plans the engineering duty life cycle deadline by our department of engineering department chief inspector by our department of engineering department chief inspector of engineering corporation; Each engineering duty comprises and is assigned to a device node of this engineering duty, multiple working groups node.
Embodiment 2
A kind of project management method, describes the work pattern of electric power facility generaI investigation engineering duty, job content, operation supervision, assessment with tree structure method for organizing, and to be correlated with human and material resources to networking.
As shown in Figures 2 to 4:
1. engineering corporation is the maximum management unit of this programme, our department of Xia Youyige engineering department of engineering corporation, a market department, and Liang Ge project management department; Liang Ge project management department comprises: Chunan project management department, Fuyang project management department.
2. our department of engineering department is the Nei Ye department of engineering corporation, comprises the post management of our department and the management of all resources.
1) our department post is by the mode Classification Management of post group, comprises management group, supervision group, Auditing Section, technology groups, secure group, quality supervision group, equipment group, data group, geography information group, Training Team.Each post group is unique, and post group comprises multiple posies type, and each post type is by one or more composition of personnel.Wherein:
Management group comprises Director-General Of Works, system manager, Personnel Staff 3 kinds of posies.
Supervision group comprises project supervisor, GPS monitor 2 kinds of posies.
Secure group comprises safety director, safe assistant director 2 kinds of posies.
Quality supervision group comprises quality supervision director, quality supervision assistant director 2 kinds of posies.
Equipment group comprises equipment control director, equipment control assistant director 2 kinds of posies.
Data group comprises data group director, data group assistant director 2 kinds of posies.
2) all resources comprise all people's power material resources in engineering corporation: need GPS to locate under all tenures and post-waiting personnel, all unallocated and equipment of having distributed and all engineering corporatioies and seek employee and the working group of track.
3. market department comprises a service groups, has and have a business personnel more in service groups.
4. project management department is the field operation department under engineering corporation, is responsible for the execution of project operation.An our department of project management department, all resources of this subordinate of project management department and multiple engineering duty is comprised under project management department.
1) GPS that the post-waiting personnel also not arranging post that our department of project management department comprises our department managerial personnel of non-field process in project management department, engineering department is assigned to project management department, engineering department are assigned to working group in the unallocated equipment to engineering duty of project management department, engineering duty Service Management, project management department seeks track.Wherein, the address of service of achievement data platform in Service Management.Synchronous platform is needed for engineering duty or working group specify respectively.
2) all resources are all human and material resources under this project management department, all duty hilllocks and the personnel awaited job assignment under comprising project management department, have allly distributed and the unallocated equipment to engineering duty, allly to have assigned and working group to be assigned a task.
Wherein, working group needs configurating mobile, is followed the trail of working trajectory and the attendance record of working group by the SIM card sequence number mode of binding mobile phone.The mode of turning out for work with mobile phone photograph replaces traditional working to check card.
3) engineering duty is a planned construction task having life cycle, is issued to the cycle starting point that respective item portion is engineering duty, and plans the engineering duty life cycle deadline by our department of engineering department chief inspector by our department of engineering department chief inspector of engineering corporation.Each engineering duty comprises and is assigned to a device node of this engineering duty, multiple working groups node.
Wherein, working group is the actual acquisition personnel of the business game group of engineering duty, field data.
For the directory tree actual tissue relation described by Fig. 2 to Fig. 4, the institutional framework relation can distinguished in corresponding diagram 1 is as follows:
1. engineering corporation
2. our department of engineering department
3. market department
4. project management department
5. all resources,
6. our department of project management department
7. personnel's (node)
8. post
9. personnel
10. equipment
gPS seeks track
engineering duty
working group
working group's (node)
service Management
post group
The above is only be described the preferred embodiment of the present invention; not that scope of the present invention is limited; under not departing from the present invention and designing the prerequisite of spirit; the various distortion that the common engineering technical personnel in this area make technical scheme of the present invention and improvement, all should fall in protection domain that claims of the present invention determine.

Claims (10)

1. an engineering management tree structure method for organizing, is characterized in that: the method comprises:
By the relation between the engineering duty of tree-shaped institutional framework performance engineering management, personnel, equipment and this three.
2. engineering management tree structure method for organizing as claimed in claim 1, is characterized in that: described engineering management comprises the management to the human and material resources that electric power facility generaI investigation engineering duty is correlated with.
3. engineering management tree structure method for organizing as claimed in claim 1 or 2, is characterized in that:
Described engineering management is divided into the organizational structure pattern of an one-level management unit and multiple classify management unit, and this organizational structure pattern presents with tree structure.
4. engineering management tree structure method for organizing as claimed in claim 3, is characterized in that: described one-level management unit is engineering corporation.
5. engineering management tree structure method for organizing as claimed in claim 3, is characterized in that: described classify management unit comprises an our department of engineering department, market department, multiple project management department.
6. engineering management tree structure method for organizing as claimed in claim 5, is characterized in that: our department of described engineering department is the Nei Ye department of engineering corporation; Our department of engineering department comprises the management in our department post, and the management of all resources.
7. engineering management tree structure method for organizing as claimed in claim 6, it is characterized in that: the management in described our department post carries out Classification Management in the mode of post group, each post group is unique, post group comprises multiple posies type, and each post type is made up of one or more on-the-job personnel.
8. engineering management tree structure method for organizing as claimed in claim 6, it is characterized in that: described all resources are all people's power material resources in engineering corporation, comprise: all on-job and post-waiting personnel, all unallocated and equipment of having distributed, and need GPS to locate under all engineering corporatioies and seek employee and the working group of track; Under all resources, comprise personnel's node, a device node and a GPS in tree structure seek the performance of track node.
9. engineering management tree structure method for organizing as claimed in claim 5, is characterized in that: described market department comprises a service groups, has and have a business personnel more in service groups.
10. engineering management tree structure method for organizing as claimed in claim 5, is characterized in that: described project management department is the field operation department under engineering corporation, is responsible for the execution of project operation; An our department of project management department, all resources of this subordinate of project management department and multiple engineering duty is comprised under project management department.
CN201510260964.4A 2015-05-21 2015-05-21 Tree-shaped structure organization method of engineering management Pending CN105184432A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510260964.4A CN105184432A (en) 2015-05-21 2015-05-21 Tree-shaped structure organization method of engineering management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510260964.4A CN105184432A (en) 2015-05-21 2015-05-21 Tree-shaped structure organization method of engineering management

Publications (1)

Publication Number Publication Date
CN105184432A true CN105184432A (en) 2015-12-23

Family

ID=54906495

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510260964.4A Pending CN105184432A (en) 2015-05-21 2015-05-21 Tree-shaped structure organization method of engineering management

Country Status (1)

Country Link
CN (1) CN105184432A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI720703B (en) * 2019-11-27 2021-03-01 遵宇科技股份有限公司 Job management system
CN113407535A (en) * 2021-06-04 2021-09-17 杭州新中大科技股份有限公司 Organization architecture of large group and data sharing and isolating method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI720703B (en) * 2019-11-27 2021-03-01 遵宇科技股份有限公司 Job management system
CN113407535A (en) * 2021-06-04 2021-09-17 杭州新中大科技股份有限公司 Organization architecture of large group and data sharing and isolating method thereof

Similar Documents

Publication Publication Date Title
CN201698493U (en) Human resource management device
CN105574657A (en) Intelligent police actual combat comprehensive application platform
GB201311587D0 (en) Automated infrastructure management system and method for enabling real time energy management
CN104680318A (en) BIM-based engineering personnel control system and method
CN109389358A (en) Project management system and method based on GIS
CN103886398A (en) Service monitoring method and system in cross-system heterogeneous environment
CN103679319A (en) Grid social management service system
CN106529901A (en) Integrated management system for construction engineering
CN104933495A (en) Work task assessment system on Android-based mobile terminal
CN105184432A (en) Tree-shaped structure organization method of engineering management
CN103699688B (en) A kind of terminal model of support terminal user's reliability management of power supply
CN103647661B (en) Topological view generating method and apparatus
CN103714407A (en) Performance assessment software system
CN105184481A (en) Power network service integrated data integration analysis research method
CN107330577A (en) A kind of company evaluation system and method based on big data
Vijekumara A study on the resettlement planning process applied in post-landslide disaster resettlement projects in Sri Lanka
CN204256779U (en) A kind of collaborative campaign lab of handling a case
CN105160473A (en) Low-voltage user line loss analysis method
Ito et al. Strengthening Governance on Disaster Risk Reduction Through Improved Disaster Damage Statistics
Bravo-Bello et al. The analytic hierarchy process for selection of suitable trees for Mexico City
Goodrich-Mahoney et al. Environment Concerns in Rights-of-Way Management 8th International Symposium
Hilal et al. Towards a heritage management strategy for Ras al-Khaimah (UAE)
CN106952319A (en) A kind of methods of exhibiting and device of grid coverage information
CN102567835A (en) Method of HRM (Human Resource Management)
Ahmadypoor et al. Function analysis of administrative divisions in implementation of land preparation with emphasis on Iran

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151223